Alcator C-Mod Run 1070529 Information

Back to runs

Miniproposals
Miniproposal:491
Date Filed: 5/25/2007
Title:MSE Calibrations
First Author:Steve Scott
Session Leader:Jin-Seok Ko (shots 1-26)

Operators
Session leader(s):Jin-Seok Ko
Physics operator(s):Bill Rowan
Engineering operator(s):Andy Pfeiffer,Bill Parkin,Bill Byford

Engineering Operator Run Comment
For MP#491. MSE Calibration SL: Steve Scott PO: Bill Rowan

Session Leader Plans
Entered: May 29 2007 08:09:10:257AM
Author: Jin-Seok Ko
Title: MP#491 MSE calibrations

SL: Steve Scott, Jinseok Ko
PO: Bill Rowan

Purpose:

1. Beam-into-gas calibration with continuous EF which includes

(1) standard EF scan
(2) pressure scan
(3) filter (Bt) scan

2. Beam-into-plasma calibration with Ip ramp
3. Beam-into-plasma calibration with plasma sweep

Run plan:

1-(1). Beam-into-gas calibration with continuous EF

Option 1: 1 shot with EF3 0->12 and EF4 0->5
Option 2: 2 shots with (1) EF3 0->9.5 and EF4 0 and
(2) EF3 3.5->12 and EF4 4

If the uncertainty in the measured pitch angle is
well beyond ~ 0.1 degree, we will do Option 2.

Waveforms are in Fig 1, 2, and 3 in MP#491.

1-(2). Beam-into-gas calibration with pressure scan

3 shots with He pressure 0.2 -> 2.0 mTorr with

(1) EF3 = -2, EF4 = 0
(2) EF3 = 10, EF4 = 0
(3) EF3 = 10, EF4 = 4

Waveforms are in Fig 9, 10 and 11 in MP#491.

3. Beam-into-plasma calibration with Ip ramp

Option 1: 1 shot with Ip 1.1->0.25
Option 2: 2 shots with (1) Ip 0.45->1.1 (2) Ip 0.25->0.7

If the uncertainty in the measured pitch angle is
well beyond ~ 0.1 degree, we will do Option 2.

Waveforms are in Fig 4, 5, and 6 in MP#491.

4. Beam-into-plasma calibration with plasma sweep

(1) With constant qpsi,

1 shot with 'partial' sweep (a = 22->14, Ip = 0.78->0.35)

Dependingon the status of this shot, we will try

1 shot with 'full' sweep (a = 22->11, Ip = 0.78->0.23)

(2) With constant Ip (= 0.23),

1 shot with 'partial' sweep (a = 22->14)

Dependingon the status of this shot, we will try

1 shot with 'full' sweep (a = 22->11)

Waveforms are in Fig 7.

1-(3). Beam-into-gas calibration with Bt scan (MSE filter scan)

(1) Bt 4.9->6.2, EF3 6.86->10.0, EF4 3.0
(2) Bt 2.8->4.2, EF3 1.81->5.18, EF4 3.0

Waveforms are in Fig 8.

Physics Operators Plans
Entered: May 28 2007 02:22:45:663PM
Author: Bill Rowan
Physop Plan for Tuesday, 28 May 2007; run 1070528


For MP#491. MSE Calibration
SL: Steve Scott
PO: Bill Rowan
The first part of this experiment is beam into helium gas. No plasma.
The second part has plasma with IP ramps and plasma sweeps.

ECDC in Deuterium before the run. ECDC started on the afternoon of 26 May 2007

Run begins at 9:00 and ends at 17:00


Beam into gas =-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
Engineering setup
------------
Power systems as on 1070425015
Turn off all supplies except TF, EF3, EF4
Set TF Current limit to 180kA.
Acoils: Disabled


Gas setup:
----------
Fill B-Top with 6 psi He; Hybrid enabled (PG4)
Purge and fill 3 times; i.e., as usual when changing gases

All other valves DISABLED.

Torus pump valves CLOSED during pulse.

ECE, VUV, Zbolo Shutters and Diagnostic valves closed.

DNB permissive enabled.


PO plan
----------
Load from 1070425015; verify seg1 is on and segments 2,3,4 are off.
Leave PG4 as on shot 1070425015.

Draw waveform as requested by SL

DNB required at 50 kV and a minimum of 6 A
=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-


IP Ramp Experiments=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-

Engineering Setup
-------------
Power systems as on 1070524012
Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled


Gas setup:
---------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
Purge and fill three times when changing gas; that is as usual

fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
pump out NINJA, then disable.

Enable the following gate valves and shutters:
ECE, VUV, Z-bolo shutters; DNB gatevalve


PO plan
---------
Draw IP ramp as requested by SL
Increase outer gap to 1 cm
Increase IP to 1.1 MA
=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-


Plasma Sweep=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-

Engineering Setup
Power systems as on 1070504004
Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled
OH2 current limit [-26,30] change to [-27,30]

Gas setup:
---------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
pump out NINJA, then disable.

Enable the following gate valves and shutters:
ECE, VUV, Z-bolo shutters; DNB gatevalve


PO plan
---------
Run the shot as loaded.
Increase the outer gap to 7 cm
Increase the outer gap as requested by SL
=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-

Session Leader Summaries
Entered: May 30 2007 08:31:07:680PM
Author: Jin-Seok Ko
1070529 Session Leader Summary


Title: MP#491 MSE calibrations


SL: Steve Scott, Jinseok Ko
PO: Bill Rowan


Overall Summary and Comments:

1. Beam-into-gas calibration with continuous EF which includes

(1) standard EF scan - done
(2) pressure scan - done
(3) filter (Bt) scan - not done

2. Beam-into-plasma calibration with Ip ramp : tried, but not successful
3. Beam-into-plasma calibration with plasma sweep : not done

We realized the beam-into-gas shots were not reproducible (the difference for
some channels up to 1 deg), so we were distracted to investigate tihs.
After Part 1-(1) and (2) done including some reproducibility test shots, we tried
Part 2 but got many fizzles and disruptions. We went back to the beam-into-gas
reproducibility test.


Shot summary

Configurations:

Shutter OPEN -> CLOSED after the run
Linear polarizer IN

PEM ON -> OFF after the run
Chiller ON -> OFF after the run
Bertan ON -> OFF after the run

Initial setting:

Retardance: 0638/0638
HV: 1870/1870/1870/1870
Filter: 5.4/50

Regarding torus pressure, scale using shot 01 between 'mks' and 'rat'


1070529 Beam-into-gas
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
shot plan HV comment
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
01 1870/1870/1870/1870 no beam, test shot
02 A-1 1870/1890/1890/1890 p=1.3mTorr
03 A-1 1870/1890/1890/1890 p=0.5mTorr
04 A-1 1870/1890/1890/1890 p=1.3mTorr
05 A1* 1870/1890/1890/1890 p=1.3mTorr EF's are from A1 in
1070425015 (beam waveform different)
06 E-3 1870/1890/1890/1890 EF3 had 0 after t = 0
07 E-3 1870/1890/1890/1890
08 E-2 1870/1890/1890/1890
09 E-1 1870/1890/1890/1890 It had EF3 -2 and EF4 0, which is
impossible. No beam anyway
10 E-1 1870/1890/1890/1890 Now it correctly had EF3 0 and EF4
-2 (NOT EF3 -2 and EF4 0)
11 A-1 1870/1890/1890/1890 A-1 but EF3 0->10kA to avoid EF3
interacting with a solenoid.
Effectivel no beam (too many faults)
12 A1* 1800/1800/1800/1800 p=1.3mTorr EF's and Beam from A1 in
1070425015 except EF3 max is 10kA,
not 12kA.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++


1070529 Beam-into-plasma
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
shot plan comments
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Beam starts at 0.4 sec (On/Off = 50ms/25ms)
13 ~ 20 C-1 fizzle, disruptions
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++


Going back to 1070529 Beam-into-gas
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
shot APD EF's mTorr DNB's
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
21 1800/1800/1800/1800 shot 12 (stairstep) shot 12 (1.3mTorr) shot 12 (modulated)
22 1800/1800/1800/1800 shot 12 (stairstep) shot 12 (1.3mTorr) shot 02 (flat)
23 1870/1890/1890/1890 shot 12 (stairstep) shot 12 (1.3mTorr) shot 12 (modulated)
24^ 1870/1890/1890/1890 shot 08 (EF3=6,EF4=0) shot 02 (1.3mTorr) shot 02 (flat)
25 1870/1890/1890/1890 shot 02*(ramp) shot 02 (1.3mTorr) shot 02 (flat)
26 1870/1890/1890/1890 shot 02*(ramp) shot 02 (1.3mTorr) shot 02 (flat)
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
^EF3 didn't reach the flat 6kA until 0.5 sec
*EF3 goes 0 to 10kA (NOT 12kA)


1070529 Background shots : MSE shutter CLOSED and everything ON
++++++++++++++++++++++++++++++++++++++++++
527 1890/1890/1890/1890 background
528 1850/1850/1850/1850 background
529 1810/1810/1810/1810 background
530 1770/1770/1770/1770 background
531 1730/1730/1730/1730 background
++++++++++++++++++++++++++++++++++++++++++


Analysis:

*************************************************************************************************
try user bin_min bin_max dt
*************************************************************************************************
main shots 4 sscott 0.06 0.1 10ms
bkgd shots 4 jinseok 0.06 0.1 10ms - 'fake' option used
*************************************************************************************************

Physics Operator Summaries
Entered: May 30 2007 06:42:54:793AM
Author: Bill Rowan
We executed the first set of beam into gas experiments in the SLs run plan. This included the EF3 and EF4 ramps and the pressure ramp. We found that if the EF3 current exceeded 10 kA, then there was a pressure increase that was not programmed. A valve may be opening up. This caused fizzles during the plasma attempts. It is hoped that overnight ECDC will be the cure.

Session Leader Comments
May 29 2007 09:21:27:190AM1070529001Jin-Seok KoNo beam

Waveform test shot
May 29 2007 09:39:33:650AM1070529002Jin-Seok KoGood beam, good signal

Plan ID : A-1

Next shot will be another A-1 with a lower pressure (0.3mTorr)
May 29 2007 09:53:42:517AM1070529003Jin-Seok KoGood beam, good signal

Plan ID : A-1

Next shot will be another A-1 with the higher pressure (1.3mTorr) again
since the erro bars are about 0.2 deg.
May 29 2007 11:21:11:800AM1070529004Jin-Seok KoGood beam, good signal

Plan ID : A-1 (with the lower pressure)

Next shot will be the repeat of 1070425015.
May 29 2007 11:21:41:910AM1070529005Jin-Seok KoGood beam, good signal

repeat of 1070425015.

Next shot will be E-3
May 29 2007 11:25:39:080AM1070529006Jin-Seok KoGood beam, good signal

repeat of 1070425015.

Next shot will be E-3
May 29 2007 12:21:16:400PM1070529007Jin-Seok KoGood beam, good signal

Next shot will be E-2.
May 29 2007 12:21:43:183PM1070529008Jin-Seok KoGood beam, good signal

Next shot will be E-1.
May 29 2007 12:28:13:983PM1070529009Jin-Seok KoNo beam. TF only.

Having EF3 negative (-2kA) as in the MP is impossible.
The proposed setting is corrected from ""EF3=-2, EF4=0"" to ""EF3=0, EF4=-2""

Next shot will be another try of Plan ""E-1"" with this correction.
May 29 2007 12:29:00:200PM1070529009Jin-Seok KoNo beam. TF only.

Having EF3 negative (-2kA) as in the MP is impossible.
The proposed setting is corrected from ""EF3=-2, EF4=0"" to ""EF3=0, EF4=-2""

Next shot will be another try of Plan ""E-1"" with this correction.
May 29 2007 12:30:29:360PM1070529010Jin-Seok KoGood beam.

Next shot will be Plan A-1 but EF3 0->10kA to avoid EF4-gatevalue interaction.
May 29 2007 12:33:05:860PM1070529011Jin-Seok KoEffectively no beam (too many faults).

We will change the plan. The next shot will not be A-1 with EF3 0->10kA

Next shot will be the repeat of 1070425015 including the beam timing, MSE APD voltages.
May 29 2007 12:37:27:080PM1070529012Jin-Seok KoGood beam.

Next will the start of beam-into-plasma.
May 29 2007 03:10:01:090PM1070529013Jin-Seok Koshot 13 to 20

tries for Plan C-1. Not successful.

Next will go back to beam-into-gas.
May 29 2007 03:30:16:257PM1070529021Jin-Seok KoUpcomping shots will have ...


+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
shot APD EF's mTorr DNB's
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
21 1800/1800/1800/1800 shot 12 (stairstep) shot 12 (1.3mTorr) shot 12 (modulated)
22 1800/1800/1800/1800 shot 12 (stairstep) shot 12 (1.3mTorr) shot 02 (flat)
23 1870/1890/1890/1890 shot 12 (stairstep) shot 12 (1.3mTorr) shot 12 (modulated)
24 shot 08 (EF3=10,EF4=0) shot 02 (1.3mTorr) shot 02 (flat)
25 1870/1890/1890/1890 shot 11 (ramp) shot 02 (1.3mTorr) shot 02 (flat)
26 1870/1890/1890/1890 shot 11 (ramp) shot 02 (1.3mTorr) shot 02 (flat)
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

May 29 2007 04:55:30:773PM1070529026Jin-Seok KoThe last shot of the day

Will take several background shots with the shutter closed and
leave everything on.

Physics Operator Comments
May 29 2007 08:41:27:003AMBill RowanLoaded 1070425015.
Got the magnetics warning
Recalculated all predictors according to Wolfe's e-mail dated 19 May 2007
verified that seg 1 is on and segs 2,3,4 are off
Setup EF3 and EF4 waveforms with SL
Loaded shot

May 29 2007 09:22:04:673AM1070529001Bill Rowan001. shot without beam. beam is a little slow in starting this morning and is conditioning now.
EF3 current did not come to a flat top as requested. There is about a 50 ms delay.
Working on A-1

Next shot.
Change the programming on both EF3 and EF4 so that the ramp ends at 1.35 s instead of 1.4 s.
Beam on next shot.

May 29 2007 09:41:33:590AM1070529002Bill Rowan002. SL declares this shot adequate for the moment. The beam current is low.
EF3 is flat enough after 1.35 s. A-1

Next shot.
Reduce the pressure from 1.3 mT to 0.5 mT.

May 29 2007 09:54:17:720AM1070529003Bill Rowan003. This is an A-2 shot.

Next shot.
Increase the gas pressure to 1.3 mT
Changed PG4 from 0.2 s to 0.5 s
For gas pressure and coil currents, this shot should be like 002.

May 29 2007 10:12:05:740AM1070529004Bill Rowan004. This is an A-1 shot.

Next shot.
Reloaded shot 1070425015.
Note that I did not have time to fix the magnetics predictors for any but segment 01 where it
does not matter anyway.

May 29 2007 10:36:22:157AM1070529005Bill Rowan005.

Next shot.
Made pressure changes and they may not be adequate.
Will need to correct from here.

May 29 2007 10:57:02:663AM1070529006Bill Rowan006.

Next shot.
Change the pressure programming
ef3 started at an earlier time.

May 29 2007 11:11:41:903AM1070529007Bill Rowan007. pressures okay. Not quite as SL wanted. There will be an explation in the po summary

Next shot.
Turn off the EF4 supply so that we can get EF4=0 as requested by SL

May 29 2007 11:30:00:820AM1070529008Bill Rowan008.
EF4 is zero.
There was no late gas puff. Confirming that EF4 is interacting with a solenoid to open a valve.
Note that shot 001 was at high EF4 and there was not beam. There was a puff on that shot so the DNB is not at fault.

Next shot.
Changed Ef3 to -2000
EF4 remains off.

May 29 2007 11:50:02:663AM1070529009Bill Rowan009.
Just TF on that shot. EF3 is not a bipolar supply so the setting was incorrect.

Next shot.
EF3 supply off
EF4 supply on and set to -2000

May 29 2007 12:02:53:050PM1070529010Bill Rowan010.
Aux power was on so currents were induced in EF3
EF3 power supply was off
EF4 okay

Next shot.
Aux power off so that EF3 is an open circuit

May 29 2007 12:16:07:620PM1070529011Bill Rowan011. okay

Next shot.
EF4 on
EF3 on
Aux power on
Reload shot 1070529005, then clip the EF3 waveform so that it does not exceed 10 kA

May 29 2007 01:31:49:880PM1070529012Bill Rowan012. okay

Next shot.
Loaded shoe 1070524007 since it is a recent shot and it is close to what is required.
Increased IP to 1.1 MA
Inserted a n IPramp starting at 0.7 s and ending at 0.1.8 s

May 29 2007 01:32:17:523PM1070529013Bill Rowan013. Fizzle

Next shot. Reduce the prefill. PG4 changed form 18 ms to 16 ms

May 29 2007 02:00:21:610PM1070529014Bill Rowan014. Another fizzle.
Very large carbon signal

Next shot.
10 minutes of ecdc before next shot
May 29 2007 02:06:38:927PM1070529015Bill Rowan015. Another fizzle.
The carbon level is still high compared to the loaded shot.

Next shot.
Load segment 1 from the l2070535030
May 29 2007 02:14:51:837PM1070529016Bill Rowan016. Another fizzle.
Prefill on the loaded shot was set for the cryo pump. PG4 = 35 ms

Next shot.
Reduced prefill to 18 ms.

May 29 2007 02:33:40:170PM1070529017Bill Rowan017. Plasma. Disruption at 0.27 s.
Looks as though something dropped in from soft x-ray and bolometry

Next shot.
Reduced prefill by 2 ms to 16 ms for disruption recovery
May 29 2007 03:47:28:810PM1070529018Bill Rowan018. Fizzle

Next shot. No pcs changes.

May 29 2007 03:46:48:887PM1070529019Bill Rowan019. Fizale

Next shot.
No PCS changes
May 29 2007 03:46:06:463PM1070529020Bill Rowan020. Plasma. Disruption at 0.35 s

Next shot.
Return to beam into gas
Change to helium
Turn off all supplies except TF, EF3 and EF4
Reload shot 1070529012

May 29 2007 03:48:24:513PM1070529021Bill Rowan021. Good shot.

Next shot. No pcs changes

May 29 2007 04:11:53:473PM1070529023Bill Rowan023. Good shot.

Next shot.
EF4 off.
EF3 = 6 kA

May 29 2007 04:40:39:250PM1070529024Bill Rowan24. Good shot.


Next shot.
Load shot 1070529002
EF4 on.
EF3 ramp as on shot 002 except that the max current is 10 kA
May 29 2007 04:40:59:893PM1070529025Bill Rowan025. Good shot.

Next shot.
No pcs changes.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:13:39:813AMPlasmaOk
209:30:58:180AMPlasmaOk
309:45:58:590AMPlasmaOk
409:58:57:923AMPlasmaOk
510:13:22:117AMPlasmaOk
610:40:55:347AMPlasmaOk
710:57:55:663AMPlasmaOk
811:21:56:550AMPlasmaOk
911:40:39:407AMPlasmaOk
1011:58:00:597AMPlasmaOk
1112:10:44:553PMPlasmaOk
1212:33:18:470PMPlasmaOk
1301:13:22:123PMPlasmaOk
1401:25:45:520PMPlasmaOk
1501:56:25:580PMPlasmaOk
1602:09:13:520PMPlasmaOk
1702:22:16:697PMPlasmaOk
1802:34:53:313PMPlasmaOk
1902:47:47:443PMPlasmaOk
2003:02:09:243PMPlasmaOk
2103:36:11:383PMPlasmaOk
2203:50:59:937PMPlasmaOk
2304:06:11:380PMPlasmaOk
2404:21:31:680PMPlasmaOk
2504:34:25:623PMPlasmaOk
2604:46:59:487PMPlasmaOk

System Availability
May 29 2007 09:13:12:470AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready.Apr 26 2007 10:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, but analyzed data not ready. 2D arrays being debugged.Apr 26 2007 10:28AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoAll fixed channels are disconnected, the variable frequency channel is being testedMay 28 2007 05:09PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019.May 21 2007 02:39PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


May 29 2007 09:45:36:293AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready.Apr 26 2007 10:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, but analyzed data not ready. 2D arrays being debugged.Apr 26 2007 10:28AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoAll fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider.May 29 2007 09:41AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019.May 21 2007 02:39PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


May 29 2007 11:40:19:177AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data.May 29 2007 11:22AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged.May 29 2007 11:23AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoAll fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider.May 29 2007 09:41AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019.May 21 2007 02:39PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf