| System Availability |
| May 30 2007 09:25:19:777AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. | May 29 2007 09:41AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 10:00:34:680AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 2 is set at 0V and shot 3 is set at 2V | May 30 2007 09:58AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 10:27:34:440AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 4 is set at 4V and shot 5 is set at 6V | May 30 2007 10:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 10:41:15:477AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 6 is set at 8V and shot 5 is set at 6V | May 30 2007 10:31AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 10:57:15:140AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 6 is set at 8V and shot 7 is set at 10V | May 30 2007 10:46AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 11:09:48:503AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 8 is set at 1V and shot 7 is set at 10V | May 30 2007 11:01AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 11:22:54:057AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 8 is set at 1V and shot 9 is set at 3V | May 30 2007 11:18AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 11:36:01:043AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 10 is set at 5V and shot 9 is set at 3V | May 30 2007 11:26AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 11:50:45:240AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 10 is set at 5V and shot 11 is set at 7V | May 30 2007 11:40AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 12:03:13:977PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 12 is set at 9V and shot 11 is set at 7V | May 30 2007 11:56AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 12:21:57:343PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 12 is set at 9V and shot 13 is set at 0.5V | May 30 2007 12:09PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 12:34:47:460PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 14 is set at 1.5V and shot 13 is set at 0.5V | May 30 2007 12:26PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 12:47:30:260PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 14 is set at 1.5V and starting shot 15 is set at 6V | May 30 2007 12:44PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 30 2007 01:13:51:003PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | The system is to be optimized. | May 30 2007 01:12PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | All fixed channels are disconnected, the variable frequency channel is being tested. Starting 1070529, the Waveform signal has a 1/2 voltage divider. On 1070530, I'll be testing the 1/2 divider: Shot 14 is set at 1.5V and starting shot 15 is set at 6V | May 30 2007 12:44PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019. | May 21 2007 02:39PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|