Alcator C-Mod Run 1070606 Information

Back to runs

Miniproposals
Miniproposal:473
Date Filed: 3/9/2007
Title:Lower Hybrid System Check-out and Initial operation
First Author:J. Randall Wilson
Session Leader:Greg Wallace (shots 1-5)

Operators
Session leader(s):Greg Wallace
Physics operator(s):
Engineering operator(s):Sam Pierson

Engineering Operator Run Comment
MP473 LH System Checkout and Initial Operation

Session Leader Plans
Entered: Jun 5 2007 02:30:18:933PM
Author: Greg Wallace
Session Leader Plan for 1070606: MP473 "LH System Checkout and Initial Operation"

The purpose of today's run will be to try to increase the LH power and
pulselength to greater than 600kW for 500ms. MSE will be attempting to measure
a change in the current profile when LH is on.

Starting shot will be 1070523019. Set launcher to 1.5mm behind limiter and set
phase shifters to 90deg current drive direction. LH will fire from 800ms to 1300ms.

We will be staying at 5.5T all day for MSE.

Start with ~200kW of LH power at 90 degree ideal phasing. Check to make sure
the CPS is working correctly and we are not arcing in the waveguides. Increase
power to 500kW then 800+kW. We will be looking for clean (no/minimal trips) LH
pulses from .8-1.3s. It will require some tweaking to the drive level of the
individual klystrons to increase the power level.

Cell Access to change phase shifters to 0 degrees.

Run 500ms shots with the first half in co-current-drive and the second half in
counter-current-drive, 120 degree approximate phasing in both cases, at the maximum power
level we can achieve without too many trips. This should give an n|| spectrum
similar to 60 degree ideal phasing, but with a slightly wider spectral peak. We
would like to see some changes with MSE between the co- and
counter-current-drive segments. We expect that getting the system to run in
this configuration will be a bit tricky, especially since we have no experience
running higher power in counter-current-drive configuration.

Physics Operators Plans
Entered: Jun 5 2007 02:34:32:903PM
Author: Ron Parker
Engineering setup for Wednesday 6 June 2007

MP473 LH System Checkout and Initial Operation

Session leaders: G. Wallace
Physics operator: R. Parker

ECDC overnight in D2, pressure=2e-4 Torr. Rmin/Rdwell/Rmax = 44/45/103 cm.
Bake at 60 C.

Power systems as on 1070523019.

Run begins at 9:00 and ends at 5:00

A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.

Gas setup:
---------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
pump out NINJA, then disable.

Enable the following gate valves and shutters:
ECE, VUV, Z-bolo shutters; DNB gatevalve

RF Systems:
----------
LH full power
No ICRF for this run

Diagnostics:
-----------
Need the DNB and MSE to measure q profiles.

Run plan: Further check out of the lower hybrid system attempting to go to full power and measure changes in
the q profile with MSE using the DNB. Plasma conditions will be 5.5 T, 0.6 to 1 MA, nl04 ~ 1 x 10^20 m^-2.

-------------------------------------------------------------------------------
Cryopump: If possible, ready to operate the pump with
plasma around 09:00.

ICRF Setup: No ICRF today

LH Setup: Ready for full power, 90 deg phasing
-------------------------------------------------------------------------------
Run plan: See SL Plan


Setup for first plasma: Reload 10705230019


Torvac setup: Gate valves open

Session Leader Summaries
Entered: Jun 6 2007 04:24:21:470PM
Author: Greg Wallace
Two plasma shots after many delays. Gave up at 16:20 due to computer issues. Next day will be LH + ICRF.

Physics Operator Summaries
Entered: Jun 6 2007 04:26:57:763PM
Author: Ron Parker
Computer problems all day -- late start, long delays, early termination.

The good news, no duds, no fizzles, no disruptions.

The bad news, only two shots.

Session Leader Comments
Jun 6 2007 02:42:03:653PM1070606002Greg WallaceFirst shot of the day at 15:30. All klystrons set at 100kW. No large changes in loop voltage. Coupling looks quite bad on the upper rows of the grill, near 50% reflection. Bottom rows noisy but near 25% reflection. Decreasing outer gap to "0" cm to help increase edge density without increasing core.

Arcing see on REV10B during first part of pulse. "Dropout" did not solve arcing problem, although secondary tripping did.
Jun 6 2007 03:02:44:640PM1070606003Greg WallaceArcing on RINT2/REV3B. Next shot will turn down power on klystron 2 and turn on cryopump. Hopefully core density will decrease without killing edge density.

Perhaps .1V reduction in loop voltage. Lowering core density should help us see more current.

Physics Operator Comments
Jun 6 2007 09:35:52:437AM1070606001Ron ParkerA belated good morning.

Computer problems have delayed the start of the run. The computer in question is a server that interfaces with the PLC's that run the machine. Although the server problem has been resolved, cooling the TF has only now begun. As a result, there will be a ~ 3 hour delay before the first shot tentatively scheduled for 12:30.
Jun 6 2007 12:38:10:093PM1070606001Ron ParkerShot 1 started to count down at 12:30, but had to be aborted because of problem with state machine.
Jun 6 2007 02:42:24:217PM1070606002Ron ParkerFinally, the first shot of the day. It went off well, good breakdown, good steady-state. LH power at ~500 kW, reflection somewhat high in top rows, only about delV/V ~ 0.1 (90 deg phasing). For nest shot, reduce the outer gap by ~7mm.
Jun 6 2007 02:59:20:047PM1070606003Ron ParkerShot 3 ran OK, coupling improved with higher density at grill.

Next: No change in shot, cryopump on. How does density at grill change?


Jun 6 2007 03:10:43:017PM1070606004Ron ParkerShot 4 was a no power shot.
Jun 6 2007 03:22:14:703PM1070606005Ron ParkerAgain, a no power shot!
Jun 6 2007 03:29:29:077PM1070606005Ron ParkerSince cryopump is in operation, prefill pulse has been increased by 20 ms (to 38 ms).
Jun 6 2007 04:22:28:467PM1070606005Ron Parker
th..th...th...that's all folks. The run is termine.

Engineering Operator Comments
ShotTimeTypeStatusComment
112:33:37:907PMTestOkstate plc worked
202:24:00:530PMPlasmaOk
302:48:43:110PMPlasmaOk
403:03:19:797PMPlasmaOkIGOR failure
503:17:49:610PMPlasmaOk
605:40:14:780PMPlasmaOk
705:52:19:950PMPlasmaOk
806:03:16:437PMPlasmaOk

System Availability
Jun 6 2007 12:33:15:733PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data.May 29 2007 11:22AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged.May 29 2007 11:23AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is running DC voltages from 5V-7V, also in the testing stage.Jun 01 2007 09:11AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019.May 21 2007 02:39PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf