Alcator C-Mod Run 1070613 Information

Back to runs

Miniproposals
Miniproposal:473
Date Filed: 3/9/2007
Title:Lower Hybrid System Check-out and Initial operation
First Author:J. Randall Wilson
Session Leader:Greg Wallace (shots 1-28)

Operators
Session leader(s):Greg Wallace
Physics operator(s):Robert Granetz
Engineering operator(s):Bill Cochran,Bill Byford,Sam Pierson

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Jun 12 2007 01:20:25:193PM
Author: Greg Wallace
Session Leader Plan for 1070613: MP473 "LH System Checkout and Initial Operation"

The purpose of today's run will be to try to increase the LH power and
pulselength to greater than 600kW for 500ms. MSE will be attempting to measure
a change in the current profile when LH is on. This will be a repeat of 1070606
which was scrubbed due to computer failure.

Starting shot will be 1070606003, but decreasing target density to 5e19 m^-3.
Set launcher to 1.5mm behind limiter and set phase shifters to 90deg current
drive direction. LH will fire from 800ms to 1300ms.

We will be staying at 5.5T all day for MSE.

Start with ~400kW of LH power at 90 degree ideal phasing. Check to make sure
the CPS is working correctly and we are not arcing in the waveguides. Increase
power to 600kW then 800+kW. We will be looking for clean (no/minimal trips) LH
pulses from .8-1.3s. It will require some tweaking to the drive level of the
individual klystrons to increase the power level.

Cell Access to change phase shifters to 0 degrees.

Run 500ms shots with the first half in co-current-drive and the second half in
counter-current-drive, 120 degree approximate phasing in both cases, at the
maximum power level we can achieve without too many trips. This should give an
n|| spectrum similar to 60 degree ideal phasing, but with a slightly wider
spectral peak. We would like to see some changes with MSE between the co- and
counter-current-drive segments. We expect that getting the system to run in
this configuration will be a bit tricky, especially since we have no experience
running higher power in counter-current-drive configuration.

Physics Operators Plans
Entered: Jun 12 2007 02:51:05:050PM
Author: Robert Granetz
Engineering setup for Wednesday 13 June 2007

MP#473 LH operation

Session leaders: G. Wallace
Physics operator: R. Granetz

ECDC overnight in D2, pressure=2e-4 Torr.  Rmin/Rdwell/Rmax = 44/45/103 cm.
Bake at 60 C.

Power systems as on 1070606003.

A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.

Gas Setup:
   fill B-Top            with  6 psi D2  Hybrid enabled  (PG4)
   fill B-side lower     with  1 psi Ar  Hybrid DISABLED (PG1)
  leave B-side upper     as is           Hybrid DISABLED (PG2)   
   fill B-main (C-side)  with 40 psi D2  Hybrid enabled  (PG3)
pumpout NINJA            and leave       DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
  ECE, VUV, Z-bolo shutters.  Enable DNB gate valve when requested by
  DNB operator.
 
Torvac setup: Gate valves open

Specific diagnostics: DNB and MSE to measure q-profiles, or at least
  changes in current profile due to LHCD

-------------------------------------------------------------------------------
Cryopump: If possible, ready to operate with plasma in the afternoon.

ICRF Setup: No ICRF for this run.

LH Setup: max power for 0.5 seconds or more; current drive phasing
-------------------------------------------------------------------------------
Run plan: see session leader plan


Session Leader Summaries
Entered: Jun 13 2007 05:30:15:033PM
Author: Greg Wallace
Summary for 1070613

Much better results than last week with respect to increasing LH power. Fixing
the phaseshifter settings on cart 3 helped dramatically with the reflections on 17
which were preventing long pulses previously.

We had several good shots (4-8, 15, 16, 20, all at 90 deg phasing) with minimal
trips and ~.5V reduction in loop voltage and signs of q-profile change from MSE.
Maximum sustained power of 725kW on shot 20 is a substantial improvement over last
week. There are still problems with arcing in several waveguides, notably 7-10
and 23 on the C row where the gasket is known to be misaligned.

Switched to 60 degree phasing after shot 20 but did not have much luck. The
intrinsic reflection on waveguides 9 & 23, in addition to some arcing issues on
klystron 5 waveguides, prevented sustained high power operation at 60. The final
two shots were an attempt to run low n|| in both the co- and counter-current
directions during the same pulse. (This can be achieved by setting the mechanical
phase shifters to 0 and running 120 degree phasing co- and counter-current, which
essentially creates a waveguide which is twice as wide, which at twice the phase
progression gives the same n||.) Ultimately these shots did not run sucessfully
due to the CPS tripping on high reflections on waveguide 6 Top.

Physics Operator Summaries
Entered: Jun 13 2007 05:11:59:533PM
Author: Robert Granetz
Run summary for Wednesday 13 June 2007

MP 473: LH operation

Session leader: G. Wallace
Physics operator: R. Granetz

The machine ran very reliably today.  Nearly all shots were full-length
plasmas.  The lower hybrid ran well on a number of shots, some with LH
power exceeding 700 kW.  However, faulting of the LH continued to be a
problem on the majority of shots.  The DNB ran flawlessly on all shots.
Most notably, MSE clearly saw a change in pitch angle during LH current
drive on several mid-radii channels, with little change seen on core
channels.  Very promising.

Scorecard: 28 plasmas
            0 duds
            0 fizzles
            0 power supply tests
            0 no-power MDS shot cycles
           --------------
    Total: 28 shot cycles


Session Leader Comments
Jun 13 2007 09:20:37:820AM1070613001Greg WallaceLH trips out on all segments. Problem appears to be 21T. Edge density reading 2-3e19 looks good. nl04 of 5e19.
Jun 13 2007 09:30:17:350AM1070613002Greg WallaceMore trips. Cart 1&2 did not fire due to fault from previous shot not being cleared. Next shot will change phase on klystron 11 by -10 degrees.
Jun 13 2007 09:42:07:507AM1070613003Greg WallaceReflections on 21T worse than before. Moving phase in this direction did not work. Will try increasing phase on klystron 11 by 15 degrees compared to "normal" on the next shot.
Jun 13 2007 10:05:04:127AM1070613004Greg WallaceGood shot! LH ran full length with no trips. +15 degrees on klystron 11 seems to have helped. Density still looks good on LH probes, although maybe a bit low. Next shot will move upper x-point out by 1cm to increase density at top of grill a bit. 0.25V reduction in Vloop. Next shot will increase power to 100kW per klystron.
Jun 13 2007 10:27:18:380AM1070613005Greg Wallace4 trips during LH pulse. Clear arcing in 23 bottom. Possibly something in 12 top on the forward signal. Next shot will turn down klystron 12 to 80kW.
Jun 13 2007 10:41:48:817AM1070613006Greg WallaceWaveguide 3 bottom arcing during first part of pulse. Arcing went away after tripout. Otherwise a great shot with .2-.3V reduction in Vloop. Next shot will increase klystron power to 115kW except tube 12 which will stay at 80kW, and try to decrease core density.
Jun 13 2007 10:50:37:533AM1070613007Greg WallaceFiliment fault shortened LH pulse. Next shot will keep klystron drive levels same but add a "dropout" at the end of the ramp. Line averaged density went down somewhat. ~0.4V of loop voltage reduction with 600kW of net power.
Jun 13 2007 11:12:16:597AM1070613008Greg WallaceGood current drive but some arcing problems on the bottom of waveguide 3. Next shot will turn down klystron 2 to 75kW but increase others to 130kW.
Jun 13 2007 11:29:09:003AM1070613009Greg WallaceLower hybrid trips after initial ramp and did not turn back on. Arcing in waveguide 9 bottom. Next shot will try tweaking the phase on klystron 7 and turning klystron 5 down to 115kW.
Jun 13 2007 11:41:33:160AM1070613010Greg WallaceMore arcing in waveguide 9 bottom. Will try starting the ramp from lower power and ramping more slowly on the next shot. Perhaps also some problems from waveguide 14.
Jun 13 2007 12:21:00:363PM1070613011Greg WallaceLooks like there might be an arc in waveguide 14. Next shot will turn down klystron 7 to 115kW.
Jun 13 2007 12:22:50:847PM1070613012Greg WallaceSudden jump in channel 14 is the problem again. Next shot will try changing phasing on klystron 8 up by 15 degrees and turning power down on klystron 7 to 75kW.
Jun 13 2007 12:45:16:113PM1070613013Greg WallaceMore arcing in waveguide 9 bottom. Seems to retry sucessfully, then arc in waveguide 14 between the jungle gym and the pant leg split.
Jun 13 2007 01:03:29:597PM1070613014Greg WallaceTrip again after ramp. Next shot will turn down arcing klystrons.
Jun 13 2007 01:02:55:533PM1070613015Greg WallaceMore arcing in waveguide 3 during second part of pulse. First and third parts of pulse look good.
Jun 13 2007 01:21:09:253PM1070613016Greg WallaceGood shot! 600kW net power for almost the entire pulse. One trip right at the end of the pulse. Steady .4V reduction in Vloop. Will try to increase power for the next shot.
Jun 13 2007 01:55:05:130PM1070613017Greg WallaceSeveral good retries but kept tripping. Cell access to add an attenuator to waveguide 13 top and bottom.
Jun 13 2007 02:05:17:613PM1070613018Greg WallacePulse ran clean until filament fault shut off the HV. Next shot will increase power.
Jun 13 2007 02:27:57:800PM1070613019Greg WallaceMany trips, but no particular channel is clearly worse than others. Will retry same shot again.
Jun 13 2007 02:45:18:440PM1070613020Greg WallaceFirst half of pulse looked good, then tripped due to arcing in waveguide 14? Next shot will be 60 degree phasing.
Jun 13 2007 02:49:48:143PM1070613021Greg Wallace60 degree phasing. Early trip and many retries but nothing stuck. Problem seems to be with 23Top. Will try changing phase on klystron 12.
Jun 13 2007 03:06:21:003PM1070613022Greg WallaceMore trips. Cell access to de-sensitize reflected signals on 23 Top. Next shot will repeat.
Jun 13 2007 03:51:18:770PM1070613023Greg WallaceTripped and did not come back on after ramp. Cell access to add some more attenuators on waveguides 9 and 23.
Jun 13 2007 04:08:02:160PM1070613024Greg WallaceMore trips. One more try to increase power by turning down klystron 5 to 80kW.
Jun 13 2007 04:12:53:550PM1070613025Greg WallaceMore trips again. Changing phase shifters to 0 degrees and running 120 degree approximate phasing to simulate 60 degree phasing. Will run first half in co current, second half counter current.
Jun 13 2007 04:39:01:427PM1070613026Greg WallaceEarly disruption.
Jun 13 2007 04:57:35:847PM1070613027Greg WallaceTrip on 6T seems to be the problem. Next shot will increase power from klystron 3 to avoid trips.
Jun 13 2007 05:04:52:347PM1070613028Greg Wallace6T high reflection still the problem. Last shot of the day.

Physics Operator Comments
Jun 12 2007 04:10:34:280PMRobert GranetzDPCS loaded from shot 1070606003. (seg1 and 2 active). Segment 1 then imported
from 1070612025. Change pre-fill puff to 18 ms. Save as shot 1070613000 in
/home/granetz/pcs_scratch
Jun 13 2007 08:55:23:053AMRobert GranetzLoaded shot 1070613000 from /home/granetz/pcs_scratch. 0.8 MA, 5.4 T, 0.7e20 m-2, LSN.
Decreased nl_04 to 0.5e20 m-2.
Jun 13 2007 09:15:41:147AM1070613001Robert GranetzShot 01 -- Plasma. Good shot. Very small outer gap, as desired. EFIT claims that it's
marginally limited during latter part of flattop. 0.8 MA, 5.4 T, nl_04=0.54e19

Next shot: no DPCS changes
Jun 13 2007 09:26:22:430AM1070613002Robert GranetzShot 02 -- Plasma. Good shot. LH is still faulting alot.

Next shot: no DPCS changes
Jun 13 2007 09:47:49:440AM1070613003Robert GranetzShot 03 -- Plasma. Good shot. Still have hard x-rays early in the shot, but the startup looks
good.

Next shot: add 2 ms to pre-fill.
Jun 13 2007 10:04:35:017AM1070613004Robert GranetzShot 04 -- Plasma. Good shot. Nice LH waveform...400 kW, steady 0.5 s.

Next shot: Move upper x-point out by 1 cm to increase density near upper
part of LH grill.
Jun 13 2007 10:23:29:270AM1070613005Robert GranetzShot 05 -- Plasma. Good shot. PLH=550 kW, 0.5 s. DNB continues to run well too.
Greg says that density at upper part of grill was higher, as desired.

Next shot: no DPCS changes.
Jun 13 2007 10:39:46:487AM1070613006Robert GranetzShot 06 -- Plasma. Good shot. PLH=500-550 kW for 0.5 s.

Next shot: decrease nl_04 to 0.35e20 m-2 after t=0.5 s.
Jun 13 2007 10:55:01:223AM1070613007Robert GranetzShot 07 -- Plasma. Good shot. Density did come down a bit after t=0.5 s.
PLH = 600 kW, for 0.2 s. Loop voltage dropped even more (0.4 volts,
compared to 0.3 volts on previous shots).

Next shot: no DPCS changes
Jun 13 2007 11:02:11:737AM1070613008Robert GranetzShot 08 -- Plasma. Good shot. P_LH = 600 kW, 0.5 s. Lots more hard x-rays during
the LH pulse and afterward.

Next shot: no DPCS changes
Jun 13 2007 11:19:35:597AM1070613009Robert GranetzShot 09 -- Plasma. Good shot. LH faulted alot.

Next shot: no DPCS changes.
Jun 13 2007 11:37:11:393AM1070613010Robert GranetzShot 10 -- Plasma. Good shot. LH faults alot.

Next shot: no DPCS changes
Jun 13 2007 11:54:30:410AM1070613011Robert GranetzShot 11 -- Plasma. Good shot. Current is dipping aaround 0.3 s.

Next shot: no DPCS changes
Jun 13 2007 12:12:52:660PM1070613012Robert GranetzShot 12 -- Plasma. Good shot. Still having some LH problems.

Next shot: no DPCS changes
Jun 13 2007 12:28:57:910PM1070613013Robert GranetzShot 13 -- Plasma. Good shot. Plasma current is taking a big dip around t=0.2 s. LH is still
tripping alot.

Next shot: no DPCS changes
Jun 13 2007 12:46:22:190PM1070613014Robert GranetzShot 14 -- Plasma. Good shot. LH still having problems.

Next shot: no DPCS changes
Jun 13 2007 01:05:09:880PM1070613015Robert GranetzShot 15 -- Plasma. Good shot. Good LH. 600 kW for 0.3 s. Droop in plasma current
during the rampup has nearly disappeared, even though I haven't done
anything about it.

Next shot: no DPCS changes
Jun 13 2007 01:20:16:130PM1070613016Robert GranetzShot 16 -- Plasma. Good shot. Very good LH pulse; 600 kW for 0.4 s.

Next shot: no DPCS changes
Jun 13 2007 01:46:56:533PM1070613017Robert GranetzShot 17 -- Plasma. Good shot. LH faulted alot.

Cell access for LH and for MSE after this shot.

Next shot: no DPCS changes
Jun 13 2007 02:22:26:080PM1070613018Robert GranetzShot 18 -- Plasma. Good shot. The dip in the current during the rampup came back,
for no obvious reason. LH power was 650-700 kW, but for only 100 ms.

Next shot: no DPCS changes
Jun 13 2007 02:23:44:533PM1070613019Robert GranetzShot 19 -- Plasma. Good shot. LH faulted alot. The dip in the current during the rampup
disappeared, again for no obvious reason.

Next shot: no DPCS changes
Jun 13 2007 02:42:08:283PM1070613020Robert GranetzShot 20 -- Plasma. Good shot. P_LH >= 700 kW for 0.2 s.

Next shot: no DPCS changes
Jun 13 2007 02:47:30:770PM1070613021Robert GranetzShot 21 -- Plasma. Good shot. LH faulted alot.

Next shot: no DPCS changes
Jun 13 2007 03:05:58:067PM1070613022Robert GranetzShot 22 -- Plasma. Good shot. LH faulted alot.

Cell access for LH and MSE after this shot.

Next shot: no DPCS changes
Jun 13 2007 03:40:18:610PM1070613023Robert GranetzShot 23 -- Plasma. Good shot. Early dip in Ip is back. LH climbed to 750 kW but then faulted.

Next shot: no DPCS changes
Jun 13 2007 03:42:12:113PM1070613023Robert GranetzThe init cycle hung, resulting in a few minutes of delay before shot 23 was
successfully executed.
Jun 13 2007 03:43:01:160PM1070613023Robert GranetzA cell access for LH occurred after this shot.
Jun 13 2007 04:00:32:770PM1070613024Robert GranetzShot 24 -- Plasma. Good shot. LH faulted alot.

Next shot: no DPCS changes
Jun 13 2007 04:12:07:177PM1070613025Robert GranetzShot 25 -- Plasma. Good shot. LH faulted alot.

Another cell access for LH occurred after this shot.

Next shot: no DPCS changes
Jun 13 2007 04:42:01:487PM1070613026Robert GranetzShot 26 -- Plasma. Disrupted very early. Looks like it just got very resistive.

Next shot: reduce pre-fill by 2 ms (disruption recovery).
Jun 13 2007 04:58:49:207PM1070613027Robert GranetzShot 27 -- Plasma. Good shot. LH faulted alot.

Next shot: no DPCS changes. Lithium pellet injector will fire after t=1.3 s.
Jun 13 2007 05:06:19:800PM1070613028Robert GranetzShot 28 -- Plasma. Good shot. Lithium pellet disrupted plasma at t=1.36 s.
LH faulted alot.

End of run

Engineering Operator Comments
ShotTimeTypeStatusComment
109:06:36:647AMPlasmaOk
209:22:24:757AMPlasmaOk
309:38:41:677AMPlasmaOk
409:52:56:253AMPlasmaOk
510:09:13:080AMPlasmaOk
610:27:48:190AMPlasmaOk
710:41:12:473AMPlasmaOk
810:56:26:910AMPlasmaOk
911:14:51:130AMPlasmaOk
1011:30:20:927AMPlasmaOk
1111:45:30:830AMPlasmaOk
1212:05:08:783PMPlasmaOk
1312:22:34:770PMPlasmaOk
1412:40:54:300PMPlasmaOk
1512:59:13:550PMPlasmaOk
1601:14:32:113PMPlasmaOk
1701:27:07:270PMPlasmaOk
1802:01:43:927PMPlasmaOk
1902:17:12:300PMPlasmaOk
2002:30:35:643PMPlasmaOk
2102:43:03:050PMPlasmaOk
2202:55:37:363PMPlasmaOk
2303:31:38:020PMPlasmaOk
2403:55:15:957PMPlasmaOk
2504:07:53:050PMPlasmaOk
2604:36:40:237PMPlasmaOk
2704:49:01:610PMPlasmaOk
2805:01:38:487PMPlasmaOk

System Availability
Jun 13 2007 09:06:12:270AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data.May 29 2007 11:22AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged.May 29 2007 11:23AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is running DC voltages from 5V-7V, also in the testing stage.Jun 01 2007 09:11AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Jun 13 2007 08:56AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf