| Session Leader Comments |
| Jun 14 2007 09:21:13:590AM | 1070614001 | Jerry Hughes | First shot is Ohmic, 1MA with pump warm. SSEP scanning -3-->+5 from 0.7 to 0.9s.
Result: Dud
Next: retry
|
| Jun 14 2007 09:21:53:997AM | 1070614002 | Jerry Hughes | Requested: Ohmic, 1MA with pump warm. SSEP scanning -3-->+5 from 0.7 to 0.9s.
|
| Jun 14 2007 09:45:37:947AM | 1070614002 | Jerry Hughes | Requested: Ohmic, 1MA with pump warm. SSEP scanning -3-->+5 from 0.7 to 0.9s.
Result: Scan in SSEP never gets to 5mm and above.
Next: Repeat with SSEP demand increased, trying to hold upper strike point fixed
|
| Jun 14 2007 09:56:16:183AM | 1070614003 | Jerry Hughes | equested: Ohmic, 1MA with pump warm. SSEP scanning from 0.7 to 0.9s.
Result: SSEP scan is improved. B-bottom MKS would seem to indicate lower
divertor pumpout starting around SSEP=+2mm. There is also a pulse in plasma
density at that time.
The upper strikepoint is still creeping toward the edge of the pumping slot.
Next: Repeat with pump COLD. Earl will try to reduce RXU. RF will still fire in the backdoor.
|
| Jun 14 2007 10:22:19:557AM | 1070614004 | Jerry Hughes | equested: Ohmic, 1MA with pump cold. SSEP scanning from 0.7 to 0.9s.
Result: Some injections during the pump-out phase. H-modes late in the shot
with RF inserted and near DN
Reaching limits in certain coils.
Next: Lower Ip to 800kA. Pump COLD. RF will still fire at 1.3s
|
| Jun 14 2007 10:25:20:730AM | 1070614005 | Jerry Hughes | equested: Ohmic, 0.8MA with pump cold. SSEP scanning from 0.7 to 0.9s.
Result: No disruption that time. SSEP droops after 0.9s.
Next: Repeat with pump WARM. Try to reduce the SSEP droop.
|
| Jun 14 2007 10:52:04:747AM | 1070614006 | Jerry Hughes | Requested: Ohmic, 0.8MA with pump WARM. SSEP scanning.
Result: Disrupts again, but the SSEP values look very desirable.
Next: Repeat with RF moved to 0.7ms
|
| Jun 14 2007 11:21:40:340AM | 1070614007 | Jerry Hughes | Requested: 0.8MA with pump WARM. SSEP scanning. Trying to get H-modes.
Result: H-mode during the SSEP scan, cooling and radiating toward the end of its
life. RF has a number of trips. The SSEP programming looks appropriate. Unfortunately the shot still disrupts.
Next: Repeat; Try to get better match on D-port; Earl will bring SSEP more
negative late in the shot to relax demands on power supplies.
|
| Jun 14 2007 11:21:34:027AM | 1070614008 | Jerry Hughes | Requested: 0.8MA with pump WARM. SSEP scanning. Trying to get H-modes.
Result: Fizzle
Next: Try again.
|
| Jun 14 2007 11:31:15:307AM | 1070614009 | Jerry Hughes | Requested: 0.8MA with pump WARM. SSEP scanning. Trying to get H-modes.
Result: RF looks better, with a decent steady H-mode thorughout the SSEP scan.
The near DN H-mode has a very hot edge, with Te,PED~800eV at times.
It looks like we have H-mode pump-out, starting at 0.818s even with the pump warm!
Next: Try again with pump COLD
|
| Jun 14 2007 11:43:50:310AM | 1070614010 | Jerry Hughes | Requested: 0.8MA with pump COLD. SSEP scanning. Trying to get H-modes.
Result: RF performs very well, with a decent steady H-mode thorughout the SSEP
scan. Te,PED gets to ~1keV, with peak well above 4keV. H89~1.7.
It's not entirely clear that we're pumping harder than we were wiht the pump
WARM. Can we improve the upper strike position?
Next: Try again with pump COLD.
|
| Jun 14 2007 05:41:52:177PM | 1070614011 | Jerry Hughes | 800kA, pump cold.
|
| Jun 14 2007 12:32:06:950PM | 1070614012 | Jerry Hughes | Requested: 0.8MA with pump COLD. SSEP scanning. Trying to get H-modes.
Result: Decent control of strike. Lose first H-mode do to an injection. The second
H-mode has quite a low edge density. Looks encouraging for straight-up USN H-modes.
Next: 600kA
|
| Jun 14 2007 12:37:20:183PM | 1070614013 | Jerry Hughes | Requested: 600kA, pump COLD
Pretty nice shot. Good H-factor, T0. The density shows the dip representative of
the SSEP flip, at roughly the same time. Central ne stays fairly flat, while the edge ne drops. Martin reports this is one of the most peaked H-modes ever.
Radiation is stable, RF is good.
Next: Repeat with pump WARM.
|
| Jun 14 2007 12:38:13:543PM | 1070614014 | Jerry Hughes | Requested: 600kA, pump WARM.
Result: Cryopump was purged just in time for pulse. However, we got a dud.
Next: Retry.
|
| Jun 14 2007 01:09:35:077PM | 1070614015 | Jerry Hughes | Requested: 600kA, pump WARM.
Result: RF is not so clean. Wukitch thinks we're near a neutral pressure limit on
J.
Next: Re-allocate power in D,E,J, but otherwise the same shot.
|
| Jun 14 2007 01:10:09:957PM | 1070614016 | Jerry Hughes | Requested: 600kA, pump WARM.
Result: RF still having trouble.
Next: Repeat shot 13 with pump COLD, see if we recover the good RF performance.
|
| Jun 14 2007 01:25:27:097PM | 1070614017 | Jerry Hughes | Requested: 600kA, pump COLD.
Result: RF loves the pump-out. Only 3 trips on J, then it runs clean as the midplane pressure drops.
Performance has dropped relative to shot 13.
Next: 600kA Ohmic, pump cold.
|
| Jun 14 2007 01:49:13:957PM | 1070614019 | Jerry Hughes | Requested: 600kA, pump warm. Ohmic
Result: Looks good.
Next: 1MA, pump COLD, with RF.
|
| Jun 14 2007 02:04:33:333PM | 1070614020 | Jerry Hughes | Requested: 1MA, pump cold, RF
Result: The first H-mode extends throughout the SSEP scan. Density pedestal doesn't show much sign of pumpout, and central density actually rises at the end of the H-mode. Subsequent H-modes have lower global density.
Next: 1MA, pump WARM, with RF.
|
| Jun 14 2007 02:09:35:613PM | 1070614021 | Jerry Hughes | Requested: 1MA, pump warm, RF
Result: Fizzle
Next: Retry
|
| Jun 14 2007 02:45:44:583PM | 1070614022 | Jerry Hughes | Requested: 1MA, pump warm, RF
Result: H-mode through the SSEP scan, but disrupts shortly after.
Next: Go to solidly USN shot, pump WARM. Throw in the RF.
|
| Jun 14 2007 02:48:19:207PM | 1070614023 | Jerry Hughes | Requested: 1MA, USN, cryopump WARM
Result: Fizzle.
Next: Retry
|
| Jun 14 2007 03:24:32:270PM | 1070614024 | Jerry Hughes | Requested: 1MA, USN, cryopump WARM
Result: 3 ELM-free H-modes. The first has a very high stored energy and H-factor.
Next: Repeat with pump COLD. Zero nl04 feedback at 0.7s simultaneous with RF on
time.
|
| Jun 14 2007 03:15:27:893PM | 1070614025 | Jerry Hughes | Requested: 1MA, USN, cryopump COLD
Result: Dud
Next: Retry
|
| Jun 14 2007 03:41:19:410PM | 1070614026 | Jerry Hughes | Requested: 1MA, USN, cryopump COLD
Result: 3 ELM-free H-modes, same as 24. Looks like there is a drop in pedestal
density, and an increase in Te.
Next: Raise target density and see if we get an EDA to start.
|
| Jun 14 2007 04:12:25:207PM | 1070614027 | Jerry Hughes | Requested: 1MA, pump COLD, with target density of 1.2e20
Result: Piezo is pegged, so we cannot fuel to the target priot to H-mode transition. With only 10% increase in starting density, the H-modes look very similar to shot 26. No sign of the QCM.
Next: Go to 800kA USN, with pump cold.
|
| Jun 14 2007 04:08:11:910PM | 1070614028 | Jerry Hughes | Requested: 0.8MA USN, pump warm.
Result: H-mode is a bit radiative, but there's a hint of the QCM in there, according to PCI spectrograph.
Next: Retry with pump COLD.
|
| Jun 14 2007 04:14:36:613PM | 1070614029 | Jerry Hughes | Requested: 800kA, pump cold.
Result: Disrupts at 620ms.
Next: Retry
|
| Jun 14 2007 04:28:45:863PM | 1070614030 | Jerry Hughes | Requested: 800kA, pump cold.
Result: Disrupts at 660ms.
Next:
|
| Jun 14 2007 04:48:30:020PM | 1070614030 | Jerry Hughes | Requested: 800kA, pump cold.
Result: Disrupts at 660ms.
There will be no more plasmas, due to a poorly understood power supply problem.
|
| Physics Operator Comments |
| Jun 14 2007 09:22:26:010AM | 1070614001 | Earl Marmar | 10 hours of boronization overnight
2 hours ECDC in helium
load 1070601030
adjust ssep sweep
import segment 1 from 1070613001
segments 1 and 4 are active
argon enabled - PG1 100 msec puff starting at 0.3 seconds
DNB gate valve enabled
dud
fill pressure very low (.015 mtorr)
|
| Jun 14 2007 09:44:32:620AM | 1070614002 | Earl Marmar | increase prefill puff to 24 msec (from 19)
plasma
disrupt early in rampdown
OH2U reached PLC limit
|
| Jun 14 2007 09:55:33:213AM | 1070614003 | Earl Marmar | increase -ve plc limits on OH1, OH2U and OH2L to -30 kA
decrease prefill puff to 20 msec (from 24)
plasma
disrupt early in rampdown
OH2U hits PLC limit
|
| Jun 14 2007 10:11:36:200AM | 1070614004 | Earl Marmar | cryopump to liquid helium temperature
increase prefill puff to 28 msec (from 20)
tweak RXU
plasma
disrupt in rampdown
|
| Jun 14 2007 10:26:31:230AM | 1070614005 | Earl Marmar | cryopump at liquid helium temp.
Ip to 800 kA
nl_04 target to 7e19
plasma
ramped all the way down
|
| Jun 14 2007 10:56:18:167AM | 1070614006 | Earl Marmar | cryopump at liquid nitrogen temp.
prefill puff to 19 msec (from 28)
tweak SSEP
plasma
disrupt at end of flat top
|
| Jun 14 2007 10:58:16:277AM | 1070614007 | Earl Marmar | cryopump at liquid nitrogen temp.
increase OH2U plc limit to -32 kA
plasma
disrupt at end of flat-top
both EF2's have reached 0 by 1.5 seconds
|
| Jun 14 2007 11:01:28:433AM | 1070614008 | Earl Marmar | cryopump at liquid nitrogen temp.
change SSEP to go back to SNL after 1.2 seconds
fizzle
|
| Jun 14 2007 11:25:18:293AM | 1070614009 | Earl Marmar | cryopump at liquid nitrogen temp.
prefill puff to 15 msec (from 18)
plasma
ramps most of the way down
interesting H-mode dynamics
density decreases when we go upper null, increases again when we go double null and then lower null.
|
| Jun 14 2007 12:05:17:887PM | 1070614010 | Earl Marmar | cryopump at liquid helium temp.
prefill puff to 27 msec (from 15)
plasma
good H-mode
|
| Jun 14 2007 12:04:56:090PM | 1070614011 | Earl Marmar | cryopump at liquid helium temp.
increase proportional gain on RXU
plasma
nice H-mode
|
| Jun 14 2007 12:21:18:497PM | 1070614012 | Earl Marmar | cryopump at liquid helium temp.
tweak RXU and ZXU gains and targets (trying to keep the upper strike from sweeping out so much)
plasma
some improvement in upper strike location
2 H-modes, second is quite low density
disrupt early in rampdown
|
| Jun 14 2007 05:18:00:113PM | 1070614013 | Earl Marmar | cryopump at liquid helium temp.
Ip to 600 kA
plasma
nice steady h-mode, H89 ~ 1.75
|
| Jun 14 2007 12:56:30:293PM | 1070614014 | Earl Marmar | cryopump supposed to be at liquid nitrogen temp.
prefill puff to 17 msec (from 27)
dud
pressure was way too low at t=0 (0.16 mtorr)
looks like either: the cryopump started to pump again at t=-2.0 seconds, or the prefill puff valve did not open properly (as on shot 1)
|
| Jun 14 2007 12:57:20:150PM | 1070614015 | Earl Marmar | cryopump at liquid nitrogen temp.
no pcs changes
plasma
|
| Jun 14 2007 01:09:24:497PM | 1070614016 | Earl Marmar | cryopump at liquid nitrogen temp.
no pcs changes
plasma
|
| Jun 14 2007 01:22:01:843PM | 1070614017 | Earl Marmar | cryopump at liquid helium temp.
prefill puff to 27 msec (from 17)
plasma
similar to 13; radiated power about 30% higher during H-mode
|
| Jun 14 2007 01:34:26:050PM | 1070614018 | Earl Marmar | cryopump at liquid helium temp.
no pcs changes
plasma
no ICRF on this shot
clear pumping during upper null part of the shot
|
| Jun 14 2007 01:49:20:177PM | 1070614019 | Earl Marmar | cryopump at liquid nitrogen temp.
prefill puff to 17 msec (from 27)
plasma
|
| Jun 14 2007 02:03:20:973PM | 1070614020 | Earl Marmar | cryopump at liquid helium temp.
prefill puff to 27 msec (from 17)
Ip to 1.0 MA, start rampdown at 1.2 seconds
nl_04 target to 0.9e20
plasma
disrupt at beginning of rampdown
|
| Jun 14 2007 02:12:14:317PM | 1070614021 | Earl Marmar | cryopump at liquid nitrogen temp.
prefill puff to 17 msec (from 27)
extend Ip flattop to 1.5 seconds
fizzle
|
| Jun 14 2007 02:44:44:503PM | 1070614022 | Earl Marmar | cryopump at liquid nitrogen temp.
prefill puff to 14 msec (from 17)
plasma
disrupt at 1 second
interesting metallic shower on the wide2 view after the disruption
|
| Jun 14 2007 03:09:41:957PM | 1070614023 | Earl Marmar | cryopump at liquid nitrogen temp.
go to 1 MA straight SNU shot (not SSEP control)
load from 1070601031
import segment 1 from 1070614022
segment 1 and 3 are active
PG1 (argon) puff to 100 msec (keeping it the same as previous shots today)
fizzle
|
| Jun 14 2007 03:10:36:240PM | 1070614024 | Earl Marmar | cryopump at liquid nitrogen temp.
no additional pcs changes
plasma
ELM-free h-modes
|
| Jun 14 2007 03:18:01:440PM | 1070614025 | Earl Marmar | cryopump at liquid helium temp.
prefill puff to 27 msec (from 14)
tweak nl_04 target (keep at 9e19 until .7 seconds)
dud
prefill change never loaded (or I didn't enter it properly)
|
| Jun 14 2007 03:38:42:707PM | 1070614026 | Earl Marmar | cryopump at liquid helium temp.
prefill puff to 27 msec (for sure this time)
plasma
3 ELM-freeish H-modes
high peak stored energy
|
| Jun 14 2007 03:50:19:740PM | 1070614027 | Earl Marmar | cryopump at liquid helium temp.
nl_04 target to 1.2e20
plasma
nl_04 got to 1e20 in L-mode, PG3 wide open .31 to .7 seconds
3 ELM-freeish H-modes
Wtot a bit lower than on shot 26
|
| Jun 14 2007 04:07:38:100PM | 1070614028 | Earl Marmar | cryopump at liquid nitrogen temp.
prefill puff to 15 msec
Ip to 800 kA
nl_04 target to 8e19
plasma
h-mode has a hint of EDA-ness
|
| Jun 14 2007 04:20:36:740PM | 1070614029 | Earl Marmar | cryopump at liquid helium temp.
prefill puff to 27 msec
early disruption (pre-ICRF)
PF breaker pulled (possibly before the disruption)
|
| Jun 14 2007 05:01:26:393PM | 1070614030 | Earl Marmar | cryopump at liquid helium temp.
no pcs changes
same early disruption, at almost the same time
PF breaker pulled again
looks like a power supply problem
DPCS outputs look fine until after rapid changes in OH2 currents
no increase in prad_2pi or Ip until the plasma responds to OH current changes
|
| System Availability |
| Jun 14 2007 09:13:40:823AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | The cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation. | May 30 2007 07:58PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,5,8,10,17) operational. | Jun 08 2007 08:29AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | The system is to be optimized. | May 30 2007 01:12PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is running DC voltages from 5V-7V, also in the testing stage. | Jun 01 2007 09:11AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -113mm (optimized for kappa~1.6). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015. | Jun 13 2007 06:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Jun 14 2007 09:56:00:747AM |
Fiber plate adjustment: btm motor 5Rev
|
| Jun 14 2007 10:01:39:247AM |
Fiber plate adjustment: btm motor 5Rev
|
| Jun 14 2007 10:11:27:370AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | The cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation. | May 30 2007 07:58PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,5,8,10,17) operational. | Jun 08 2007 08:29AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | The system is to be optimized. | May 30 2007 01:12PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is running DC voltages from 5V-7V, also in the testing stage. | Jun 01 2007 09:11AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -113mm (optimized for kappa~1.6). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015. | Jun 13 2007 06:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Jun 14 2007 10:16:59:243AM |
alignment looks better. keep adjusting btm motor 5Rev
|
| Jun 14 2007 10:26:47:370AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | The cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation. | May 30 2007 07:58PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,5,8,10,17) operational. | Jun 08 2007 08:29AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | The system is to be optimized. | May 30 2007 01:12PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is running DC voltages from 5V-7V, also in the testing stage. | Jun 01 2007 09:11AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -113mm (optimized for kappa~1.6). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015. | Jun 13 2007 06:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Jun 14 2007 10:30:47:010AM |
Fiber plate adjustment: btm motor 3Rev
|
| Jun 14 2007 10:43:32:027AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | The cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation. | May 30 2007 07:58PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,5,8,10,17) operational. | Jun 08 2007 08:29AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | The system is to be optimized. | May 30 2007 01:12PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is running DC voltages from 5V-7V, also in the testing stage. | Jun 01 2007 09:11AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -113mm (optimized for kappa~1.6). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015. | Jun 13 2007 06:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Jun 14 2007 11:52:24:950AM |
Fiber plate adjustment: btm 3Fwd
|
| Jun 14 2007 12:03:46:340PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | The cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation. | May 30 2007 07:58PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,5,8,10,17) operational. | Jun 08 2007 08:29AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | The system is to be optimized. | May 30 2007 01:12PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is running DC voltages from 5V-7V, also in the testing stage. | Jun 01 2007 09:11AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -113mm (optimized for kappa~1.6). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015. | Jun 13 2007 06:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Jun 14 2007 12:07:55:323PM |
Fiber plate adjustment: btm 3Fwd
|
| Jun 14 2007 12:19:25:137PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data. | May 29 2007 11:22AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | The cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation. | May 30 2007 07:58PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 24 2007 08:40AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels (except 1,5,8,10,17) operational. | Jun 08 2007 08:29AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged. | May 29 2007 11:23AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | The system is to be optimized. | May 30 2007 01:12PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is running DC voltages from 5V-7V, also in the testing stage. | Jun 01 2007 09:11AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL_04 at 71.04 cm from 3/9/07 calibration | May 23 2007 07:38AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | 2 lasers, 20 spatial channels. Fiber holder position is -113mm (optimized for kappa~1.6). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015. | Jun 13 2007 06:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|