Alcator C-Mod Run 1070615 Information

Back to runs

Miniproposals
Miniproposal:491
Date Filed: 5/25/2007
Title:MSE Calibrations
First Author:Steve Scott
Session Leader:Steve Scott (shots 1-24)

Operators
Session leader(s):Steve Scott
Physics operator(s):Ron Parker,Joseph Snipes
Engineering operator(s):Bill Cochran,Bill Parkin,Sam Pierson

Engineering Operator Run Comment
070615 SL_PLAN. MP491 MSE Calibrations

Session Leader Plans
Entered: Jun 15 2007 12:11:43:050AM
Author: Jin-Seok Ko

1070615 SL_PLAN. MP491 MSE Calibrations

SL : Steve Scott, Jinseok Ko
PO : Ron Parker

Executive summary

A. Optimization of torus gas pressure for beam-into-gas calibration : 2 shot
B. Standard beam-into-gas calibration : 4 shot
C. Investigation on time variation in pitch angle : 1 shot
D. Beam-into-plasma calibration with Ip ramp : 2 or 4 shots + 2 'setup' shots
E. Beam-into-plasma calibration with plasma sweeping : maximum allowable trial shots ~ 7
F. Beam-into-plasma reproducibility test : 1 or 2 shots
G. Beam-into-gas reproducibility test : 1 shot
H. MSE spectrum (filter) scan : 5 shots

Total expected number of shots: 13 He4 gas shots + 12 ~ 15 D2 plasma shots



A. Optimization of torus gas pressure for beam-into-gas calibration : 2 shot

This is the torus pressure scan within a shot with a constant pitch angle
to find an optimized torus pressure that can minimize secondary-beam-neutral
effect. The torus pressure found in these shots will be used in the folloing
beam-into-gas shots.

After the shot, pitch angle vs pressure plot is investigated. Hopefully, we
will find a largest pressure that maintains the pitch angle constant.

Reference 1070529010 (but not the same)

Gas: He4 (0.04 - 0.3 mTorr)
DNB: 0.1 - 1.5 sec flattop
BT : constant 5.4 T during DNB flattop (0.1 - 1.5 sec)

EF3: constant 0 kA during DNB flattop (0.1 - 1.5 sec)
EF4: constant -2 kA during DNB flattop (0.1 - 1.5 sec)

torus pressure: constant 0.04 mTorr from 0.1 - 0.7 sec
increase to 0.1 mTorr till 1.1 sec
constant 0.1 mTorr from 1.1 - 1.3 sec
increase to 0.3 mTorr till 1.5 sec



B. Standard beam-into-gas calibration : 4 shot

Using the optimized torus pressure (p_opt) found in Step A1, 4 different
combinations of EF3 + EF4 are used to have the calibration data.

Gas: He4 (""p_opt"" mTorr)
DNB: 0.1 - 1.5 sec flattop
BT : constant 5.4 T during DNB flattop (0.1 - 1.5 sec)

B1: reference 1070529025 (but not the same)

EF3: constant 0 kA till 0.2 sec
increase to 10 kA till 1.5 sec
EF4: constant 0 kA during the entire shot

B2:

EF3: constant 0 kA till 0.2 sec
increase to 10 kA till 1.1 sec
constant 10 kA from 1.1 - 1.3 sec
decrease to 8 kA till 1.5 sec
EF4: constant 4 kA from 0.1 - 1.5 sec

B3: reference 1070529012 (exact)

EF3: constant 0 kA till 0.25 sec
increase to 6 kA till 0.65 sec
constant 6 kA from 0.65 - 0.9 sec
increase to 10 kA till 1.3 sec
constant 10 kA from 1.3 - 1.5 sec
EF4: constant 4 kA from 0.1 - 1.5 sec

B4:

EF3: constant 0 kA during the entire shot
EF4: constatn 0 kA till 0.2 sec
increase to -4 kA till 1.1 sec
constant -4 kA from 1.1 - 1.3 sec
descrese to -3 kA till 1.5 sec



C. Investigation on time variation in pitch angle : 1 shot

This addresses the time variation in the measured pitch angle within a shot.
We have a clean, constant pitch angle during the entire shot and observe
any time variation.

Gas: He4 (""p_opt"" mTorr)
DNB: 0.1 - 1.5 sec flattop
BT : constant 5.4 T during DNB flattop (0.1 - 1.5 sec)

EF3: constant 8 kA during the DNB flattop*
EF4: constant 0 kA during the DNB flattop

*EF3 flattop should start at least 0.3 sec before the DNB-On time



D. Beam-into-plasma calibration with Ip ramp : 2 or 4 shots + 2 'setup' shots

Maintaining the plasma shape, only the Ip ramps down during a shot. Using the
EFIT-calculated pitch angle at the edge channel, the MSE edge channel is
calibrated.

Two scenerios are considered. D1: large Ip ramp in a single shot. If D1 is
not successful, D2: two small Ip ramps in two seperate shots

Gas: Deuterium plasma (target Nel = 0.6 - 0.7e20)
DNB: 0.4 - 1.9 sec modulated as on/off = 60/40 msec
BT : constant 5.4 T during DNB (0.4 - 1.9 sec)

No ICRF/LHCD

D1: reference 1060316014

Ip: 1.1 MA @ 0.7 sec
0.25 MA @ 1.8 sec

Repeat D1 (total number of shots will be 2 + 2 setup shots = 4 shots)

D2:

D2a: reference 1060316014

Ip: 1.1 MA @ 0.7 sec
0.45 MA @ 1.8 sec

D2b: reference 1070405012

Ip: 0.7 MA @ 0.5 sec
0.25 MA @ 1.8 sec

Repeat D2a and D2b (total number of shots will be 4 + 2 setup shots = 6 shots)



E. Beam-into-plasma calibration with plasma sweeping : maximum allowable trial shots ~ 7

The plasma edge is swept past each of the MSE channel locations by ramping the plasma's
major and minor radius. Unlike the Ip-ramp plasma calibration, this provides the
calibration data for inner channels.

Many setup shots may be required. After we try 7 shots, not being successful, we will
stop this test and go to the next one.

Reference 1060412022

Gas: Deuterium plasma (try for ~ constant nebar)
DNB: 0.4 - 1.9 sec modulated as on/off = 60/40 msec
BT : constant 5.4 T during DNB (0.4 - 1.9 sec)
kappa: try for a constant (~ 1.23)

No ICRF/LHCD

E1: partial sweep (a = 22 -> 14 cm) with constant qpsi (2 ~ 4 shots)
E2: full sweep (a = 22 -> 11 cm) with constant qpsi (2 ~ 4 shots)
E3: partial sweep (a = 22 -> 14 cm) with constant Ip = 0.23 MA (2 ~ 3 shots)
E4: full sweep (a = 22 -> 11 cm) with constant Ip = 0.23 MA (2 ~ 3 shots)

Details:

E1: Rmajor 65.7 cm @ 0.6 sec -> 58.0 cm @ 1.7 sec
a 21.7 cm @ 0.6 sec -> 14.0 cm @ 1.7 sec
Ip 0.78 MA @ 0.6 sec -> 0.348 MA @ 1.7 sec (for constant qpsi)

E2: Rmajor 65.7 cm @ 0.6 sec -> 55.0 cm @ 1.7 sec
a 21.7 cm @ 0.6 sec -> 11.0 cm @ 1.7 sec
Ip 0.78 MA @ 0.6 sec -> 0.227 MA @ 1.7 sec (for constant qpsi)

E3: Rmajor 65.7 cm @ 0.6 sec -> 58.0 cm @ 1.7 sec with constant Ip = 0.23 MA
a 21.7 cm @ 0.6 sec -> 14.0 cm @ 1.7 sec with constant Ip = 0.23 MA

E4: Rmajor 65.7 cm @ 0.6 sec -> 55.0 cm @ 1.7 sec with constant Ip = 0.23 MA
a 21.7 cm @ 0.6 sec -> 11.0 cm @ 1.7 sec with constant Ip = 0.23 MA



F. Beam-into-plasma reproducibility test : 1 or 2 shots

This addresses a rather large time scale reproducibility issue for beam-into-plasma
shots.

Repeat D1 if D1 is successful (1 shot )
Repeat D2 if D2 is successful (2 shots)



G. Beam-into-gas reproducibility test : 1 shot

This addresses a rather large time scale reproducibility issue for beam-into-gas
shots.

Repeat B1



H. MSE spectrum (filter) scan : 5 shots

If time allows, we will investigate the behavior of the MSE bandpass filters.
MSE Stark lines will be shifted within a shot by Bt ramp with fixed filter passband.
Vertical fiels are ramped as well in order to maintain the same pitch angle.

Reference 1070425026

Gas: He4 (""p_opt"" mTorr)
DNB: 0.1 - 1.5 sec flattop

H1:

MSE filter setting: 5.4T/50keV

BT : 2.8 T @ 0.2 sec -> 4.2 T @ 1.4 sec
EF3: 1.81 kA @ 0.2 sec -> 5.18 kA @ 1.4 sec
EF4: 3 kA during DNB flattop

H2:

MSE filter setting: 5.4T/50keV

BT : 4.9 T @ 0.2 sec -> 6.2 T @ 1.4 sec
EF3: 6.86 kA @ 0.2 sec -> 10.0 kA @ 1.4 sec
EF4: 3 kA during DNB flattop

H3:

MSE filters start cooling

BT : 4.9 T @ 0.2 sec -> 6.2 T @ 1.4 sec
EF3: 6.86 kA @ 0.2 sec -> 10.0 kA @ 1.4 sec
EF4: 3 kA during DNB flattop

H4:

MSE filters at minimum temperature

BT : 4.9 T @ 0.2 sec -> 6.2 T @ 1.4 sec
EF3: 6.86 kA @ 0.2 sec -> 10.0 kA @ 1.4 sec
EF4: 3 kA during DNB flattop

H5:

MSE filter temperature set to maximum

BT : 2.8 T @ 0.2 sec -> 4.2 T @ 1.4 sec
EF3: 1.81 kA @ 0.2 sec -> 5.18 kA @ 1.4 sec
EF4: 3 kA during DNB flattop

Physics Operators Plans
Entered: Jun 14 2007 05:06:33:207PM
Author: Ron Parker
Engineering setup for Friday 15 June 2007

MP491 MSE Calibrations

Session leader: Steve Scott
Physics operator: Ron Parker

ECDC overnight in D2, pressure=2e-4 Torr. Rmin/Rdwell/Rmax = 44/45/103 cm.
Bake at 60 C.

Power systems as on 1070606003.

A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
pumpout NINJA and leave DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, Z-bolo shutters. Enable DNB gate valve when requested by
DNB operator.

Torvac setup: Gate valves open

Specific diagnostics: DNB and MSE
-------------------------------------------------------------------------------
Cryopump: No cryopump for this run.

ICRF Setup: No ICRF for this run.

LH Setup: No LH for this run.
-------------------------------------------------------------------------------
Run plan: see session leader plan


Session Leader Summaries
Entered: Jun 15 2007 07:34:23:420PM
Author: Jin-Seok Ko
1070615 SL_SUMMARY. MP491 MSE Calibrations

SL : Steve Scott, Jinseok Ko
PO : Ron Parker, Joe Snipes

Executive summary

Beam-into-gas calibrations:

Still confused with gas pressure dependence.
Reproducibility is not good in general.

Beam-into-plasma calibrations:

Good Ip ramp calibration
Reproducibility is not that bad.



A. Optimization of torus gas pressure for beam-into-gas calibration

- planned 2 shots
- took 5 shots (including 2 OH test shots and 1 no-beam shot)
- so actually 2 shots : 1070615003, 1076015005

- hard to find a consistent trend between the measured pitch angle
and the torus pressure. We temporarily chose 0.15 mTorr as 'p_opt'.



B. Standard beam-into-gas calibration

- planned 4 shots
- took 5 shots (first B1 had too high pressure and also EF3 didn't reach 10kA)
: 1070615006 ~ 1070615010

- got good beam-into-gas calibration data.
- still, significant shot-to-shot variations



C. Investigation on time variation in pitch angle :

- planned 1 shot
- took 1 shot: 1070615011

- the within-shot variation in pitch angle is very weired.



D. Beam-into-plasma calibration with Ip ramp

- planned 4 or 6 shots
- took 12 shots

5 disruptions : 1070615012, 014, 017, 018, 021
4 fizzles : 1070615013, 015, 018, 022

1 shot for D1 : Ip 1 MA @ 1 sec -> 0.4 MA @ 2.3 sec (1076015022)
2 shots for D2b : Ip 0.8 MA @ 1 sec -> 0.1 MA @ 1.9 sec (1070615019, 020)

- really good beam-into-plasma calibration data
- in shot 22, we had 'ohmic-driven' H-mode. Priceless shot
- the main cause of the disruption turns to be a low density (lock mode)



E. Beam-into-plasma calibration with plasma sweeping

- planned 7 shots
- not done this time



F. Beam-into-plasma reproducibility test

- planned 1 or 2 shots
- took 1 shot : 1070615024

- shot 20 was reloaded.
- measured pitch angle reproducibility is good.



G. Beam-into-gas reproducibility test

- planned 1 shot
- took 1 shot : 1070615025



H. MSE spectrum (filter) scan

- planned 5 shots
- took 2 shots : 1076015026, 027

- but we forgot to ask Physop to increase the torus pressure from 0.15 mTorr to 0.75 mTorr
- also forgot to increase APD high voltage. Effectively no signal for MSE.
- therefore, we didn't get any from the last three shots

Physics Operator Summaries
Entered: Jun 15 2007 09:50:18:720AM
Author: Ron Parker
Note that the starting shot is modeled after 1070529015, contrary to PO Plan (SL Plan came near midnight last night!).

First 2 shots will be to explore OH2 problem that developed last night.
Entered: Jun 15 2007 09:51:14:517AM
Author: Ron Parker
Shots 1 and 2 were OH2 tests. The results looked normal, however no problem was found.
Entered: Jun 15 2007 09:52:39:940AM
Author: Ron Parker
Shot 3 was good for beam into gas. (Not exactly desired pressure pulse, but apparently close enough.)
Entered: Jun 15 2007 10:00:08:490AM
Author: Ron Parker
On "shot" 4, the beam did not fire (not clear why). But this was useful in showing the effect of the beam pulse on the gas pressure in the machine.
Entered: Jun 15 2007 10:26:28:963AM
Author: Ron Parker
Shot 5 was good, beam fired. Reproduced shot 3.
Entered: Jun 15 2007 05:19:05:590PM
Author: Joseph Snipes
I was not Physop for the first half of the run, but here is the summary for shots 19
through 27. There were 5 plasma shots and one fizzle following a disruption. Then,
the last three shots were without plasma for beam into gas. Shot 23 was a special
long pulse discharge ramping down from 1.1 MA, intending to go to zero at 3 s, but it
disrupted at 2.3 s. Still, it was a sufficiently long ramp to get reasonably good
MSE data. The A-coils has been left disabled throughout the day until shot 22 even
though they were requested to be enabled. Shot 21 had a 1.1 MA disruption due to a
locked mode at low density with no A-coil current. Otherwise, the machine ran pretty
well for the requested conditions.


Shot,Duration(s),Ipmax(MA),Result Shot,Duration(s),Ipmax,Result
| 01 0.000 0.013 Dud | 02 0.000 0.016 Dud |
| 03 0.000 0.012 Dud | 04 0.000 0.012 Dud |
| 05 0.000 0.012 Dud | 06 0.000 0.037 Dud |
| 07 0.000 0.039 Dud | 08 0.000 0.054 Dud |
| 09 0.000 0.056 Dud | 10 0.000 0.020 Dud |
| 11 0.000 0.031 Dud | 12 0.794 1.151 Plasma |
| 13 0.000 0.041 Fizzle | 14 0.801 1.037 Plasma |
| 15 0.000 0.042 Fizzle | 16 1.949 0.842 Plasma |
| 17 0.419 0.783 Plasma | 18 0.000 0.039 Fizzle |
| 19 1.920 0.843 Plasma | 20 1.921 0.838 Plasma |
| 21 0.970 1.177 Plasma | 22 0.000 0.038 Fizzle |
| 23 2.350 1.109 Plasma | 24 1.927 0.842 Plasma |
| 25 0.000 0.039 Dud | 26 0.000 0.033 Dud |
| 27 0.000 0.053 Dud
Date 1070615: 27 shots. 9 plasmas. 4 fizzles. 14 duds. 0 System Error.
(Plasma = Ip gt 60.0 kA Dud = H_alpha lt 0.40 V)
Total plasma duration: 13.05 s (exceeding -100 kA)

Session Leader Comments
Jun 15 2007 07:35:51:017PMJin-Seok Ko1070615 Run. MP491 MSE Calibrations

Configurations:

Shutter OPEN -> OFF
Linear polarizer IN
PEM ON -> OFF
Chiller ON -> OFF
Oven ON -> OFF
Bertan ON -> OFF

Bad Ch1 APD was replaced by good Ch8 APD.
(Only APD changed, nothing else)

Now Ch8 is dead and Ch1 revives.

test shot for this change: 107615999 (yes. not 1070615999!)


PEM position laser ON -> OFF
Bkgd detector ON -> OFF

Initial settings:

Retardance: 0638/0638
Filter: 5.4T/50keV
HV: 1890/1890/1890/1890


1070615
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
shot plan comments
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
001 N/A OH test shot
002 N/A OH test shot

003 A
004 no beam
005 A

p_opt is determined to be '0.15 mTorr'

006 B1 pressure too high, EF3 not reach 10kA
007 B1
008 B2
009 B3
010 B4

011 C

012 D1 disruption at 0.8sec, also beam starts at -0.3 sec, also forgot to lower Bertan HV
013 D1 fizzle

HV 1750/1750/1750/1750
We changed by mistake 'beam_delay', not 'beam_length'. Corrected now.

014 D1 disruption at 0.8sec
015 N/A 800kA benign shot tried but fizzle
016 N/A good 800kA benign shot
017 D1 with less severe condition tried but early disruption (before Ip ramp starts)
018 D1 fizzle
019 ~D2b good Ip ramp. 0.8MA@1sec -> 0.1MA@1.9sec during Bt flattop
020 ~D2b good Ip ramp. 0.8MA@1sec -> 0.1MA@1.9sec during Bt flattop

Plasma 0 - 3 sec
MSE daq timing from 2048 -> 3000 (0 to 3 sec)

998 N/A test shot - pulse went to ~ 3 sec.

DNB starts at 0.8 sec, on/off = 70/30 msec

021 ~D1 disrupted at 0.8sec, realized low density is a problem (lock mode - sawtooth diappeared)
022 ~D1 fizzle
023 ~D1 good long shot (d@2.3sec). 1MA@1sec -> 0.4MA@2.3sec

MSE daq timing from 3000 -> 2048 (0 to 2 sec, normal)
DNB starts at 0.4 sec, on/off = 70/30 msec (length : 1.5 sec)

024 F repeat of shot 20 (Plan D2b)

DNB starts at 0.1 sec, on/off = 70/30 msec (length : 1.5 sec)

025 G repeat of shot 07 (Plan B1) -> Analysis fail

026 H1 -> Analysis fail
027 H2 -> Analysis fail

Alas, we forgot to ask Physop to increase the torus pressure from 0.15mTorr to 0.75 mTorr.
Also, forgot to increase APD high voltage. Effectively no signal for MSE.

Done for the day.
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++



Analysis

+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
try dt min bin max bin analysis starts analysis ends file
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
b2g shots 1 -1000 0.06 0.10 0.02 1.99 1070615_big_1.*
b2p shots 1 -1000 0.02 0.00 0.02 1.99 1070615_1.*
shot 24 1 -1000 0.02 0.00 0.02 2.98 1070615_1.*
(shot 24 not analyzed yet.)
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

Jun 15 2007 10:08:26:500AM1070615003Jin-Seok KoShot 1 and 2 are OH test shots.

High D observed in shot 2 <- turns out it is from DNB

Shot 3 : Plan A. Good
Jun 15 2007 10:40:46:897AM1070615004Jin-Seok Kono beam

try again
Jun 15 2007 10:41:07:240AM1070615005Jin-Seok Koplan A repeat. good. done with plan A
Jun 15 2007 10:41:40:503AM1070615006Jin-Seok Koplan B1.
pressure too high
EF3 didn't reach 10kA (went to 9kA)

try again
Jun 15 2007 10:51:14:723AM1070615007Jin-Seok Kogood. B1 is done. Next shot will be for B2.
Jun 15 2007 11:11:34:470AM1070615008Jin-Seok Kogood. B2 is done. Next shot will be for B3.
Jun 15 2007 11:21:41:573AM1070615009Jin-Seok Kogood. B3 is done. Next shot will be for B4.
Jun 15 2007 11:27:47:467AM1070615010Jin-Seok Kogood. B4 is done. C for the next shot
Jun 15 2007 12:37:57:407PM1070615011Jin-Seok Kogood. C done. End of Beam-into-gas.

D for the next shot
Jun 15 2007 12:45:47:440PM1070615012Jin-Seok KoBeam-into-plasma starts here. Plan D1 tried.

Disruption at 0.8 sec

Beam started at -0.3 sec.

Also forgot to lower the APD HV, resulting in some saturations.

HV -> 1750/1750/1750/1750
Jun 15 2007 12:50:58:493PM1070615013Jin-Seok KoD1 tried again but no beam.

Result: Fizzle.

It turns out we changed by mistake 'beam_delay', not 'beam_length'. Corrected now.

Try D1 again.
Jun 15 2007 12:53:47:700PM1070615014Jin-Seok KoD1 tried again

Disruption at 0.8 sec

Next shot will be 800kA flat, normal shot.
Jun 15 2007 01:14:59:230PM1070615015Jin-Seok Ko800kA flat, normal shot tired, but fizzle.

Will be tried again in the next shot.
Jun 15 2007 01:43:29:233PM1070615016Jin-Seok KoNice 800kA flat, normal shot

Power room access to check the power supplies for EFCU and EFCL.

D1 with less severe condition will be tried in the next shot.
Jun 15 2007 01:44:02:140PM1070615017Jin-Seok KoD1 with less severe condition tried but early disruption (0.4 sec)
Jun 15 2007 01:46:02:267PM1070615017Jin-Seok KoD1 with less severe condition (slow Ip ramp) tried but early disruption (0.4 sec)
even befor the Ip ramp starts.

The cause is not clear. Will be tried again.
Jun 15 2007 02:12:35:913PM1070615018Jin-Seok KoFizzle
Jun 15 2007 02:12:47:833PM1070615019Jin-Seok KoNice Ip ramp shot!
Jun 15 2007 02:34:00:073PM1070615020Jin-Seok KoAnohter Nice Ip ramp shot! (repeat of shot 19)

Next shot will be 0 - 3 sec long pulse plasma to have a higher
ramp-starting Ip (~1.1 MA).

Beam timing is adjusted accordingly.
MSE daq time is ajusted accordingly.

Jun 15 2007 03:38:38:827PM1070615021Jin-Seok KoPlasma : 0 - 3 sec, Ip ramp starts from 1 MA at 1 sec.
Beam : starts at 0.8 sec, ON/OFF = 70/30 msec
MSE : daq for 0 - 3 sec

disruption at 0.8 sec

try again
Jun 15 2007 03:59:37:200PM1070615022Jin-Seok Kofizzle.

We realized that the low density was a problem. Mis-communication on NeL and NeBar

Will try again with a raised Nel (0.4 -> 0.6)
Jun 15 2007 04:14:45:197PM1070615023Jin-Seok Kogood long pulse shot (disrupted @ 2.3 sec)

Ip ramp from 1MA @ 1sec to 0.4MA @ 2.3sec

Next shot will be Plan F : repeat of shot 20 (Plan D2b)
Jun 15 2007 04:15:41:963PM1070615024Jin-Seok Kogood shot. done for Plan F.

Last beam-into-plasma shot

Next shot will be Plan G : repeat of shot 07 (Plan B1)

Physics Operator Comments
Jun 15 2007 10:41:56:113AM1070615006Ron ParkerTwo problems: Gas 2X too high (difference between Ratiomatic and MKS gauges) and
IC_EF3 didn't make it to 10 kA. Repeat, trying to fix pressure and IC_EF3
Jun 15 2007 11:06:09:077AM1070615007Ron ParkerShot 7 was good.
Jun 15 2007 11:06:27:733AM1070615008Ron ParkerShot 8 was good. Keep moving on SL plan.
Jun 15 2007 11:18:56:883AM1070615009Ron ParkerShot 9 was OK. Move on to shot B4.
Jun 15 2007 11:52:13:497AM1070615010Ron ParkerShot 10 was good for beam into gas.
Jun 15 2007 11:53:04:007AM1070615011Ron ParkerShot 11 completes beam into gas (for now).
Jun 15 2007 12:16:50:687PM1070615011Ron ParkerNext shot will be plasma attempt.
Jun 15 2007 12:36:26:060PM1070615012Ron ParkerShot 12 disrupted.
Jun 15 2007 12:50:03:320PM1070615013Ron ParkerShot 13 fizzled.
Jun 15 2007 12:56:38:687PM1070615014Ron ParkerShot disrupted. Next will likely fizzle.

We'll set up for a "normal" 800 kA shot.
Jun 15 2007 01:33:47:337PM1070615015Ron ParkerShot 15 fizzled.
Jun 15 2007 01:33:10:320PM1070615016Ron ParkerShot 16 was a normal 800 kA low n shot. Now we'll try to ramp the current down.
Jun 15 2007 01:34:15:477PM1070615016Ron ParkerDelay while power supply problem is investigated.
Jun 15 2007 01:47:56:020PM1070615017Ron ParkerShot 17 disrupted at 0.4 s

Next: fizzle?
Jun 15 2007 01:57:30:103PM1070615018Ron ParkerFizzle, as usual after disruption.
Jun 15 2007 02:20:27:270PM1070615020Joseph SnipesShot 20: Joe Snipes taking over for Ron Parker as physop for the remainder of the run. Repeat. Good shot.
Jun 15 2007 03:29:36:070PM1070615021Joseph SnipesShot 21: Extended TF flattop out to 3.0 s and extended all waveforms and wires out
to 3 s as well. TF invert time set to 3.0 s. Raised Ip to 1.1 MA arriving at 0.7 s
and remaining there until 1.0 s to begin the rampdown. Disrupted at 1.0 s apparently
due to a locked mode that started at 0.8 s.
Jun 15 2007 03:33:16:823PM1070615022Joseph SnipesShot 22: It turns out the A-coils have not been enabled all day. They should now
be enabled for this shot. Also raised nl04 to 7 x 10^19 m-2. Fizzle!
Jun 15 2007 03:53:42:870PM1070615023Joseph SnipesShot 23: Another attempt to get the long pulse ramp down with a 3 s TF flattop. Got
most of the long pulse. Disrupted at 2.3 s. Curious Ohmic H-mode from 1.71 s to
1.86 s with only 0.75 MA.
Jun 15 2007 04:07:36:723PM1070615024Joseph SnipesShot 24: Reloaded shot 1070615020 and increased nl04 to 6 x 10^19 m^-2. Good shot.
Jun 15 2007 04:39:11:357PM1070615025Joseph SnipesShot 25: Going back to beam into gas shots. Copied shot 1070615007 with EF3 but no
EF4. Opened breaker to EF4 to ensure no induced current. TF also on at 150 kA.
Jun 15 2007 04:55:21:963PM1070615026Joseph SnipesShot 26: Now running EF3, EF4, and TF. TF should ramp from 2.8 T at 0.2 s to 4.2 T
at 1.4 s. EF3 current should ramp from 1.81 kA at 0.2 s to 5.18 kA at 1.4 s. EF4
should be constant at 3 kA from 0.1 s to 1.5 s during the DNB pulse.
Jun 15 2007 04:59:43:797PM1070615027Joseph SnipesShot 27: Now running EF3, EF4, and TF. TF should ramp from 4.9 T at 0.2 s to 6.2 T
at 1.4 s. EF3 current should ramp from 6.86 kA at 0.2 s to 10 kA at 1.4 s. EF4
should be constant at 3 kA from 0.1 s to 1.5 s during the DNB pulse.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:09:26:950AMTestOk
209:20:56:960AMTestOk
309:38:41:713AMTestOk
409:51:16:080AMTestOk
510:04:03:590AMTestOk
610:24:18:103AMTestOk
710:40:01:990AMTestOk
810:54:01:273AMTestOk
911:09:36:220AMTestOk
1011:23:22:463AMTestOkTF, EF4
1111:38:10:820AMTestOkTF, EF3
1212:22:57:923PMPlasmaOk
1312:35:46:653PMPlasmaOk
1412:48:50:523PMPlasmaOk
1501:02:07:917PMPlasmaOk
1601:14:49:260PMPlasmaOk
1701:39:53:730PMPlasmaOk
1801:52:50:583PMPlasmaOk
1902:05:08:920PMPlasmaOk
2002:17:46:800PMPlasmaOk
2103:16:17:310PMPlasmaOk
2203:31:22:243PMPlasmaOk
2303:43:39:190PMPlasmaOk
2403:58:15:903PMPlasmaOk
2504:22:33:360PMPlasmaOk
2604:39:23:467PMPlasmaOk
2704:55:45:573PMPlasmaOk

System Availability
Jun 15 2007 09:09:04:387AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data.May 29 2007 11:22AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged.May 29 2007 11:23AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is running DC voltages from 5V-7V, also in the testing stage.Jun 01 2007 09:11AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -124.5mm (standard). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Jun 14 2007 06:21PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


Jun 15 2007 03:15:55:403PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data.May 29 2007 11:22AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoLooks like low freq. LO has gone out. Only high frequency channel now working.Jun 15 2007 02:31PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged.May 29 2007 11:23AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is running DC voltages from 5V-7V, also in the testing stage.Jun 01 2007 09:11AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -124.5mm (standard). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Jun 14 2007 06:21PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf