Alcator C-Mod Run 1070622 Information

Back to runs

Miniproposals
Miniproposal:490
Date Filed: 5/24/2007
Title:Assessing LHCD in ICRF -Heated L and H-modes
First Author:Amanda Hubbard
Session Leader:Amanda Hubbard (shots 1-21)

Operators
Session leader(s):Amanda Hubbard
Physics operator(s):Earl Marmar
Engineering operator(s):Ed Fitzgerald,Bill Parkin

Engineering Operator Run Comment
MP 490 LHCD in ICRF Heated L & H modes, EO Pierson, PO Marmar, S/l Hubba

Session Leader Plans
Entered: Jun 21 2007 04:19:05:107PM
Author: Amanda Hubbard
Session leader plan for 1070622
Session leaders: Amanda Hubbard, Greg Wallace
Physics operator: Earl Marmar


MP 490: Assessing LHCD in ICRF-Heated L and H-modes :DAY 2


This run follows up on Day 1, 1070607, which consisted of low power coupling studies. Note that following that run, some errors in phase settings were discovered.


The main goal of today is to combine LHCD with ~ 2 MW of ICRF, for a few different physics conditions, and document both coupling and current drive. In contrast to Tuesday's run, we will stick with a moderate LH power level, around 500 kW, putting a priority on clear LH traces rather than higher power.


ICRF: Will primarily use J-port and E-port, around 1 MW each. For some shots later in the day, will replace E with D-port to document differences. For first shots, ICRF timing 0.7-1.4 s.

LHCD: Set up for 90 degree ideal phasing, using latest tables. Suggest setting klystron powers as on 1070619024, which ran clean at 480 kW net coupled. Turn on at 0.8 s-1.3 s (after H-mode formed, in priniciple).


CRYOPUMP will be used for some of the run, should be ready for operation by 10 am.


OVERNIGHT BORONIZATION is requested. Use settings as on overnight 1070620.
Run plan: For each condition, plan to spend a few shots as needed to bring up LHCD power.

DNB and MSE are requested, from at least 0.65 s.
NINJA disabled to start run, may be used with D2 later.

1) LSN H-mode. Load from 1070607022 -800 kA, 5.5 T, small outer gap, target nel 7e19 m-2.
May tweak target ne depending on H-mode density and character, and/or try cryopump.


2) LSN H-mode, 600 kA. Target 6e19 m-2. Should give lower pedestal density. CRYOPUMP on to help J-port.


3) Switch to USN L-mode. 800 kA. Load 1070607012. target 6e19 m-3.
ICRF on at 0.9 s. LHCD on at 0.7 s, to give ohmic comparison.
May turn Cryopump on if ne rise an issue.


For 1-2 shots, try replacing E-port with D-port to document differences in coupling (expect worse R with D)

4) Swept Ssep H-modes. Start with either 600 or 800 kA, depending on LSN results. Load waveforms from eg shot 1070614012. Likely to take some shape development to make gaps suitable for LHCD, which is why this is at the end of the day. But, we expect lower ne H-mode pedestals which could be very good for advanced scnearios. Time permitting, repeat with and without cryopump.

Physics Operators Plans
Entered: Jun 21 2007 09:56:52:900PM
Author: Earl Marmar
MP 490: Assessing LHCD in ICRF-Heated L and H-modes :DAY 2

SL: Hubbard/Wallace
PO: Marmar

Engineering setup:
-----------------
Power systems as on 1070607022

A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.
NOTE: This is different from the setup on Thursday, 1070621.

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
pumpout NINJA and leave DISABLED

DNB and MSE are requested, from at least 0.65 s.
NINJA disabled to start run, may be used with D2 later.

CRYOPUMP will be used for some of the run, should be ready for operation by 10 am.

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, DNB, Z-bolo shutters.

Torvac setup: Gate valves open

ICRF: Transmitters #1,2 and 4 in RUN ON by 08:30. Will primarily use J-port and E-port, around 1 MW each. For some shots later in the day, will replace E with D-port to document differences. For first shots, ICRF timing 0.7-1.4 s.

LHCD: Set up for 90 degree ideal phasing, using latest tables. Suggest setting klystron powers as on 1070619024, which ran clean at 480 kW net coupled. Turn on at 0.8 s-1.3 s (after H-mode formed, in priniciple).

OVERNIGHT BORONIZATION using settings as on overnight 1070620. Follow with 2 hours ECDC in He-4 prior to the start of the run.


This run follows up on Day 1, 1070607, which consisted of low power coupling studies. Note that following that run, some errors in phase settings were discovered.


The main goal of today is to combine LHCD with ~ 2 MW of ICRF, for a few different physics conditions, and document both coupling and current drive. In contrast to Tuesday's run, we will stick with a moderate LH power level, around 500 kW, putting a priority on clear LH traces rather than higher power.

Session Leader Summaries
Entered: Jun 22 2007 05:40:03:703PM
Author: Amanda Hubbard
Run summary for 1070622
Session leaders: Amanda Hubbard, Greg Wallace
Physics operator: Earl Marmar

MP 490: Assessing LHCD in ICRF-Heated L and H-modes :DAY 2

This run was only marginally successful, due to engineering difficulties in simulateously running LHCD with ICRF. On many shots, this combination led to failures of the chopper, and thus to disruptions. The problem is not currently understood, and was not seen in a similar run on Tuesday.

We did get some discharges with 400 kW LHCD and either J or E-port (ie, 1 MW).
At this power level, and 90 degree phasing, LH ran very cleanly and reliably all day. Because of the other issues, we did not spend time pushing up the power so it may have been possible to increase.

As planned, the first half of the run (shots 1-13) was LSN, planned to give H-modes although with only 1 MW it was L-mode. For these shots, ICRF was turned on before LHCD. Reflection coefficients were reasonable, in both L and H-modes. But, due to disruption issue, we only got brief H-mode periods (eg shots 5,7,9). Shots 11, 13 had E only plus LHCD,(L-mode) and also disrupted promptly. Shot 5 was LH only.

None of these shots had much signature of non-thermals or current drive at this nel and power level.

From shot 14 we switched to USN. Disruption issues continues, when LH and E-port were combined. The cryopump was used from shot 18 and helped keep nel constant at nel 6e19 m-2. Shots 17 and 20 had LHCD only, and quite strong non-thermals (~ 2 keV on ECE).

Perhaps the most interesting shot of the day was shot 21, which succeeded in combining LHCD and J-port ICRF. Interestingly, the non-thermals DROPPED sharply during the (100 ms) ICRF pulse. This might be related to the D-alpha rise. Shot 14 showed evidence of a similar effect.

In summary, we got some useful discharges but by no means completed the run plan . Will need to revisit once machine problems are resolved. There is likely room to raise LH power.

Physics Operator Summaries
Entered: Jun 22 2007 06:13:17:170PM
Author: Earl Marmar
This was a tough day.

On many shots with combined ICRF and LH, the EFC power supply shut off in the middle of the shot (with an IOC indication, according to the engineers), leading to a prompt disruption.

Various combinations of ICRF antennas, with and without LH were tried. All cases when EFC tripped off had at least LH plus E-port. The one shot (21) with LH plus only J (no D or E) did not have the EFC problem, but J tripped off after only 130 msec.

Shot 15 had ICRF into plasma plus LH into dummy load and suffered the same EFC problem.


Before shot 18 we started having data system problems, with Pat announcing that the next shot would be "shot 1". After a no-power cycle, we eventually had a second go at shot 18, which worked. Shot 19 hung in init. Before shot 22, Pat announced that the next shot would be "shot 21". The shot went through, and the data were stored in shot number 21 (not 1070622021, but 21). Josh moved the data to 1070622022.

Early hards appeared on quite a few shots. Fiddling with prefill had little or no obvious effect. There were no fizzles today, despite having 10 full-current (800 kA) disruptions. This probably says something about boronization, which was done overnight before the run.

We ran both SNL and SNU shots today, with cryopump at liquid helium temperature for shots 18, 20 and 21, all upper single-null.

Scorecard:

plasmas 19
power supply duds 2
no power cycle 1

Total cycles 22 (plus a second, stealth shot 18)

Session Leader Comments
Jun 22 2007 09:11:29:387AMAmanda Hubbard'Good boronization' last night. Added to the remaining boron before 1070621, this should give good wall conditions.
Jun 22 2007 09:34:47:280AM1070622001Amanda HubbardDisrupts 0.83 s. Cooling event 0.813x ms.

Got 1.7 MW ICRF (J+E) at 0.7 s as requested. Also 300 kW of LHCD at 0.8.
Decent H-mode, nel 0.74-1.4 e20 m-2. ne0 2.4 e20 m-3. Te0 ~ 3 keV.
Jun 22 2007 09:48:38:683AM1070622002Amanda HubbardDisrupts 0.825 s - veru similar event to shot 1. Chopper problem suspected.

Note that ne rise in (short) H-mode is lower this shot; good news.
Jun 22 2007 10:15:57:797AM1070622003Amanda HubbardOhmic discharge -ran through. Note it is dithering ~ 0.6 secs.
Jun 22 2007 10:57:07:687AM1070622005Amanda HubbardLH only for this shot. 420 kW, at 0.8 s. Ran well with slightly increased gaps (Rout 90.1-90.3 cm); plasma looks 'normal'
Jun 22 2007 01:31:33:307PM1070622007Amanda HubbardICRH and LH - another chopper disruption at 0.775.
Jun 22 2007 01:37:40:013PM1070622009Amanda Hubbard
ICRF and LH - chopper disruption again, soon after LH on.

Jun 22 2007 01:40:31:330PM1070622010Amanda HubbardICRF, plus LH into dummy load. Runs through. J has HV trip, very late H-mode with E only. More ELM-free.

Jun 22 2007 02:00:08:360PM1070622011Amanda HubbardE-only, plus LHCD at 0.8 s.

Disrupted at ~ 1 sec, another EFC problem.
L-mode. LH 400 kW clean, Refl ~ 25%, which is decent, but very little effect on the plasma (no ECE response, little Vloop).
Jun 22 2007 02:45:01:380PM1070622013Amanda HubbardRepeat, following changes in power room.
Very similar disruption at 1 sec.

Unuaual plasma transtion ~0.95 s - radiation increases, edge ECE goes up, core ECE drops. Hards go up. Maybe a non-thermal dump?

Next shot: switch to upper null L-mode (step 3 of plan). LH on at 0.7 s, ICRF (E+J) on at 0.9.
Jun 22 2007 03:02:24:453PM1070622014Amanda Hubbard switch to upper null L-mode (step 3 of plan). LH on at 0.7 s, ICRF (E+J) on at 0.9.

Plasma disrupts at 1 sec again!
Got some non-thermals during LH-only phase. They drop when ICRF comes on, though reflections are OK and LH does not trip. May be due to ne puff- start cooling down cryopump in case it is needed.

Next shot: LH into dummy load.
Jun 22 2007 03:02:46:797PM1070622015Amanda Hubbard

LH into dummy load. Disrupts anyway.
Jun 22 2007 03:45:55:723PM1070622015Amanda HubbardLH into dummy load. ICRF into plasma. EFC disruption at 0.95 s anyway.
Jun 22 2007 03:46:37:283PM1070622016Amanda HubbardNo LH, ICRF or DNB. Runs through, not v interesting.
Jun 22 2007 03:44:21:547PM1070622017Amanda HubbardLHCD only into USN target - runs through fine. Got some non-thermals, GPC2 ~ 1 keV.
Nel 6e19 m-2, ne0 ~1.4e20 m-3. Some Vloop drop.

Next: Add E-port ICRF only, and use cryopump.
Jun 22 2007 04:16:03:827PM1070622018Amanda HubbardJ-port only. Cryopump was COLD. Kept nel fairly constant at 6e19 m-3.

Still USN, L-mode. Next, add LHCD (which we intended this shot, was confusion because of the no power shot).
Jun 22 2007 04:36:57:267PM1070622019Amanda Hubbardno power - data problems.
Jun 22 2007 05:02:15:457PM1070622020Amanda HubbardFull length plasma with LHCD. But, J-port did not run (computer issues related to server hang, we think).

Steady nel 6e19 with Cryopump ON. ~ 2 keV non-thermal ECE.
Jun 22 2007 05:15:24:717PM1070622021Amanda HubbardFinally got LHCD with J-port ICRF.
Interesting discharge - non thermsls (ECE, neuts/hards), clearly DROP back to near-ohmic levels when ICRF comes on (0.9-1.026 s) and recover, even increase, after it trips out.

May be due to a gas puff, though cryopump, which is still cold, keeps nel quite constant.

Full length shot, Li pellet at 1.4 s.

Physics Operator Comments
Jun 22 2007 09:47:35:273AM1070622001Earl Marmarload from 1070607022
import segment 1 from 1070621002

plasma
early disruption (.82 seconds) in H-mode

looks like the chopper is turning off at ~0.8 seconds
Jun 22 2007 09:48:14:323AM1070622002Earl Marmarno pcs changes

plasma
early disruption (.82 seconds)

looks like the same chopper problem as on shot 1
Jun 22 2007 10:17:06:983AM1070622003Earl Marmarturn off ICRF and LH for this shot
no pcs changes

plasma, ramps all the way down
no problem with the chopper

some early hards


Jun 22 2007 10:54:43:450AM1070622004Earl Marmaradd 2 msec to prefill puff (now 18 msec)

plasma

ICRF was staggered (first J, then E)
things look fine during J pulse
ugly, with lots of radiated power during E
very small outer gap, as programmed, through most of the flattop

disrupt at 1.13 seconds
no obvious problems with the chopper
Jun 22 2007 10:55:17:327AM1070622005Earl Marmardecrease RCUR 1.5 mm (to increase outer gap 3 mm)

plasma

LH only on this one, ~400 kW, clean

ramps all the way down
Jun 22 2007 11:11:46:213AM1070622006Earl Marmarno pcs changes

programmed for ICRF + LH

plasma
disrupt 0.808 seconds (preceded by big increase in radiated power during ICRF, prior to LH)
Jun 22 2007 12:12:04:743PM1070622007Earl Marmarno pcs changes

programmed for ICRF + LH

plasma

chopper turns off at .766
disrupt at .78 seconds

Jun 22 2007 12:44:22:567PM1070622008Earl Marmarload 1070621010
import segment 1 from 1070622007

programmed for ICRF (D, E and J)

plasma


Jun 22 2007 01:25:35:380PM1070622009Earl Marmarload 1070622007

programmed for ICRF plus LH

plasma
EFC trips, followed by disruption
Jun 22 2007 01:42:50:610PM1070622010Earl Marmarno pcs changes

programmed for ICRF into plasma, LH into dummy load

plasma
ramped all the way down
J tripped early in the ICRF pulse
LH fired into dummy load

some early hards
Jun 22 2007 02:08:30:977PM1070622011Earl Marmarno pcs changes

programmed for ICRF (E only) and LH into plasma

plasma
EFC off and then disrupt at 1.02 seconds
Jun 22 2007 02:19:40:763PM1070622012Earl MarmarEngineers have done something to the EFC power supply doors to make sure the door-open interlock is not having a problem during the shots

no pcs changes
programmed for ICRF (E only) and LH into plasma

power supply dud
missing many power supplies - alternator excitation problem
Jun 22 2007 02:39:32:000PM1070622013Earl MarmarEngineers have done something to the EFC power supply doors to make sure the door-open interlock is not having a problem during the shots

no pcs changes
programmed for ICRF (E only) and LH into plasma

plasma

EFC off and then disrupt at 1 second
Jun 22 2007 02:58:21:747PM1070622014Earl Marmargo to SNU plasma
load from 1070607012 (segment 3 is active)
import segment 1 from 1070622013
increase prefill puff to 20 msec (from 18 msec)
Ip to 800 kA

plasma
EFC off then disrupt at 0.95 seconds
Jun 22 2007 03:10:28:740PM1070622015Earl Marmarno pcs changes
ICRF programmed to go into plasma, LH into dummy load

plasma
EFC off, then disrupt at 0.93
Jun 22 2007 03:28:17:160PM1070622016Earl Marmarno pcs changes
ICRF, LH and DNB off

plasma
ramps all the way down
Jun 22 2007 03:42:06:643PM1070622017Earl Marmarno pcs changes
LH and DNB on, ICRF still off

plasma
ramps all the way down
Jun 22 2007 04:07:31:103PM1070622018Earl Marmarcryopump at liquid helium temp
prefill puff to 32 msec

DNB and J-port ICRF on, LH, D and E off

plasma
ramps all the way down

Jun 22 2007 04:22:29:957PM1070622019Earl Marmarcryopump at liquid helium temp
prefill puff to 32 msec

LH and DNB and J-port ICRF on, D and E off

data system problem
no power
Jun 22 2007 05:01:02:020PM1070622020Earl Marmarcryopump at liquid helium temp
prefill puff to 32 msec

LH and DNB and J-port ICRF on, D and E off

plasma
got LH and DNB, no power from J

ramps all the way down

Jun 22 2007 05:30:49:557PM1070622021Earl Marmarcryopump at liquid helium temp

LH, DNB, D and J ICRF on, E off
LPI gate valve enabled

plasma
got LH, DNB and J-port
J tripped just after 1 second

got the pellet - beautiful toroidal ring on wide2 camera view

ramped all the way down


Jun 22 2007 05:33:20:090PM1070622022Earl Marmarcryopump at liquid helium temp
increase prefill puff to 37 msec

LH, DNB, D and J ICRF on, E off
LPI gate valve enabled

power supply dud
OH2U was off by almost a factor of 2 in current at t=0

There was also a strange data system problem for this shot. During init, Pat announced that this would be shot 21, and the data ended up stored in shot 21 (not 1070622021, but actually 21). Josh said he would move the data to 1070622022 after everything was stored.


Engineering Operator Comments
ShotTimeTypeStatusComment
109:21:55:100AMPlasmaOk
209:34:37:030AMPlasmaOk
310:07:19:570AMPlasmaOk
410:20:52:300AMPlasmaOk
510:42:10:910AMPlasmaOk
610:57:43:720AMPlasmaOk
711:43:16:850AMPlasmaOk
812:25:54:833PMPlasmaOk
912:44:47:003PMPlasmaOk
1001:29:42:053PMPlasmaOk
1101:42:17:813PMPlasmaOk
1202:14:56:527PMPlasmaBadAlt exitation timed out
1302:24:46:783PMPlasmaOk
1402:44:32:753PMPlasmaOkEFC IOC
1502:59:05:170PMPlasmaOkEFC IOC
1603:13:57:230PMPlasmaOk
1703:35:37:073PMPlasmaOk
1804:01:54:740PMPlasmaOk
1904:15:54:970PMPlasmaBadno power shot, comp probs
2004:44:22:210PMPlasmaOk
2105:00:29:660PMPlasmaOk

System Availability
Jun 22 2007 09:21:31:990AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data.May 29 2007 11:22AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoOnly high frequency channels now working (17 to 32). LO looks good. Most likely it is the 5V supply for mixer bais and amp that is the problem.Jun 20 2007 09:23AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. dipole configuration. Using #4 transmitter only. Max power about 1.5 MW instead of 3 MW.Jun 20 2007 09:22AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged.May 29 2007 11:23AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem temporarily unavailable since 1070616001Jun 19 2007 08:20AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -124.5mm (standard). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Jun 14 2007 06:21PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


Jun 22 2007 12:44:22:660PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data.May 29 2007 11:22AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoOnly high frequency channels now working (17 to 32). LO looks good. Most likely it is the 5V supply for mixer bais and amp that is the problem.Jun 20 2007 09:23AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. dipole configuration. Using #4 transmitter only. Max power about 1.5 MW instead of 3 MW.Jun 20 2007 09:22AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged.May 29 2007 11:23AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem temporarily unavailable since 1070616001Jun 19 2007 08:20AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -124.5mm (standard). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Jun 14 2007 06:21PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf