Alcator C-Mod Run 1070626 Information

Back to runs

Miniproposals
Miniproposal:489
Date Filed: 4/30/2007
Title:Damping Rate of Toroidal Alfvén Eigenmodes at the Threshold of Stability in the Presence of ICRF He
First Author:Jason Sears
Session Leader:Jason Sears (shots 1-23)

Operators
Session leader(s):Jason Sears
Physics operator(s):Bill Rowan
Engineering operator(s):Bill Cochran,Bill Parkin

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Jun 25 2007 03:06:20:230PM
Author: Jason Sears
Run Plan for 1070626, pm session

MP#489 "Damping rate of TAEs near stability threshold with ICRF fast ions"

Goal
****
Observe the stability of moderate n (~6-14) TAEs relative to the ICRF generated ion tail temperature as the ICRF power is successively increased. This experiment was preliminarily investigated on 1060526 under MP#404a, and was resumed recently on 1070605 with an improved set of magnetic field probes, but with ICRF unable to surpass 2.1MW. Today's run will attempt to extend the ICRF scan to higher power as well as to add statistics in conditions already achieved on 1070605.

Run Preparation
***************
* Prepare argon for HIREX
* Setup GPC2 gratings for 5.9 T
* Enable the dpcs_ftae2 procedure in DPCS (see Wolfe email of 1070601)
* Turn on Active MHD and set qAE to 1.5, AE_order to 2

Run Plan
********
Reload equilibrium from 1070605020.

Shot Plan
*********
Attempt highest possible RF power, hopefully up to 3.5MW, during 0.75-1.5s. Consider modifying nl04 down to 0.6e20 and Ip up to 0.7 MA on recommendation of RF operator for maximum heating efficiency. If J port is not able to operate for the full period, repeat attempt at highest power several times, at least until a good fTAE sweep is obtained during J operation. Then decrease RF power in 0.5 MW steps to 0. The most important shots for this run are those above 2.1MW, which will provide additional data points outside the range of 1070605.

Contingency
***********
If power supply problems prohibit ICRF operation above 2.1MW, repeat the scan from 1070605. Then if time remains, move to diverted and H mode configuration (as in 1051202011) and repeat the power scan from highest available power to 0.

Physics Operators Plans
Entered: Jun 25 2007 07:19:45:463PM
Author: Bill Rowan
Engineering Setup for Tuesday, 26 June 2007; Run 1070626

MP#: 489 "Damping of TAEs w/ICRF tails present"

SL: Jason Sears, Joe Snipes
PO: Bill Rowan

Engineering Setup
------------------
Overnight ECDC in helium at request of SL
Bake at 60 C.

Run begins at 09:00 and ends at 15:00
Run ends at 15:00 for the PSFC barbecue

Power systems as on 1070605020

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
---------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
pump out NINJA and then disable.

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, Z-bolo shutters
Enable DNB gatevalve if requested by DNB operator.


RF Systems:
----------
ICRF: FMIT#1,2,4 in RUN-ON by 08:30


Diagnostics
----------
DNB: 50 kV, 6A by 09:00


Torvac setup
----------
Gate valves open

Session Leader Summaries
Entered: Jun 26 2007 03:32:08:087PM
Author: Jason Sears
Today was a successful run with some great RF shots. We ended at 3pm for the PSFC barbeque, but still achieved 23 shots and 16 full length discharges. Great job Bill.

We nearly achieved the target RF power, getting up to 3.1MW. Thanks Yijun. More importantly, we observed UNSTABLE TAEs in shots 3 and 4, indicating that we achieved high enough tail energies to drive the total damping rate to zero. Other RF powers between 2 and 3MW were also filled in. The cryopump seemed to be a valuable tool to decrease the neutral pressure in the antenna box and assist in RF operation.

TAEs during RF were hard to observe despite good Active MHD amplifier performance and reasonable signal to noise of the magnetic probes. This could be possibly because they weren't being excited or because they had such low damping rates (and thus exist in very narrow frequency bands) that I missed them in preliminary analysis. With this second possibility in mind, I decreased the Active MHD frequency sweep rate for several shots near the end of the run to expand any low damping rate resonances in time. The system function was certainly not stationary throughout each shot, but did its evolution represent TAEs? More analysis will be necessary to distinguish system resonances (which should be compensated by the standard calibration) from TAEs.

During early shots I found that a very convincing TAE was observed around 0.291s in most shots (before RF started). I took advantage of this reliability by cutting out the Active MHD for a short time starting right at 0.291s. A true resonant mode with a low damping rate will continue to oscillate for several periods when the drive is removed. From time traces, it should be clear whether a resonant mode existed there. I will need to remove the direct coupling component before a conclusion can be made, however.

Finally, in the case that TAEs simply weren't excitable or observable during the RF phase, I increased the current in the last two shots to a more standard 0.8MA in an attempt to bring the q=1.5 surface closer to the Active MHD antennas and magnetic probes.

Shot summary:
*************
001: disruption at 0.7s
002: disruption at 0.7s
003: plasma 3MW unstable modes observed
004: plasma 3MW unstable modes observed
005: plasma 3MW density decreased to 0.65e20 to avoid DE beat
006: plasma 2MW density returned to 0.7e20 (beat wave still avoided)
007: plasma 2MW
008: plasma 2MW
009: plasma 2.7MW
010-014: field supply problems, no plasmas
015: plasma 2.3MW
016: plasma 2.3MW
017: plasma 2.7MW Jport starting at 0.7s
018: plasma 2.3MW Active MHD sweep reduced to 0.75e6 Hz/s
019: plasma 2.8MW
020: plasma 2.8MW Active MHD cutout at 4.5s
021: plasma 2.3MW Active MHD sweep increased back to 1.5e6 Hz/s, cutout at 0.291s
022: plasma 2.3MW increased Ip to 0.8MA
023: plasma 2.2MW, Ip=0.8MA, cutout 0.291-0.292s


Physics Operator Summaries
Entered: Jun 26 2007 03:36:20:137PM
Author: Bill Rowan

The plasmas configuration was limited on the high field side.

The cryopump was used after shot 001 to reduce the neutral gas pressure in the vicinity of J-port antenna. The conventional wisdom (I do not know how well this has been demonstrated) is that the pressure reduction leads to more reliable J-port performance. J-port was reliable today.

A glowing spot on the high field side between G and H ports was correlated with high RF power. This persisted throughout the day but disappeared for the shots with lower RF power.

Two shots disrupted (001 and 002) and several displayed locked modes. The disruptions stopped when the RF was started before time of disruption. Appearance of the locked mode was correlated with RF turn off. The locked mode was removed from the flat top by extending the RF to the end of the flattop.


plasmas
001(disruption),002(disruption),003,004,005,
006,007,008,009,015,016,017,018,019,020,021,
022,023

duds due to power supply failure
010,011,012.

power supply tests
013,014


Scorecard
18 Plasmas
00 Fizzles
00 Duds
03 Duds due to power supply failure
02 Power supply tests
---------------------
23 total








Session Leader Comments
Jun 26 2007 10:38:56:080AM1070626006Jason SearsPlasma

Increased density target back to 0.7e20 to try to get unstable mode back. Forgot to mention the change to RF, so only 2MW.

Also, all my previous shot summaries today were under MHD rather than session_leader.
Jun 26 2007 11:01:18:617AM1070626007Jason SearsPlasma

Cryopumping from shot 3 for RF performance, and it seems to be working.
RF was 3MW til about 0.7s, then down to 0.5s. Try again to find the unstable mode.
Jun 26 2007 11:16:44:313AM1070626008Jason SearsPlasma

ICRF 2MW. No unstable modes.
Jun 26 2007 11:25:27:570AM1070626009Jason SearsPlasma

2.7MW RF. No unstable mode
Jun 26 2007 12:10:25:557PM1070626010Jason SearsNo power shot due to OH2
Jun 26 2007 12:10:41:667PM1070626011Jason SearsDud due to EF3
Jun 26 2007 12:47:21:430PM1070626012Jason SearsDud
Jun 26 2007 12:47:32:960PM1070626013Jason SearsDud
Jun 26 2007 01:12:09:243PM1070626015Jason SearsPlasma

2.3MW
Jun 26 2007 01:28:19:553PM1070626016Jason SearsPlasma

2.3MW
Jun 26 2007 01:35:57:450PM1070626017Jason SearsPlasma

Jport RF starting at 0.7s. Achieved 2.7MW
Jun 26 2007 01:58:38:950PM1070626018Jason SearsPlasma

Changed Active MHD sweep rate from 1.5e6 to 750e3, in case resonances during RF are very low damping rate.

2.3MW Rf
Jun 26 2007 02:16:46:327PM1070626019Jason SearsPlasma

2.8MW
Jun 26 2007 02:31:49:760PM1070626020Jason SearsPlasma

Attempted Active MHD cutout during predicted resonance (ohmic period) at 0.45s. Successful cutout, but it's not clear in the time domain whether the mode continued to ring (or even if I caught the middle of the TAE).
Next shot move to 1.5e6 sweep rate and try the same thing.

2.85MW
Jun 26 2007 02:39:05:157PM1070626021Jason SearsPlasma

2.3MW (no Jport)

Achieve Active MHD coutout at 0.291s. Still not sure if Active MHD cutout in the middle of a resonance.
Jun 26 2007 02:46:45:380PM1070626021Jason SearsCorrection: no D port. Will finish the run with E and J only.

Also, back to 1.5e6 Active MHD sweep rate now.

Jun 26 2007 02:45:27:987PM1070626022Jason SearsPlasma

2.3 MW

Moved current to 0.8MA to see if resonances come out toward the Active MHD antenna a little.

Also no cutout, looking for a resonance during ohmic around 0.29s, to cutout in the next shot.
Jun 26 2007 02:57:29:357PM1070626023Jason SearsPlasma

cutout at 0.291-0.292

Ip=0.8MA
Picrf=2.2MW

Physics Operator Comments
Jun 26 2007 07:50:33:263AMBill RowanThe beam will not be available today. Bob reported that the breaker is out. The beam was not requested by the SL for today, but it will be needed later in the week. Will wait until Dexter has an opportunity to look at this.
Jun 26 2007 08:20:45:380AMBill RowanLoaded 1070605020.

The shot loaded was cryopumped.

SL has requested cryopumping if available. Jim is checking.

Import segment 1 from 1070622020. This is a cryo pumped shot. Will change the prefill if cryopumping is not available. Earlier in run 1070622, when cryopump was not on, the prefill was set to 18 ms. Will use that if there is no cryo on the first shot.



Jun 26 2007 08:24:24:870AMBill Rowan
The dpcs_ftae2 procedure is already turned on so I will do nothing.

Jun 26 2007 08:26:43:400AMBill RowanEnabled PG1, B-side lower for the first shot. SL request

Jun 26 2007 08:59:04:960AMBill RowanReduced the prefill to 18 ms since there will be no cryo on the first shot.

Jun 26 2007 09:57:59:987AM1070626001Bill Rowan001. Disruption at 0.7 s

Next shot.
Loaded B21_PROJ form wire 9 segment 2 of shot 1070622020
Try again.

Jun 26 2007 09:58:10:110AM1070626002Bill Rowan002. Disruption at 0.7 s

Next shot.
Move the RF earlier. To 0.5 s.
Cryopump on for the next shot.
Increase the prefill to 32 ms

Jun 26 2007 09:57:26:863AM1070626003Bill Rowan003. Plasma
locked mode at 1.3s
cryopump is on
something glowing on the inner wall between G and H

Next shot.
Moved integrator gate on segment 2 back to 0.2 s
Zeroed ACOIL_CUR

Jun 26 2007 10:07:59:543AM1070626004Bill Rowan004. Plasma
Locked mode turns on as RF is turned off.
Still see a glow between G and H

Next shot.
Try to increase the length of the RF. What happens to the locked mode.

Jun 26 2007 10:10:16:997AM1070626004Bill RowanDecrease nl_04 to 6.5 e+19

Jun 26 2007 10:18:32:207AM1070626005Bill Rowan005. Plasma
Locked mode followed RF

Jun 26 2007 10:26:51:587AM1070626005Bill RowanNext shot.
reloaded shot 004
Jun 26 2007 10:34:59:953AM1070626006Bill Rowan006. Plasma
RF drop out at 1.25 s

Next shot.
repeat for more power

Jun 26 2007 10:37:46:970AM1070626006Bill Rowanadd a second argon puff. 50 ms at 0.7 s

Jun 26 2007 10:53:40:150AM1070626007Bill Rowan007. Plasma

Next shot.
No PCS changes. Repeat for higher RF power

Jun 26 2007 11:22:55:740AM1070626008Bill Rowan008. Plasma

Next shot

Jun 26 2007 11:25:47:930AM1070626009Bill Rowan009. Plasma

Next shot.
No PCS changes

Jun 26 2007 11:52:55:340AM1070626010Bill Rowan010. No power shot. OH2 fault.
Interlock problem on OH2 power supply

Next shot.
No PCS changes

Jun 26 2007 12:04:45:320PM1070626011Bill Rowan011. Dud due to power supplies. No EF3
PLC failure

Next shot.
No PCS changes

Jun 26 2007 12:13:08:527PM1070626012Bill Rowan012. Dud due to power supply. No EF3

Jun 26 2007 12:39:02:127PM1070626013Bill Rowan013. EF3 test. No EF3.

Jun 26 2007 12:51:30:853PM1070626014Bill Rowan014. EF3 test. Successful

Next shot.
Try for plasma

Jun 26 2007 01:04:39:270PM1070626015Bill Rowan015. Plasma

Next shot.
Repeat for higher RF power

Jun 26 2007 01:26:37:927PM1070626016Bill Rowan016. Plasma

Next shot.
No dpcs changes

Jun 26 2007 01:36:18:840PM1070626017Bill Rowan017. Plasma

Next shot.
No DPCS changes

Jun 26 2007 01:49:40:507PM1070626018Bill Rowan018. Plasma


Jun 26 2007 01:52:09:353PM1070626018Bill Rowan
Next shot.
No DPCS changes.

Jun 26 2007 02:12:00:777PM1070626019Bill Rowan019. Plasma

Next shot.
No DPCS changes

Jun 26 2007 02:21:27:313PM1070626020Bill Rowan020. Plasma

Next shot.
No DPCS changes

Jun 26 2007 02:38:51:717PM1070626021Bill Rowan021. Plasma

Next shot.
IP=800 kA.

Jun 26 2007 02:56:33:323PM1070626022Bill Rowan022. Plasma

Next shot.
No DPCS changes

Jun 26 2007 02:56:19:183PM1070626023Bill Rowan023. Plasma

Last shot

Engineering Operator Comments
ShotTimeTypeStatusComment
109:05:28:447AMPlasmaOk
209:27:59:153AMPlasmaOk
309:43:16:320AMPlasmaOk
410:00:30:393AMPlasmaOk
510:13:54:373AMPlasmaOk
610:29:32:637AMPlasmaOk
710:47:31:773AMPlasmaOk
811:06:14:010AMPlasmaOk
911:20:19:610AMPlasmaOk
1011:34:22:530AMPlasmaBadNo Power shot, OH2U door fault
1111:56:19:593AMPlasmaBadEF3 did not fire, no PLC pulse
1212:09:41:697PMPlasmaBadNo Ef3
1312:36:50:640PMTestBadEF3, no plc pulse
1412:47:26:727PMTestOkEF3 test OK
1501:00:15:093PMPlasmaOk
1601:13:34:900PMPlasmaOk
1701:27:59:397PMPlasmaOk
1801:47:08:287PMPlasmaOk
1901:59:55:313PMPlasmaOk
2002:14:54:527PMPlasmaOk
2102:27:36:663PMPlasmaOk
2202:41:09:627PMPlasmaOk
2302:54:04:090PMPlasmaOk

System Availability
Jun 26 2007 09:05:03:900AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data.May 29 2007 11:22AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoOnly high frequency channels now working (17 to 32). LO looks good. Most likely it is the 5V supply for mixer bais and amp that is the problem.Jun 20 2007 09:23AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. dipole configuration. Using #4 transmitter only. Max power about 1.5 MW instead of 3 MW.Jun 20 2007 09:22AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged.May 29 2007 11:23AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAll low frequency channels (50, 60, 75, 88, 88u, 88l and 110) have been installed (for the first time!) on 1070626. Thery are being tested. The PPPL variable frequency channel is installed and being run (for now) at fixed frequency (Voltage set at 6V). 140GHz channel still down.Jun 26 2007 08:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -124.5mm (standard). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Jun 14 2007 06:21PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


Jun 26 2007 10:47:08:013AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data.May 29 2007 11:22AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoOnly high frequency channels now working (17 to 32). LO looks good. Most likely it is the 5V supply for mixer bais and amp that is the problem.Jun 20 2007 09:23AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. dipole configuration. Using #4 transmitter only. Max power about 1.5 MW instead of 3 MW.Jun 20 2007 09:22AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged.May 29 2007 11:23AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAll low frequency channels (50, 60, 75, 88, 88u, 88l and 110) have been installed (for the first time!) on 1070626. Thery are being tested. The PPPL variable frequency channel is installed and being run (for now) at fixed frequency (Voltage set at 6V). 140GHz channel still down. Throughout the day (1070626), the 50GHz channel hasn't worked properly.Jun 26 2007 10:44AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -124.5mm (standard). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Jun 14 2007 06:21PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf