Alcator C-Mod Run 1070717 Information

Back to runs

Miniproposals
Miniproposal:298a
Date Filed: 5/20/2002
Title:C-Mod Plasma Startup
First Author:Jim Irby
Session Leader:Steve Wolfe (shots 1-16)

Operators
Session leader(s):Steve Wolfe
Physics operator(s):
Engineering operator(s):Bill Cochran

Engineering Operator Run Comment
Reverse Field Power System Tests

Session Leader Plans
Entered: Jul 17 2007 08:28:43:950AM
Author: Steve Wolfe
Session Leader plan for plasma startup portion of Tuesday,
July 17, 2007 - Reverse field startup

MP#298a C-Mod startup
SL: wolfe
PO: Hutch

The main part of today's run will be power system checkout following
the reversal of the bus work. A 5-hour boronization is scheduled for the
afternoon. In between, we will try to get reverse field startup and
control ready for tomorrow's run. 

Power tests are scheduled to begin at 09:00 and estimated to take 4 hours. 
Nominal end time for plasma tests is 15:00, with possibility of extending
to 16:00 if needed.

Plan: 
------

During power tests, monitor the magnetics and bus currents to 
verify the bus configuration. Monitor the DPCS outputs (with PLC
power supply control) to verify correct polarity on the demands. 

For the plasma startup tests, the starting condition will be the shot 
designated for tomorrow's run, 
1070614024, modified for reverse field operation. Note that this shot
uses Segment 3 "1.0MA Upper Null". 

Engineering should set Power systems as on 1070614024
EXCEPT: Acoil in reverse configuration: -Dtop +Dbot +Jtop -Jtop


Gas system setup:
 fill B-Top with 6 psi D2 Hybrid enabled (PG4)
 fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
 leave B-side upper as is Hybrid DISABLED (PG2)
 fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
 NINJA as is, disabled

Enable the following gate valves, ssuming no vacuum problems:
ECE, VUV, DNB, Z-bolo shutters.

Torvac setup: Gate valves open

Physop PCS setup procedure is given in the note under topic
HYBRID for 1070717.

The goal will be to get a reasonably robust startup and verify 
control into the active segment. Along the way we'll be verifying
that the correct fizzle sequence has been loaded (dpcs_fizzle 
source_shot=1060517007) to maintain +150kA and double swing the 
OH's to -15kA. If we get that far, we're done. If not, Earl gets to
deal with it tomorrow. 



Physics Operators Plans

Session Leader Summaries
Entered: Jul 17 2007 02:25:11:017PM
Author: Steve Wolfe
The power tests were completed well ahead of schedule,
by about 11AM. 

Plasma attempts started with #14 and proceeded Dud, Fizzle, Plasma
After the successful plasma on #16 we declared victory and stopped
for the day. The shot was based on the starting shot for tomorrow,
1070614024. Note that the NL04 feedback was disabled for today's shot. 

The tweaks were to increase the pre-puff a little and make BR0 
substantially more positive (started at -.003 and ended at +002.)
The RCUR offset was left at +1000, and could possibly be decreased
a little. 

TCI was not available because of an SF6 dump in the morning, so the
shot was run with pre-programmed gas. Thomson indicated it was at
1e20 falling to 5e19/m^3. ECE was not on for #16, for unknown reasons.

A successful mini-run, completed by noon.


Physics Operator Summaries
Entered: Jul 17 2007 12:13:10:083PM
Author: Ian Hutchinson
Abnormal field direction setup completed.

In addition to the flipping of coil current traces and the calling of
the B21 predictor with the new setting, it proved necessary for
startup to approximately reverse the Br offset from -3mT to +2mT. That
gave a full length plasma on shot 16.

This shot 16 has nl04 zeroed in segment 3 which needs to be restored
appropriately when the interferometer is operative.


Session Leader Comments
Jul 17 2007 09:22:51:387AM1070717001Steve Wolfe
Shot#1 EFC test under PLC control.
That seemed to work.
However, it looks like the fizzle sequence did the right thing,
and it was before Ian changed it??

Jul 17 2007 09:29:40:927AM1070717002Steve Wolfe
Shot#2: EF2U power test
looks ok. fizzle sequence seems to be in the
right direction, I guess Ian had already loaded the
new value before shot#1. 

Next: EF2L PLC test

Jul 17 2007 09:56:26:770AM1070717003Steve Wolfe
Shot#3: EF2L test looks ok. 

Next: A-coil test under hybrid control
Draw a waveform in seg 1 and turn off seg3



Jul 17 2007 09:55:13:453AM1070717004Steve Wolfe
Shot#4

Next: A-coil test under hybrid control
Draw a waveform in seg 1 and turn off seg3

That looks like PLC control. Straight up and straight
down at 800A, on at -.2 off at +1.8sec

Also, the waveform ends early, at 1.7. That was the
fizzle detector coming in.

Next: Move on to EF3


Jul 17 2007 10:08:46:797AM1070717004Steve Wolfe
Shot#4: The signs of the signals from the
A-coil test on the locked mode loops match 
those from last year's test 1060517013. Magnitudes
are about half, which is consistent since shot 13
had 1500A and this one 800. They seem to be hooked 
up correctly, I don't know that we need to re-test. 

Still need to confirm the B21_PROJ feedback



Jul 17 2007 10:01:47:323AM1070717005Steve Wolfe
Shot#5: EF3 test
Looks ok. 


Jul 17 2007 10:09:59:113AM1070717006Steve Wolfe
Shot#6: EF4 forward bridge test at 1000A
Looks ok, field is positive. 


Jul 17 2007 10:27:09:397AM1070717008Steve Wolfe
Shot#7: EF1U forward bridge test

Shot#8: EF1L test, 

both look ok

Jul 17 2007 10:34:33:080AM1070717009Steve Wolfe
Shot#9: OH1 test, also looking at the demand from the 
B21_PROJ feedback. Actually, it shouldn't ask for anything
because this is just forward bridge, and it will be in the
fizzle segment anyway. Never mind. 

OH1 looks ok. Bz0 is negative. 

Moving on to OH2's

Jul 17 2007 10:44:36:090AM1070717010Steve Wolfe
Shot#10: OH2U test
Looks ok, BR0 is negative, flux is positive. 

next OH2L


Jul 17 2007 10:54:19:193AM1070717011Steve Wolfe
Shot#11: OH2L test

Looks ok, although there is a small overshoot on the
bus current at the start of the pulse that did not show up
on the upper. Field direction looks right. 

Next: TF test


Jul 17 2007 11:04:56:880AM1070717012Steve Wolfe
Shot#12: TF test (there will be two of these)
50kA TF test. Looks ok. 


Jul 17 2007 11:16:55:237AM1070717013Steve Wolfe
Shot#13: 100kA TF test
Got 100kA. After Bill checks the bus,
we'll be ready to try for plasma. 


Jul 17 2007 11:37:56:777AM1070717014Steve Wolfe
Shot#14: First plasma attempt. 
TCI is dead due to an SF6 incident this morning. 
Ian is turning off NL04 feedback and will use pre-programmed PG3. 

Dud. Fill is pretty low, .035mTorr
BR looks negative (more so than recent normal field shots)
RCUR looks funny, way inside. 

OH2 currents look too far apart, I think the BR needs a big change.


Jul 17 2007 11:51:00:480AM1070717015Steve Wolfe
Shot#15: Second plasma attempt. 
Fizzle, that's the right direction I think

Looks like it may get lost vertically; also 
moving in. 


Jul 17 2007 12:00:45:880PM1070717016Steve Wolfe
Shot#16: Third plasma attempt. 
plasma full length, looks pretty low density. 

Upper null, Right gap is down to 5mm according to EFIT
around .4sec, near crossover. 

I think we're done. 


Physics Operator Comments
Jul 17 2007 09:54:07:047AMIan HutchinsonFollowed Wolfe's instructions on shot 1070717 to do all the flips and to
change the dpcs_fizzle source to 1060517007.

After Gary updates the B21 configuration, call the b21 predictor in segments
2-4.
Jul 17 2007 11:15:36:140AMIan HutchinsonSet RCUR offset to -1000 from +1000.
Jul 17 2007 11:43:03:470AM1070717014Ian HutchinsonSet nl04 gain to zero because the interferometer is inoperative.
There seems to be a reasonable preprogrammed density level in the V of seg 3.
Try a full shot.

Dud.

For next shot.
Fill puff to 20ms from 15ms.
Br offset to 0 from -3mT.
Jul 17 2007 11:55:44:593AM1070717015Ian HutchinsonFizzle.

Br offset to +2mT.
Jul 17 2007 12:03:09:523PM1070717016Ian HutchinsonPlasma to rampdown.
Seems to be a strong startup.
Jul 17 2007 12:08:07:670PM1070717016Ian HutchinsonPlasma to rampdown.
Seems to be a strong startup.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:14:12:407AMTestOkEFC Test
209:23:08:370AMTestOkEF2U Test
309:34:15:727AMTestOkEF2L Test
409:44:26:740AMTestOkA-Coil Test PLC Control
509:56:12:457AMTestOkEF3 PLC Test
610:04:31:480AMTestOkEF4 Forward PLC test
710:13:13:617AMTestOkEF1U Forward PLC Test
810:22:16:470AMTestOkEF1L Forward PLC Test
910:30:44:950AMTestOkOH1 Forward PLC Test
1010:39:04:973AMTestOkOH2U Forward PLC Test
1110:50:06:800AMTestOkOH2L Forward PLC Test
1211:01:55:330AMTestOkTF 50kA PLC Test
1311:14:22:467AMTestOkTF 100kA PLC Test
1411:29:01:767AMPlasmaOk
1511:41:25:030AMPlasmaOk
1611:53:58:000AMPlasmaOk

System Availability
Jul 17 2007 09:13:44:470AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated for senstivity, still need better time constants. Midplane and divertor AXUV being digitized, processing calibration data.May 29 2007 11:22AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoOnly high frequency channels now working (17 to 32). Ch 22 has bad video amp. LO is OK. Problem looks to be in mixer amp unit.Jul 11 2007 10:52AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. dipole configuration. Using #4 transmitter only. Max power about 1.5 MW instead of 3 MW.Jun 20 2007 09:22AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, processing calibration data. Divertor views showing significant noise, and not available. Upper view being debugged.May 29 2007 11:23AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesToday (1070713) is the first day with the new waveguides. 50, 60, 75 88, 88l,88u, 110 and the variable frequency channel are operational but still in testing.Jul 13 2007 08:40AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 10 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.Jul 11 2007 09:18AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -124.5mm (standard). Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Jun 14 2007 06:21PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf