Alcator C-Mod Run 1070807 Information

Back to runs

Miniproposals
Miniproposal:503
Date Filed: 7/12/2007
Title:Scaling of the L-H transition at low density
First Author:Joseph Snipes
Session Leader:Joseph Snipes (shots 1-34)

Operators
Session leader(s):Joseph Snipes
Physics operator(s):Earl Marmar
Engineering operator(s):Bill Cochran,Bill Byford,Gary Dekow

Engineering Operator Run Comment
MP503 Scaling of the L-H Transition at Low Density SL:J. Snipes PO: Marm

Session Leader Plans
Entered: Aug 6 2007 12:56:11:963PM
Author: Joseph Snipes
Session Leader Plan for Tuesday 1070807
MP503 Scaling of the L-H Transition at Low Density

This run requires high ICRF power and reproducible wall conditions. So, we would like an overnight ECDC in helium Monday night at the usual settings.

Load shot 1070803028 to use its startup segment 1 and then load segment 2 from 1070612025 and turn on segment 2 and turn off segment 4 and then recalculate all magnetics predictors for use without F19 in segment 2. Change Ip to 0.9 MA and nl04 to 6 x 10^19 m^-2. Ramp the ICRF power from 0.5 s to 1.5 s from 0.5 MW to 2.5 MW. Then, scan the density from shot to shot from 5 to 4 to 3 x 10^19 m^-2 taking two shots at each density if necessary. Then, reduce Ip to 0.6 MA and repeat the density scan. Then, increase Ip to 1.2 MA and repeat the density scan. At the lower densities, the ICRF ramp will probably need to go up to 3.5 MW to find the H-mode threshold. The idea is to map out the density dependence of the H-mode threshold for each plasma current, particularly at low and moderate densities. If time remains after all this is done, we will repeat each current at slightly higher densities of 7 and 8 x 10^19 m^-2.

Physics Operators Plans
Entered: Aug 7 2007 09:47:02:737AM
Author: Earl Marmar
Physop and Engineering Setup for Tuesday, 1070807

MP MP503 Scaling of the L-H Transition at Low Density
Session Leader: J. Snipes
Physop: E. Marmar

Overnight ECDC in HELIUM-4


Power systems as on 1070612025
A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid ENABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
NINJA 10 psi deuterium, ENABLED

Enable the following gate valves and shutters: ECE, VUV, Z-bolo shutters, DNB

Torvac setup: Gate valves open during pulse.

ICRF: D E and J-port ready at the beginning of run
Ramp the ICRF power between 0.5 s to 1.5 s from 0.5 MW to 2.5 MW.
LH: Not needed
CRYOPUMP: Ready for operation on the first shot

Plan: Start with 900kA, LSN. Scan the density from shot to shot, starting at nl_04=6e19 m^-2, then go down to 4e19 and then 3e19, taking two shots at each density if necessary. Then, reduce Ip to 0.6 MA and repeat the density scan. Then, increase Ip to 1.2 MA and repeat the density scan. At the lower densities, the ICRF ramp will probably need to go up to 3.5 MW to find the H-mode threshold. The idea is to map out the density dependence of the H-mode threshold for each plasma current, particularly at low and moderate densities. If time remains after all this is done, we will repeat each current at slightly higher densities of 7 and 8 x 10^19 m^-2.


Session Leader Summaries
Entered: Aug 7 2007 05:48:08:730PM
Author: Joseph Snipes
The run started late because of software problems with the machine cooling so that we did not get the first shot until 10:00 am. There were a number of disruptions and 11 fizzles so that we ended up with only 11 good shots with clear L-H transitions. This meant that we had very little time to explore all of the densities and currents that we wanted to run and no time to check for reproducibility of any condition. Nonetheless, we did manage to get L-H threshold points for several densities at 0.6 MA, 0.9 MA, and 1.2 MA. This gave a fairly clear result that the minimum density for the threshold around nebar = 1 x 10^20 m^-3, which is somewhat higher than previous results that were around 8 x 10^19 m^-3. Because we did not boronize, there were certainly rather high moly radiation levels for all of the shots, so that might explain why the low density limit is somewhat higher than previously. There appears to be no current dependence to the low density limit in that all three currents more or less overlayed each other in (Ptot - dW/dt)/Pscaling vs nebar. Plotting the same relative threshold power vs n/n_G clearly separated out the low current points indicating that there was no clear dependence on the Greenwald density limit. The experiment should be repeated with a good boronization and perhaps with between-shot boronization to determine if reduced moly radiation would change the result at all.

Physics Operator Summaries
Entered: Aug 22 2007 01:53:05:323PM
Author: Earl Marmar
After a delayed start (RSView server problem delayed cooling), engineering systems worked well for most of the day.

We had significant problems with fizzles today. Playing with fill did not seem to help much. Shot 23 fizzled because the cryopump stopped pumping deuterium just before the shot.

We ended the day with 4 beam into gas (no fields) for MSE.

Summary:
plasmas 18
fizzles 12
beam into gas 4

total cycles 34

Session Leader Comments
Aug 7 2007 08:31:38:320AM1070807001Joseph SnipesDelay for cooling because the RSView software failed last night. We expect to start around 10:00 am.
Aug 7 2007 10:32:20:337AM1070807001Joseph SnipesShot 1: Good shot. Lost core Thomson data due to a computer problem. Cell access to reboot the Thomson computer. First L-H transition right at 0.86 s.
Aug 7 2007 10:33:11:553AM1070807002Joseph SnipesShot 2: Runaways early. Disrupted at 0.26 s.
Aug 7 2007 11:13:33:930AM1070807004Joseph SnipesShot 4: Good shot. First H-mode transition at 0.836 s.
Aug 7 2007 11:24:03:247AM1070807005Joseph SnipesShot 5: Reducing nl04 to 5 x 10^19 m^-2. Good shot. First L-H transition at 0.605 s.
Aug 7 2007 11:36:25:610AM1070807006Joseph SnipesShot 6: Good shot. nl04 reduced to 4 x 10^19 m^-2. First L-H transition at 0.988 s.
Aug 7 2007 11:48:25:940AM1070807007Joseph SnipesShot 7: nl04 reduced to 3 x 10^19 m^-2. Early runaways and disruption at 0.27 s.
Aug 7 2007 12:13:13:157PM1070807008Joseph SnipesShot 8: Good shot. First L-H transition at 1.24 s. Gas evolving off of the RF
raised the density above the requested value.
Aug 7 2007 12:20:47:603PM1070807009Joseph SnipesShot 9: Dithering very late nearly in H-mode at 3 MW. Need to repeat with higher power.
Aug 7 2007 12:30:11:897PM1070807010Joseph SnipesShot 10: Fizzle!
Aug 7 2007 01:08:44:283PM1070807012Joseph SnipesShot 12: Disrupted violently at 0.86 s with only 2 MW of ICRF.
Aug 7 2007 01:09:35:800PM1070807013Joseph SnipesShot 13: Go to 0.6 MA and 0.6 x 10^20 m^-2. Fizzle!
Aug 7 2007 01:48:54:707PM1070807015Joseph SnipesShot 15: Fizzle again.
Aug 7 2007 02:02:36:457PM1070807016Joseph SnipesShot 16: Good shot. Brief H-mode with the L-H transition at 0.77 s
Aug 7 2007 02:20:19:040PM1070807017Joseph SnipesShot 17: Reduce nl04 to 5 x 10^19 m^-2. Good shot. L-H transition at 1.15 s.
Aug 7 2007 03:38:56:113PM1070807018Joseph SnipesShot 18: Reduce nl04 to 4 x 10^19 m^-2. Good shot. Marginal L-H transition at 0.99 s that does not really appear to be an L-H transition on the edge Te.
Aug 7 2007 02:48:32:557PM1070807019Joseph SnipesShot 19: Disrupted at 0.94 s. No H-modes.
Aug 7 2007 03:07:29:467PM1070807020Joseph SnipesShot 20: Go to 1.2 MA and nl04 of 7 x 10^19 m^-2. Disrupted at 0.44 s due to a programming error by the physop.
Aug 7 2007 03:12:03:113PM1070807021Joseph SnipesShot 21: Try again at nl04 = 7 x 10^19 m^-2. Fizzle!
Aug 7 2007 03:55:42:070PM1070807024Joseph SnipesShot 24: Finally got a plasma back. Ohmic H-mode after long dithering with up to 2 MW of ICRF. Ohmic L-H transition at 1.45 s.
Aug 7 2007 04:18:54:063PM1070807025Joseph SnipesShot 25: nl04 set to 6 x 10^19 m^-2. Good shot. Disrupted after a Li pellet at 1.72 s. Dithering H-modes throughout the shot with the first transition at 0.54 s.
Aug 7 2007 04:21:04:960PM1070807026Joseph SnipesShot 26: nl04 set to 5 x 10^19 m^-2. Good shot. Disrupted at 1.45 s. Dithering H-modes throughout the shot with the first transition at 0.778 s.
Aug 7 2007 04:31:37:957PM1070807027Joseph SnipesShot 27: Set nl04 = 0.7 x 10^20 m^-2 and Ip = 0.9 MA. Fizzle!
Aug 7 2007 04:57:36:953PM1070807029Joseph SnipesShot 29: Fizzle again.
Aug 7 2007 05:10:35:673PM1070807030Joseph SnipesShot 30: Try going to 0.6 MA and nl04 = 7 x 10^19 m^-2. Good shot. Several H-modes with the first L-H transition at 0.648 s.
Aug 7 2007 05:30:25:443PM1070807031Steve ScottNew experiment: beam-into-gas, NO FIELDS. Measure spectrum from beam thru MSE optics, to determine
the Doppler shift and thereby infer the angle between the MSE sightline and the DNB.

This will be a repeat of shot 1070803032. torus pressure about 3.0 mTorr (D2).

First two shots will have the MSE linear polarizer left in situ (while we wait for oxygen to return
to the test cell).

Result: good dnb. got the same gas puff as 1070803032, except we got
a little extra gas (up to an additional 0.5 mTorr) starting at
0.7 sec.

Overall, this is an acceptable member of the scan.

next: repeat but withoout the extra Ninja puff ...

Note: we got a DNB pulse in excess of the nominal maximum of 1.50 sec.
Need to check with Dexter about why the controls allowed this. We had
defined a maximum 'on' time of 1400 ms, but the controls seemed to pay
more attention to the defined on/off time.
Aug 7 2007 05:36:00:420PM1070807032Steve Scottgood gas but DNB faulted at 1.37 sec.
Aug 7 2007 05:42:36:367PM1070807033Steve ScottThis is the last dnb-into-gas shot with the MSE linear polarizer left in place.
Result: DNB is correct duration, but suffered one fault. Overall, this is
acceptable. Good gas pulse.
Aug 7 2007 05:52:03:970PM1070807034Steve ScottPrior to this shot, we removed the linear polarizer from MSE. We expect the signal strength to the
spectrometer to increase by a factor 2 - 2.5

result: good dnb, good gas.

This is the final shot of this micro-expermient.

Physics Operator Comments
Aug 7 2007 10:24:04:577AM1070807001Earl Marmarcomputer problem (RSView server) delayed cooling 1 hour

set up for first shot
load from 1070803028
import segment 2 from 1070612025 into segment 2
turn on segment 2, turn off segment 4
recall all magnetics that used f19
Ip to 0.9 MA
nl_04 to 6e19
argon puff to 50 msec (from 100)

cryopump is cold (liquid He temp)
no DNB (conditioning)

plasma
early hards; small bounce
density looks good;
multiple h-modes

problem with TF bus Rogowski
Aug 7 2007 10:49:18:683AM1070807002Earl Marmarcell access before shot 2 for Thomson scattering computer problem

no pcs changes

plasma
lots of hards, early disruption
P_fill (ratiomatic) = 0.034 mTorr

TF bus rogowski integrator still having trouble
Aug 7 2007 10:48:20:523AM1070807003Earl Marmarprefill puff to 50 msec (from 37)

fizzle
P_fill (ratiomatic) = 0.047 mTorr
Aug 7 2007 11:15:42:353AM1070807004Earl Marmarprefill puff to 45 msec (from 50)

plasma
P_fill = 0.042 mTorr
early hards are reduced
multiple h-modes

TF rogowski looks ok
Aug 7 2007 11:26:12:440AM1070807005Earl Marmarnl_04 target to 5e19

plasma
some early hards
multiple h-modes
Aug 7 2007 11:38:49:640AM1070807006Earl Marmarprefill puff to 47 msec (from 45)
nl_04 target to 4e19

plasma
early hards about the same
h-modes
Aug 7 2007 11:50:45:037AM1070807007Earl Marmarnl_04 target to 3e19

plasma
more runaways
early disruption
Aug 7 2007 12:08:07:730PM1070807008Earl Marmarno pcs changes

plasma
early hards gone, then hards rising through the shot
late h-mode

Aug 7 2007 12:35:07:043PM1070807009Earl Marmarslight change to early nl_04 target, still trying for 3e19
TF flattop to 1.5

plasma
density is rising during RF
no h-mode
disrupt early in rampdown

Aug 7 2007 12:34:26:527PM1070807010Earl Marmarno pcs changes

fizzle

Aug 7 2007 12:52:29:233PM1070807011Earl Marmarprefill puff to 45 msec (from 47)

fizzle
Aug 7 2007 01:08:18:500PM1070807012Earl MarmarEF4 15 A more negative prior to t=0

plasma
got the low density
hot L-mode (>5 keV at tops of sawteeth)
h_89 ~ 1.5
h_98 ~ 1.4
possible locked mode
disrupt at 0.88 seconds
Aug 7 2007 01:10:28:863PM1070807013Earl MarmarIp to .6 MA
nl_04 to 6e19

fizzle


Aug 7 2007 01:26:35:290PM1070807014Earl Marmarprefill puff to 44 msec (from 45)

fizzle
Aug 7 2007 01:56:42:807PM1070807015Earl Marmarno pcs changes

cycle problems
no-power cycle, shot # did not increment.

Plasma attempt
fizzle


Aug 7 2007 02:14:13:110PM1070807016Earl MarmarEF4 back to -1335A
BR_0 offset to -.004 (from -.0035)

prefill puff to 42 msec (from 44 msec)

plasma
short h-mode


Aug 7 2007 02:22:17:430PM1070807017Earl Marmarnl_04 to 5e19
extend TF flattop to 2.0 s(for OH double swing)
change OH and TF invert times to 2.4 s
fizzle off to 2.1 seconds

plasma
one h-mode


Aug 7 2007 02:37:51:120PM1070807018Earl Marmarnl_04 to 4e19

plasma
might be a brief h-mode just before it disrupts at 1.05 s)
Aug 7 2007 02:49:45:760PM1070807019Earl Marmarprefill puff to 41 msec (from 42)

plasma
disrupt 0.94 seconds
no obvious h-mode
Aug 7 2007 03:02:00:290PM1070807020Earl MarmarIp to 1.2 MA
intended nl_04 target to 7e19
but it was actually 4e19

plasma

early disruption (1 MA)
Aug 7 2007 03:16:08:180PM1070807021Earl Marmarnl_04 target to 7e19 (really)

fizzle
Aug 7 2007 03:28:43:163PM1070807022Earl Marmarprefill puff to 39 msec (from 41)

fizzle
Aug 7 2007 03:43:25:370PM1070807023Earl Marmarprefill puff to 38 msec (from 39)

fizzle
fill pressure was 0.07 mTorr; looks like the cryopump stopped pumping just before the shot
Aug 7 2007 03:59:07:183PM1070807024Earl Marmarprefill puff to 38 msec (from 39)

plasma
ohmic h-mode near end of flattop


Aug 7 2007 04:07:45:240PM1070807025Earl Marmarprefill puff to 39 msec (from 38)
nl_04 target to 6e19

plasma
no obvious h-mode
Li pellet then disrupt (in ramp-down)
Aug 7 2007 05:01:14:753PM1070807026Earl Marmarnl_04 target to 5e19

plasma
disrupt at 1.45 s
Aug 7 2007 04:38:47:680PM1070807027Earl Marmarprefill puff to 36 msec (from 39)

nl_04 target to 7e19
Ip to 0.9 MA

fizzle



Aug 7 2007 04:48:51:727PM1070807028Earl Marmarprefill puff to 34 msec (from 36)

fizzle
Aug 7 2007 05:03:47:180PM1070807029Earl MarmarBR_0 offset to -.0035 (from -.004)

fizzle
Aug 7 2007 05:12:26:877PM1070807030Earl Marmarprefill puff to 32 msec (from 34)
Ip to 600 kA
nl_04 still set to 7e19

plasma
several h-modes
Aug 7 2007 05:16:38:787PM1070807031Earl Marmarload from 1070803032

deuterium gas puff for DNB into gas MSE tests
Aug 7 2007 05:34:49:217PM1070807032Earl Marmarrepeat

deuterium gas puff for DNB into gas MSE tests
Aug 7 2007 05:41:25:740PM1070807033Earl Marmarrepeat

deuterium gas puff for DNB into gas MSE tests
Aug 7 2007 05:51:40:657PM1070807034Earl Marmarrepeat

deuterium gas puff for DNB into gas MSE tests

Engineering Operator Comments
ShotTimeTypeStatusComment
110:00:33:063AMPlasmaOk
210:31:04:443AMPlasmaOk
310:44:14:553AMPlasmaOk
411:04:19:543AMPlasmaOk
511:17:45:980AMPlasmaOk
611:30:58:830AMPlasmaOk
711:46:11:237AMPlasmaOk
812:01:40:643PMPlasmaOk
912:14:57:223PMPlasmaOk
1012:27:52:627PMPlasmaOk
1112:41:50:160PMPlasmaOk
1212:55:10:817PMPlasmaOk
1301:07:44:533PMPlasmaOk
1401:20:43:563PMPlasmaOk
1501:47:03:687PMPlasmaOk
1601:59:56:577PMPlasmaOk
1702:14:05:267PMPlasmaOk
1802:26:38:357PMPlasmaOk
1902:42:35:970PMPlasmaOk
2002:56:45:347PMPlasmaOk
2103:10:06:487PMPlasmaOk
2203:23:31:360PMPlasmaOk
2303:36:02:190PMPlasmaOk
2403:49:14:907PMPlasmaOk
2504:01:58:263PMPlasmaOk
2604:16:11:127PMPlasmaOk
2704:29:24:720PMPlasmaOk
2804:42:08:373PMPlasmaOk
2904:54:38:107PMPlasmaOk
3005:07:16:903PMPlasmaOk
3105:20:09:057PMTestOkMSE Calibration
3205:30:25:943PMTestOkMSE Calibration
3305:39:34:847PMTestOkMSE Calibration
3405:48:27:153PMTestOkMSE Calibration

System Availability
Aug 7 2007 10:00:08:703AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoOnly high frequency channels now working (17 to 32). Ch 22 has bad video amp. LO is OK. Problem looks to be in mixer amp unit.Jul 11 2007 10:52AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 88, 88l and 88u are operational. 60GHz is a little noisy. Variable frequency channel has just been modified (on 1070731) and is being tested. 110GHz is not working.Aug 07 2007 08:34AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 10 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.Jul 11 2007 09:18AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -110.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 02 2007 05:52PM (yma)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


Aug 7 2007 10:30:45:363AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoOnly high frequency channels now working (17 to 32). Ch 22 has bad video amp. LO is OK. Problem looks to be in mixer amp unit.Jul 11 2007 10:52AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 88, 88l and 88u are operational. 60GHz is a little noisy. Variable frequency channel has just been modified (on 1070731) and is being tested. 110GHz is not working.Aug 07 2007 08:34AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Old spectrometers have been removed. Additional spatial channels have been added, but are not yet calibrated. Aug 07 2007 10:08AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -121.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 07 2007 10:08AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf