Alcator C-Mod Run 1070816 Information

Back to runs

Miniproposals
Miniproposal:506
Date Filed: 7/12/2007
Title:H-modes with cryopumping in upper single null topology
First Author:Jerry Hughes
Session Leader:Jerry Hughes (shots 8-27)

Operators
Session leader(s):Jerry Hughes
Physics operator(s):Jim Irby,Steve Wolfe
Engineering operator(s):Andy Pfeiffer,Bill Parkin

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Aug 16 2007 01:05:01:187PM
Author: Jerry Hughes
MP506, run B: H-modes with cryopumping in USN, normal field direction
SL: Jerry Hughes
PO: Jim Irby

We will pick up this run where it left off on 1070808.

This run is intended to complete the evaluation of pedestal and global
H-mode response to cryopumping. It will be run in USN topology to
maximize particle flux to the pumping slots.

Requirements:

**Diagnostics
Edge and core Thomson, ECE diagnostics, CXRS, bolometer arrays, PCI,
reflectometry, Hirex

**Gas
NINJA plenum loaded with 10psi D2
Argon puff: 50ms at 0.3s (Argon at 1psi)

**ICRF
at least 3MW available
flat waveforms from 0.7 to 1.5s

**cryopump cooled to He temp on first shot, and most thereafter

Shot sequence:
Proceed as follows until time runs out.

1. Reload 1070808001 (800kA, 5.4T, nl04=1e20). Pump COLD. Prf=3MW.
2. Lower target to nl04=8e19, pump COLD. Prf=3MW
3. Re-adjust target based on results of 1,2. Pump COLD. Prf=3MW
4. Lower Ip to 600kA, target nl04=8e19. Pump COLD. Prf=3MW
5. Lower target to nl04=6e19, pump COLD. Prf=3MW
6. Re-adjust target based on results of 4,5. Pump COLD. Prf=3MW
7. Choose a promising low-collisionality target from 1--6 and rerun with max.
available Prf. Pump COLD.
8. Choose a suitable 800kA shot from 1--3 and rerun with pump WARM
9. Choose a suitable 600kA shot from 4--6 and rerun with pump WARM
10. Lower Ip to 400kA, nl04-->6e19. Prf=3MW. Pump COLD
11. Lower target to nl04=4e19, pump COLD
12. Re-adjust target based on results of 10,11. Pump COLD. Prf=3MW
13. Choose a suitable shot from 10--12 and rerun with pump WARM
14. Choose a low Ip, low density pumped target from above. Rerun with a current
ramp up to 1MA from 1.1 to 1.5s, to see if low density H-mode can be maintained
concurrent with Te,PED rise.

Physics Operators Plans
Entered: Aug 16 2007 09:02:16:127AM
Author: Jim Irby
Checklist before operation:

. 2200 V hi-pot of TF (complete: still open)
. no power cycle test to verify
----- TF voltage tap scanner operation
----- proper operation of TF ground fault warning program
. verify that TF is now gounded through 54M
. verify that TF fault instrumentation is back in operation

Operation:

. 10 kA, 0.25 s TF test under PLC control (SOP following work on regulator)
. 50 kA, 0.5 s TF test under PLC control (as on 1070814003)
. 150 kA, 1.0 s TF test
. 150 kA, 2.0 s TF test
. Plasma operation

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid ENABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
NINJA 10 psi deuterium, ENABLED
Entered: Aug 16 2007 04:54:34:963PM
Author: Steve Wolfe
Engineering setup and Physop Plan for
post-run beam-into-gas shots on Thursday, 16-Aug-2007
SL: Scott
PO: wolfe (taking over from Irby)

Engineering setup from 1070803032:
NO POWER SYSTEMS
Gas setup:
 Btop filled with D2 to 6psi (same as the plasma run) ENABLED
All other valves disabled. 
NINJA disabled and off.
Ratiomatic ON

PCS: Load from 1070803032, verify seg1 on, segs 2-4 off.


Session Leader Summaries
Entered: Aug 17 2007 12:24:43:920PM
Author: Jerry Hughes
1070816 Run Summary.
MP506, run B: H-modes with cryopumping in USN, normal field direction

This run was intended to complete the evaluation of pedestal and global H-mode response to cryopumping. It was run in USN topology to maximize particle flux to the pumping slots. This run picked up where we left off on 1070808, before experimental operations were suspended to diagnose and ameliorate an intermediate TF ground fault condition. Plasma attempts began shortly after noon, and we were successful in making 15 discharges, all with ICRF heated H-modes. A range of currents (Ip=0.4, 0.6, 0.8MA) and target densities (nl04 from 0.6 to 1.0e20) were run, in an attempt to produce steady low-density H-mode regimes.

Early discharges at 0.8MA showed promise, with relatively stationary H-modes lasting for several confinement times. Radiated power rose steadily in these H-modes, leading to an instability which rapidly cooled the pedestal and fueled the plasma, resulting in radiative collapse of the H-mode. Edge fluctuation measurements revealed quasi-coherent modes, though they were apparently insufficient to control impurity accumulation. The H-modes with the best confinement properties appeared to have classic grassy ELMs replacing the QCM, a regime we have not observed clearly in some time.

ICRF performance was quite good, with routine net power of ~3MW. On shot 13 we attempted to couple 4MW and obtained a transient H-mode, followed by an extremely radiative L-mode. Performance was never really the same after this shot. For example, when we attempted to re-run shot 11 on shot 20, the rate-of-rise in radiated power was ~2x higher. Most of the late afternoon was spent trying to obtain steady H-modes at high q. On shot 24 a particularly low-density H-mode was maintained for 500ms at 400kA.

We obtained only one direct comparison of a pumped and unpumped discharge: shots 20 and 22. Neutral pressure at the cryopump was several times higher in the unpumped case, and pedestal temperatures were lower. The indications are that the pump was working, and that an effect was had on the pedestals. We did, however, see little long-term pump-out of the H-mode discharges following their formation. This contrasts somewhat with the result in the reversed-field USN cases. Some careful analysis will be needed to figure out what all this means.



Physics Operator Summaries
Entered: Aug 17 2007 08:39:59:823AM
Author: Jim Irby
SL: Hughes
PO: Irby

We began with tests of the TF magnet from 10 kA up to 150 kA. Before
the run a 2200 V hi-pot of the magnet had been done and indicated the
fault was either completely gone or at a high resistance. We
carefully monitored ground fault, scanner, and real-time TF tap data
and saw no indications of a fault. The M54 tap was being used as a
ground for these tests and for the rest of the day during plasma
operation.

On shot 08 we made a very nice plasma (loaded from 1070808001) using
the cryopump and with 1.8 MW of ICRF. We also had a 1.5A ground fault
late in ramp-down. No other faults were detected the rest of the day.

The machine ran extremely well during plasma operation. We had one
cryopump dump induced fizzle and one dud caused by an inattentive
Physop; the prefill pressure was allowed to drop too low.

Changes around the bus tunnel seem to have added noise to the TF bus voltage signals. We need to investigate this problem on Monday.

The cooling/warming cycles over the last few days improved the performance of the OH coaxes. Another issue we should investigate.


tests 01,02,04,05,06,07
data 03

plasma 08,09,11,12,13,14,15,16,17,18
20,21,22,23,24
fizzle 10
dud 19

Session Leader Comments
Aug 16 2007 01:24:52:130PM1070816008Jerry HughesUSN, Ip=825kA, Bt=5.38T
Steady H-mode, with 1.6MW flat. Pedestal density rises after 1s, and plasma
becomes more ELM-free.
Pressure at pump rises to 4mtorr, at beginning of H-mode, then drops to 1mTorr.
Aug 16 2007 01:29:41:857PM1070816009Jerry HughesUSN, Ip=825kA, Bt=5.39T
Steady H-mode, with more ICRF. Te,PED promptly jumps to >600eV. The same
H-mode-killing behavior occurs at 1.16s --- i.e. radiation, pedestal cooling,
enhanced pedestal fueling.
Upper chamber and midplane pressure very similar to shot 8.
Aug 16 2007 01:59:08:930PM1070816012Jerry HughesUSN, Ip=825kA, Bt=5.39T
early MARFE, 3 H-modes, each one colder than the previous.
Aug 16 2007 08:37:17:783PM1070816013Jerry HughesUSN, Ip=825kA, Bt=5.39T
Impressive early H-mode, transient. Despite having 3.9MW steady, it stays in
L-mode after 1s. Radiation is quite high. We are probably cooking limiters.

Aug 16 2007 02:33:13:397PM1070816014Jerry HughesUSN, Ip=825kA, Bt=5.39T
target nl04 is closer to 1e20 on this shot.
5 ELM-free H-modes.
Brian is questioning the efficacy of the pump, since they are operating it
as a pot, and not flowing strongly. It is true that we're not seeing a lot of
pump-out reflected in the starting densities of these multiple H-modes.
Aug 16 2007 02:57:57:110PM1070816015Jerry HughesUSN, Ip=600kA, Bt=5.39T
nl04 target is 8e19
Cryopump will have strongly flowing He for this shot.
Result: Transient H-modes. Lower density as expected. Reflectometry indicates
QCM, but it seems to be insufficient to relieve impurity confinement.
Brian indicates no difference in the pumping rate vs. not flowing strongly.
However, he thinks the strike position should be moved out and more onto the
pumping slots.
Aug 16 2007 03:10:49:813PM1070816016Jerry HughesUSN, Ip=600kA, Bt=5.39T
nl04 target is 8e19
Strike point was moved out as requested, but it didn't affect the upper chamber
pressure, and had no significant effect on the H-mode density.
4 transient H-modes. The first one has Te,PED>500eV.
Aug 16 2007 04:37:00:540PM1070816017Jerry HughesUSN, Ip=600kA, Bt=5.39T
nl04 target is lowered 6e19
It is more ELM-free like.
Aug 16 2007 04:39:49:510PM1070816018Jerry Hughesnl04-->1e20.
H-modes still transient. H-mode densities are not that different than with
lower targets.
Aug 16 2007 04:00:21:840PM1070816019Jerry HughesNo plasma
Aug 16 2007 04:10:30:930PM1070816020Jerry HughesAn attempt to recover shot 011. ~800kA, nl04~8e19
Radiated power rise is ~2x higher than on shot 11. H-modes are transient, and
are never able to reach the high Te,PED of earlier today.
It seems we have definitely lost our lovely boronization. The QCM is there
on reflectometry, but the impurites are still killing us. For next shot, back off
ICRF demand to 2.5MW steady.
Aug 16 2007 04:19:30:050PM1070816021Jerry HughesDropped ICRF program to 2.5MW. Results are similar. Several transient H-modes.
YAGs did not fire.
Aug 16 2007 04:56:24:170PM1070816022Jerry HughesThis was a shot with the pump WARM to compare with shot 20. Upper chamber pressure
is several times higher. The H-modes appear to have colder pedestals.
Aug 16 2007 05:06:49:010PM1070816023Jerry Hughes400 kA. Very low density H-mode there. Repeat to improve RF matching.
Aug 16 2007 05:23:13:810PM1070816024Jerry HughesLong, low density H-mode. That's the last plasma shot.
Aug 16 2007 05:15:46:927PM1070816025Steve ScottThis shot starts a short (about 3 shot) series of DNB-into-torus shots with NO fields.
Reference shot = 1070803032. about 3mTorr torus pressure in D2

Purpose: measure Doppler shift and thereby infer angle of MSE views

result: DNB very similar to the reference shot 1070803032: peak current
about 6.5, drooping down to about 3.9.

gas pressure identical to reference shot. this is a fine member of the
scan.

next: repeat.
Aug 16 2007 05:24:57:970PM1070816026Steve ScottDNB = idential to shot 25
gas = identical to shot 25
so this is another member of the scan
Aug 16 2007 05:38:12:390PM1070816027Steve ScottDNB = terminated just a little earlier than previous shots
gas = identical to shot 26

This is the last shot in the scan and the last shot cycle of the night.

---------------------------------------------------------------------------------

Physics Operator Comments
Aug 16 2007 09:05:50:800AM1070816001Jim IrbyNo power cycle test

gf data looks good

tf scanner data looks good (magnet about 1.4 mOhm)

density feedback ready
Aug 16 2007 09:26:06:747AM1070816002Jim Irby10 kA TF test

no ground fault detected

scanner looks good: 1.47 mOhm

bus rogs look good

got plenty of gas (PCS still loaded with beam into gas test)

ground_fault routine ran properly: 2.407 A max current indicated in log


Aug 16 2007 09:38:13:200AM1070816003Jim Irbyno power test --- data system issues
Aug 16 2007 10:14:27:820AM1070816004Jim Irbytry for 50 kA test

loaded 1070808001 into PCS

test looks good --- no increase in gf current


Aug 16 2007 10:24:28:050AM1070816005Jim Irby100 kA, 1s pulse

no ground fault current detected

just noted that the sparker is not running (looks like supply is off or not triggered)

scanner looks good


Aug 16 2007 10:47:24:090AM1070816006Jim Irby150 kA, 1 s pulse

no detectable fault on gf Pearson

realtime mb53, mb54, signals clean

Aug 16 2007 11:44:44:423AM1070816007Jim Irbywent into cell and found sparker trigger disconnected (???). Sparker test shot okay now.

150 kA, invert a +1 s, TF pulse, PLC

Vincent opens CNPA gatevalve --- very small, brief rise is pressure

prepuff from 20 to 27 ms (cryopump will be used on first plasma shot)
loaded into tree

------------------
no faults
sparker okay
------------------



Aug 16 2007 12:54:39:613PM1070816008Jim Irbypeople enter cell to check TF power supply


This shot will be a plasma attempt

ICRF is ready
cryopump is cold

------------------------------------------------------
plasma into rampdown --- h-mode
noise on TF bus voltage appears to be coming from chopper

see 2 A on TF gf at 4.05 s for about 100 ms




Aug 16 2007 01:10:25:350PM1070816009Jim Irbyextended TF flat-top to 2 s --- get rid of waggle
loaded tree
DPCS same otherwise

cryopump cold
icrf ready

--------------------------
plasma into rampdown --- a couple of h-modes

no gf detectable
real-time taps good


Aug 16 2007 01:24:27:960PM1070816010Jim IrbyJerry is in command
repeat shot 09

cyropump cold

-----------------------
fizzle --- looks like cryopump was dumping before shot

no gf
scanner good
tf taps good
Aug 16 2007 01:39:44:010PM1070816011Jim IrbyTry again

Did recal on seg 2 Ip --- now 0.0 offset


------------------
plasma into rampdown --- a couple of h-modes
got proper Ip this time (800 vs 835)
hards are gone

no gfs
taps look good
scanner looks good


Aug 16 2007 01:54:50:210PM1070816012Jim Irbyincreased nl_04 request to 1.e20/m^2 by 0.5 s

---------
plasma into rampdown --- marfe

still having problem with Ip control

gf okay
taps okay
scanner okay
Aug 16 2007 02:17:21:377PM1070816013Jim Irbynl_04 request dropped to 0.9e20/m^2 at ~.5 s
loaded tree

--------------------
plasma into rampdown

gf good
taps good
scanner
Aug 16 2007 02:28:01:030PM1070816014Jim Irbyadded point in nl_04 after 0.5 s with peak request to 1.1e20/m^2 --- trying to get higher target w/o marfe

--------------------------
plasma into rampdown -- multiple h-modes and early marfe

120 kJ

gf, taps, scanner okay

Aug 16 2007 02:54:42:560PM1070816015Jim IrbyIp request from 800 to 600 kA
nl_04 request from 1.e20 to 0.8e20/m^2

-----------------
plasma --- still have marfe

gf, taps, scanner okay
Aug 16 2007 03:10:23:267PM1070816016Jim IrbyRXU from -.03 to -.02 m
loaded tree

--------------
plasma into rampdown

gf, scanner, taps okay
Aug 16 2007 03:24:44:767PM1070816017Jim Irbynl_04 request to 6e19 from 8e19/m^2

----------------
plasma into rampdown, lower density, marfe gone

gf,scanner,taps okay
Aug 16 2007 03:38:50:910PM1070816018Jim Irbynl_04 request to 1e20/m^2

-----------------
plasma into rampdown --- marfe

gf,scanner,taps okay
Aug 16 2007 03:54:39:800PM1070816019Jim Irbyreloaded shot 1070816011

----------------
dud --- fill pressure has been low most of day
Aug 16 2007 04:15:53:543PM1070816020Jim Irbyprepuff to 31 ms

------------------
plasma ----

all okay
Aug 16 2007 04:25:07:070PM1070816021Jim Irbyrepeat DPCS

---------------------
plasma

gf,scanner,taps okay

problem with YAG
Aug 16 2007 04:32:19:720PM1070816022Jim Irbyno cryopump for this shot
prepuff from 30 to 20 ms

----------------
plasma
Aug 16 2007 04:53:28:557PM1070816023Jim Irbyloaded shot 1070816016
ip request to 400 kA
nl_04 request to 6e19/m^2
prepuff to 32 ms
loaded tree

---------------------------

plasma

gf, scanner, taps okay

Aug 16 2007 05:00:24:720PM1070816025Steve Wolfe

Shot#25:  Load from 1070803032, verify seg1 on, segs 2-4 off.
BEam-into-gas (NO FIELDS)
Load at 16-Aug-2007 16:59:36.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done

PCS is ready for beam-into-gas shots

Aug 16 2007 05:39:29:267PM1070816027Steve Wolfe
SHot#27: Third shot of beam-into-gas. Successful.
Done with Beam-into-gas shots,

END OF RUN

Engineering Operator Comments
ShotTimeTypeStatusComment
108:51:11:783AMTestOkTF Scanner
209:08:28:053AMTestOkTF 10 KA
309:34:48:303AMTestBadIgor failed
409:58:47:440AMTestOkTF 50 KA
510:12:27:847AMTestOkTF 100kA PLC TEST
610:27:44:473AMTestOkTF 150 kA
711:26:12:137AMTestOkTF 150KA 2sec
812:10:03:013PMPlasmaOk
912:57:28:960PMPlasmaOk
1001:13:12:507PMPlasmaOk
1101:28:42:417PMPlasmaOk
1201:43:07:713PMPlasmaOk
1301:57:58:017PMPlasmaOk
1402:17:26:830PMPlasmaOk
1502:33:04:927PMPlasmaOk
1602:59:08:160PMPlasmaOk
1703:12:08:097PMPlasmaOk
1803:26:56:350PMPlasmaOk
1903:43:27:553PMPlasmaOk
2003:57:01:150PMPlasmaOk
2104:13:50:060PMPlasmaOk
2204:26:36:900PMPlasmaOk
2304:42:22:543PMPlasmaOk
2404:55:30:670PMPlasmaOk
2505:12:42:593PMTestOkBeam into Gas
2605:22:19:747PMTestOkBeam into Gas
2705:32:26:133PMTestOkBeam into Gas

System Availability
Aug 16 2007 08:50:46:580AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesLow freq. LO wiil be off for power test and first few plasma.Aug 14 2007 10:05AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoOnly the variable frequency channel is connected on 1070809 and 1070810 but not operationalAug 09 2007 09:32PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Old spectrometers have been removed. Additional spatial channels have been added, but are not yet calibrated. Aug 07 2007 10:08AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -121.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 07 2007 10:08AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


Aug 16 2007 01:57:39:503PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesLow freq. LO wiil be off for power test and first few plasma.Aug 14 2007 10:05AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 50, 60, 75 and 88 (u,l and center) are installed. The variable frequency channel is being tested. 110 is not functioningAug 16 2007 01:45PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Old spectrometers have been removed. Additional spatial channels have been added, but are not yet calibrated. Aug 07 2007 10:08AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -121.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 07 2007 10:08AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


Aug 16 2007 02:58:50:283PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoStill problems with low freq. RF section. Upper 16 channel workingAug 16 2007 02:45PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 50, 60, 75 and 88 (u,l and center) are installed. The variable frequency channel is being tested. 110 is not functioningAug 16 2007 01:45PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Old spectrometers have been removed. Additional spatial channels have been added, but are not yet calibrated. Aug 07 2007 10:08AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -121.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 07 2007 10:08AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf