Alcator C-Mod Run 1070820 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):
Engineering operator(s):

Engineering Operator Run Comment
MSE Calibrations (DNB into gas)

Session Leader Plans
Entered: Aug 20 2007 12:33:57:643PM
Author: Jin-Seok Ko
MSE spectrum measurement

Load 1070803032

Torus: D2 gas with no fields

DNB starts at 0.4 sec with a long pulse for 1.4 sec

shot

01 ch9 fiber as it is
02 ch9 fiber as it is
03 ch9 fiber remove/reinstall
04 ch9 fiber remove/reinstall
05 ch9 fiber remove/reinstall
06 ch9 fiber rotate (cw)
07 ch9 fiber rotate further (cw)
08 ch9 fiber rotate (ccw)

Physics Operators Plans

Session Leader Summaries
Entered: Aug 20 2007 02:26:58:193PM
Author: Jin-Seok Ko
1070820 Beam into gas without fields - spectrum measurements

Load 1070803032 (D2 gas with ~ 3mTorr, No field)

Shutter OPEN
Linear polarizer OUT
PEM REMOVED

Ch9 to McPerson (hasn't been moved since the last test)

++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
shot dnb configuration
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
01 DAC: 4.1 as it is
02 DAC: 4.1 as it is pic 1

pic 1 - removed/reinstalled - pic 2

03 DAC: 4.1

removed/reinstalled - pic 3

04 DAC: 4.1 - only for 0.5 sec. discard this shot
05 DAC: 4.1 - beam fault

2 dnb conditioning shots

06 DAC: 4.1

removed/reinstalled - pic 4

07 DAC: 4.1

cw - pic 5

08 DAC: 4.1

cw further - pic 6

09 DAC: 4.1

ccw - pic 7 (discard), pic 8 & 9

10 DAC: 4.1

++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

Shutter CLOSED
Linear polarizer OUT
PEM REMOVED

Ch9 still to McPerson

Physics Operator Summaries

Session Leader Comments
Aug 20 2007 12:54:47:333PM1070820001Steve ScottMSE Beam-into-gas, no fields. Measuring Doppler shift. Setup as per 1070826027.

Note: the fiber configuration currently in place (MSE channel 9 into the spectrometer) has not been
changed, at all, since shot 1070817027.

DNB: exact duplicate of 1070816027. gas: about 0.1 mTorr lower than 1070816027.

Good shot. This is an esteemed member of our little scan.

Next shot: repeat with no changes.

Aug 20 2007 01:16:41:397PM1070820002Steve ScottDNB and gas were identical to shot 001.
this is another member of the scan.
Aug 20 2007 01:13:22:203PM1070820003Steve ScottPrior to this shot, Jinseok removed the fiber from the holder mechanism in the entrance slit,
and replaced it, as best he could, exactly in the original orientation.

DNB: good
GAS: good

Next: do the same thing for the next shot.
Aug 20 2007 01:21:45:060PM1070820004Steve ScottPrior to this shot, Jinseok removed the fiber from the holder mechanism in the entrance slit
(i.e. he repeated the procedure for the previous shot) and replaced it, as best he could,
in exactly the original orientation.

DNB: terminated after about 0.5 sec. not a good dnb pulse
GAS: ok.

next shot: repeat without taking any further action.
Aug 20 2007 01:32:53:483PM1070820005Steve ScottDNB: completely faulted. we will get no photons from this shot.

Next shot: reduce the DNB arc current a little, take a conditioning shot,
then take a repeat shot into the torus.
Aug 20 2007 01:45:34:613PM1070820006Steve Scottgood dnb. good gas.

Next shot: once again, Jinseok will remove the fiber from the holder mechanism and replace it,
as best he can, in exactly the same orientation.
Aug 20 2007 01:54:38:173PM1070820007Steve ScottPrior to this shot, Jinseok removed the fiber from the holder mechanism in the spectrometer and then
replaced it, as best he could, in exactly the same orientation.

DNB: good.
GAS: good.

Aug 20 2007 04:29:15:373PM1070820008Jin-Seok KoPrior to this shot, I rotated the fiber by about 2 deg in the clockwise. Took the picture

DNB: good.
GAS: good.
Aug 20 2007 04:29:35:297PM1070820009Jin-Seok KoPrior to this shot, I rotated the fiber by about 2 deg FURTHER in the clockwise. Took the picture

DNB: good.
GAS: good.
Aug 20 2007 04:31:24:423PM1070820010Jin-Seok KoPrior to this shot, I rotated the fiber back to its nominal position then
rotated it by about 2 deg in the counter-clockwise. Took the picture

DNB: good.
GAS: good.

This is the end of run.

Shutter closed.
Beam shut off.
Fiber ch9 still in the spectrometer

Physics Operator Comments
Aug 20 2007 12:19:22:810PMSteve Wolfe
Loaded Steve Scott's beam-into-gas shot from 1070816027
Load at 20-Aug-2007 12:17:57.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done

Should be ready for him to run his tests, as soon as he has a beam operator.


Engineering Operator Comments
ShotTimeTypeStatusComment
112:48:57:290PMTestOkMSE Calibration
212:58:46:887PMTestOk
301:08:56:823PMTestOk
401:18:49:590PMTestOk
501:28:35:273PMTestOk
601:42:31:407PMTestOk
701:51:53:500PMTestOk
802:01:18:607PMTestOk
902:10:37:010PMTestOk
1002:20:29:853PMTestOk

System Availability
Aug 20 2007 12:48:37:510PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoStill problems with low freq. RF section. Upper 16 channel workingAug 16 2007 02:45PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 50, 60, 75 and 88 (u,l and center) are installed. The variable frequency channel is being tested. 110 is not functioningAug 16 2007 01:45PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Old spectrometers have been removed. Additional spatial channels have been added, but are not yet calibrated. Aug 07 2007 10:08AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -121.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 07 2007 10:08AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf