Alcator C-Mod Run 1070823 Information

Back to runs

Miniproposals
Miniproposal:495a
Date Filed: 6/22/2007
Title:Alfvén Cascades studies with ICRH and LHCD
First Author:Eric Edlund
Session Leader:Eric Edlund (shots 1-24)

Operators
Session leader(s):Eric Edlund
Physics operator(s):Bill Rowan
Engineering operator(s):Andy Pfeiffer,Bill Byford,Bill Parkin

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Aug 22 2007 06:40:39:487PM
Author: Eric Edlund
MP #495a
Alfven Cascade studies with ICRH and LHCD

The purpose of these experiemnts is to investigate the excitation of Alfven Cascades in the current ramp phase, utilizing ICRH for heating and a fast ion source, and LHCD to maintain a reversed shear q-profile. With the help of ICRF for early heating, the LH system will be operated at mid and high n|| to achieve off-axis current drive. These experiments will adjust the relative timing of the ICRH and LHCD to try to maintain q>1 for as long as possible.

----------------------------
SETUP:

target: 1070619006
Try to smooth the initial density rise as in shots 1070712017,
1070626017 and 1070712006. RF will turn on at 0.080 seconds and be off
by 0.700 seconds. We will run plasmas to 1.5 seconds to allow MSE some
time for calibrations - try to achieve steady density throughout the
flattop and from 1.0 to 1.5 seconds.

ICRF: all transmitters run-on by 8:30am

LH: 90 degree ideal phasing, normal field, current direction
waveform: step from 0 to 0.3 MW at 0.150 seconds, pulse length of 0.4
seconds, 75 kW per klystron. Set grill at 1.5 mm behind limiter.

Diagnostics: 1) PCI and magnetics digitized at 10 MHz
2) Thomson and ECE required
3) Hirex requested with 1 or 2 ms integration time. No initial Ar
puffing, can try Ar in the flattop
4) MSE will run in the Ohmic flattop after the RF is off.

----------------------------
SHOT SEQUENCE:

001: ICRF on at 0.080 seconds (E and J only), ramp to 2.0 MW at 0.100
seconds, full power to 0.700 seconds. *NO* LH on this shot.

002-005: increase ICRF power to 3.0 MW. Adjust plasma geometry as needed,
perhaps running inner-nose limited. Increase rate of current ramp to
reach 600 kA at 0.100 seconds.

006-007: Try running at 600 and 500 kA max plasma current.

008-013: Use 800 kA discharge and apply LHCD at 0.3 MW. Attempt to
increase LH power to 0.4 MW or beyond. Move LH start time to 0.100
seconds.

014-015: Attempt to couple LH starting at 0.020 seconds.

016-023: Change LH to 120 degree phasing. Initial LH operation at 0.3 MW, turn
on at 0.150 seconds, pulse length of 0.4 seconds. Over the next 7
next 7 shots, move the start time of LH earlier, and increase power to
0.4 or 0.5 MW.

024-025: Repeat best perfromance from prior 8 shots at 600 kA.


Physics Operators Plans
Entered: Aug 22 2007 09:18:56:507AM
Author: Bill Rowan
Engineering Setup for Thursday, 23 August 2007; Run 1070823

MP495A Alfven Cascade Studies with LHCD and ICRF


SL: Eric Edlund
PO: Bill Rowan

Engineering Setup
------------------
Overnight ECDC

Run begins at 09:00 and ends at 17:00

Power systems as on 1070619006

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
---------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, DNB, Z-bolo shutters

Torvac setup: Gate valves open after the shot

ICRF Setup: ICRF required for this run

LH Setup: LHCD required for this run

DNB: DNB required for this run

Cryopump: No cryopump for this run


Session Leader Summaries
Entered: Aug 23 2007 06:19:04:570PM
Author: Eric Edlund
MP #495a

Disruptions were a present factor in initial operation, until shot 008. To try
to reduce the impurity concentration, we tried pulling the plasma off the inner
wall, this seemed to help.

ICRF systems ran well, reaching 4 MW in the ramp on shot 014. LH experienced
some troubles, losing an optical arc detection on klystron #10. Turned off the
third crate and reduced power to about 240 kW.

Main results are that cascades seem to be killed by the presence of LH.
Simialar shots with and without LH show significant changes in RSAE activity,
though TAE activity is, at first observation, unaffected.

Initial results from hard x-ray data show that LH current is being driven
on-axis in all cases. This may explain the loss of RSAEs. The slight amount of
central reversed shear may be destroyed by the on-axis current drive.

AE activity was never as clear today as it was on 1040406. Possible reasons are
the plasma positioning on the inner wall and impurity concentration in the
ramp-up.

We did no run a plasma with LH operating prior to the ICRH. This would be a
useful case to compare to, as we would be able to test if the current drive is
capable of being localized off-axis in the absence of ICRF, or if it will always
be centrally localized during the ramp because of lower temperatures and
densities.

Physics Operator Summaries
Entered: Aug 24 2007 08:05:36:730AM
Author: Bill Rowan
C-Mod ran well today. There was an apparent EF1L power supply problem on the first shot which resulted in a dud. Engineering investigation did not identify a problem, and the failure did not recur. A computer problem caused the loss of one shot. ICRF and LH difficulties caused the loss of a couple of hours in the afternoon.

No significant changes were made to segment 1 during the day.

There were several disruptions. One (006) was associated with molybdenum influx. For the others, there was no measurement due to spectrometer HV shutdown during the shot. The disruptions were still useful for the SL since they occured after the end of the experimental period which was from 0.1 s to 0.2 s.

Although requested in the run plan, ECDC was not run overnight prior to the run.

Score card
17 plasmas (003,005,006,008,010,012,013,014,015,017,018,019,020,021,022,023,024)
04 fizzles (004,007,009,011)
03 engineering (001,002, 016)
24 total

Session Leader Comments
Aug 23 2007 10:03:17:953AM1070823003Eric Edlunddisruption at 0.73 seconds
strong traces of coherent modes on magnetics, t=0.15, f~550 kHz
faint traces on PCI
Aug 23 2007 10:31:33:480AM1070823005Eric EdlundTAE traces seen on magnetics and PCI, no cascades.
Increase RF power to 3 MW.
adjust flattop current to 800 kA.
Aug 23 2007 10:48:22:257AM1070823006Eric Edlundearly disruption, moly injection
try to pull the plasma off the inner wall
Rf is going to try to ramp to full power around 0.12 seconds
Aug 23 2007 11:30:50:650AM1070823008Eric Edlundsome TAE modes
disruption at 0.28 seconds
reduce RF power and move LH to 0.120 seconds
Aug 23 2007 11:46:03:140AM1070823010Eric Edlundgood shot.
some TAEs during the ramp and chirping modes during sawteeth
try to put the plasma on the nose and repeat at same settings
Aug 23 2007 12:09:56:230PM1070823012Eric Edlundgood shot
no cascades, early TAE activity
try turning off LH and increasing ICRF power to 4 MW
Aug 23 2007 12:20:42:260PM1070823013Eric Edlundgood shot
no cascades, early TAE activity
D port did not fire.
try to reduce ramp-up target density by about 10%, reduce flattop density t0 0.8

Aug 23 2007 01:40:55:720PM1070823014Eric Edlundcascade activity.
no LH
Aug 23 2007 01:41:37:533PM1070823015Eric Edlundreturn after long break for ICRF
no cascades, some TAE activity
repeat again with no LH
Aug 23 2007 03:37:11:617PM1070823018Eric Edlundreturn after long break for LH
some TAE modes, no cascades
LH tripped, running at 120 degrees
ICRF running at 3+ MW
sawteeth enter at about 0.210 seconds
Aug 23 2007 03:55:08:880PM1070823019Eric Edlundgood shot.
LH set to 90 degrees to recover.
No power to D
cascadesm seen to start around 0.13 seconds, cut out midway through ramp
sugessting that the reversed shear vanishes
Aug 23 2007 04:15:40:190PM1070823020Eric Edlundgood shot.
LH set to 105 degrees
TAES and some chirping modes after 0.150 seconds
Aug 23 2007 04:32:45:030PM1070823021Eric Edlundgood shot.
LH set to 120 degrees
TAEs, no cascades
Aug 23 2007 04:43:48:220PM1070823022Eric Edlundgood shot.
LH set to 120 degrees
some weak cascades showing up around 0.13 seconds
LH this time starting at 0.16 seconds
suggests that LH is killing cascades

Physics Operator Comments
Aug 23 2007 08:01:12:860AMBill Rowan
No overnight ECDC
Aug 23 2007 08:38:58:870AMBill RowanLoaded from 1070619006
Reminded to recalculate predictors
Recalculated predictors for segments 2-3 (segment 4 is beam into gas test)
Loaded segment 1 from 1070822027 seg 1
Loaded shot

Aug 23 2007 08:54:56:753AMBill RowanLoaded from seg 3 shot 1070629006 into seg 2. correction from SL
Aug 23 2007 09:23:38:157AM1070823001Bill Rowan001. Dud. Problem with EF1L

Aug 23 2007 09:39:58:307AM1070823002Bill Rowan002. PLC communtation test for EF1L
for this test, the engineers loaded 1070315019
test shot worked.

Next shot. Try for plasma again
Aug 23 2007 09:52:57:327AM1070823003Bill Rowan003. Disruption at 0.72 s
Long enough for SL, I think, but ...
Aug 23 2007 09:57:59:583AM1070823003Bill RowanSharp increase on soft x-ray before the disruption.

Next shot.
No PCS changes
Aug 23 2007 10:06:24:050AM1070823004Bill Rowan004. Take this to be the post-disruption fizzle

Next shot.
No PCS changes
Aug 23 2007 10:25:22:940AM1070823005Bill Rowan005. Full length shot.
For this shot we did increase the RF by 200 ms so that it now turns off at 0.9s
Delay before this shot due to computer problems.

Aug 23 2007 10:27:29:427AM1070823005Bill RowanNext shot.
Reduced ip to 0.8 MA
Aug 23 2007 10:29:12:367AM1070823005Bill RowanExtend the TF flattop to 2 s
Aug 23 2007 10:46:54:533AM1070823006Bill Rowan006. Disruption at 0.4 s
Spectroscopy reports moly influx

Aug 23 2007 10:49:47:710AM1070823006Bill Rowan006. Disruption at 0.4 s
Spectroscopy reports moly influx

Next shot
No pcs changes
Aug 23 2007 10:58:17:647AM1070823007Bill Rowan007. The usual post disruption fizzle.

Next shot.
Increased the inner gap by approximately 4 mm

Aug 23 2007 11:09:38:070AM1070823008Bill Rowan008. Plasma. Early disruption

Next shot
Increased the inner gap by another 5 mm

Aug 23 2007 11:16:14:440AM1070823008Bill Rowanncreased the outer gap by 5 mm at the request of LH

Aug 23 2007 11:20:06:150AM1070823009Bill Rowan009. Post disruption fizzle

Next shot.
No further PCS changes

Aug 23 2007 11:44:27:170AM1070823010Bill Rowan10. plasma

Next shot
RXL increased by approx 1.0 cm
Aug 23 2007 11:57:13:393AM1070823011Bill Rowan011. Fizzle

Next shot
Add 2 ms to the prefill for a total of 19 ms

Aug 23 2007 12:20:36:840PM1070823012Bill Rowan012. Plasma. Full length

Next shot
Reduced density slightly
Aug 23 2007 12:34:12:543PM1070823013Bill Rowan013. Plasma

Aug 23 2007 12:33:40:667PM1070823014Bill Rowan014. Plasma. Full length
SL would prefer that the plasma have a larger outer gap and that it ride more on the inner nose

Next shot.
Increased the outer gap by approx 5 mm
RXL reduce by 5 mm early
ZXL reduced by 5 mm early

Aug 23 2007 01:44:38:617PM1070823016Bill Rowan016. No power shot
Computer problems.
Aug 23 2007 01:57:59:043PM1070823017Bill Rowan017. Plasma. distuption at 0.5 s

Next shot.
reload 1070823015

Aug 23 2007 03:07:32:163PM1070823017Bill RowanLH problems. SL decided to reduce the LH by one cart of 8. This reduces the power, of course

Aug 23 2007 03:41:15:233PM1070823018Bill Rowan018. plasma, full length

Next shot.
ZXL reduced by 5 mm between 0.1 and 0.2 s

Aug 23 2007 03:50:30:370PM1070823019Bill Rowan019. plasma full length

Next shot
zxl reduced by 5 mm between 0.1 and 0.2 s

Aug 23 2007 04:07:51:273PM1070823020Bill Rowan020. plasma, full length

next shot.
No pcs changes
Aug 23 2007 04:27:15:913PM1070823021Bill Rowan021. plasma. full length

next shot

reduced nl_04 to 5e+19 at 0.2 s
Aug 23 2007 04:42:17:187PM1070823022Bill Rowan022. plasma, full length

next shot
No PCS changes
Aug 23 2007 04:59:55:260PM1070823023Bill Rowan023. plasma, full length

next shot
no pcs changes

Aug 23 2007 05:05:55:940PM1070823024Bill Rowan024. plasma. early disruption

Last shot.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:08:37:650AMPlasmaBadEF1L com fault
209:36:39:800AMTestOkEF1 Commutation Test
309:49:18:103AMPlasmaOk
410:02:49:357AMPlasmaOk
510:21:14:200AMPlasmaOk
610:37:39:927AMPlasmaOk
710:51:28:823AMPlasmaOk
811:04:03:343AMPlasmaOk
911:17:07:503AMPlasmaOk
1011:29:41:977AMPlasmaOk
1111:45:28:310AMPlasmaOk
1211:58:08:830AMPlasmaOk
1312:11:16:450PMPlasmaOk
1412:25:25:407PMPlasmaOk
1501:21:47:737PMPlasmaOk
1601:43:04:067PMPlasmaBadNo Power pcdaqenq 1 server problem
1701:52:50:177PMPlasmaOk
1803:31:42:717PMPlasmaOk
1903:44:38:550PMPlasmaOk
2003:58:15:603PMPlasmaOk
2104:13:00:373PMPlasmaOk
2204:31:44:077PMPlasmaOk
2304:49:24:460PMPlasmaOk
2405:03:51:047PMPlasmaOk

System Availability
Aug 23 2007 09:08:09:977AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoStill problems with low freq. RF section. Upper 16 channel workingAug 16 2007 02:45PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 50, 60, 75 and 88 (u,l and center) are installed. The variable frequency channel is being tested. 110 is not functioningAug 16 2007 01:45PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Old spectrometers have been removed. Additional spatial channels have been added, but are not yet calibrated. Aug 07 2007 10:08AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -121.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 07 2007 10:08AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf