Alcator C-Mod Run 1070824 Information

Back to runs

Miniproposals
Miniproposal:495a
Date Filed: 6/22/2007
Title:Alfvén Cascades studies with ICRH and LHCD
First Author:Eric Edlund
Session Leader:Eric Edlund (shots 33-35)
Miniproposal:499a
Date Filed: 7/30/2007
Title:Parametric Decay and Density Limit for LHEH/LHCD
First Author:Yuichi Takase
Session Leader:Yuichi Takase (shots 1-32)

Operators
Session leader(s):Yuichi Takase,Eric Edlund
Physics operator(s):Joseph Snipes
Engineering operator(s):Sam Pierson,Andy Pfeiffer,Gary Dekow

Engineering Operator Run Comment
MP499A Parameteric Decay and density Limit for LHEH/LHCD E/O Pierson P/O

Session Leader Plans
Entered: Aug 23 2007 11:36:58:690AM
Author: Yuichi Takase
MP499A Parametric Decay and Density Limit for LHEH/LHCD
SL: Yuichi Takase
PO: Joe Snipes

D, 5.4T (no 8T shots), 1MA
start with low density LSN shot
1070807005 with Ip changed from 0.9MA to 1MA

LH 90deg ideal phasing
start 0.95s stop 1.3s
7 segments (50ms/seg)
1: 50-75kW
2-3: 75
4-5: 30
6-7: 75

ICRF (J port) 2MW
1.15-1.3s

A-side reciprocating Langmuir probe
2 plunges up to the LCFS, with peak insertion times
at 1.05s and 1.25s

L-mode/H-mode comparison with sequentially increasing density
approximate range
nel_04 = (0.5 - 1.5) x 10^20 m^-2
(possibly a little lower and higher)

vary accessibility near the high end of density range
by changing LH phasing to 60 and 135 deg (nonideal)

compare with limiter plasma if time allows

Physics Operators Plans
Entered: Aug 23 2007 04:41:57:373PM
Author: Joseph Snipes
Engineering Setup for Friday, 24 August 2007; Run 1070824

MP499A Parametric Decay and Density Limit for LHEH/LHCD
SL: Yuichi Takase
PO: Joe Snipes

Engineering Setup
------------------
Overnight ECDC in Helium

Run begins at 09:00 and ends at 17:00

Power systems as on 1070807005

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
---------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, DNB, Z-bolo shutters

Torvac setup: Gate valves open after the shot

ICRF Setup: E and J ready before the run

LH Setup: LHCD required for this run

DNB: DNB not required but can piggyback
Cryopump: No cryopump for this run

Run plan:
D, 5.4T, 1MA
start with low density LSN shot
1070807005 with Ip changed from 0.9MA to 1MA

LH 90deg ideal phasing
start 0.95s stop 1.3s
7 segments (50ms/seg)
1: 50-75kW
2-3: 75
4-5: 30
6-7: 75

ICRF (J port) 2MW
1.15-1.3s

A-side reciprocating Langmuir probe
2 plunges up to the LCFS, with peak insertion times
at 1.05s and 1.25s

L-mode/H-mode comparison with sequentially increasing density
approximate range
nel_04 = (0.5 - 1.5) x 1020 m-2
(possibly a little lower and higher)

vary accessibility near the high end of density range
by changing LH phasing to 60 and 135 deg (nonideal)

compare with limiter plasma if time allows

Session Leader Summaries
Entered: Aug 26 2007 02:11:22:947PM
Author: Eric Edlund
MP #495 a

Summary for shots 033 through 035.

The plan was for these remaining shots was to run a combination of LH and ICRH in the current ramp, this time with the LH preceding the ICRH. This was a follow-up on 1070823, where due to multiple cell accesses, we did not have time to complete this scan.

For these shots, LH was turned on at 0.100 seconds, and the ICRH at 0.150 seconds.

Shot 033 had 400 kW of LH power at 90 degree phasing. The PCI data system did not acquire data during the time window of interetest, so o observation could be made from this. Magnetics showed no signs of Alfven Cascades, though some TAEs were present following the ICRH. A disruption occured later in the shot.

Shot 034 was a fizzle.

Shot 035 had 400 kW of LH power at 105 degree phasing, an early trip cut the LH power from 0.10 to 0.12 seconds, and was then steady from 0.12 to 0.15 seconds. The PCI system (this time with the correct time window), saw no signs of Alfven cascades before or after the ICRH was turned on.

The case with LH at 105 degree phasing (shot 035) had a sawtooth entry time about 50 ms earlier than in the 90 degree case (shot 033). Direct comparison of the role of LH in this is not entirely clear due to the loss of power in the first 30 ms of the LH pulse on shot 035. Investigations with the hard x-ray system also show that the fast-electron density is not hollow, suggesting that the current is being driven on-axis.
Entered: Aug 26 2007 07:06:13:353PM
Author: Yuichi Takase
MP499A Parametric Decay and Density Limit for LHEH/LHCD
SL: Yuichi Takase
PO: Joe Snipes

The purpose of this experiment was to investigate the dependence of parametric decay instability on edge (inside/outside the LCFS) density and temperature under ITER relevant conditions, i.e., in diverted configuration at ITER magnetic field. Comparison was made between L-mode and H-mode conditions, and for different LH wavenumber spectra. These experimental results provide important information for determining the frequency for the ITER LHCD system.

Frequency spectra near the LH pump frequency (for lower and upper sidebands) and near zero frequency (for low frequency quasi-modes) were obtained by splitting the signal from a midplane RF electrostatic probe on the LH grill and sweeping two spectrum analyzers over 20ms. In addition, frequency integrated RF wave power was measured using the NE (northeast) tip of the A-side reciprocating Langmuir probe to obtain the radial profile of RF wave power (passband of the filter included both the pump and the sideband LH waves).

This was a very productive run. A number of interesting results were obtained. Two 100ms LH pulses, 1st without ICRF (L-mode) and 2nd with ICRF (H-mode), were used. A density scan with LH at 90 degree current drive phasing
(n_parallel = 2.3) indicated that interaction with electrons disappears around nel_04 = 0.6e20m-2. Intense parametric decay is not observed until the density is around nel_04 = 0.9e20m-2, substantially higher than where interaction with electrons disappears.

For the same density, parametric decay is weaker in H-mode, and the spectral shape indicates that the maximum growth rate occurs at a region where the local temperature is higher. A similar result was observed at 60 degree phasing. Unfortunately poor LH coupling prevented injection of LH power with high wavenumber (120 degree phasing) at low densities. At the same denisity, waves with smaller wavenumber (less accessible waves) tend to excite stronger parametric decay.

A-side reciprocating Langmuir probe detected large amplitude RF signal at low densities. The wave amplitude decreased rapidly at densities nel_04 > 0.9e20m-2. The radial profile of RF wave amplitude was not monotonic, but increased and decreased during a radial scan, indicating that the wave field is localized radially. The localization was very pronounced at densities around nel_04 = 1.0e20m-2 (shot 011, for example).

There were difficulties coupling LH power into low and high density discharges. Magnetic field scan and comparison between limiter and divertor discharges were not performed. Further analysis is in progress.

Physics Operator Summaries
Entered: Aug 24 2007 05:24:22:763PM
Author: Joseph Snipes
It was a good run. The machine and both RF systems worked quite well. Startups were fairly reliable including a fizzle following each major disruption. Parametric decay instabilities were observed on a number of shots except at very low density, as expected. The last few shots were also devoted to current rise with combined LH+ICRF and a number of TAEs were observed, though no Alfven cascades were observed. There were 35 shots with 30 plasmas and 5 fizzles.

Shot,Duration(s),Ipmax(MA),Result Shot,Duration(s),Ipmax,Result
| 01 0.243 0.681 Plasma | 02 1.965 1.006 Plasma |
| 03 1.984 1.006 Plasma | 04 1.985 1.005 Plasma |
| 05 1.984 1.009 Plasma | 06 1.985 1.005 Plasma |
| 07 2.020 1.003 Plasma | 08 1.926 0.999 Plasma |
| 09 2.020 1.003 Plasma | 10 2.010 1.006 Plasma |
| 11 1.754 1.000 Plasma | 12 0.000 0.055 Fizzle |
| 13 1.737 1.000 Plasma | 14 1.863 1.001 Plasma |
| 15 1.305 1.024 Plasma | 16 0.000 0.049 Fizzle |
| 17 1.313 1.014 Plasma | 18 0.000 0.050 Fizzle |
| 19 1.892 1.000 Plasma | 20 0.000 0.050 Fizzle |
| 21 1.806 1.000 Plasma | 22 1.970 1.009 Plasma |
| 23 1.993 1.007 Plasma | 24 1.997 1.005 Plasma |
| 25 1.997 1.003 Plasma | 26 1.997 1.005 Plasma |
| 27 1.997 1.005 Plasma | 28 1.996 1.004 Plasma |
| 29 1.997 1.004 Plasma | 30 1.997 1.005 Plasma |
| 31 1.998 1.007 Plasma | 32 1.997 1.003 Plasma |
| 33 0.408 0.863 Plasma | 34 0.000 0.053 Fizzle |
| 35 0.906 0.857 Plasma
Date 1070824: 35 shots. 30 plasmas. 5 fizzles. 0 duds. 0 System Error.
(Plasma = Ip gt 60.0 kA Dud = H_alpha lt 0.40 V)
Total plasma duration: 53.04 s (exceeding -68 kA)

Session Leader Comments
Aug 24 2007 09:16:02:243AM1070824001Yuichi TakaseD, 5.4T, 1MA, LSN
start with 1070807005 with Ip changed to 1MA
LH: start with 90 deg ideal phasing, two high-power pulses 1.0-1.1 and 1.2-1.3s.
ICRF: J-port 2MW 1.15-1.3s
LH probe spectrum analyzer sweep at 1.25s for 20ms

nl_04=0.37e20, disrupted @ 0.23s
Aug 24 2007 09:32:15:067AM1070824002Yuichi TakaseRepeat

1MA, nl_04=0.5e20, ICRF OK (2MW), no LH (tripping: outer gap too large?)
ICRF induces H-mode and raises the density to over 0.7e20
Aug 24 2007 09:39:09:390AM1070824003Yuichi TakaseRepeat with smaller outer gap, more gas

Better, but still no LH (tripping)
H-mode during ICRF
Aug 24 2007 10:15:39:710AM1070824004Yuichi TakaseRepeat with smaller outer gap, more gas
moved LH probe spectrum sweep to 1.05s

Better, got 1st LH pulse (0.25MW)
no parametric decay
Aug 24 2007 10:33:49:783AM1070824005Yuichi Takasemoved LH probe spectrum sweep to 1.25s
ad LH power ramp 1.2-1.25s (LH ends at 1.35s)

got partial 2nd LH pulse, partial freq. spectrum
firing A-side reciprocating probe (2 strokes during LH)
Aug 24 2007 10:39:16:637AM1070824006Yuichi Takaseextend LH pulse to 1.35s
ad LH power ramp 1.2-1.25s (LH ends at 1.35s)

higher density, nel_04=0.75
spectrum at 1.05s, no parametric decay (1st LH pulse)
2nd LH two trips, two trips on ICRF too.
Aug 24 2007 10:48:18:260AM1070824007Yuichi Takaselower upper triangularity to reduce LH reflection on top row (did not help much)

higher density, nel_04=0.75 (1.0 during H-mode)
Only partial 2nd LH pulse
spectrum at 1.3s, some parametric decay (peak at 4.47GHz)

Aug 24 2007 11:07:14:430AM1070824008Yuichi Takasehigher density, nel_04=1.0

good LH pulse, but no ICRF (tripping), so no H-mode
spectrum at 1.05s, parametric decay with about 3 IC sidebands
RLP shows RF power profile peaked part way in
not much electron response to LH (0.4MW)
Aug 24 2007 11:36:11:897AM1070824009Yuichi Takasenel_04=1.0
good LH pulse.
ICRF tripping, but got H-mode, and spectrum during H-mode (1.3s)
parametric decay with about 3 IC sidebands, similar to 1st LH pulse

Aug 24 2007 11:40:54:653AM1070824010Yuichi Takaserepeat, but ICRF with J + E, instead of J only
nel_04=1.0
Both LH and ICRF good. spectrum similar to previous shot.

Aug 24 2007 11:53:48:097AM1070824011Yuichi Takasehigher density, nel_04=1.25
spectrum still similar (1st LH pulse)
vey sharp peak on RLP (highly localized radially)

Aug 24 2007 11:57:14:943AM1070824012Yuichi Takasefizzle
Aug 24 2007 12:16:41:223PM1070824013Yuichi TakaseBoth LH and ICRF good.
spectrum during 2nd LH still look similar.
could be accessibility problem.
Aug 24 2007 12:30:07:247PM1070824014Yuichi Takasesame density
only got partial spectrum during 1st LH pulse

Aug 24 2007 12:49:18:150PM1070824015Yuichi Takasehigher density, nel=1.6
1st LH pulse (weaker parametric decay?)
no ICRF, no H-mode


Aug 24 2007 12:54:01:500PM1070824016Yuichi Takasefizzle


Aug 24 2007 01:22:19:340PM1070824017Yuichi Takasenel_04=1.5
LH phasing changed to 120 deg. to improve accessibility
good LH (0.38MW), ICRF (0.55MW), disrupt at 1.3s
spectrum during 1st LH
Aug 24 2007 01:22:38:390PM1070824018Yuichi Takasefizzle
Aug 24 2007 01:55:43:800PM1070824019Yuichi Takasenel_04=1.25
got spectrum during 1st LH pulse (0.37MW)
Aug 24 2007 02:01:33:590PM1070824020Yuichi Takasefizzle
Aug 24 2007 02:17:26:973PM1070824021Yuichi Takasenel_04=1.25 -> 2.0
spectrum during 2nd LH pulse (H-mode)
Aug 24 2007 02:21:03:963PM1070824022Yuichi Takasenel_04=1.0 -> 2.0
spectrum during 1st LH pulse (weaker parametric decay)
Aug 24 2007 02:32:08:463PM1070824023Yuichi Takasenel_04=0.8 -> 1.5
LH tripping
need to repeat
Aug 24 2007 03:12:46:277PM1070824024Yuichi Takasenel_04=0.8 reduced outer gap
LH still tripping

Aug 24 2007 03:13:02:870PM1070824025Yuichi Takasenel_04=0.8 reduced outer gap some more
LH still tripping

Aug 24 2007 03:19:06:597PM1070824026Yuichi Takasenel_04=0.8 reduced outer gap and upper triangularity some more
LH still tripping
reduce LH power and change spectrum analyzer sweep time for next shot
Aug 24 2007 03:33:08:120PM1070824027Yuichi Takasenel_04=0.65 (lower density)
reduced LH power and changed spectrum analyzer sweep timing (1.13-1.15s)
LH still tripping
edge densty probably too low for this wavenumber
try 60 degrees for the next shot
Aug 24 2007 03:40:00:793PM1070824028Yuichi TakaseLH phasing 60 degrees
nel_04=0.75
LH much better, but no spectrum
spectrum analyzer sweep (1.05-1.07s) was during LH trip

Aug 24 2007 04:38:14:723PM1070824029Yuichi TakaseLH phasing 60 degrees
nel_04=0.75
Strong parametric decay (1st LH pulse), lower sideband comparable to pump

Aug 24 2007 04:39:30:507PM1070824030Yuichi TakaseLH phasing 60 degrees
nel_04=0.65
Very weak parametric decay (1st LH pulse)
Large signal on RLP

Aug 24 2007 04:40:49:760PM1070824031Yuichi TakaseLH phasing 60 degrees
nel_04=0.6 -> 0.9
Weak parametric decay (2nd LH pulse)

Aug 24 2007 04:43:11:903PM1070824032Yuichi TakaseLH phasing 105 degrees
nel_04=0.9
Weak parametric decay (1st LH pulse)

========================================

End of this MP

Handing over to Miklos

Physics Operator Comments
Aug 24 2007 09:03:32:020AM1070824001Joseph SnipesShot 1: Copied shot 1070807005 and reduced the prepuff to 19 ms duration and
increased Ip to 1 MA. Rotating MHD mode locks at 0.19 s leading to a disruption
at 0.23 s.
Aug 24 2007 09:34:19:240AM1070824003Joseph SnipesShot 3: Increased prepuff by 3 ms to 22 ms duration. Increased RCUR by 3 mm to
reduce the outer gap to improve LH coupling. Runaways starting at 0.03 s. Need
more early gas.
Aug 24 2007 09:48:36:717AM1070824004Joseph SnipesShot 4: Increased prepuff by 3 ms to 25 ms duration. Increased RCUR by 2.5 mm to
further reduce the outer gap to improve LH coupling. Good shot.
Aug 24 2007 10:03:01:613AM1070824005Joseph SnipesShot 5: Increased prepuff by 2 ms to 27 ms duration. Good shot.
Aug 24 2007 10:16:52:150AM1070824006Joseph SnipesShot 6: Raised nl04 to 7 x 10^19 m^-2. Good shot.
Aug 24 2007 10:33:36:283AM1070824007Joseph SnipesShot 7: Increased RXU by 1 cm to better match the LH launcher. Increased the
flattop length by 0.1 s for Steve Scott for the DNB out to 1.6 s on Ip and 1.7 s
on TF. Good shot.
Aug 24 2007 10:50:11:967AM1070824008Joseph SnipesShot 8: Increased nl04 to 1 x 10^20 m^-2. Lengthened the flattop out to 1.7 s
for Ip and all P's. Disrupted in rampdown at 1.91 s.
Aug 24 2007 11:11:06:700AM1070824009Joseph SnipesShot 9: Changed rampdown slightly to attempt to avoid the late disruption.
Decreased prepuff to 20 ms duration. NINJA puff at 0.7 s. RCUR decreased by
2.0 mm as CLEARIN was decreased by 2 mm. Good shot.
Aug 24 2007 11:22:35:797AM1070824010Joseph SnipesShot 10: Enabled argon gas with a 70 ms puff from 0.3 to 0.37 s. Extended nl04
to 1.5 s at 1 x 10^20 m^-2. Readjusted CLEARIN and RCUR to try to flatten out
the outer gap. Good shot.
Aug 24 2007 11:34:56:253AM1070824011Joseph SnipesShot 11: Raised nl04 to 1.22 x 10^20 m^-2. Increased argon pulse length to
0.1 s. Reduced prepuff by 1 ms to 19 ms duration. Decreased RCUR by 2.5 mm to
increase the outer gap by 5 mm. Good shot though it disrupted in the rampdown
at 1.73 s.
Aug 24 2007 11:47:32:820AM1070824012Joseph SnipesShot 12: Extended EF2_by_EF4 out to 1.7 s. Reduced RCUR by 2.5 mm to again
increase the outer gap by 5 mm. Fizzle!
Aug 24 2007 12:16:55:177PM1070824013Joseph SnipesShot 13: Reduced prepuff to 17 ms duration. NINJA puff moved to 0.8 s. Good
shot but disrupted in rampdown again at 1.73 s. Railing the OH1 supply.
Aug 24 2007 12:35:14:737PM1070824014Joseph SnipesShot 14: Increased current limit on OH1 to +/- 30 kA. Increased the ICRF pulse
out to 1.5 s. Disrupted a bit later at 1.86 s.
Aug 24 2007 12:38:47:417PM1070824015Joseph SnipesShot 15: Reduced flattop on all P's to 1.5 s. Increased nl04 to 1.6 x 10^20 m^-2.
Disrupted at 1.3 s.
Aug 24 2007 12:50:57:387PM1070824016Joseph SnipesShot 16: Reduced nl04 to 1.5 x 10^20 m^-2. Reduced prepuff by 2 ms to 15 ms
duration. Fizzle!
Aug 24 2007 01:05:31:567PM1070824017Joseph SnipesShot 17: Repeat. Disrupted at 1.31 s.
Aug 24 2007 01:16:31:487PM1070824018Joseph SnipesShot 18: Reduced nl04 to 1.22 x 10^20 m^-2. Fizzle!
Aug 24 2007 01:29:19:540PM1070824019Joseph SnipesShot 19: Repeat. Good shot.
Aug 24 2007 01:42:20:670PM1070824020Joseph SnipesShot 20: Increased prepuff by 2 ms to 17 ms duration. Fizzle!
Aug 24 2007 01:56:10:190PM1070824021Joseph SnipesShot 21: Reduced prepuff by 2 ms to 15 ms duration. Good shot. Disrupted in
rampdown around 1.78 s.
Aug 24 2007 02:08:17:333PM1070824022Joseph SnipesShot 22: Reduced nl04 to 1 x 10^20 m^-2. Reduced prepuff to 14 ms duration.
Good shot.

Aug 24 2007 02:27:57:457PM1070824023Joseph SnipesShot 23: Reduced nl04 to 0.7 x 10^20 m^-2. Good shot.
Aug 24 2007 02:34:56:907PM1070824024Joseph SnipesShot 24: Increased RCUR by 4 mm to reduce the outer gap. Good shot.
Aug 24 2007 02:53:50:950PM1070824025Joseph SnipesShot 25: Increased RCUR by 2 mm to reduce the outer gap some more. Also
increased RXU by 1 to 1.5 cm to better match the shape of the LH launcher.
Good shot.
Aug 24 2007 03:14:29:467PM1070824026Joseph SnipesShot 26: Increased RCUR by 0.5 mm to reduce the outer gap a bit more. Also
increased RXU to 1.0 cm to better match the shape of the LH launcher. Good
shot.
Aug 24 2007 03:21:38:960PM1070824027Joseph SnipesShot 27: Increased RCUR early to try to flatten the outer gap in the current
flattop to the lower value of outer gap. Reduced nl04 to 6 x 10^19 m^-2 to try
to get the desired 7 x 10^19 m^-2. Good shot.
Aug 24 2007 03:34:59:430PM1070824028Joseph SnipesShot 28: Reloaded shot 26 but now with 60 degree phasing on the LH launcher.
Good shot.
Aug 24 2007 03:48:58:000PM1070824029Joseph SnipesShot 29: Repeat. Good shot.
Aug 24 2007 04:06:00:223PM1070824030Joseph SnipesShot 30: Reduced nl04 to 5 x 10^19 m^-2. Good shot.
Aug 24 2007 04:20:57:730PM1070824031Joseph SnipesShot 31: Repeat. Good shot.
Aug 24 2007 04:33:36:360PM1070824032Joseph SnipesShot 32: Increased nl04 to 8 x 10^19 m^-2. LH phase changed to 105 degrees.
Good shot.
Aug 24 2007 04:43:20:683PM1070824033Joseph SnipesShot 33: Changing to Miklos/Eric's program from yesterday for the last two shots.
Loaded shot 1070823010. Turning on LH from 0.1 s and ICRF from 0.14 s. LH
phasing set to 90 degrees. Disrupted at 0.4 s.
Aug 24 2007 04:58:42:803PM1070824034Joseph SnipesShot 34: Reduced prepuff to 14 ms duration. Fizzle.
Aug 24 2007 05:08:52:083PM1070824035Joseph SnipesShot 35: LPI enabled with a pellet after 0.5 s. Increased prepuff to 15 ms
duration. Disrupted at 0.9 s. No pellet.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:00:02:797AMPlasmaOk
209:13:19:693AMPlasmaOk
309:27:01:590AMPlasmaOk
409:43:38:600AMPlasmaOk
510:01:11:330AMPlasmaOk
610:15:06:867AMPlasmaOk
710:31:48:470AMPlasmaOk
810:47:42:947AMPlasmaOk
911:06:14:397AMPlasmaOk
1011:19:46:730AMPlasmaOk
1111:32:41:517AMPlasmaOk
1211:45:34:927AMPlasmaOk
1311:58:42:510AMPlasmaOk
1412:17:58:413PMPlasmaOk
1512:35:49:177PMPlasmaOk
1612:48:56:163PMPlasmaOk
1701:01:59:450PMPlasmaOk
1801:14:54:830PMPlasmaOk
1901:27:20:050PMPlasmaOk
2001:40:16:570PMPlasmaOk
2101:53:49:733PMPlasmaOk
2202:06:20:300PMPlasmaOk
2302:19:21:930PMPlasmaOk
2402:32:44:480PMPlasmaOk
2502:50:50:650PMPlasmaOk
2603:03:20:857PMPlasmaOk
2703:20:01:367PMPlasmaOk
2803:33:20:193PMPlasmaOk
2903:47:19:970PMPlasmaOk
3004:03:44:077PMPlasmaOk
3104:16:18:253PMPlasmaOk
3204:28:44:117PMPlasmaOk
3304:41:11:527PMPlasmaOk
3404:53:57:407PMPlasmaOk
3505:06:11:143PMPlasmaOk

System Availability
Aug 24 2007 08:59:39:017AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoStill problems with low freq. RF section. Upper 16 channel workingAug 16 2007 02:45PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 50, 60, 75 and 88 (u,l and center) are installed. The variable frequency channel is being tested. 110 is not functioningAug 16 2007 01:45PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Old spectrometers have been removed. Additional spatial channels have been added, but are not yet calibrated. Aug 07 2007 10:08AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -121.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 07 2007 10:08AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


Aug 24 2007 11:45:15:393AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoStill problems with low freq. RF section. Upper 16 channel workingAug 16 2007 02:45PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesLH is available with transmitters 2-11 working.Aug 24 2007 11:36AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 50, 60, 75 and 88 (u,l and center) are installed. The variable frequency channel is being tested. 110 is not functioningAug 16 2007 01:45PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Old spectrometers have been removed. Additional spatial channels have been added, but are not yet calibrated. Aug 07 2007 10:08AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -121.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 07 2007 10:08AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf