Miniproposal:468
Date Filed: 3/8/2007
Title:LH-driven fast electron diffusion time measurement
First Author:Andrea Schmidt
Session Leader:Andrea Schmidt (shots 6-22)

Operators
Session leader(s):Andrea Schmidt
Physics operator(s):Robert Granetz
Engineering operator(s):Gary Dekow

Engineering Operator Run Comment
MP 468: LH-driven fast electron diff. Sl: Schmidt PO:Granetz

Session Leader Plans
Entered: Aug 24 2007 04:03:31:437PM
Author: Andrea Schmidt
1/2 run day for MP 468:

Basic plan:
Obtain HXR data for LH-modulated plasmas at several conditions (several good shots at each condition):
1) 90 deg ideal phasing, nl04=5e19, Ip=500 kA
2) 90 deg ideal phasing, nl04=7.5e19, Ip=500 kA
3) (time-permitting) 120 ideal phasing, nl04=7.5e19, Ip=800 kA
4) (time-permitting) 120 ideal phasing, nl04=7.5e19, Ip=800 kA
5) (time-permitting and if there is no time for a cell access after #2 is done) 90 deg ideal phasing, nl04=1e20, Ip=800 kA

Plasma starting shot:
1070523021, with Ip changed from 800 kA to 500 kA

LH start settings:
90 deg ideal phasing
Alternating 12.5 ms on, 12.5 ms off from 0.6 to 1.5 s
Net power of ~400 kW desired (see run 1070523, shots 21, 22, 23, and 25 for klystron power settings)

Physics Operators Plans
Entered: Aug 27 2007 09:39:49:447AM
Author: Robert Granetz
Engineering setup for Monday 27 Aug 2007 (1/2 day)

MP#468 LH-driven fast electron diffusion time measurement (1/2 day)

Session leader: A. Schmidt
Physics operator: R. Granetz

No boronization needed.

Run will start at 13:00 and end at 17:00. (1/2 day run)

Power systems as on 1070523021 (with Ip changed to 0.5 MA)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
   fill B-Top            with  6 psi D2  Hybrid enabled  (PG4)
   fill B-side lower     with  1 psi Ar  Hybrid DISABLED (PG1)
  leave B-side upper     as is           Hybrid DISABLED (PG2)   
   fill B-main (C-side)  with 40 psi D2  Hybrid enabled  (PG3)
  leave NINJA            as is           DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
  ECE, VUV, DNB, Z-bolo shutters
 
Torvac setup: gate valves open after the shot

Specific diagnostics: HXR, DNB

-------------------------------------------------------------------------------
ICRF Setup: no

LH Setup: 90 deg ideal phasing
          Alternating 12.5 ms on/12.5 ms off from t=0.6 to 1.5 s (note
            later start time than previous shots)
          Net power of approx. 400 kW desired (see run 1070523, shots 21,
            22, 23, and 25 for klystron power settings)

DNB: yes, ready for first shot.  50 kV, 6 A; modulation: 60 ms on/40 ms off

Cryopump: no
-------------------------------------------------------------------------------
Run plan: Obtain HXR data for LH-modulated plasmas at several conditions
(several good shots at each condition):
1) 90 deg ideal phasing, nl04=5e19, Ip=500 kA
2) 90 deg ideal phasing, nl04=7.5e19, Ip=500 kA
3) (time-permitting) 120 ideal phasing, nl04=7.5e19, Ip=800 kA
4) (time-permitting) 120 ideal phasing, nl04=7.5e19, Ip=800 kA
5) (time-permitting and if there is no time for a cell access after #2 is
done) 90 deg ideal phasing, nl04=1e20, Ip=800 kA

Session Leader Summaries
Entered: Aug 27 2007 05:33:47:990PM
Author: Andrea Schmidt
Obtained HXR data for LH-modulated plasmas at 3 conditions (4-5 good shots at each condition):
1) 90 deg ideal phasing, nl04=5e19, Ip=500 kA (Shots 7-11,21)
2) 90 deg ideal phasing, nl04=7.5e19, Ip=500 kA (Shots 13-16, 22)
3) 90 deg ideal phasing, nl04=1e20, Ip=800 kA (Shots 17-20)

Realized that TS was off for shots up to and including 17, so shots 21 and 22 were devoted to recreating conditions 1) and 2) for TS data. Nearly no LH trips, disruption on shot 11.

Physics Operator Summaries
Entered: Aug 27 2007 05:30:28:937PM
Author: Robert Granetz
Run summary for Monday 27 Aug 2007

MP#468 LH-driven fast electron diffusion time measurement (1/2 day)

Session leader: A. Schmidt
Physics operator: R. Granetz

This run involved only one magnetic configuration, at several different
densities and two different currents.  Most of the shot-to-shot changes
involved LH phasing.  So it was an easy day for the physics operator (for a
change).

The machine ran well.  The only anomolies were shots 11 and 12, which had
early disruptions, with a large shower of glowing debris seen on the WIDE2
and JANT cameras on shot 11.  This blew a few fuses in OH1.  Fortunately
the problem went away on its own.

Scorecard: 16 plasmas
            1 duds
            0 fizzles
            0 power supply tests
            5 no-power MDS shot cycles
           --------------
    Total: 22 shot cycles

Session Leader Comments

Physics Operator Comments
Aug 27 2007 12:43:55:950PMRobert GranetzLoaded seg 1, 3, 4 from 1070824035 (last shot on Friday); set pre-fill at 17 ms.

Loaded seg 2 from 1070523021 seg 2.
Call all magnetics estimators
Set Ip at 0.5 MA.

Also turned off dpcs_ftae2 test_pro.
Aug 27 2007 09:40:31:963AM1070827001Robert GranetzShot 01 -- test shot cycle
Aug 27 2007 11:27:17:597AM1070827002Robert GranetzShot 02 -- test shot cycle
Aug 27 2007 11:27:24:020AM1070827003Robert GranetzShot 03 -- test shot cycle
Aug 27 2007 11:27:30:143AM1070827004Robert GranetzShot 04 -- test shot cycle
Aug 27 2007 11:26:57:127AM1070827005Robert GranetzShot 05 -- test shot cycle
Aug 27 2007 04:19:14:440PM1070827006Robert GranetzShot 06 -- Dud. The indicated Br0 and Bz0 are several mT different than usual, but
we don't believe these MFLUX signals.

Next shot: increase pre-fill 3 ms.
Aug 27 2007 01:19:57:410PM1070827007Robert GranetzShot 07 -- Plasma. Good shot. 0.5 MA, 5.4 T, 0.5e20 m-2. P_LH=0.4 MW (modulated).

Next shot: extend Bt flattop out to 2.1 s. Decrease pre-fill by 1 ms. Also extend
density flattop to 1.5 s.
Aug 27 2007 01:31:47:570PM1070827008Robert GranetzShot 08 -- Plasma. Good shot. Breakdown is still late. Some early hard x-rays.

Next shot: add 2 ms to pre-fill.
Aug 27 2007 01:50:15:393PM1070827009Robert GranetzShot 09 -- Plasma. Good shot. Breakdown is now only 1-2 ms late.

Next shot: no DPCS changes.
Aug 27 2007 02:17:51:013PM1070827010Robert GranetzShot 10 -- Plasma. Good shot.

Next shot: no DPCS changes
Aug 27 2007 02:46:42:887PM1070827011Robert GranetzShot 11 -- Plasma. Disrupted at t=0.88 s after first getting resistive. There was a
large spray of glowing particles, most likely from the inboard wall in
the vicinity of K-port. (See JANT and WIDE2 views.)

Next shot: reduce pre-fill by 2 ms (disruption recovery). Raise nl_04 to 0.75e20 m-2
Aug 27 2007 03:08:37:500PM1070827012Robert GranetzShot 12 -- Plasma. Another early disruption. Lots of hard x-rays. Lost some fuses
in OH1.

Power room access required to change fuses and check SCR's

Next shot: no DPCS changes
Aug 27 2007 03:07:05:280PM1070827013Robert GranetzShot 13 -- Plasma. Good shot. Big marfe around t=0.5 s. Got an OH1 coax resistance
warning (pertained to the previous disruption).

Next shot: no DPCS changes
Aug 27 2007 03:25:29:963PM1070827014Robert GranetzShot 14 -- Plasma. Good shot.

Next shot: tweak the density around 0.5 s to get rid of the slight overshoot.
Aug 27 2007 03:36:01:713PM1070827015Robert GranetzShot 15 -- Plasma. Good shot.

Next shot: another tweak to the density around 0.5 s.
Aug 27 2007 03:48:27:913PM1070827016Robert GranetzShot 16 -- Plasma. Good shot.

Next shot: raise nl_04 to 1.0e20 m-2 and Ip to 0.8 MA.
Aug 27 2007 04:07:03:040PM1070827017Robert GranetzShot 17 -- Plasma. Good shot. It turns out that the Thomson diagnostic was mistakenly not turned
on up to now.

Next shot: Turn on Thomson scattering diagnostic. Tweak nl_04 around t=0.5 s.
Aug 27 2007 04:21:40:317PM1070827018Robert GranetzShot 18 -- Plasma. Good shot.

Next shot: no DPCS changes
Aug 27 2007 04:39:26:233PM1070827019Robert GranetzShot 19 -- Plasma. Good shot.

Next shot: tweak nl_04 down to 0.95e20 m-2
Aug 27 2007 04:56:48:807PM1070827020Robert GranetzShot 20 -- Plasma. Good shot.

Next shot: reload seg 2 from shot 10 (0.5 MA, 0.5e20 m-2). Change nl_04 to 0.45e20 m-2 on the
belief that going back down in density will give us an overshoot, and the session
leader wants to match the actual density on shot 10, now that we are getting Thomson
data.
Aug 27 2007 05:24:20:007PM1070827021Robert GranetzShot 21 -- Plasma. Good shot.

Next shot: reload seg 2 from shot 16 (0.5 MA, 0.75e20 m-2). The lithium
pellet injector will be fired at t=1.6 s.
Aug 27 2007 05:29:37:297PM1070827022Robert GranetzShot 22 -- Plasma. Good shot. Lithium pellet injected at t=1.6 s.

End of run.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:39:05:980AMTestOkcycle test tf scanner
210:19:25:960AMTestOkTF Scanner Test
310:36:24:847AMTestOkTF scanner
410:46:12:080AMTestOkTF Scanner Test
511:03:04:997AMTestOkTF Scanner
612:54:32:573PMPlasmaOk
701:08:44:470PMPlasmaOk
801:21:48:977PMPlasmaOk
901:39:35:300PMPlasmaOk
1001:55:15:340PMPlasmaOk
1102:13:06:633PMPlasmaOk
1202:25:57:717PMPlasmaBadOH1 supply Fault
1302:58:29:233PMPlasmaOk
1403:11:06:520PMPlasmaOk
1503:26:26:260PMPlasmaOk
1603:42:01:270PMPlasmaOk
1703:57:16:057PMPlasmaOk
1804:15:52:997PMPlasmaOk
1904:30:21:347PMPlasmaOk
2004:46:14:387PMPlasmaOk
2105:03:03:397PMPlasmaOk
2205:17:36:277PMPlasmaOk

System Availability
Aug 27 2007 09:38:39:820AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEnoStill problems with low freq. RF section. Upper 16 channel workingAug 16 2007 02:45PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesLH is available with transmitters 2-11 working.Aug 24 2007 11:36AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 50, 60, 75 and 88 (u,l and center) are installed. The variable frequency channel is being tested. 110 is not functioningAug 16 2007 01:45PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Old spectrometers have been removed. Additional spatial channels have been added, but are not yet calibrated. Aug 07 2007 10:08AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -121.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 07 2007 10:08AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


Aug 27 2007 01:21:35:693PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized.Jul 19 2007 04:48PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesThe cryopump is operational in a manual mode. We will be working on interfacing its control system with the C-Mod state machine for semi-automatic operation.May 30 2007 07:58PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jun 20 2007 05:35PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesChs 17-32 workingAug 27 2007 01:11PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,5,8,10,17) operational. Jun 08 2007 08:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. Max power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes80 MHz. Maxc power is about 1.5 MWJun 20 2007 09:23AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHz. 4-strap configuration. Max ~ 3 MW.Jul 17 2007 03:52PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesLH is available with transmitters 2-11 working.Aug 24 2007 11:36AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed.Jul 19 2007 04:49PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesThe system is to be optimized.May 30 2007 01:12PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 50, 60, 75 and 88 (u,l and center) are installed. The variable frequency channel is being tested. 110 is not functioningAug 16 2007 01:45PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Old spectrometers have been removed. Additional spatial channels have been added, but are not yet calibrated. Aug 07 2007 10:08AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -121.0mm. Density is calibrated according to Raman scattering results from 26 May, supplemented with ECE cutoffs obtained on shot 1070531015.Aug 07 2007 10:08AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf