ShotTimeTypeStatusComment

System Availability
Oct 26 2007 03:50:02:100PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized. ***NO SAFETY HAZARD FOR IN-VESSEL***Sep 14 2007 11:59AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Sep 19 2007 06:14PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafe for vessel entrySep 14 2007 01:25PM (granetz)Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBnosafe for vessel entry (gate valve "open" hose is unplugged)Sep 14 2007 01:26PM (granetz)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesChs 17-32 workingAug 27 2007 01:11PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticnoPower is off. Gauge is removed from vessel.Sep 14 2007 01:38PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detector warm.Sep 14 2007 01:47PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Most channels (except 1,5,8,10,17) operational. Sep 14 2007 01:48PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesLH is available with transmitters 2-11 working.Aug 24 2007 11:36AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed. ***NO SAFETY HAZARD FOR IN-VESSEL***Sep 14 2007 11:57AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSystem under vacuum but not safed to machine. Gate valve air lines need to be removed.Sep 14 2007 11:57AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Gate valve disabled.Sep 14 2007 01:47PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoSystem is SAFE as of 9/14/2007 11:30 AM. We will be performing a variety of calibrations and inspections over the next several weeks.Sep 14 2007 11:32AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoVoltages are off on all detectors. Supplies are turned off. Key removed from supply to all global detectos, high voltage lead disconnected from He3 bankSep 14 2007 11:24AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll high voltage power supplies have been turned off and unpluggedSep 14 2007 12:59PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoProbe voltage power supplies have been turned off.Sep 14 2007 01:02PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe voltage power supplies have been turned off. Pneumatic air supply has been disconnected. Vacuum system is up to air.Sep 14 2007 01:03PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe voltage power supplies have been turned off. Pneumatic air supply has been disconnected.Sep 14 2007 01:03PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe voltage power supplies have been turned off. Coil drive power supply has been turned off.Sep 14 2007 01:04PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCInoCO2 and HeNe Lasers are off ----- safe for machine entrySep 14 2007 12:16PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is disassembled to allow for manned access. Laser access from the YAG lab is blocked by a physical shutter plate.Sep 14 2007 12:01PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem is disassembled to allow for manned access. Laser access from the YAG lab is blocked by a physical shutter plate.Sep 14 2007 12:02PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf