Power System tests followed by plasma attempt

Session Leader Plans

Physics Operators Plans
Entered: Nov 19 2007 03:16:53:690PM
Author: Steve Wolfe
Engineering Setup and Physop plan for Tuesday, Nov 20

Power Systems Testing
SL: Cochran,Irby
PO: Wolfe

Run begins at 9:00 AM (08:30 Lockup)

The main purpose of this run is Engineering Power System tests. 
These will also provide fields suitable for checking out the 
replacement flux loops at F10, F11, and F19, as well as the 
remainder of the magnetics equilibrium diagnostics. 

Most of the testing will be carried out under PLC control. DPCS will 
be used for double swing EF4 testing, and to provide inputs for the
Chopper test and the A-Coil tests. Gas puff tests will be carried out 
using DPCS program waveforms, as requested. 

Gas Setup:
-----------
fill B-top 6psi D2 Hybrid Disabled (PG4)
fill B-side lower 1 psi Argon Hybrid Disabled (PG1)
fill B-side Upper as is, Hybrid Disabled (PG2)
fill B-main 40psi D2 Hybrid Disabled (PG3)
NINJA pumped out, Disabled
* Valves will be Enabled for testing during the course of the day.

Shot sequence for the power system testing will be determined by the
Engineering operator.

Magnetics signals, particularly those from the replaced flux loops 
will be monitored for polarity and amplitude during the PF testing. 
If these are ok, then the following steps could be done to start using
them again:
1) Turn the corresponding INPUTs on in the Hybrid model tree,
   both under CONFIG and DPCS_CONFIG
2) Change \analysis::recon_vac:static_shot from 2014 to 2003 
3) Change \analysis::efit_green:static_shot from 2007 to 2008 (Also in \efit)
   Change expressions in fwtsi in both \analysis::efit_efitin and
     \efit::efit_efitin. May need to change icalz as well?
4) CVS update /usr/local/cmod/codes/pcs/user_algs/contihh/ianup.pro
   to pick up the reversion to ian_001 for new shots
5) With the new ianup.pro in place, run 
   usr/local/cmod/codes/mhd/fluxihh/load_predictors_procedure.sh
   to put back the predictors in the tree
6) Add a line to \hybrid::top.config:config_id to recalculate mag
   predictors. 
Note that it may be better to let the first plasma attempts use the
same subset of flux loops that we ended up with in August, and then make
the changes to turn the new ones on again.
See logbook entry from Nov 16 01:28PM under DPCS and MHD topics. 

It is extremely unlikely that we will try for plasma on Tuesday, especially 
if the leak has not been found. In case we do get that far and decide to
try, the following power system setup should be used:

Power systems as on 1070830001
Acoil Configuration +Dtop -Dbot -Jtop +Jbot, Enabled
Gas setup as above, except ENABLE B-top and B-main. 

TORVAC: Pumping Gate valves open

Enable the following gate valves and shutters, assuming no vacuum problems:
 Z-bolo shutter. 
Check with Terry and/or Reinke before opening VUV 
ECE will NOT be available

ICRF setup: None
LH: none

Physop plan: 
 Try for plasma with the programming as on the target shot. Check null
and magnetics signals on replacement flux loops. Once plasma is obtained,
check EFIT reconstruction, chisq values of new loops. If not already done,
update fluxihh predictors in analysis tree (/usr/local/cmod/codes/mhd/fluxihh/load_predictors_procedure.sh) and check
startup signals and gap values during flattop.
Get at least two consecutive successful startups before recalculating 
predictors to use the new loops. Probably start by only updating seg2 
predictors. 






Session Leader Summaries

Physics Operator Summaries
Entered: Nov 20 2007 05:34:19:993PM
Author: Steve Wolfe
Physop summary for Tuesday, Nov 20, 2007
Power system tests and C-Mod startup.
SL: ?
PO: wolfe
EO: Dekow,Cochran,Byford

Power testing went fairly smoothly, and was completed
on shot 29. One remaining outstanding issue is that the
TF bus rogowski is reading 10-15% low, compared to the 
shunt, and also to the Btor signal.

The new replacement magnetics flux loops f10,f11,f19 seem to
be working ok. No other active magnetics are reporting problems.
MFLUX plots look reasonable, perhaps with a small up-down assymetry
associated with f11. 

Shots 30 and 31 were plasma attempts, taken despite the fact that
the air leak is still present with a base pressure of 3.6e-6Torr.
Programming was taken from 1070830001, an 800kA successful shot
from the next to last day of operation last summer.
Both resulted in fizzles, with no current pickup and high CIII light.
The zmeter isn't working. Flashes were not seen on the tv, either
ch 33 or the h-port view. The mflux nulls looked reasonable, certainly
better than they had been. 

The EFIT static shot was updated to 2008 before the plasma attempts.
None of the other changes relative to the replacement loops were 
implemented during the run. 

After shot 31, we shut down the run in order to resume leak checking.
There seems no point in continuing until the leak is fixed. 

Following the run, I completed items #1-4 of the steps listed in
the po_plan for incorporating the replacement flux loops. EFIT, MFIL and
RECON_VAC are ready to go using the new loops. Calling predictors
using vacuum, filament, and fluxihh algorithms should generate
predictors using the new loops. 

I have not yet updated the coefficients used for the analysis tree
fluxihh predictors (including rcur,clearin, etc.) and I have 
not yet added a line to the \hybrid::top.config:config_id with
instructions for changing the predictors. I'll do these tomorrow,
assuming we run and get plasmas, which assumes the leak gets fixed.

Scorecard:
-----------

    Tests   29
    Duds     0
    Fizzles  2
    Plasmas  0
    ======= ==
    Shots   31




Session Leader Comments

Physics Operator Comments
Nov 20 2007 04:29:44:780PMSteve Wolfe
Following the run on Tuesday, Nov 20
Update /usr/local/cmod/codes/pcs/user_algs/contihh/ianup.pro

This should cause mfil and the fluxihh algorithm for predictors
to revert to the original ian tree which uses all the flux loops
(in their nominal locations). Calling the predictors should now 
result in getting predictors with the right things loaded. I'll test 
that now.

It seems to only retrieve ian shot version 1, which is correct.
The predictor has entries for f10,f11 and f19.




Nov 20 2007 05:25:14:740PMSteve Wolfe
Following the run on Tuesday, Nov 20
Try using recon_vac:static_shot=2003 on the Br0 trace
for shot31. It is broken, at least in IDL. Also in 
scopes. It may be an IEEE float or library issue, the
values are in the 10^22 range. This means I'm going to need to make a new
one anyhow.

The numbers for the coefficients don't look crazy
IDL> print,mdsvalue('ANALYSIS::TOP:RECON_VAC:BR_0:MATRIX')
   0.00100399    -0.105050   -0.0928029   -0.0386942   -0.0182297   -0.0251558  -0.00671100  -0.00594429   -0.0706493   -0.0332532
   -0.0330985    0.0328775    0.0330541    0.0718021   0.00554995   0.00650418    0.0250986    0.0182487    0.0387873    0.0929127
     0.103649    -0.496878    -0.484248
Ah, the problem is that the mag_data:signal is the wrong 
shape, because it was stored from the other static shot prescription

Try again, and the value using 2003 comes out +.0005T compared
to -.002T. The mflux value is coming out around -.0005T.

Put the static shot value back in the pulse file. 

In the analysis model, set analysis::recon_vac:static_shot=2003.
This will allow recalculation of vacuum predictors (br_0) and the
recon_vac calculation in the tree will be consistent with the 
new predictors, and will hopefully be close to correct. 



Nov 20 2007 09:28:19:233AM1071120001Steve Wolfe
shot#1: EFC test
gas on for b-top only 59ms pulse at -.5sec
hung up in INIT. Josh cleared it
Only about 100A of efc, only got about 40V on vstatic
Got gas. 0.12mTorr on ratiomatic. 


Nov 20 2007 09:30:25:030AM1071120001Steve Wolfe
shot#1: EFC test
Bit noise level blip on f10,f11 (both negative) and
f19 (positive). Signs seem consistent with nearby loops.
Can't tell anything from the magnitude; we only got about 
40A of current. 


Nov 20 2007 09:37:16:860AM1071120002Steve Wolfe
shot#2: EFC test repeat
Got about 100amps, again looks like low 
voltage on all three TMX's. 


Nov 20 2007 10:01:22:150AM1071120003Steve Wolfe
shot#3: Turn off B-top puff
Bill and Gary changed a chip on the EFC regulator board
Repeat EFC test
Got current this time, about 800amps, looks normal.
Torus pressure is rising (with gate valves closed) into the 
high e-5 scale at 1:30 into recool
1e-4 at 2:00 min
magnetics signals look reasonable, between 5 and 9mWb on the
new loops, correct polarity


Nov 20 2007 10:09:06:810AM1071120004Steve Wolfe
shot#4: 800V EFC test. 
Gary will restart the cycle, per jas
Current looks ok again, voltage still seems to be 600V?




Nov 20 2007 10:22:50:080AM1071120005Steve Wolfe
shot#5: 800V EFC test with current limit at 2.5ka
fizzle detector moved out. Got a nice flat pulse 
at 1700A, near 1000V. Looks good to me.

magnetics look ok, f10=-36, f11=-27,f19=+22
f01 has nothing but bit noise, which may be ok since it's on
the midplane. All other flux loops have visible signal.





Nov 20 2007 10:33:09:900AM1071120006Steve Wolfe
shot#6: EF2U test (PLC control)
EF2U about -3kA, also +600A induced in ef3
all flux loops have signal, mflux looks reasonable.



Nov 20 2007 10:40:43:307AM1071120007Steve Wolfe
shot#7: EF2L test (PLC control)
EF3L at -3kA, mflux looks reasonable 

Next: acoil test, dpcs control

Nov 20 2007 10:52:11:810AM1071120008Steve Wolfe
Shot#8: Setting up for acoil pulse. 
Load from 1070315001, get warnings and ack them

This one had program for 1000A and 500A, but only got
first levelto 550A because of offset. 
Increase levels to 1200,800, should get ~600 and 200.
Ignore f10,f11,f19 warnings on wires 1,2,3,4,6,7 since we're
not using these, and the loops are apparently ok anyway!
Load at 20-Nov-2007 10:44:03.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done

Got 775 amps and 300A looks good to me. 

Nov 20 2007 11:04:29:347AM1071120009Steve Wolfe
Shot#9: On to EF3 test
+2500A on EF3. Mflux looks ok, no obvious magnetics problems

Next EF4

Nov 20 2007 11:14:01:790AM1071120010Steve Wolfe
Shot#10: EF4 forward bridge
We finally noticed that the bigboard is not updating
the shot number or the coil currents/voltages. Yuri is 
looking into it. 
-1000A on EF4. Vacbrbz Bz0 signal says -.051T, vac says -.046
mflux looks good. 

Next: reverse bridge


Nov 20 2007 11:23:50:307AM1071120011Steve Wolfe
Shot#11: EF4 reverse bridge
No current. Didn't this happen last time?



Nov 20 2007 11:38:39:313AM1071120012Steve Wolfe
Shot#12: EF4 reverse bridge repeat
Got 1000A positive, and induced 400A in EF3 on the
shut off

Next: EF4 double swing, load from 1070315020



Nov 20 2007 12:09:01:903PM1071120013Steve Wolfe
Shot#13:  EF4 double swing, load from 1070315020
ignore f10,f11,f19 warnings on wires 1,2,3,4,6,7

Filling in configuration /31-JUL-2007 17:52:43.27/
Filling in DPCS configuration /31-JUL-2007 17:46:18.39/
about to ask alcdaq2 to copy /home/wolfe/pcs_scratch/pcs_model to /cmod/trees/models/pcs/pcs_model
about to ask alcdaq2 to copy /home/wolfe/pcs_scratch/dpcs_model to /cmod/trees/models/dpcs/dpcs_model
Load at 20-Nov-2007 11:39:52.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done

Looks good to me. Well, no it doesn't. I'm only seeing 
-1100Amps and program is -1345
dpcs is showing -240A of error signal. voltage demaind 
is only -750V. Maybe doesn't have enough gain? It's at P=8.
Gary says it looked the same in march. 

Move on, maybe need to come back to it

Behavior explained, PLC current limit was at 2000A, 
but the coils are in parallel so should have been >2800 for
that program. It was riding the current rail. 

Nov 20 2007 12:05:42:400PM1071120014Steve Wolfe
Shot#14:  EF1U forward bridge
-1700A square pulse. 
Looks ok. mflux is reasonable

Nov 20 2007 12:14:50:093PM1071120015Steve Wolfe
Shot#15: EF1U reverse bridge
2000A positive 
magnetics look ok


Nov 20 2007 12:25:00:330PM1071120016Steve Wolfe
Shot#16: EF1L forward bridge
Bill will replace relays on comm circuits
-2000A, magnetics look ok. 

next: reverse bridge

Nov 20 2007 12:36:47:883PM1071120017Steve Wolfe
Shot#17: EF1L reverse bridge
+2000A, ok

Next: OH1 forward bridge 
(wait on the commutations)


Nov 20 2007 12:45:32:607PM1071120018Steve Wolfe
Shot#18: OH1 forward bridge 
(wait on the commutations)
-3kA 


Nov 20 2007 12:53:54:140PM1071120019Steve Wolfe
Shot#19: OH1 reverse bridge 
+2kA, ok


Nov 20 2007 01:05:21:660PM1071120020Steve Wolfe
Shot#20: OH2u forward bridge 
-2.5ka

Nov 20 2007 01:15:50:977PM1071120021Steve Wolfe
Shot#21: OH2u reverse bridge 
got -1000A (wrong direction???)

Nov 20 2007 01:26:14:183PM1071120022Steve Wolfe
Shot#22: OH2u reverse bridge repeat with correct sign
of plc voltage setting
+2700A, looks like more oscillation than in the forward direction
~400a P-P, compared to <100a for forward bridge. 


Nov 20 2007 01:37:29:640PM1071120023Steve Wolfe
Shot#23: OH2L forward bridge  
-2600A, looks ok. 

Next: reverse bridge, ECE gate valve will be enabled, per Amanda


Nov 20 2007 01:46:00:487PM1071120024Steve Wolfe
Shot#24: OH2L reverse bridge  
ECE gate valve requested enable
+2300A   



Nov 20 2007 01:57:17:883PM1071120025Steve Wolfe
Shot#25: EF1 commutation
2000A successful commutation

Next oh commutation



Nov 20 2007 02:08:42:277PM1071120026Steve Wolfe
Shot#26: oh commutation
10kA commutation successful

next do the TF's; first Gary needs an access

Nov 20 2007 02:47:37:937PM1071120027Steve Wolfe
Shot#27: 
50kA TF test
While I'm waiting, go ahead and load from 1070830001
change seg2 title to 0.8MA SNL
Load at 20-Nov-2007 14:16:28.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done

Note that the startup (still using 07 configuration)
has 
 EF4U = -1335
 Br0 = -.0035
 rcur = 700
 pg4 = 20ms

TF 50ka test
looks good, no sign of a ground fault
There may be a small (< 1mWb) assymetry between f11 and f17

Nov 20 2007 03:04:19:403PM1071120028Steve Wolfe
Shot#28: 
100kA TF test
only got 87ka on the rogowski
Shunt claims it is 100kA,
Bt says 3.51T, which implies the shunt is correct.
May be a problem with the tf rogowski at the 10% level
mflux br0 is positive by .5mT

Nov 20 2007 03:09:21:080PM1071120029Steve Wolfe
Shot#29: 
150kA TF test
rogowski reads 130ka, bt=5.24

Next: set up for plasma


Nov 20 2007 03:27:39:883PM1071120030Steve Wolfe
Shot#30: 
plasma attempt. 
same as above, except drop pg4 from 20 to 16ms
Base pressure is still 3.6e-6 from air leak
fizzle, got light but no current.
CIII signal is .015, Halpha=0.6, zmeter dark
mflx null looks fair. 
breakdown time 6.3ms
I'm not sure we can do much better with the leak.

try raising pg4 back to 20ms

Nov 20 2007 03:37:51:183PM1071120031Steve Wolfe
Shot#31: 
try raising pg4 back to 20ms
fizzle, no current, light about the same.

Shut it down and leak check. 

Engineering Operator Comments
ShotTimeTypeStatusComment
109:15:27:837AMTestOkEFC 400V 1k
209:32:14:127AMTestBadEFC did not fire
309:51:27:257AMTestOkEFC 600V Test
410:03:37:200AMTestOkEFC Test
510:16:03:593AMTestOkEFC test
610:27:05:147AMTestOkEF2U Test
710:37:10:790AMTestOkEF2L test
810:48:14:870AMTestOkA-Coil test
910:58:55:050AMTestOkEF3 Test
1011:09:50:007AMTestOkEF4 forward bridge test
1111:20:56:040AMTestBadEF4 Reverse test
1211:35:54:923AMTestOkEF4 reverse bridge test
1311:47:13:957AMTestOkEF4 double swing test
1412:00:44:963PMTestOkEF1U
1512:11:10:810PMTestOkEF1U reverse test
1612:21:50:737PMTestOkEF1L forward bridge test
1712:31:39:677PMTestOkEF1L reverse test
1812:41:59:823PMTestOkOH1 forward test
1912:51:57:733PMTestOkOH1 reverse test
2001:01:43:660PMTestOkOH2U forward test
2101:12:20:867PMTestBadOH2U reverse test
2201:22:11:027PMTestOkOH2U reverse test
2301:32:57:280PMTestOkOH2L forward test
2401:42:46:267PMTestOkOH2L reverse test
2501:54:06:523PMTestOkEF1U-L commutation test
2602:04:34:027PMTestOkOH commutation test
2702:40:19:473PMTestOkTF 50kA test
2802:52:39:120PMTestOkTF 100kA test
2903:05:09:233PMTestOkTF 150kA test
3003:19:32:443PMPlasmaOkAll Power Supplies Fired
3103:33:18:510PMPlasmaOk

System Availability
Nov 20 2007 09:15:06:180AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils calibrated and operational, data in the tree. Outboard midplane AXUV calibrated and operational, data in the tree. Full midplane and divertor views being digitized. ***NO SAFETY HAZARD FOR IN-VESSEL***Sep 14 2007 11:59AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Sep 19 2007 06:14PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafe for vessel entrySep 14 2007 01:25PM (granetz)Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBnosafe for vessel entry (gate valve "open" hose is unplugged)Sep 14 2007 01:26PM (granetz)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesChs 17-32 workingAug 27 2007 01:11PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticnoPower is off. Gauge is removed from vessel.Sep 14 2007 01:38PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detector warm.Sep 14 2007 01:47PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Most channels (except 1,5,8,10,17) operational. Sep 14 2007 01:48PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesLH is available with transmitters 2-11 working.Aug 24 2007 11:36AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane calibrated and operational, data being stored in tree. Divertor views showing significant noise, and not available. Upper view being digitized and analyzed. ***NO SAFETY HAZARD FOR IN-VESSEL***Sep 14 2007 11:57AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSystem under vacuum but not safed to machine. Gate valve air lines need to be removed.Sep 14 2007 11:57AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Gate valve disabled.Sep 14 2007 01:47PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoSystem is SAFE as of 9/14/2007 11:30 AM. We will be performing a variety of calibrations and inspections over the next several weeks.Sep 14 2007 11:32AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoVoltages are off on all detectors. Supplies are turned off. Key removed from supply to all global detectos, high voltage lead disconnected from He3 bankSep 14 2007 11:24AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll high voltage power supplies have been turned off and unpluggedSep 14 2007 12:59PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoProbe voltage power supplies have been turned off.Sep 14 2007 01:02PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe voltage power supplies have been turned off. Pneumatic air supply has been disconnected. Vacuum system is up to air.Sep 14 2007 01:03PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe voltage power supplies have been turned off. Pneumatic air supply has been disconnected.Sep 14 2007 01:03PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe voltage power supplies have been turned off. Coil drive power supply has been turned off.Sep 14 2007 01:04PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is disassembled to allow for manned access. Laser access from the YAG lab is blocked by a physical shutter plate.Sep 14 2007 12:01PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem is disassembled to allow for manned access. Laser access from the YAG lab is blocked by a physical shutter plate.Sep 14 2007 12:02PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf