Alcator C-Mod Run 1071127 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):Steve Wolfe
Engineering operator(s):Bill Parkin,Bill Byford

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans

Physics Operators Plans
Entered: Nov 26 2007 01:55:00:737PM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

Tasks to consider:

1) check TF Rogowski
2) begin to debug OH supply ripple
3) produce a plasma


Run begins at 09:00 and ends at 17:00

Power systems as on: 1071120031

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
Leave NINJA pumped out and DISABLED

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
Vessel temp: 60/60/60
ICRF(yes/no): no
LH(yes/no): no
DNB(yes/no): no
Cryopump (yes/no): no

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s
Entered: Nov 27 2007 08:09:05:237AM
Author: Steve Wolfe
PO Plan addendum

Plan for plasma operation:
0) Start from 1071120031, which still uses the old predictors with
zero weights for the f10,f11,f19. Also, the fluxihh coefficients in 
the analysis tree are still consistent with these predictors. EFIT,
MFLUX, MFIL, processed magnetics, should all be using the new loops.

1) Try to get plasma, tweaking mainly gas and small tweaks for null,
rcur. While doing this, let engineers check out the TF rogowski and
instrument oh2U reverse bridge to investigate oscillation.

2) Once we get a plasma, switch to new predictors in seg2, change seg2
title. Compare EFIT results on next plasma. Run 
   usr/local/cmod/codes/mhd/fluxihh/load_predictors_procedure.sh
to put back the coefficients for the new predictors into the analysis tree,
and compare the RCUR, ZCUR traces at startup on the INIT scope.

3) Once we get two startups (with current rise) in a row, change to new
predictors in seg 1, adjust BR0 and RCUR offset, change seg1 title. 
Tune startup. 

4) Proceed to run plasmas for cleanup, evaluation. 



Session Leader Summaries

Physics Operator Summaries
Entered: Nov 27 2007 05:59:47:017PM
Author: Steve Wolfe
Physop summary for Tuesday, Nov 27
MP#298a C-Mod startup
PO: wolfe
EO: Cochran, Parkin, Byford

Minimal progress was made today on the restart of operation. 
We got two short ugly plasmas, #4 (first attempt) and #18. Both
were less than 200msec and 600kA (programmed flattop was 800ka)

The TF rogowski signal got fixed. The problem was apparently
the slot in which the integrator card was sitting. 

Not sure if there was any progress on the OH2 oscillation. I don't think
so. 

The replaced flux loops continue to work, but we had one shot
#15, on which f25 and f15 failed. These were two of the ones 
that needed to be zapped at the start of the last campaign,
and Bob went in and zapped them again, which seemed to have fixed them
for now. Need to be on the lookout for more of these, which are
presumed to be vacuum-side connector contact issues. 

There was a flap at about the same time because two TF turns
73TM and 74TM were showing high resistance on the post-shot 
scanner. Eventually we got a successful backporch TF waveform
working and Jim verified that the resistance with 50kA in the
TF was an acceptable, though somewhat high, 3uOhm. The scanner
values were above 8uOhms. Yuri had to modify the RSView program
to allow a TF fizzle delay of 2500ms in order to get the backporch
to run. 

Also before shot 16 we took advantage of the long cell access to  
ECDC for about half an hour. It didn't seem to help much. 

Before the run a power supply in the rack with the halpha, CIII,
and other diode signal pre-amps was fried. The supply was removed
for repair, and did not get replaced during the day. The Halpha
and CIII signals are present on today's shots but with very low
amplitude; presumably we are seeing the photovoltaic response. Anyhow
the timing and relative amplitudes today are useable, but not the
absolute levels. 

The wide1 (A-port, TV ch 19 I think) was working, and also DANT.
Wide 2 was not. Jim took a look at it during an access, but it
still never got working, and there seems to be no data in Mdsplus
for this signal. 

There were a number of data system hangs, resulting in two no power shots 
and some other delays. There was also a mystery power supply failure
of the OH's and EF1's on shot #11, which may have been related to the
data system meltdown on shot#10. 

We got as far as step 2 of the addendum plan, calling seg2 predictors
which use the new flux loops, at shot#19. I also managed after two 
tries to get the corresponding coefficient into the analysis tree,
for Ian's RCUR and ZCUR signals, among others in the fluxihh family.
We never got another plasma past the segment switch, so got no evidence
of how the predictors are working. The RCUR and ZCUR traces
around breakdown look reasonable, slightly different from the old ones
but trends are similar. 

I never got close to calling the startup segment predictors, since
we never got two current rises in a row. I tweaked the gas a lot and
the Br, Bz, and RCUR settings some, but I don't think any of it really
mattered. The machine is just too dirty.

The ratiomatic signals started off the day looking unreasonably low,
and then Brian recalibrated and they ended up seeming too high. We got 
duds below 20msec on PG4, and all the fizzles appeared to be moving in.
Shot 18 seemed to move out nicely and had a clean,if somewhat slow
current rise. It may not have been coincidence that before this shot
I reduced the RCUR offset from 700 to 0, but subsequent shots at this
and even -500RCUR still looked like they moved in. Other changes were
a 10A tweak to IC_EF4U and 0.5mT on Br_0. We ended up with
 RCUR = +700 (where it started)
 Br_0 = -0.0035 (where we started)
 EF4 = -1345 (10amps more negative than start)
 PG4 = 28msec (8msec more than start)
I expect this combination will give a current rise on the first shot
tomorrow, assuming we ECDC overnight.

Note that shots from today will not give a warning about using predictors
including the repaired flux loops. Nevertheless the predictors in seg1
still do not use these, and seg2 only uses them for shots 19 and later. 
The segment titles designate (obscurely) which uses what; 2007 means 
it uses the old ones, 2008 the new. The next
physop should remember to change the seg1 title after he calls the 
new predictors. 

Scorecard:
-----------
     Data system cycles    3
     No power shots        2
     Power supply duds     1
     Duds (other)          4
     fizzles              12
     "plasmas" (short)     2
    ===================   ==
     Shots                24


Session Leader Comments

Physics Operator Comments
Nov 27 2007 08:35:47:730AM1071127001Steve Wolfe
Shot#1: Cycle test with gas
Got a little gas from Btop .025mTorr on ratiomatic, 
nothing visible from B-side main, but only got 30V for 80msec.
I expect more from B-top at 20msec, but it may be ok.

Before we started, there was some kind of electrical fault, 
with flames, around a C-port bottom instrumentation rack. It may
have affected H-alpha. There is camac from ha2bright and CIII, but
at the bitnoise level.  



Nov 27 2007 08:47:41:140AM1071127002Steve Wolfe
Shot#2:  
Another cycle test with gas

Gas looks the same. If it's right I'll probably need to up the 
pg4 puff, 

Nov 27 2007 08:57:29:160AM1071127003Steve Wolfe
Shot#3:  
Draw a pg3 feedforward at 100V from -.2 to .2 (fd at .08)
(Remember to reload the right waveform before we start)
That gave us a lot of gas. over a mTorr. Ok it's working

Reload from shot2 for next shot


Nov 27 2007 10:00:22:713AM1071127004Steve Wolfe
Shot#4:  Import seg1 from shot2 for next shot
Load at 27-Nov-2007 08:59:14.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done

Ready for first plasma try, leave pg4 at 20msec for now.
Plasma to 0.12sec, 500kA
NO TF rogowski trace above bit noise
Late breakdown ~9msec. Halpha very low .06,
CIII=.02, but baseline is .018. It looks like there
is a big gain problem there. No plasma tv
Ratiomatic at .025mTorr as it was on test shots.

No EFIT. 

Nov 27 2007 10:15:49:783AM1071127004Steve Wolfe
Shot#4:  EFIT log is showing "Problem with time range"
I've never seen that error before. 

It runs ok from the command line:
 type mode (2=file, 3=snap, 4=time, 5=input, 6=com file, 7=snap_ext, 8,9=MDStree,10=burst):
8

 type shot #, start time(ms), time step(ms), steps(< 301):
1071127004,0,0,0

Wait, it was the burst mode efi01 that had that error.
Looks like the normal one ran. Big chisq 


Nov 27 2007 10:26:53:053AM1071127005Steve Wolfe
Shot#5: Try increasing pg4 puff. I think the spectroscopy
pre-amps are off-line due to the linestrip glitch this morning
PG4 from 20 to 25msec

TF rogowski still broken
Fizzle. breakdown earlier, 6.5msec
Zmeter signal is an order of magnitude higher, up to 0.15.
ratiomatic is reading .034mTorr. 
Plasma seems to be moving in. MFLUX null looks low.

Next: repeat, I think it's just dirt

Nov 27 2007 11:04:04:717AM1071127006Steve Wolfe
Shot#6: Try again, after some pluggging and unplugging of
tf roqowski signal paths. 
Hangs during INIT -- NO POWER SHOT

Nov 27 2007 11:17:20:270AM1071127007Steve Wolfe
Shot#7: Try again
fizzle 
TF rogowski working again.
PF breaker pulled late 
bd time ~6ms, still looks like it's moving in,
two peaks on zmeter, around 0.1

Next: pg4 back to 20msec
There was a network hang for several minutes after this shot

Nov 27 2007 11:34:16:430AM1071127008Steve Wolfe
Shot#8:  pg4 back to 20msec
fizzle, CIII up, zmeter a little lower, .05 to .07
bd @5.3msec
Next: drop pg4 to 16ms 

Nov 27 2007 11:51:31:063AM1071127009Steve Wolfe
Shot#9:  pg4 from 20 to 16msec
Resisting the temptation to raise Br0 and lower Bz0
Dud, dropped it too far. Ratiomatic reads .021mTorr

Next: back to 20msec
 

Nov 27 2007 12:02:06:160PM1071127010Steve Wolfe
Shot#10:  pg4 from 16 to 20msec
Hung in INIT again, NO POWER SHOT

Nov 27 2007 12:33:28:597PM1071127011Steve Wolfe
Shot#11:  pg4 from 16 to 20msec
Dud - No OH1, OH2's, EF1's; got TF, EF3 and the TMXs and chopper

Next: Nothing to change on this end



Nov 27 2007 12:46:50:883PM1071127012Steve Wolfe
Shot#12:  pg4 from 16 to 20msec
Dud, got all the supplies this time. 

Next: Pg5 up to 25msec


Nov 27 2007 01:00:28:543PM1071127013Steve Wolfe
Shot#13:  pg4 from 20 to 28msec (go a little higher than #5)
fizzle, not much current. Zmeter around 0.06 (both peaks)

Next: IC_EF4U from -1335 to -1345


Nov 27 2007 01:14:02:017PM1071127014Steve Wolfe
Shot#14:  IC_EF4U from -1335 to -1345
fizzle. Not much difference

Next: Br0 up 0.5mT

Nov 27 2007 01:28:47:133PM1071127015Steve Wolfe
Shot#15:  Br0 from -.0035 to -.003 
Brian has recalibrated the ratiomatic, which raises the
value by factor 1.7. That makes the pressure on
shot#14 .063mTorr. Leave it. 
dud. Br0 was up to +.005T, I must have mistyped? 
No, it does say -.003. While I'm puzzling over this,
there will be a cell access for Willy, and we will start ECDC when the
scan finishes.






Nov 27 2007 01:36:43:667PM1071127015Steve Wolfe
Shot#15: We got flux loop baseline offsets
on F25 and F15. F25 is very obviously broken 
on the mflux plot. The baseline offset is .14Wb !
F15 partial has a 3mWb offset (multiply by 17 for the impact)

Bob will investigate when the O2 is up in the cell.







Nov 27 2007 01:56:37:877PM1071127016Steve Wolfe
Shot#16: Bob has zapped both F15 and F25. He reports that
f25 was not shorted to the machine, and F15 was and still is.

Willy says the tf taps for the turns in question already were 
on the live set, but the digitizer has died, which may be 
causing the bad readings. He is going to move them. We will 
not be needing a backporch. 

Once people get finished, we will stop ecdc and take a repeat of 
shot 15, with fingers crossed for the flux loops f15 and 25. 







Nov 27 2007 02:24:59:217PM1071127016Steve Wolfe
Shot#16: Repeat after zapping loops and ecdc
Willy says he moved TM72,TM73,TM74 (inputs 14,15,16) are now
turns MB71,MB75,MB76.
Bill extended tf to 3.0sec so we should get a backporch

Fizzle. Did not get the backporch. Didn't change the fizzle delay.
Flux loops look ok. TF scanner still showing high on 73,74TM
Br0 is now back to between 0 and -.001T, looks like the
change I was after (but it didn't work).

Willy will put these back on inputs 14-16, and we'll try extending 
the fizzle delay on TF to 1.5sec








Nov 27 2007 03:14:05:267PM1071127017Steve Wolfe
Shot#17: Willy will move TM72-74 back to inputs14-16, as 
indicated on /usr/local/cmod/codes/engineering/scopes/scope_tf_tap.dat

I will drop pg4 back from 28 to 24msec, leaving br0 at -.003 and
EF4 at -1345a. 
Also, on the unlikely chance we get a full length shot, change the
seg2 tf rampdown to 1.6sec to a backporch at 2.5sec

fizzle. More light on CIII, also a bit of current. 
Still no back porch. It looks like 1.5sec is not enough delay, 
it's inverting at 1.58sec, which is correct. Maybe the slew rate 
is down. 

Next: put the br0 back to -.0035, and reduce rcur offset


Nov 27 2007 03:38:40:573PM1071127018Steve Wolfe
Shot#18:  put the br0 back from -.003 to -.0035, 
and reduce rcur offset from 700 to 0.
According to a note from 1060308010, Joe and Yuri modified
the TF fizzle delay to allow a setting of 2500ms, but the
present RSVIEW program seems to reject any value over 1500,
as indicated on the screen. They are being summoned. Apparently
the fix did not survive the RSView conversion; redone now.

plasma to 170msec, 600ka
Also got the backporch. Jim reports that turns 73 and 74 are 
"just fine". 

I'm going to go ahead and call fresh predictors in seg2


Nov 27 2007 04:06:02:037PM1071127019Steve Wolfe
Shot#19: Call predictors in seg2 for RCUR,ZCUR (both),CLEARIN,RXL,
ZXL, RXU,ZXU,ssep
change seg2 title.
Load at 27-Nov-2007 15:43:06.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done

Tried to run /usr/local/cmod/codes/mhd/fluxihh/load_predictors.sh
and it bombs trying to find fullpath. I FIXED THAT LAST TIME!!!
This means the analysis tree coefficients will be trashed. 

The fullpath routine is there but it didn't compile
Run it manually, in IDL, after compiling the fullpath pro.
I think I need to modify the load_predictors_procedure_main.pro 
to compile fullpath.  Meanwhile, run it in IDL with the /force
switch.

I think it worked on the manual load. Try it and see what comes out.
fizzle, not unexpected.  
The rcur trace looks like it moves in, zcur is actually on-screen (-.04).
Rcur(t=0) changed from .63 to .76
Zcur(t=0) changed from -.04 to +.13
Zmeter is high again. I think the new coefficients loaded ok, and of 
course we don't know about the seg2 predictors. 

Next: drop Pg4 back to 20ms

Nov 27 2007 04:11:20:523PM1071127020Steve Wolfe
Shot#20: drop Pg4 back from 24 to 20ms
Dud, Can't run the pressure that low anymore; ratiomatic
claims .05mTorr and now I don't believe that either

Next: put it up to 25msec

Nov 27 2007 04:25:35:620PM1071127021Steve Wolfe
Shot#21: Pg4 from 20 to 25ms
fizzle again. At least there's some light. 
Not much current though. 

Next: raise pg4 from 25 to 28ms (Why not?)

Nov 27 2007 04:41:11:613PM1071127022Steve Wolfe
Shot#22: Pg4 from 25 to 28 ms
fizzle, more CIII light, maybe marginally more current.
Still seems to be moving in, if I'm interpreting the
new improved RCUR signal correctly. 
Ratiomatic now claiming .072mTorr, which seems high.
Before this shot, had ZBOLO shutter opened for Earl; it had
been closed all day I think. 

Next: try a negative rcur offset to slow Bz down even more

Nov 27 2007 04:49:20:037PM1071127023Steve Wolfe
Shot#23: Rcur offset from 0 to -500, attempting to slow down
the Bz rise to allow the current to come up. This is now
1200A-m more negative than we used last campaign, and I've probably
wandered into the wilderness. 

fizzle. might have lasted a little longer, but still bad.
CIII light still high (relatively speaking). 

Next: rcur back to +700, where we started

Nov 27 2007 05:00:58:510PM1071127024Steve Wolfe
Shot#24: Rcur offset from -500 to +700, back where it started the day.
The other settings are now:
Br_0 = -0.0035 (where we started)
EF4 = -1345 (10amps more negative than start)
PG4 = 28msec (8msec more than start)

fizzle, a little less current, similar light signals. 
That's all for today. 

Engineering Operator Comments
ShotTimeTypeStatusComment
108:25:52:587AMTestOkShot Cycle test
208:42:56:543AMTestOkShot Cycle
308:54:45:080AMTestOkShot Cycle test
409:50:19:947AMPlasmaOk
510:19:47:037AMPlasmaOk
711:08:29:890AMPlasmaOk
811:30:08:227AMPlasmaOk
911:43:05:653AMPlasmaOk
1012:17:12:917PMTestOkno power shot
1112:29:55:860PMPlasmaBadNo OH1, OH2's or EF supplies
1212:44:08:613PMPlasmaOk
1312:56:50:353PMPlasmaOk
1401:10:03:390PMPlasmaOk
1501:22:34:897PMPlasmaOk
1602:16:30:633PMPlasmaOk
1703:01:42:340PMPlasmaOk
1803:30:41:397PMPlasmaOk
1903:51:13:437PMPlasmaOk
2004:06:37:473PMPlasmaOk
2104:20:32:980PMPlasmaOk
2204:32:54:453PMPlasmaOk
2304:45:22:393PMPlasmaOk
2404:57:56:417PMPlasmaOk

System Availability
Nov 27 2007 08:25:26:680AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersnofoil and diode 2pi's, midplane AXUV, midplane foils, divertor AXUV and WB1-AX, WB2-AX,WB2-LY all attached and collecting data but need to be debugged. Nov 26 2007 10:28PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Sep 19 2007 06:14PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticnoPower is off. Gauge is removed from vessel.Sep 14 2007 01:38PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detectors warm, and dewar disassembled to repair Ch 9.Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesLH is available with transmitters 2-11 working.Aug 24 2007 11:36AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRecovering from vacuum failure during opening. Still at pressure too high to open, will be a few days still.Nov 20 2007 05:22PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll high voltage power supplies have been turned off and unpluggedSep 14 2007 12:59PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoProbe voltage power supplies have been turned off.Sep 14 2007 01:02PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe voltage power supplies have been turned off. Pneumatic air supply has been disconnected. Vacuum system is up to air.Sep 14 2007 01:03PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe voltage power supplies have been turned off. Pneumatic air supply has been disconnected.Sep 14 2007 01:03PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe voltage power supplies have been turned off. Coil drive power supply has been turned off.Sep 14 2007 01:04PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


Nov 27 2007 09:49:57:743AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersnofoil and diode 2pi's, midplane AXUV, midplane foils, divertor AXUV and WB1-AX, WB2-AX,WB2-LY all attached and collecting data but need to be debugged. Nov 26 2007 10:28PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Sep 19 2007 06:14PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticnoPower is off. Gauge is removed from vessel.Sep 14 2007 01:38PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detectors warm, and dewar disassembled to repair Ch 9.Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoLH I-Q detector removed for repairs and calibrations to follow.Nov 27 2007 09:39AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoVoltage control problems using upgraded PLC control codeNov 27 2007 09:17AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll high voltage power supplies have been turned off and unpluggedSep 14 2007 12:59PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoProbe voltage power supplies have been turned off.Sep 14 2007 01:02PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe voltage power supplies have been turned off. Pneumatic air supply has been disconnected. Vacuum system is up to air.Sep 14 2007 01:03PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe voltage power supplies have been turned off. Pneumatic air supply has been disconnected.Sep 14 2007 01:03PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe voltage power supplies have been turned off. Coil drive power supply has been turned off.Sep 14 2007 01:04PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Nov 27 2007 10:53:15:230AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersnofoil and diode 2pi's, midplane AXUV, midplane foils, divertor AXUV and WB1-AX, WB2-AX,WB2-LY all attached and collecting data but need to be debugged. Nov 26 2007 10:28PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticnoPower is off. Gauge is removed from vessel.Sep 14 2007 01:38PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detectors warm, and dewar disassembled to repair Ch 9.Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoLH I-Q detector removed for repairs and calibrations to follow.Nov 27 2007 09:39AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoVoltage control problems using upgraded PLC control codeNov 27 2007 09:17AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll high voltage power supplies have been turned off and unpluggedSep 14 2007 12:59PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoProbe voltage power supplies have been turned off.Sep 14 2007 01:01PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoProbe voltage power supplies have been turned off.Sep 14 2007 01:02PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe voltage power supplies have been turned off. Pneumatic air supply has been disconnected. Vacuum system is up to air.Sep 14 2007 01:03PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe voltage power supplies have been turned off. Pneumatic air supply has been disconnected.Sep 14 2007 01:03PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe voltage power supplies have been turned off. Coil drive power supply has been turned off.Sep 14 2007 01:04PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Nov 27 2007 02:16:17:057PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersnofoil and diode 2pi's, midplane AXUV, midplane foils, divertor AXUV and WB1-AX, WB2-AX,WB2-LY all attached and collecting data but need to be debugged. Nov 26 2007 10:28PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detectors warm, and dewar disassembled to repair Ch 9.Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoLH I-Q detector removed for repairs and calibrations to follow.Nov 27 2007 09:39AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoVoltage control problems using upgraded PLC control codeNov 27 2007 09:17AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoPneumatic air supply is still disconnected.Nov 27 2007 01:46PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke