Alcator C-Mod Run 1071128 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):Jim Irby
Engineering operator(s):Andy Pfeiffer,Ed Fitzgerald,Sam Pierson

Engineering Operator Run Comment
1) begin to debug OH supply ripple 2) produce a plasma PO Jim Irby

Session Leader Plans

Physics Operators Plans
Entered: Nov 27 2007 05:33:06:163PM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

Tasks to consider:

1) begin to debug OH supply ripple
2) produce a plasma


Run begins at 09:00 and ends at 17:00

Power systems as on: 1071127024

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
Leave NINJA pumped out and DISABLED

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
Vessel temp: 60/60/60
ICRF(yes/no): no
LH(yes/no): no
DNB(yes/no): no
Cryopump (yes/no): no

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries

Physics Operator Summaries
Entered: Nov 29 2007 08:21:57:233AM
Author: Jim Irby
The first shot today was a fizzle, but on shot 02, after a gas adjustment, a 250 ms plasma was produced. Unfortunately, we did not get another plasma until shot 11. The rga indicated a continual shot-to-shot decrease in impurity levels until by shot 10 we were back down to pre-shot 02 levels, though that is unlikely to explain the plasma on shot 11. Before shot 05 we did 30 minutes of D2 ECDC while CAMAC and data system issues were worked out. The main effect of the ECDC was to to stir up more impurities, that then took still longer to clean out of the machine. The discharge on shot 11 lasted 350 ms, but evolved much less impurity gas than shot 02. This result seemed to have been a good thing, but we still did not get another plasma, even as the rga indicated a relatively clean background gas.

On shot 21 the DPCS failed, apparently because its server rebooted right before or during the shot cycle. Strange magnet currents were produced. This problem is being very actively investigated. No stress alarms were generated.

On shot 22 the oh1 switch did not close, probably because of the problem on shot 21.

I only made one small tweak to Bz0 and another to Br0 during the run. Most tweaks were to the gas. I doubt any of these changes would have mattered in a well conditioned machine. If we have similar bad luck with plasma production on Thursday, we should consider warming up the machine somewhat and continuing the 120C bake.


plasmas: 02,11


problems:
---------

data/camac problems 06,07

fuse replaced in oh1 supply --- SCRs okay, hipot okay

duds 17,18 --- F25 issue --- zapping fixed problem

shot 21: DPCS server reboot

Session Leader Comments

Physics Operator Comments
Nov 28 2007 08:08:51:950AMJim IrbyPower supply for H-Alpha rack that failed yesterday has been re-installed.

RGA levels of mass 28, 32, 18 considerably lower than yesterday morning.
Nov 28 2007 09:06:24:143AM1071128001Jim IrbyH-alpha/CIII signals should be at proper amplitude today

Prepuff will be left at 28 ms as on 1071127024

I asked the rf guys not to condition this morning before the run after they brought up rga levels on their first pulse.

Loaded 1071127024 w/o change just to verify PCS operation --- ok

Comparison of VB signal from 1071127004 with signal from 1070831030 indicated very little difference during breakdown or well into the discharge.

----------------------------

fizzle

h-alpha and ciii signals back in operation
ciii signal probably about a factor of 5 larger than seen on clean boronized machine.






Nov 28 2007 09:30:39:280AM1071128002Jim Irbyprepuff from 28 to 26 ms

plasma for 288 ms

h/(h+d) = 20% --- not bad

lost it starting about 286 ms

RGA levels still up a factor of 10 after 15 minutes

peak gas puff about 21 Torr-l/s but no gas required past 110 ms or so


Nov 28 2007 09:57:52:977AM1071128003Jim Irbywaiting for cooling --- ln2 pump did not turn on after shot.

cooling ready but will start shot cycle at t=+25 minutes....

fizzle ---

ln2 pump did turn back on after this shot

---------------------------------

fizzle --- impurity levels still high before shot particularly masses 14 and 18.

fields okay
gas maybe a little high


Nov 28 2007 09:59:26:977AM1071128004Jim Irbyno DPCS changes

fizzle

will ecdc before next shot


Nov 28 2007 11:02:12:093AM1071128005Jim Irbyecdc for 30 minutes. Large levels of mass 28,32, 18, etc during ecdc compared to levels this morning just before we stopped it.

prepuff from 26 to 24 ms
loaded tree

starting shot cycle at t=+55 minutes

-------------------------------------------

7.9e-7 Torr at check

fizzle --- breakdown earlier than on shot 2
fields okay


Nov 28 2007 11:22:03:993AM1071128006Jim IrbyDPCS repeat

5.1e-7 Torr in check

-------------------------

fizzle
fields and gas okay

lost TCI data and probably other signals (h-alpha, ciii)


Nov 28 2007 11:39:09:547AM1071128007Jim Irbyno power shot --- check out data system

still lots of missing data --- TCI, TF tap data, halpha, ciii....

Nov 28 2007 11:48:19:393AM1071128007Jim Irby11:48 going into cell to check h-alpha rack
ln2 pump off
Nov 28 2007 11:52:17:490AM1071128007Jim Irbybad fan in CAMAC crate did in highway --- replacing...
Nov 28 2007 12:27:45:380PM1071128008Jim Irbyafter replacing oh1 fuse, and fan in CAMAC crate we are ready to try again I hope. TCI test shot was okay indicating at least some of the data system is back.

No DPCS changes.

-----------------------------

fizzle --- boring --- a little plasma current

gas and fields still okay

tf tap, halpha, tci, etc back in operation


Nov 28 2007 12:35:30:160PM1071128009Jim Irbyprepuff from 24 to 27 ms

----------------------------

fizzle
Nov 28 2007 12:58:09:327PM1071128010Jim Irbyef4 from -1345 to -1355 A

note that most RGA lines are at or below levels seen before shot 2 today.

increased cc cooling to 35% from 25%

----------------------------------------

fizzle

Note that ecdc before shot 5 had no effect on the ciii light. However, the ciii light was similar to level seen on shot 1 by shot 8 when the data system was functioning again.

fields (bz0, br0) now identical to shot 2, but gas higher and breakdown later.




Nov 28 2007 02:21:43:057PM1071128011Jim Irbyno DCPS changes

plasma for 350 ms but start losing it by 260 ms

about a factor of two lower signal levels seen on RGA immediately following discharge compared to shot 02 (though discharge lasted 90 ms longer).

fields good --- breakdown earlier


Nov 28 2007 01:21:10:100PM1071128012Jim Irbyno changes

fizzle
Nov 28 2007 01:33:01:637PM1071128013Jim Irbyno changes

fizzle


Nov 28 2007 01:59:10:277PM1071128014Jim Irbyprepuff from 27 to 25 ms

fizzle

fields okay

rga indicates levels factor of two above those before shot 11

ciii signal largest of day so far
Nov 28 2007 02:05:21:397PM1071128015Jim Irbyno DCPS changes

IGT at check 2.6e-7 Torr

fizzle

fields okay --- gas low?



Nov 28 2007 02:34:12:763PM1071128016Jim Irbycc cooling back to 25 from 35%. Slow increase in mass 14 and 28 reversed by this change.

prefill from 25 to 29 ms

Br0 from -0.0035 to -0.00375

waiting on IGOR....


IGT at check 2.1e-7 Torr

------------------------------------

fizzle --- breakdown later, ciii lower

m14 and 28 still a factor of two high relative to pre shot 11.


Nov 28 2007 02:51:44:037PM1071128017Jim Irbyprepuff back to 24 ms from 29.
loaded tree

fizzle --- big jump in fields --- f25 problem (not shorted though)


Nov 28 2007 03:05:49:150PM1071128018Jim Irbywill try again w/o cell entry to fix f25

prefill from 24 to 25 ms

dud --- fields indicate intense magnetic storm on Jupiter --- Bob goes to cell


Nov 28 2007 03:36:45:820PM1071128019Jim Irbyf25 was zapped.
no DPCS changes

---------------------------

fields okay again, but fizzle

ciii large (.027)




Nov 28 2007 03:50:05:450PM1071128020Jim Irbyno changes


fizzle -- gas low relative to shot 02 and 15



Nov 28 2007 04:00:38:733PM1071128021Jim Irbyprefill to 27 from 24 ms

DPCS or other serious error --- OH1 went in wrong direction, servers may have rebooted during shot cycle.


Nov 28 2007 04:55:57:617PM1071128022Jim IrbyDPCS issues resolved by Josh and Steve ---trying again for plasma

no DPCS changes (same as shot 21)

dud --- oh1 switch did not close

all to the power room...
Nov 28 2007 05:06:14:447PM1071128023Jim Irbytry again. Bill and Sam think the problem has been fixed. This shot will at least show we are ready for the run tomorrow.

fizzle --- no faults

all done

Engineering Operator Comments
ShotTimeTypeStatusComment
108:56:49:687AMPlasmaOk
209:10:19:897AMPlasmaOk
309:37:56:483AMPlasmaOk
409:50:25:460AMPlasmaOk
510:48:13:620AMPlasmaOk
611:02:47:127AMPlasmaOk
711:19:54:680AMPlasmaBadState Init failure
812:15:43:107PMPlasmaOk
912:28:55:003PMPlasmaOk
1012:43:58:587PMPlasmaOk
1112:56:48:403PMPlasmaOk
1201:11:39:973PMPlasmaOk
1301:27:40:790PMPlasmaOk
1401:43:53:297PMPlasmaOk
1502:02:04:010PMPlasmaOk
1602:28:10:917PMPlasmaOk
1702:41:44:860PMPlasmaOk
1802:57:56:553PMPlasmaOk
1903:22:21:220PMPlasmaOk
2003:39:46:023PMPlasmaOk
2103:53:36:840PMPlasmaOk
2204:31:47:887PMPlasmaBadoh1 switch did not fire
2305:04:14:337PMPlasmaOk

System Availability
Nov 28 2007 08:56:31:640AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersnofoil and diode 2pi's, midplane AXUV, midplane foils, divertor AXUV and WB1-AX, WB2-AX,WB2-LY all attached and collecting data but need to be debugged. Nov 26 2007 10:28PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detectors warm, and dewar disassembled to repair Ch 9.Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoLH I-Q detector removed for repairs and calibrations to follow.Nov 27 2007 09:39AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoVoltage control problems using upgraded PLC control codeNov 27 2007 09:17AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoPneumatic air supply is still disconnected.Nov 27 2007 01:46PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Nov 28 2007 10:47:55:260AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersnofoil and diode 2pi's, midplane AXUV, midplane foils, divertor AXUV and WB1-AX, WB2-AX,WB2-LY all attached and collecting data but need to be debugged. Nov 26 2007 10:28PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detectors warm, and dewar disassembled to repair Ch 9.Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoLH I-Q detector removed for repairs and calibrations to follow.Nov 27 2007 09:39AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoVoltage control problems using upgraded PLC control codeNov 27 2007 09:17AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoPneumatic air supply is still disconnected.Nov 27 2007 01:46PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Nov 28 2007 04:31:48:497PM

Warning: mssql_fetch_array(): supplied argument is not a valid MS SQL-result resource in /bigdisk/www/html/research/alcator/facility/system_availability/index.php on line 126
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change


Nov 28 2007 05:04:00:040PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersnofoil and diode 2pi's, midplane AXUV, midplane foils, divertor AXUV and WB1-AX, WB2-AX,WB2-LY all attached and collecting data but need to be debugged. Nov 26 2007 10:28PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detectors warm, and dewar disassembled to repair Ch 9.Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoLH I-Q detector removed for repairs and calibrations to follow.Nov 27 2007 09:39AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoVoltage control problems using upgraded PLC control codeNov 27 2007 09:17AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoPneumatic air supply is still disconnected.Nov 27 2007 01:46PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke