| Physics operator(s): | Robert Granetz |
| Engineering operator(s): | Ed Fitzgerald |
| Engineering Operator Run Comment |
| MP#473: LH check-out and initial operation |
| Session Leader Plans |
| Entered: Nov 28 2007 02:25:25:197PM |
| Author: Greg Wallace |
| Session leader plan for 1071129
MP#473: LH check-out and initial operation SL: G. Wallace PO: R. Granetz Plasma setup: Start with a shot from 1071128 which works and go from there. Ip~750kA, nl_04~0.9e20, outer gap~1cm. LH setup: Set launcher to 1.5mm behind LH limiter. Phase shifters set to 90 deg current drive direction. Before first plasma: Puff LH Gas System into vessel with gate valves closed to calibrate the new capillaries. 1) Enable CPS and start with short, low power pulses at 40kV beam voltage. 3 x 25ms pulses at 50% duty cycle (12.5 on, 12.5 off), 20kW per klystron. Start with 90 degree phasing for all pulses. Vary nl_04 and/or outer gap to verify that the CPS is operating correctly. Repeat at 60 and 120 degree phasing. (May require cell acces to set CPS trip levels.) 2) Increase pulse length to 500ms, single phase during each shot. 60, 90, 120 degree phasing, 20kW per klystron. 3) Increase power in 5kW (per klystron) incriments under good coupling conditions. If shot does not run clean, go back to previous lower power level for several shots before increasing again. |
| Physics Operators Plans |
| Entered: Nov 28 2007 04:47:40:643PM |
| Author: Robert Granetz |
Engineering setup for Thursday 29 Nov 2007 MP#473: LH check-out and initial operation Session leader: G. Wallace Physics operator: R. Granetz ECDC overnight in D2 and bake at 60 C. Run will start at 09:00 and end at 17:00. Power systems as on 1071128004. NOTE: WE MAY WANT TO DO BETWEEN-SHOT ECDC. A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard configuration) Gas Setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) leave NINJA as is DISABLED Enable the following gate valves and shutters, assuming no vacuum problems: ECE, VUV, Z-bolo (Do not enable DNB gate valve.) Torvac setup: gate valves open after the shot Specific diagnostics: plasma TV (wide1, wide2), hard x-ray monitor ------------------------------------------------------------------------------- ICRF Setup: no LH Setup: as per session leader's instructions DNB: no Cryopump: no ------------------------------------------------------------------------------- Run plan: NOTE: given that reliable plasma operation has not been achieved yet, most of this run may end up being devoted to plasma startup, rather than LH startup. Start with the best shot from 1071128 (011) and set Ip=0.75 MA, nl_04= 0.9e20 m-2, outer gap = 1 cm. LH launcher initially set to 1.5 mm behind limiter. 90 deg phasing. Follow session leader's run plan. Density and/or outer gap may be varied during the day. We may also try calibrating the new LH gas puff system between shots. |
| Session Leader Summaries |
| Entered: Nov 29 2007 04:49:54:820PM |
| Author: Greg Wallace |
| Three test shots were fired with the new new LH_B and LH_D capillaries on the NINJA. Preliminary analysis shows flow rates ~.5 torr*l/s, at 94 torr D2 in the plenum. This is in the ballpark of our anticipated flow rate of ~.1 torr*l/s.
No plasma shots with LH today due to network problems, duds, and fizzles. This run day will be delayed until we reliably get plasmas. |
| Physics Operator Summaries |
| Entered: Nov 29 2007 05:19:48:283PM |
| Author: Robert Granetz |
Run summary for Thursday 29 Nov 2007
MP#473 LH startup
Session leader: G. Wallace
Physics operator: R. Granetz
A very frustrating day, partly due to computer problems...network
difficulties as well as shot cycle difficulties. These resulted in
us losing about half the attempted shot cycles. This left 18 shot
cycles that had power supplies enabled, of which 15 had all power
supplies working. Of these, we had 4 plasmas, 10 fizzles, and 1 dud.
The final shot (029) was a full-length plasma. After shot 15 I updated
all the DPCS estimators in segment 1 to use the newly-repaired flux
loops. Segment 2 had already been updated a couple of days ago. So
shot 1071129029 is a good one to load for future runs.
Because of all the difficulties with plasma operation today, the lower
hybrid system was not turned on at all. However, we did successfully
test the LH gas puffing system, and did some initial calibrations into
the empty vacuum chamber before plasma operation began this morning.
Scorecard: 4 plasmas
4 duds
10 fizzles
0 power supply tests
13 no-power MDS shot cycles
--------------
Total: 31 shot cycles (The number of shot cycles does not match the
the final shot number because several cycles didn't increment
the shot counter.)
|
| Session Leader Comments |
| Physics Operator Comments | |||
| Nov 29 2007 09:07:16:280AM | 1071129001 | Robert Granetz | The first shot will be a no-power test in order to check that the computer problems earlier this morning have been fixed. |
| Nov 29 2007 09:21:04:130AM | 1071129001 | Robert Granetz | Shot 01 -- No-power test of computers and network. Worked okay on the 2nd attempt. Next shot: try for plasma. |
| Nov 29 2007 09:32:13:230AM | 1071129002 | Robert Granetz | Shot 02 -- Dud. No EF4. Next shot: try again, this time with all supplies. |
| Nov 29 2007 09:56:22:067AM | 1071129003 | Robert Granetz | Shot 03 -- Nothing happened? The STATE machine entered PULSE, but MDSplus didn't. So there is no data for shot 03. Next shot: no-power shot to check that shot cycle is working properly. |
| Nov 29 2007 10:09:29:150AM | 1071129003 | Robert Granetz | Shot 03 -- No-power test shot. This is the 2nd attempt at a shot 03 cycle. Looks like the shot cycle worked this time, so we have data for this shot 03. Next shot: go for plasma. |
| Nov 29 2007 10:38:04:520AM | 1071129004 | Robert Granetz | Shot 04 -- Plasma. A real plasma. Disrupted at t=1.31 s. Don't know why. Ip=0.72 MA, Bt=5.4 T, nl_04=1.0e20 m-2. Prad (2pi diode) is only 0.2 MW. H/(H+D) starts at 0.2 and rises to 0.4. No LH. EFIT chi-squareds on new flux loops are around 0.5, which means that I've specified the new position coordinates correctly, I guess. Next shot: No DPCS changes. If I get several plasmas in a row, I'll start updating the predictors in segment 1. |
| Nov 29 2007 10:45:29:850AM | 1071129005 | Robert Granetz | Shot 05 -- No-power shot because shot cycle hung up again. Not sure if this cycle actually will be recorded as shot 05. Next shot: another no-power test shot |
| Nov 29 2007 11:04:04:450AM | 1071129005 | Robert Granetz | Shot 05 -- Another failed shot cycle. Not sure if any data will be recorded. Next shot: Who knows. I don't even know what the shot number will be. |
| Nov 29 2007 11:13:33:987AM | 1071129006 | Robert Granetz | Shot 06 -- No-power test shot. This cycle worked properly. Next shot: Try for plasma again. |
| Nov 29 2007 11:28:48:947AM | 1071129007 | Robert Granetz | Shot 07 -- Fizzle. Fields and pressure look reasonable. Next shot: repeat; don't change a thing |
| Nov 29 2007 11:43:09:607AM | 1071129008 | Robert Granetz | Shot 08 -- Fizzle. Next shot: decrease pre-fill pulse by 2 ms. |
| Nov 29 2007 11:54:20:033AM | 1071129009 | Robert Granetz | Shot 09 -- Fizzle. Next shot: add -15 amps to IC_EF4 |
| Nov 29 2007 12:18:07:747PM | 1071129010 | Robert Granetz | Shot 10 -- Dud. Next shot: add +0.5 mT to Br0 |
| Nov 29 2007 12:25:36:810PM | 1071129011 | Robert Granetz | Shot 11 -- Fizzle. Br0 did not change. I might not have loaded the 0.5 mT change. Next shot: definitely loaded the +0.5 mT change to Br0 for the next shot. |
| Nov 29 2007 12:39:57:020PM | 1071129012 | Robert Granetz | Shot 12 -- No-power shot due to hangup in INIT Next shot: go for plasma again. |
| Nov 29 2007 12:56:13:540PM | 1071129013 | Robert Granetz | Shot 13 -- Dud. OH1 did not commutate. Next shot: try again |
| Nov 29 2007 01:08:26:873PM | 1071129014 | Robert Granetz | Shot 14 -- Fizzle. Next shot: add +15 amps back to IC_EF4 |
| Nov 29 2007 01:29:24:400PM | 1071129015 | Robert Granetz | Shot 15 -- Plasma. Disrupted at t=0.42 s. Looks like the plasma was getting resistive. Okay, so now I think I know what the fields and gas pressure should look like on a plasma shot. Next shot: ""Call"" all the magnetics-based estimators in segment 1 in order to use the new flux loops. This means we may have to start the breakdown tweaking from scratch again, but it has to be done. |
| Nov 29 2007 01:50:46:687PM | 1071129016 | Robert Granetz | Shot 16 -- Dud. EF3 didn't fire. It's breaker pulled out sometime before PULSE. Therefore there were very large induced currents in EF3, and I can't use this dud to figure out adjustments in the RCUR and Br0 offsets. Next shot: try again, no DPCS changes |
| Nov 29 2007 02:21:47:497PM | 1071129017 | Robert Granetz | Shot 17 -- Fizzle. The null actually looks decent.
Next shot: change RCUR offset in seg 1 to be +1000 A-m. |
| Nov 29 2007 02:45:55:413PM | 1071129018 | Robert Granetz | Shot 18 -- Fizzle. Decent null and pressure. Next shot: add -0.3 mT to Br0. |
| Nov 29 2007 02:47:04:240PM | 1071129019 | Robert Granetz | Shot 19 -- Fizzle. Slightly later breakdown. Next shot: Set Br0 offset back to 0.0000 |
| Nov 29 2007 03:02:52:543PM | 1071129020 | Robert Granetz | Shot 20 -- no-power shot cycle because we got stuck in INIT. Next shot: try again |
| Nov 29 2007 03:15:45:953PM | 1071129021 | Robert Granetz | Shot 21 -- no-power cycle again. Next shot: who knows? |
| Nov 29 2007 03:36:35:040PM | 1071129022 | Robert Granetz | Shot 22 -- no power cycle; INIT problem Next shot: no-power cycle test |
| Nov 29 2007 05:10:27:610PM | 1071129023 | Robert Granetz | Shot 23 -- No-power shot cycle. Next shot: no-power shot cycle |
| Nov 29 2007 03:49:43:373PM | 1071129024 | Robert Granetz | Shot 24 -- No-power shot cycle Next shot: try for plasma? |
| Nov 29 2007 04:03:47:113PM | 1071129025 | Robert Granetz | Shot 25 -- Plasma! This used the newly-repaired flux loops in all predictors in both segments 1 and 2, so at least we accomplished something today. Next shot: more plasma |
| Nov 29 2007 04:17:42:023PM | 1071129026 | Robert Granetz | Shot 26 -- Fizzle. Next shot: decrease nl_04 to 0.5e20 m-2 |
| Nov 29 2007 04:29:14:467PM | 1071129027 | Robert Granetz | Shot 27 -- Fizzle. Next shot: reduce pre-fill by 2 ms. |
| Nov 29 2007 04:49:18:380PM | 1071129028 | Robert Granetz | Shot 28 -- No-power shot cycle. Next shot: Plasma attempt...probably shot 28 again. |
| Nov 29 2007 05:02:43:573PM | 1071129029 | Robert Granetz | Shot 29 -- Plasma. Full-length shot!! Ip=0.75 MA, Btor=5.4 T, nl_04=6e19 m-2. End of run. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:16:30:490AM | Test | Ok | Shot cycle test |
| 2 | 09:28:55:307AM | Plasma | Bad | EF4 did not fire |
| 3 | 09:44:11:157AM | Test | Ok | Shot cycle test |
| 4 | 10:19:18:310AM | Plasma | Ok | |
| 5 | 10:38:22:537AM | Test | Bad | |
| 6 | 11:11:10:500AM | Test | Ok | shot cycle test |
| 7 | 11:23:22:960AM | Plasma | Ok | |
| 8 | 11:37:54:637AM | Plasma | Ok | |
| 9 | 11:50:24:093AM | Plasma | Ok | |
| 10 | 12:05:00:710PM | Plasma | Ok | |
| 11 | 12:18:42:230PM | Plasma | Ok | |
| 13 | 12:52:29:917PM | Plasma | Ok | |
| 14 | 01:05:06:903PM | Plasma | Ok | |
| 15 | 01:17:36:300PM | Plasma | Bad | OH1 type 1 fault self powered cct fired |
| 16 | 01:40:51:920PM | Plasma | Bad | EF breaker opened right before shot |
| 17 | 02:28:55:763PM | Test | Ok | |
| 18 | 02:29:02:890PM | Plasma | Ok | |
| 19 | 02:46:19:583PM | Test | Ok | |
| 20 | 02:56:52:230PM | Plasma | Bad | No power shot computer problems |
| 21 | 03:08:00:263PM | Plasma | Bad | No Power shot, Comp probs |
| 22 | 03:16:50:893PM | Test | Bad | |
| 24 | 03:44:04:653PM | Test | Ok | cycle test |
| 25 | 03:57:37:127PM | Plasma | Ok | PF breaker pulled after plasma disrupted |
| 26 | 04:10:56:680PM | Plasma | Ok | |
| 27 | 04:26:14:123PM | Plasma | Ok | |
| 29 | 04:51:54:617PM | Plasma | Ok | full length!!! |
| System Availability | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Nov 29 2007 09:15:56:567AM | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Nov 29 2007 01:40:17:420PM | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Nov 29 2007 03:57:25:127PM | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Nov 29 2007 04:10:38:570PM | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||