ShotTimeTypeStatusComment
109:53:59:040AMTestOk
210:04:20:497AMTestOk
310:16:33:390AMTestOk

System Availability
Nov 30 2007 09:53:29:647AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoDiode 2pi working fine, foil 2pi still in the same poor condition as last campaign. Midplane AXUV down, fixing problem with AXA. Midplane foils working fine, but need calibration. 2D bolometry is being digitized but need to debug and calibrate gains.Nov 29 2007 01:38PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detectors warm, and dewar disassembled to repair Ch 9.Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesLH I-Q detectors repaired and calibrations done. Nov 29 2007 06:37AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoPneumatic air supply is still disconnected.Nov 27 2007 01:46PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke