Alcator C-Mod Run 1071204 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):Earl Marmar
Engineering operator(s):Bill Cochran,Bill Byford,Ed Fitzgerald

Engineering Operator Run Comment
MP#298a: C-Mod Startup and Conditioning PO Earl Marmar

Session Leader Plans

Physics Operators Plans
Entered: Dec 3 2007 05:16:03:783PM
Author: Earl Marmar
Engineering setup for Tuesday 4 Dec 2007

MP#298a: C-Mod Startup and Conditioning

Physics operator: E. Marmar

ECDC overnight in D2 and bake at 60 C.

Run will start at 09:00 and end at 17:00.

Power systems as on 1071129029.

NOTE: WE MAY WANT TO DO BETWEEN-SHOT ECDC.

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, Z-bolo (Do not enable DNB gate valve.)

Torvac setup: gate valves open after the shot (but we may change this during the run).

ICRF: Not required, but assuming it doesn't cause startup problems, ICRF can do between-shot conditioning into vacuum

LH: Not required

Plan: Start from 1071129029. If plasma is cleaning up, raise current and density.

Session Leader Summaries

Physics Operator Summaries
Entered: Dec 4 2007 05:03:12:093PM
Author: Earl Marmar
In the end, a decent day. We got off to a very slow start. The first shot disrupted at .72 seconds, and then we had 12 consecutive fizzles. The null looked wierd, and Steve Wolfe noticed that OH1 was 300 A more negative than we were programming. This is a power supply problem that also occurred last May. Adding integral gain (4) between -.1 and 0 seconds solved the problem. After that we had many full length plasmas, including 1 MA SNL, and .8 MA USN. J-port was also exercised. From shot 21 on the gate valves were closed during pulse and for the first 300 seconds in recool.

Scorecard:
Plasmas: 13
Fizzles: 16
Duds: 0

Total cycles: 29

Session Leader Comments

Physics Operator Comments
Dec 4 2007 09:16:53:457AM1071204001Earl Marmarload from 1071129029
750 kA, 5e19
prefill puff = 23 msec

plasma
disrupt at .72 seconds
Dec 4 2007 09:41:48:403AM1071204002Earl Marmarreduce prefill puff 2 msec (to 21 msec)

fizzle
Dec 4 2007 09:59:58:913AM1071204003Earl Marmarno pcs changes

fizzle; a tiny bit of current on this one
Dec 4 2007 10:24:58:873AM1071204004Earl Marmarno pcs changes

fizzle
Dec 4 2007 10:41:15:600AM1071204005Earl Marmarreduce RCUR offset from 1000 to 500
reduce prefill puff by 2 msec to 19 msec

fizzle
Dec 4 2007 11:03:04:310AM1071204006Earl Marmarreduce RCUR offset from 500 to 0
EF4 10 A more negative at t=0 (now -1365)

fizzle
Dec 4 2007 11:44:08:373AM1071204007Earl Marmar15 minutes ECDC in D_2 prior to this shot
torus pressure IGT = 1e-6 just prior to pulse

fizzle
Dec 4 2007 11:44:35:200AM1071204008Earl Marmarreload shot 1
prefill puff to 17 msec (from 23)

fizzle
better looking burnout on the z-meter; no current rise to speak of

Dec 4 2007 11:52:22:783AM1071204009Earl MarmarBR_0 offset to +.0005 from 0.

fizzle
later breakdown

Dec 4 2007 12:14:05:523PM1071204010Earl MarmarBR_0 offset to 0 (from 0.0005)
prefill puff to 20 msec (from 17)

fizzle

Dec 4 2007 12:26:32:190PM1071204011Earl MarmarEF4 15 A more negative at t=0 (now -1370)

fizzle
Dec 4 2007 12:40:56:353PM1071204012Earl Marmarno pcs changes

fizzle
Dec 4 2007 01:01:27:690PM1071204013Earl Marmarprefill puff to 23 msec

fizzle
Dec 4 2007 01:13:17:740PM1071204014Earl Marmaradd integral gain to IC_OH1 (gain of 4 between -.1 and 0. seconds)
IC_EF4 back to -1755A before t=0

plasma, full length
later breakdown
B_z evolution quite different
H/(H+D) ~ .2
Dec 4 2007 01:30:35:183PM1071204015Earl Marmarno pcs changes

plasma, full length
H/(H+D) ~ .26
Dec 4 2007 01:34:59:687PM1071204016Earl Marmarenable argon (B-side lower, PG1), 60 msec puff starting at .3 seconds

plasma
disrupt at .36 sec, just after big increase in Prad
Dec 4 2007 01:54:17:630PM1071204017Earl Marmarprefill puff to 21 msec (from 23)
nl_04 target to 7e19
move argon puff to .8 seconds (still 60 msec)

plasma
got the higher density
ramps most of the way down
Dec 4 2007 02:10:44:463PM1071204018Earl MarmarIp to 1 MA

plasma
ramps most of the way down
H/(H+D) starts at .26, ramps to ~.3
Dec 4 2007 02:14:33:827PM1071204019Earl Marmarno pcs changes

plasma
Dec 4 2007 02:37:05:960PM1071204020Earl Marmarlengthen Ip flattop to 1.5 seconds

plasma
rampdown disruption (.6 MA)
Dec 4 2007 03:06:03:470PM1071204021Earl Marmarclose the gate valves for 300 seconds following the shot

plasma
fil pressure is about 15% higher than on shot 20
ramps down to 200 kA
Dec 4 2007 03:05:39:080PM1071204022Earl Marmarno pcs changes

fizzle
fill pressure is about 15 % higher than on shot 20
Dec 4 2007 03:23:04:197PM1071204023Earl Marmarreduce prefill puff to 18 msec (from 21 msec)

I've loaded segment 3 from 1070830018 (.8 MA upper null) and recalculated all the magnetics. Segment 3 is off, segment 2 (1 MA lower null) still on.

plasma
ramps almost all the way down
some ICRF, with tiny H-modes?
H/(H+D) rising to .4 during flattop
Dec 4 2007 03:54:32:770PM1071204024Earl Marmarturn off segment 2, turn on segment 3
USN, 0.8 MA, 7e19

plasma
Dec 4 2007 04:07:20:493PM1071204025Earl Marmarincrease prefill puff 1 msec, now 19 msec
Ip to 0.9 MA
nl_04 to 8e19

plasma
disrupt at .35 s
Dec 4 2007 04:19:55:920PM1071204026Earl Marmarback to .8 MA, still upper null

fizzle
Dec 4 2007 04:39:31:130PM1071204027Earl Marmarreduce prefill puff by 1 msec to 18 msec

plasma
density closer to 1e20 (target .8e20)
disrupt near end of rampdown
Dec 4 2007 04:53:25:450PM1071204028Earl Marmarnl_04 target to 6.5e19

Li pellet planned at ~1.35 seconds

fizzle

Engineering Operator Comments
ShotTimeTypeStatusComment
109:06:34:047AMPlasmaOk
209:39:47:983AMPlasmaOk
309:52:18:940AMPlasmaOk
410:14:01:133AMPlasmaOk
510:34:08:063AMPlasmaOk
610:51:35:917AMPlasmaOk
711:20:52:740AMPlasmaOk
811:34:15:510AMPlasmaOk
911:47:04:580AMPlasmaOk
1011:59:39:240AMPlasmaOk
1112:13:48:057PMPlasmaOk
1212:28:07:113PMPlasmaOk
1312:45:00:463PMPlasmaOk
1401:00:03:860PMPlasmaOk
1501:16:27:400PMPlasmaOk
1601:29:29:340PMPlasmaOk
1701:44:38:550PMPlasmaOk
1801:58:01:833PMPlasmaOk
1902:12:24:340PMPlasmaOk
2002:28:53:880PMPlasmaOk
2102:44:09:540PMPlasmaOk
2202:59:38:093PMPlasmaOk
2303:13:12:660PMPlasmaOk
2403:41:12:373PMPlasmaOk
2503:56:44:473PMTestBad
2604:17:12:623PMPlasmaOk
2704:32:00:630PMPlasmaOk
2804:48:54:273PMPlasmaOk
2905:01:21:220PMPlasmaOk

System Availability
Dec 4 2007 09:06:11:110AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoDiode 2pi working fine, foil 2pi still in the same poor condition as last campaign. Midplane AXUV down, fixing problem with AXA. Midplane foils working fine, but need calibration. 2D bolometry is being digitized but need to debug and calibrate gains.Nov 29 2007 01:38PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Detectors warm, and dewar disassembled to repair Ch 9.Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesLH I-Q detectors repaired and calibrations done. Nov 29 2007 06:37AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoDetector Warm. Nov 21 2007 09:04AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoPneumatic air supply is still disconnected.Nov 27 2007 01:46PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Dec 4 2007 09:39:34:543AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoDiode 2pi working fine, foil 2pi still in the same poor condition as last campaign. Midplane AXUV down, fixing problem with AXA. Midplane foils working fine, but need calibration. 2D bolometry is being digitized but need to debug and calibrate gains.Nov 29 2007 01:38PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesDetectors cooled this morning. Signals on all but Chs 2, 9. Not yet recalibrated - may drift today.Dec 04 2007 09:28AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesLH I-Q detectors repaired and calibrations done. Nov 29 2007 06:37AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, low speed to start out.Dec 04 2007 09:27AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoPneumatic air supply is still disconnected.Nov 27 2007 01:46PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Dec 4 2007 03:40:54:123PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoDiode 2pi working fine, foil 2pi still in the same poor condition as last campaign. Midplane AXUV down, fixing problem with AXA. Midplane foils working fine, but need calibration. 2D bolometry is being digitized but need to debug and calibrate gains.Nov 29 2007 01:38PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesDetectors cooled this morning. Signals on all but Chs 2, 9. Not yet recalibrated - may drift today.Dec 04 2007 09:28AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetectors warm. Nov 21 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBody I Fault Circuit Failed. Troubleshooting 12/04 evening and 12/05 morning Dec 04 2007 03:20PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, low speed to start out.Dec 04 2007 09:27AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsno Nov 16 2007 01:32PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoPneumatic air supply is still disconnected.Nov 27 2007 01:46PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke