Alcator C-Mod Run 1071205 Information

Back to runs

Miniproposals
Miniproposal:355
Date Filed:11/12/2003
Title:ICRF Testing & Conditioning
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-26)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Robert Granetz
Engineering operator(s):Andy Pfeiffer,Bill Parkin,Bill Byford

Engineering Operator Run Comment
MP#355: ICRF startup and conditioning MP#488: Fast ferrite tuner on E-po

Session Leader Plans
Entered: Dec 5 2007 12:55:26:950PM
Author: Steve Wukitch
SL Plan

Start with 1071204023 (1 MA, 5.4 T, 0.8-1.0e20m-2, lower null)

1. run D, E, and J separately for conditioning purposes
initially for short pulses to high power
run longer pulses at lower power
may adjust to press on with conditioning

2. if running well, investigate simultaneous antenna operation

We will modify discharge parameters as deemed necessary.

will be monitoring voltage and power limits
will adjust density and current to avoid J neutral pressure limit

Physics Operators Plans
Entered: Dec 4 2007 03:55:20:117PM
Author: Robert Granetz
Engineering setup for Wednesday 05 Dec 2007

MP#355: ICRF startup and conditioning
MP#488: Fast ferrite tuner on E-port

Session leader: S. Wukitch
Physics operator: R. Granetz

ECDC overnight in D2 and bake at 60 C.

Run will start at 09:00 and end at 17:00.

Power systems as on 1071204023

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
   fill B-Top            with  6 psi D2  Hybrid enabled  (PG4)
   fill B-side lower     with  1 psi Ar  Hybrid DISABLED (PG1)
  leave B-side upper     as is           Hybrid DISABLED (PG2)   
   fill B-main (C-side)  with 40 psi D2  Hybrid enabled  (PG3)
  leave NINJA            as is           DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
  ECE, VUV, Z-bolo (Do not enable DNB gate valve.)
 
Torvac setup: gate valves open after the shot

Specific diagnostics: standard set

-------------------------------------------------------------------------------
ICRF Setup: All transmitters in run-on by 08:00.

LH Setup: no

DNB: no

Cryopump: no
-------------------------------------------------------------------------------
Run plan: start from 1071204023 (1 MA, 5.4 T, 0.8-1.0e20m-2, lower null)


Session Leader Summaries
Entered: Dec 5 2007 05:11:51:230PM
Author: Steve Wukitch
Run Summary

Using a standard 1 MA, we began plasma testing and conditioning of all
transmitters, antennas, and FFT matching network (on E antenna).
Overall the run was quite successful: D conditioned to 2 MW, E
conditioned to 1.75 MW, and J conditioned to 1.5 MW. The addition of
the prematching transformers in the D network reduces the voltage in
the 9" section by ~30% and likely contributed to the high power
obtained today. In addition, the phase shifter and stub tuner have
SF6 in this campaign due to the reduced leak rate. The FFT network
had some problems with its computer and our ability to communicate
with it. For E antenna, DC2 has failed and we think this is due to a
crimped cable. The J antenna improved a bit during the run but
appears to be limited by arcing. Andy measured the water content this
morning and found that it was quite high (~3000 ppm). This is likely
a result of the absorbed water in the teflon. We plan to dry the
lines out by flowing dry nitrogen through the coax lines for several
days and monitoring the water content. We need to increase the pulse
length to 1 second from the current 0.3 second pulse lengths and run
simultaneously (which will have to wait until the H/D gets a bit
lower). With respect to the machine conditions, the density and H/D
increase strongly with RF power and the H/D.

Physics Operator Summaries
Entered: Dec 5 2007 05:05:01:710PM
Author: Robert Granetz
Run summary for Wednesday 05 Dec 2007

MP#355 ICRF startup and conditioning
MP#488 Fast ferrite tuner on E-port

Session leader: S. Wukitch
Physics operator: R. Granetz

Plasma operation was very reliable today, particularly since it's only the
3rd or 4th plasma run since closing up the machine.  All but one plasma
went full-length.  The ICRF systems were duly exercised, and all antennas
eventually reached power levels of 1.5-1.9 MW for brief periods of time.
The FFT on E-port showed promising results on some shots.  Late in the run
(from shot 19 onwards) the gate valves were kept closed for 300 seconds
after each shot so that pressure and RGA data could be taken to study wall
retention.

There were two long cell accesses to work on RF things and to change the
RGA configuration, and this limited the number of shot cycles a bit.

Scorecard: 25 plasmas
            0 duds
            0 fizzles
            0 power supply tests
            2 no-power MDS shot cycles
           --------------
    Total: 27 shot cycles (The number of shot cycles does not match the
           the final shot number because one cycle didn't increment
           the shot counter.)

Session Leader Comments
Dec 5 2007 09:18:47:943AM1071205001Steve Wukitchno power
Dec 5 2007 09:39:19:810AM1071205002Steve Wukitch002 L-mode Plasma
t = 0.75 sec: Bt=5.4 T,Ip = 1.0 MA
nl04 = 0.8e20 /m^2, LSN, gap 1.1 cm.

D: mismatched.
E: ran to 0.90 sec. 1 fault - under FFT control
J: ran 25 faults

notes: J is unlikely to run very well. Our current theory is that the
transmission lines still have too high of relative humidity.
FFT control is a bit rough
D antenna has transformers to reduce voltage in the ps/st set

next: repeat with RF run individually
Dec 5 2007 09:59:48:477AM1071205003Steve Wukitch003 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: mismatched
E: ran 9 faults
J: ran max faults

next: repeat
note: D_DC1_U_F is reading 10 V - something is wrong
E stub tuner setting appears off
Dec 5 2007 10:07:24:667AM1071205004Steve Wukitch004 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: mismatched
E: ran 9 faults
J: ran 3 faults

next: repeat

Dec 5 2007 10:14:22:623AM1071205005Steve Wukitch005 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: mismatched
E: ran 5 faults
J: ran 5 faults

next: cell entry to fix D_DC1U_F (hopefully)
repeat
Dec 5 2007 11:39:52:590AM1071205006Steve Wukitch006 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: mismatched
E: ran 9 faults
J: ran 5 faults
note: D_DC1U_F now working - should be able to match now
FFT: communication problem identified and worked around
but FFT computer did not work on this shot

Dec 5 2007 12:20:12:420PM1071205007Steve Wukitch007 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran
E: ran 1 faults
J: ran 5 faults

Dec 5 2007 12:00:06:210PM1071205008Steve Wukitch008 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 1 fault
E: ran 3 faults
J: ran 5 faults

next: raise D, reboot FFT computer, and lower J

Dec 5 2007 12:12:59:090PM1071205009Steve Wukitch009 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 6 faults
E: ran
J: ran 4 faults - seems to be voltage limited

next: repeat D level, raise E, and repeat J

Dec 5 2007 12:59:12:653PM1071205010Steve Wukitch010 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 1 fault
E: ran 10 faults
J: ran 4 faults

next: nudge D and E up a bit

Dec 5 2007 12:59:01:497PM1071205011Steve Wukitch011 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 2 faults
E: ran
J: ran 3 faults

next: nudge D and E up a bit

Dec 5 2007 12:56:55:967PM1071205012Steve Wukitch012 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran max faults
E: FFT overload
J: ran

next: back off D and nudge up J

Dec 5 2007 01:38:02:027PM1071205013Steve Wukitch013 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 3 faults
E: ran 5 faults
J: ran 4 faults

next: increase D and change order to J, E, D

Dec 5 2007 01:48:01:987PM1071205014Steve Wukitch014 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 8 faults
E: ran 1 fault
J: ran 2 faults

Dec 5 2007 01:38:17:467PM1071205015Steve Wukitch015 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 5 faults
E: ran FFT computer issue
J: ran 4 faults

Dec 5 2007 02:14:02:713PM1071205016Steve Wukitchno trigger to ICRF - DIO2 did not go
Dec 5 2007 02:20:13:060PM1071205017Steve Wukitch017 no power from RF - DIO2 problem
Dec 5 2007 02:37:00:707PM1071205018Steve Wukitch018 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 4 faults
E: ran fft trigger mistimed
J: ran 2 faults

Dec 5 2007 03:43:02:800PM1071205019Steve Wukitch019 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 1 fault
E: fft issue
J: ran 3 faults


Dec 5 2007 03:49:25:917PM1071205020Steve Wukitch020 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran
E: fft issue
J: ran 3 faults

next: fft communication corrected

Dec 5 2007 04:00:57:450PM1071205021Steve Wukitch021 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 4 faults
E: ran
J: ran 3 faults

next: up E to 1.5 MW


Dec 5 2007 04:13:05:973PM1071205022Steve Wukitch022 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 4 faults
E: ran 3 faults fft copley ps fault
J: ran 3 faults


Dec 5 2007 04:46:09:377PM1071205024Steve Wukitch024 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 2 faults
E: ran 1 faults fft copley ps fault post discharge
J: ran 2 faults

Dec 5 2007 04:55:40:033PM1071205025Steve Wukitch025 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 6 faults
E: ran 3 faults fft copley ps fault post discharge
J: ran 4 faults

Dec 5 2007 05:08:12:510PM1071205026Steve Wukitch026 L-mode Plasma
(@ t = 0.60 sec): Bt= 5.4 T, Ip = 1.0 MA
nl04 = 0.8e20 /m^2
D: ran 4 faults
E: ran 3 faults
J: ran 2 faults

Physics Operator Comments
Dec 5 2007 08:38:16:413AMRobert GranetzGot the usual ECDC in D2 and the 60 C bake overnight.

Vessel pressure is 3.4e-7 torr at 30 C right now.

Loaded all segments from shot 23 yesterday (1071204023). nl_04 is set to 0.7e20 m-2, but
the shot got to 0.9e20 m-2, so I'll leave it as is for now.
Dec 5 2007 09:13:26:990AM1071205001Robert GranetzShot 01 -- No-power shot. Commutation banks were turned off. MDS cycle ran fine.

Next shot: go for plasma.
Dec 5 2007 09:44:57:890AM1071205002Robert GranetzShot 02 -- Plasma. Good full-length shot. 1 MA, 5.4 T, nl_04=0.76e20 m-2.
Prf[D/E/J]= 0 / 0.2 / 0-0.9 MW. Startup looks quite clean. Wth=50 kJ.
Right gap = 9-10 mm, left gap = 11-12 mm, kappa=1.65.
H/(H+D)=0.15-0.24

Next shot: no DPCS changes
Dec 5 2007 09:48:41:550AM1071205003Robert GranetzShot 03 -- Plasma. Good shot. Prf[D/E/J]= 0 / 0.2 / 0-0.8 MW. H/(H+D)=0.23-0.29

Next shot: turn on argon puff at t=0.30 s for 50 ms.
Dec 5 2007 10:02:38:290AM1071205004Robert GranetzShot 04 -- Plasma. Good shot. Late rampdown was a little dirtier...could that be due
to turning on the argon puffing? Prf from J-port = 1 MW, and much cleaner.
Not much from D+E. H/(H+D)=0.25-0.34

Next shot: no DPCS changes
Dec 5 2007 10:16:17:480AM1071205005Robert GranetzShot 05 -- Plasma. Good shot. Not much from D+E. J didn't work as well as the
previous shot. H/(H+D)=0.28-0.35

Cell access required for RF.

Next shot: increase argon puff to 70 ms (from 50). Add +15 amps to IC_EF4.
Dec 5 2007 11:24:23:587AM1071205006Robert GranetzWe had an hour-long break between shots 5 and 5 for cell access to work on the FFT and
other ICRF stuff.
Dec 5 2007 11:31:56:463AM1071205006Robert GranetzShot 06 -- Plasma. Good shot. Prf[D+E] still not giving much. J is at 1 MW, with some
faulting. Breakdown is slightly better (finite tangential Z-meter signal), and
the hard x-rays decreased. H/(H+D)=0.30-0.36. The hydrogen fraction has been
rising on a shot-by-shot basis all morning.

Next shot: increase argon puff by another 20 ms (to 90 ms)
Dec 5 2007 11:51:08:550AM1071205007Robert GranetzShot 07 -- Plasma. Good shot. Both D and E had about 0.5 MW...first significant power from
them today. J gets up to 1.2 MW, with some faulting. H/(H+D)=0.30-0.40

Next shot: at Bruce's request, program RXL to move inward by 5 mm over the time from t=1.0 to
1.5 s in order to decrease the vertical sweeping of the outboard strike point.
Dec 5 2007 12:08:26:730PM1071205008Robert GranetzShot 08 -- Plasma. Good shot. D, E, and J all on. D gets up to 0.75 MW, J up
to 1.3 MW. GPC2 has large oscillations on it. H/(H+D)=0.30-0.38

Next shot: increase argon puff another 20 ms (to 110 ms).
Dec 5 2007 12:16:35:170PM1071205009Robert GranetzShot 09 -- Plasma. Good shot. GPC2 still has large oscillations on it. D-port is getting
close to 1 MW. H/(H+D)=0.31-0.39

Next shot: add another 20 ms to the argon puff (to 0.13 s)
Dec 5 2007 12:31:48:847PM1071205010Robert GranetzShot 10 -- Plasma. Good shot. D-port reaches 1 MW; so does J. E had some
faulting problems on this shot. H/(H+D)=0.30-0.42

Next shot: no DPCS changes
Dec 5 2007 12:39:42:477PM1071205011Robert GranetzShot 11 -- Plasma. Good shot. Better performance from D, E, and J.

Next shot: no DPCS changes
Dec 5 2007 01:04:27:657PM1071205012Robert GranetzShot 12 -- Plasma. Good shot. No E-port power, and D-port faulted badly.
J ran without any faults. H/(H+D)=0.31-0.40

Next shot: no DPCS changes
Dec 5 2007 01:10:31:110PM1071205013Robert GranetzShot 13 -- Plasma. Good shot. Disrupted late in rampdown. All antennas going, with
some faulting.

Next shot: increase argon puff another 20 ms (to 0.15 s)
Dec 5 2007 01:26:22:790PM1071205014Robert GranetzShot 14 -- Plasma. Good shot. Disrupted late in rampdown. E ran well; J ran
okay too. We're averaging about 1 MW of ICRF throughout the flattop,
but no heating observed, probably due to high H fraction.
H/(H+D)=0.33-0.42

Next shot: no DPCS changes
Dec 5 2007 01:35:58:573PM1071205015Robert GranetzShot 15 -- Plasma. Good shot. E-port ran well, D and E ran, but with faults.

Next shot: increase argon puff another 20 ms (to 0.17 s).
Dec 5 2007 01:51:16:440PM1071205016Robert GranetzShot 16 -- No-power shot because the cycle got stuck in INIT.

Dec 5 2007 02:11:41:480PM1071205016Robert GranetzShot 16 -- Plasma. Good shot. (This is actually the 2nd shot 16; the first was a no-power
cycle problem.) RF didn't seem to turn on at all.

Next shot: repeat; no DPCS changes
Dec 5 2007 02:24:55:110PM1071205017Robert GranetzShot 17 -- Plasma. Good shot. No RF again.

Next shot: increase argon puff another 20 ms to 0.19 s
Dec 5 2007 03:05:15:123PM1071205018Robert GranetzShot 18 -- Plasma. Good shot. RF turned on for this shot. D-port ramped up
to about 1.3 MW. E-port was close to 1 MW. J-port gets up to 1.7 MW.
H/(H+D)=0.32

Short cell access after this shot to move the RGA to the other side of the bypass
so that we can do some outgassing measurements between shots.

Next shot: Keep the gate valves closed for 300 seconds after the shot. We'll do this
after all shots for the remainder of today's run. On advice of Earl and
Steve Wolfe, I've reduced the pre-fill by 2 ms to compensate for the gate
valve closure.
Dec 5 2007 03:39:59:483PM1071205019Robert GranetzShot 19 -- Plasma. Good shot. Gate valves remained closed for 5 minutes after the shot.
D-port ramped up to 1.5 MW; J-port also peaked around 1.5 MW. Nothing from E-port.
H/(H+D)=0.30-0.40

Next shot: add another 20 ms to the argon puff (to 0.21 s)
Dec 5 2007 03:48:30:710PM1071205020Robert GranetzShot 20 -- Plasma. Good shot. Gate valves are being kept closed for 5 minutes after the
shot. D-port ran well; nothing from E.

Next shot: add another 20 ms to argon puff (to 0.23 s)
Dec 5 2007 04:02:44:733PM1071205021Robert GranetzShot 21 -- Plasma. Good shot. 1-1.8 MW from each of the antennas. No heating though.
H/(H+D)=0.30-0.40

Next shot: increase argon puff by 20 ms again (to 0.25 s)
Dec 5 2007 04:16:27:410PM1071205022Robert GranetzShot 22 -- Plasma. Good shot. 1.5-1.9 MW from each antenna.

Next shot: add another 20 ms to argon puff (to 0.27 s)
Dec 5 2007 04:28:03:417PM1071205023Robert GranetzShot 23 -- Plasma. Disrupted at t=0.3 s, so it wasn't the argon. I'll chalk it up
to a random injection.

Next shot: reduce pre-fill by 2 ms to compensate for the disruption.
Dec 5 2007 04:46:39:670PM1071205024Robert GranetzShot 24 -- Plasma. Good shot. All antennas got up to 1.5-1.9 MW.

Next shot: add 2 ms back to the pre-fill (since this post-disruption shot did not
disrupt)
Dec 5 2007 05:01:09:803PM1071205025Robert GranetzShot 25 -- Plasma. Good shot. Prf=1.5-2 MW from each antenna. H/(H+D)=0.30-0.42

Next shot: reduce pre-fill by 1 ms.
Dec 5 2007 05:05:50:600PM1071205026Robert GranetzShot 26 -- Plasma. Good shot. Prf=1.8-2 MW from each antenna.

End of run

Engineering Operator Comments
ShotTimeTypeStatusComment
109:09:29:253AMTestBadcommutation supplies not on
209:22:32:540AMPlasmaOk
309:37:56:483AMPlasmaOk
409:52:58:347AMPlasmaOk
510:06:32:120AMPlasmaOk
611:24:30:710AMPlasmaOk
711:38:21:873AMPlasmaOk
811:51:36:393AMPlasmaOk
912:05:20:913PMPlasmaOk
1012:19:43:500PMPlasmaOk
1112:33:53:380PMPlasmaOk
1212:48:11:087PMPlasmaOk
1301:02:24:983PMPlasmaOk
1401:16:41:270PMPlasmaOk
1501:30:52:430PMPlasmaOk
1602:02:00:427PMPlasmaOk
1702:17:01:967PMPlasmaOk
1802:30:12:563PMPlasmaOk
1903:29:06:087PMPlasmaOk
2003:42:01:970PMPlasmaOk
2103:55:10:620PMPlasmaOk
2204:08:39:627PMPlasmaOk
2304:22:52:210PMPlasmaOk
2404:36:09:903PMPlasmaOk
2504:49:16:783PMPlasmaOk
2605:01:43:320PMPlasmaOk

System Availability
Dec 5 2007 09:09:01:097AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoDiode 2pi working fine, foil 2pi still in the same poor condition as last campaign. Midplane AXUV down, fixing problem with AXA. Midplane foils working fine, but need calibration. 2D bolometry is being digitized but need to debug and calibrate gains.Nov 29 2007 01:38PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesDetectors cooled this morning. Signals on all but Chs 2, 9. Recalibrated 12/4.Dec 05 2007 08:36AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesDetectors cooled 12/5. Dec 05 2007 08:36AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBody I Fault Circuit Failed. Troubleshooting 12/04 evening and 12/05 morning Dec 04 2007 03:20PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, low speed to start out.Dec 04 2007 09:27AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoPneumatic air supply is still disconnected.Nov 27 2007 01:46PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Dec 5 2007 09:37:47:110AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoDiode 2pi working fine, foil 2pi still in the same poor condition as last campaign. Midplane AXUV down, fixing problem with AXA. Midplane foils working fine, but need calibration. 2D bolometry is being digitized but need to debug and calibrate gains.Nov 29 2007 01:38PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoLN2 manual valve is closed. LHe valve is closed and disconnected from PLC.Sep 14 2007 01:26PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesDetectors cooled 12/4. Signals on all but Chs 9. Recalibrated 12/4.Dec 05 2007 09:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesDetectors cooled 12/5. Most channels operational.Dec 05 2007 09:30AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoCoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanocoaxial line disconnected from the antennaSep 14 2007 11:24AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoAntenna is still connected. We will only do transmitter work after the lines are disconnected and capped. Sep 14 2007 11:26AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBody I Fault Circuit Failed. Troubleshooting 12/04 evening and 12/05 morning Dec 04 2007 03:20PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane and WB1-LY attached but need to be debuggedNov 20 2007 05:21PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, low speed to start out.Dec 04 2007 09:27AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoPneumatic air supply is still disconnected.Nov 27 2007 01:46PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnoData acquisition upgraded before FY08. Still waiting on engineering network connection to run digitizers.Nov 27 2007 09:16AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke