| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Greg Wallace |
| Physics operator(s): | Ron Parker |
| Engineering operator(s): | Bill Parkin,Gary Dekow |
| Engineering Operator Run Comment |
| MP#473 LH check out and initial operation |
| Session Leader Plans |
| Entered: Dec 6 2007 03:03:42:947PM |
| Author: Greg Wallace |
| Session leader plan for 1071207
MP#473: LH check-out and initial operation SL: G. Wallace PO: R. Parker Plasma setup: Start with 1071205026 and go from there. Set Ip~750kA, nl_04~0.8e20, outer gap~1cm. LH setup: Set launcher to 1.5mm behind LH limiter. Phase shifters set to 90 deg current drive direction. 1) Enable CPS and start with short, low power pulses at 40kV beam voltage. 3 x 25ms pulses at 50% duty cycle (12.5 on, 12.5 off), 20kW per klystron. Start with 90 degree phasing for all pulses. Vary nl_04 and/or outer gap to verify that the CPS is operating correctly. Repeat at 60 and 120 degree phasing. (May require cell acces to set CPS trip levels.) 2) Increase pulse length to 500ms, single phase during each shot. 60, 90, 120 degree phasing, 20kW per klystron. 3) Increase power in 5kW (per klystron) incriments under good coupling conditions. If shot does not run clean, go back to previous lower power level for several shots before increasing again. |
| Physics Operators Plans |
| Entered: Dec 6 2007 05:43:21:130PM |
| Author: Ron Parker |
| Engineering setup for Friday 07 Dec 2007
MP#473: LH check-out and initial operation SL: G. Wallace PO: R. Parker ECDC overnight in D2 and bake at 60 C. Stop ECDC by 7:00 am. Run will start at 09:00 and end at 17:00. Power systems as on 1071204027 A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard configuration) Gas Setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) NINJA DISABLED Enable the following gate valves and shutters, assuming no vacuum problems: ECE, VUV, Z-bolo (Do not enable DNB gate valve.) Torvac setup: gate valves open Specific diagnostics: standard set ------------------------------------------------------------------------------- ICRF Setup: Turned off for entire run LH Setup: Set launcher to 1.5mm behind LH limiter. Phase shifters set to 90 deg current drive direction. DNB: no Cryopump: no ------------------------------------------------------------------------------- Run plan: Start with 1071205026 and go from there. Set Ip~750kA, nl_04~0.8e20, outer gap~1cm. |
| Session Leader Summaries |
| Entered: Dec 7 2007 05:09:28:903PM |
| Author: Greg Wallace |
| Session Leader Summary for 1071207:
This was the first run day of the 2008 campaign for the lower hybrid system. The goal of this run day was to make sure the LH system was still operational and increase power slowly to the maximum level without damaging the waveguides. After accidentally firing at t=0 on the first shot, the LH system ran smoothly for the rest of the day. The power was increased slowly shot to shot, eventually working up to just over 700kW (135 kW per klystron) on shot 21. This is comparable to the maximum power level achieved during the 07 campaign, with any operation above 500kW troublesome during the 07 campaign. The last 25ms of the LH pulse on shot 21 tripped out due to an arc in the jungle gym between the Magic-T and the Pant Leg. This was the only arc all day and burned for less than 0.5ms. A bad capacitor in the commutator cap bank caused us to stop operation for two hours after shot 21. Shot 24 (the next shot after the cap bank was fixed) had many arcs despite decreasing power slightly from 21. The arcing appeared during the ramp at ~300kW level. After this, we went back to the 50kW per klystron level, which ran clean. The next shot at 60kW per klystron also ran clean. A final shot at 70kW per klystron ran clean as well. Overall, performance today was surprisingly good. We had several good shots in a row with greater than 500kW net, which was essentially the limit of reliable operation during the 07 run campaign. After the arc at 700+kW, peformance appeared to be greatly reduced although the technique of drastically reducing power and slowly raising it seemed to work until time ran out. |
| Physics Operator Summaries |
| Entered: Dec 7 2007 05:19:59:707PM |
| Author: Ron Parker |
| The machine performed extremely well today. The programmed shot (800 kA, 5.4T, nl_04~0.6e20 m-2, was repeated all day as a target for conditioning the LH antenna/system. Every shot was a full length plasma with the exception of shot
23 which was the first shot after a ~1.5 hour shutdown, and one subsequent power test. The shutdown was needed to replace a capacitor in the OH1 commutation bank, which failed during shot 21. The LH system also performed extremely well, with the power coming quickly up to 700 kW on shot 21, although on that shot it did not quite make full length before tripping. On the next shot, the LH system tripped on the rampup at ~325 kW. After increasing power slowly on the next 3 shots, the power was brought back to a steady 350 kW with no dropouts. Scorecard: 26 plasma attempts, one fizzle, the rest (25) full length shots. |
| Entered: Dec 7 2007 05:20:22:160PM |
| Author: Ron Parker |
| Shot 27 ran full length. |
| Session Leader Comments | |||
| Dec 7 2007 09:19:00:177AM | 1071207001 | Greg Wallace | First shot with LH of the 08 campaign. CPS enabled. 3x25ms pulses at 50% duty cycle (12.5 on, 12.5 off), 20kW per klystron.
LH accidentally fired at t=0. First of 3 pulses tripped but ran clean after that. Density at grill looks perfect during flat top. Next shot will move to t=700ms. Phasing off on klystrons 2-6, probably due to temperature drift. Atma will fix for next shot. |
| Dec 7 2007 09:39:04:730AM | 1071207002 | Greg Wallace | CPS enabled. 3x25ms pulses at 50% duty cycle (12.5 on, 12.5 off), 20kW per klystron, 90 degree CD phasing. Shot ran clean at 700ms as desired. Phasing on #2 and #4 are off by ~10 degrees.
Next shot will change to 60 degree phasing. |
| Dec 7 2007 09:50:39:253AM | 1071207003 | Greg Wallace | CPS enabled. 3x25ms pulses at 50% duty cycle (12.5 on, 12.5 off), 20kW per klystron, 60 degree CD phasing. Shot ran clean through all pulses with decent coupling.
Next shot will change to 120 degree phasing. |
| Dec 7 2007 10:02:41:990AM | 1071207004 | Greg Wallace | CPS enabled. 3x25ms pulses at 50% duty cycle (12.5 on, 12.5 off), 20kW per klystron, 120 degree CD phasing. Shot ran clean through all pulses with decent coupling.
Next shot will be same power level, 90 degrees, single 500ms pulse starting at 700ms. |
| Dec 7 2007 10:16:29:980AM | 1071207005 | Greg Wallace | 500ms pulse starting at 700ms. Ran clean, good coupling. Everything looks ready to increase power. Next shot will be at 30kW per klystron. |
| Dec 7 2007 10:32:38:987AM | 1071207006 | Greg Wallace | Shot ran clean at 30kW per klystron. Next shot will ramp from 30-40 kW per klystron. |
| Dec 7 2007 10:48:14:617AM | 1071207007 | Greg Wallace | Shot ran clean. Next shot will increase flat top to 50 kW per klystron. |
| Dec 7 2007 11:10:25:190AM | 1071207008 | Greg Wallace | Shot ran clean at 50kW per klystron during flat top. Next shot will increase flat top to 60kW per klystron and increase ramp time to 100ms. |
| Dec 7 2007 11:24:33:070AM | 1071207009 | Greg Wallace | Shot ran clean at 60kW during the flat top. Next shot will increase flat top to 70kW per klystron and increase start of ramp to 40kW per klystron. |
| Dec 7 2007 11:40:07:827AM | 1071207010 | Greg Wallace | Another clean shot. Increasing power again to 80kW per klystron during flat top. Some noticable signs of current drive on loop voltage, HXR, and ECE. |
| Dec 7 2007 11:55:59:050AM | 1071207011 | Greg Wallace | Shot ran clean again at 80kW per klystron during flat top. Next shot will increase ramp to 200ms and power to 90kW per klystron during flat top. Signs of current drive are starting to appear.... |
| Dec 7 2007 12:07:48:587PM | 1071207012 | Greg Wallace | Another clean shot at 475 kW net, 90 kW per klystron! We have maxed out the calibration at 40kV so now we need to go to 50kV beam voltage. Next shot will be at 100kW per klystron. |
| Dec 7 2007 12:26:58:263PM | 1071207013 | Greg Wallace | Still clean. nl_04 increases from 6 to 7 during the LH pulse. Next shot will repeat the same plasma and LH power to see if outgassing from the LH launcher is reduced. |
| Dec 7 2007 12:39:37:613PM | 1071207014 | Greg Wallace | Density excursion seems less steady during LH as compared to shot 13. Will repeat at this power level one more time. |
| Dec 7 2007 12:49:16:540PM | 1071207015 | Greg Wallace | Density rises to just over 7e19 on nl_04 again, but starting from a bit higher density. Next shot will increase power in flat top to 110kW per klystron. |
| Dec 7 2007 01:07:08:640PM | 1071207016 | Greg Wallace | All clear at 110kW. Reflected power on column 23 is pretty high, ~8kW on RINT12. Density still rising during LH pulse.
Next shot will increase to 115kW per klystron. |
| Dec 7 2007 01:18:25:723PM | 1071207017 | Greg Wallace | All looks good at 115kW per klystron. Next shot 120kW. |
| Dec 7 2007 01:48:14:140PM | 1071207018 | Greg Wallace | Clean running at 120kW per klystron. Increase to 125kW per klystron for next shot. |
| Dec 7 2007 01:47:32:500PM | 1071207019 | Greg Wallace | Clean running at 125kW per klystron. Increase to 130kW per klystron for next shot. |
| Dec 7 2007 02:01:33:050PM | 1071207020 | Greg Wallace | Still going strong at 130kW per klystron. Going up to 135kW for the next shot. |
| Dec 7 2007 02:20:55:997PM | 1071207021 | Greg Wallace | This shot was at 135kW per klystron. Looks like an arc in the jungle gym between the Magic-T and the Pant Leg split on column 3. Arc only lasted for less than 0.5ms. Next shot will decrease power back to 130kW per klystron. |
| Dec 7 2007 04:39:26:987PM | 1071207024 | Greg Wallace | Much arcing during the shot, even before reaching flat top of 130kW per klystron. The short arc during shot 21 seems to have changed something in the jungle gym on column 3. The arc started in the same place as in shot 21 (between the Magic-T and the Pant Leg) then moved up above the pant leg on later trips. Next shot will decrease power level back down to 50kW per klystron in the flat top. |
| Dec 7 2007 04:45:40:287PM | 1071207025 | Greg Wallace | Clean pulse at 50kW per klystron. Next shot will be 60kW per klystron. |
| Dec 7 2007 04:56:26:557PM | 1071207026 | Greg Wallace | Shot ran clean at 60kW per klystron. Next shot will be 70kW per klystron. |
| Dec 7 2007 05:09:04:950PM | 1071207027 | Greg Wallace | Final shot at 70kW per klystron ran clean. After drastically reducing the power we seem to be able to work it up again. |
| Physics Operator Comments | |||
| Dec 7 2007 10:00:36:693AM | 1071207001 | Ron Parker | Shot 1 ran as programmed, full length.
LH pulses were early. |
| Dec 7 2007 10:01:28:397AM | 1071207002 | Ron Parker |
Shot 2 was a repeat of shot 1. |
| Dec 7 2007 10:02:10:380AM | 1071207003 | Ron Parker | Shot 3 again repeated. Still full length, no changes. |
| Dec 7 2007 09:59:54:303AM | 1071207004 | Ron Parker | Shot 4 ran well, very repeatable. |
| Dec 7 2007 10:28:04:030AM | 1071207005 | Ron Parker | Shot 5 repeated. LH pulse now extended. |
| Dec 7 2007 10:27:29:500AM | 1071207006 | Ron Parker | Shot 6 ran well, still the same shot that we started the run with. |
| Dec 7 2007 10:45:57:070AM | 1071207007 | Ron Parker | Shot 7 ran well, LH power up to 220 kW ~0.5 s. |
| Dec 7 2007 11:13:29:720AM | 1071207008 | Ron Parker | Shots continue to roll. LH net pwr approaching 300 kW.
Next: lower programmed density from 7.5 to 6.5e19 cm-2. |
| Dec 7 2007 11:27:56:773AM | 1071207009 | Ron Parker | Shot 9 ran well, density slightly lower (nl_04~0.7). |
| Dec 7 2007 12:06:22:430PM | 1071207012 | Ron Parker | Shots keep reproducing, LH power up to nearly 1 MW forward, 0.5 MW net. |
| Dec 7 2007 12:25:07:140PM | 1071207013 | Ron Parker | Shot 13 ran well, plasma density is increasing during LH pulse, evidence of outgassing from LH antenna?
|
| Dec 7 2007 12:48:13:397PM | 1071207014 | Ron Parker | Shot 14 ran well, density rises fron 6 to 7e19 cm-2 during LH pulse. |
| Dec 7 2007 12:46:52:257PM | 1071207015 | Ron Parker | Shot 15 ran well, density still rises during LH pulse. |
| Dec 7 2007 01:25:48:693PM | 1071207015 | Ron Parker | Shot 15 ran well. |
| Dec 7 2007 01:25:33:787PM | 1071207016 | Ron Parker | Shots continue to reproduce. |
| Dec 7 2007 01:24:36:117PM | 1071207017 | Ron Parker | Shot 17 ran fine, LH up to 600 kW.
|
| Dec 7 2007 01:34:14:197PM | 1071207018 | Ron Parker | Shot 18 ran well, LH power teasing up. |
| Dec 7 2007 02:08:15:430PM | 1071207019 | Ron Parker | Shot 19 ran well, LH reflection showed a a small glitch. |
| Dec 7 2007 02:08:53:193PM | 1071207020 | Ron Parker | Shot 20 ran well, LH pwr ~ 670 kW. |
| Dec 7 2007 02:15:26:603PM | 1071207021 | Ron Parker | Shot ran, but small bang at end of shot heard in CTRL Rm.
LH pwr up to 700 kW, but trip at end of pulse (1.17 s.) |
| Dec 7 2007 03:46:07:030PM | 1071207021 | Ron Parker | The problem associated with the bang in the power room was a bad capacitor in the OH1 commutation bank. After > 1 hour delay, the capacitor bank has been repaired and the run will resume. First shot will be a power test. |
| Dec 7 2007 04:14:10:870PM | 1071207022 | Ron Parker | This was a no power shot. |
| Dec 7 2007 04:13:09:320PM | 1071207023 | Ron Parker | Shot fizzled, ruining th string of 21 straight full length discharges. |
| Dec 7 2007 04:37:44:737PM | 1071207024 | Ron Parker | Shot 24 ran, but now LH is intermittent, breaking down first on the rampup at ~350 kW (net). |
| Dec 7 2007 04:44:58:957PM | 1071207025 | Ron Parker | Shot ran well, LH stayed on with dropout and reached ~260 kW. |
| Dec 7 2007 04:57:19:510PM | 1071207026 | Ron Parker | Shot 26 ran full length, as did LH with ~300 kW flat top.
|
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:01:19:030AM | Plasma | Ok | |
| 2 | 09:30:05:400AM | Plasma | Ok | |
| 3 | 09:42:51:607AM | Plasma | Ok | |
| 4 | 09:56:14:927AM | Plasma | Ok | |
| 5 | 10:09:38:667AM | Plasma | Ok | |
| 6 | 10:24:40:467AM | Plasma | Ok | |
| 7 | 10:40:11:333AM | Plasma | Ok | |
| 8 | 11:03:57:920AM | Plasma | Ok | |
| 9 | 11:17:09:037AM | Plasma | Ok | |
| 10 | 11:30:46:930AM | Plasma | Ok | |
| 11 | 11:43:49:013AM | Plasma | Ok | |
| 12 | 11:57:58:550AM | Plasma | Ok | |
| 13 | 12:16:59:870PM | Plasma | Ok | |
| 14 | 12:30:08:093PM | Plasma | Ok | |
| 15 | 12:43:51:570PM | Plasma | Ok | |
| 16 | 12:57:11:543PM | Plasma | Ok | |
| 17 | 01:11:58:970PM | Plasma | Ok | |
| 18 | 01:26:53:617PM | Plasma | Ok | |
| 19 | 01:40:42:810PM | Plasma | Ok | |
| 20 | 01:53:54:283PM | Plasma | Ok | |
| 21 | 02:08:18:820PM | Plasma | Ok | OH1 comm bank failed after commutation |
| 22 | 03:54:23:157PM | Test | Ok | |
| 23 | 04:07:10:990PM | Plasma | Ok | |
| 24 | 04:24:03:590PM | Plasma | Ok | |
| 25 | 04:40:19:940PM | Plasma | Ok | |
| 26 | 04:52:47:820PM | Plasma | Ok | |
| 27 | 05:05:18:577PM | Plasma | Ok | |
| System Availability | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Dec 7 2007 09:00:56:670AM | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||