Alcator C-Mod Run 1071213 Information

Back to runs

Miniproposals
Miniproposal:355
Date Filed:11/12/2003
Title:ICRF Testing & Conditioning
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-16)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Bill Rowan
Engineering operator(s):Bill Byford

Engineering Operator Run Comment
MP#355 ICRF Startup, conditioning, MP#488 E-Port Fast Ferrite Tuner

Session Leader Plans
Entered: Dec 13 2007 09:13:19:127AM
Author: Steve Wukitch
SL Plan

Start with 1071212029 (0.8 MA, 5.4 T, 1.0e20m-2, upper single null)

Continue where we left off yesterday with the cryopump controlling the
H/D to ~10%; overlapping D and E antenna to test fft operation; and
condition the antennas and machine. We also will investigate the
limits on J antenna.

1. Overlap D and E antenna to condition antennas and limits of FFTs in
USN discharges. J antenna will be operated separately to establish
its limits. The LH will be injecting power as well but will need
to monitor impurity injections.

2. Time permitting we will investigate LSN discharges to condition
other surfaces.

We will modify discharge parameters as deemed necessary.

will be monitoring voltage and power limits
will adjust density and current to avoid J neutral pressure limit
-

Physics Operators Plans
Entered: Dec 12 2007 04:55:27:253PM
Author: Bill Rowan
MP#355 ICRF startup and conditioning
MP#488 Fast ferrite tuner on E-port

Session leader: Wukitch
Physics operator: Rowan

Lower Hybrid Conditioning as compatible with ICRF Operation

-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1071212029 (1 MA, 5.4 T, 0.8e20/m^2, USN)


Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo

Torvac gatevalve toggle (yes/no): yes

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): yes
DNB(yes/no): if available
Cryopump (yes/no): yes

Vessel temperature: 60/60/60

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s


Session Leader Summaries
Entered: Dec 13 2007 03:37:15:963PM
Author: Steve Wukitch
Run Summary

Although the shot total was limited by a number of issues (see below),
D and E antennas were operated up to 1.5 MW simultaneously in USN
discharges. With the cryopump on, the H/D was managed relatively
well, was rising to 15% during a pulse and starting near 10%, and we
obtained reasonable heating with 4 MW total power. The FFT
performance was reasonable but there appears to be a power level at
which the solution is off significantly. We are still investigating
whether this is a control problem or hardware feature. J antenna is
still lagging behind the D and E in terms of conditioning and our next
step is to measure the RH of the 6" coax lines and modify the telfon
spacers to allow for more effective pumping and purging.

An interesting observation is that the density in front of the LH
coupler changed dramaticly between 011 and 012. Discharge 011 is USN,
0.8 MA and 012 is LSN, 1.0 MA. The H/D is ~12% in 011 and ~14% in 012
which will not significantly change the single pass absorption. We
will have to look into this a bit because it will partially explain
why ICRF operation is relatively more successful at injecting high
power in USN compared to LSN.

Physics Operator Summaries
Entered: Dec 13 2007 07:21:34:033PM
Author: Bill Rowan
The run consisted of 16 shots in LSN and USN configurations. The shot rate was limited by problems with thermocouple instrumentation, EF3 power supply, and ICRF fault instrumentation.

Shot 1071212029 was loaded as the model for USN operation. Shot 1071212013 was loaded as the model for LSN operation. Plasmas breakdown and current rise were reliable. The breakdown fields were not adjusted at all during the day. Only the prefill was adjusted to provide appropriate pressure with and without the cryopump.

The cryopump operated on all 14 shots on which it was requested.

Scorecard

13 plasmas USN:002,003,005,006,007,008,009,010,011
LSN: 012,013,014,016
01 Fizzle 015.
01 dud 001
01 engineering failure 004 (EF3)
-------
16 total


Session Leader Comments
Dec 13 2007 09:16:06:360AM1071213001Steve Wukitchno plasma
Dec 13 2007 09:22:28:770AM1071213002Steve Wukitch002 Bt=5.4 T, Ip=0.8 MA, nl04= 0.8e20 /m^2, USN
result: plasma
D: ran 0.48 MJ
E: did not run
J: 5 faults 0.1
cryo cold
next: why no E?

Dec 13 2007 10:13:57:040AM1071213003Steve Wukitch003 Bt=5.4 T, Ip=0.8 MA, nl04= 0.8e20 /m^2, USN
result: plasma
D: ran 2 faults 0.8 MJ
E: did not run
J: 4 faults 0.11
cryo cold
next: cell access to find false fault
found bad contact and have "fix" it

Dec 13 2007 11:56:32:080AM1071213005Steve Wukitch005 Bt=5.4 T, Ip=0.8 MA, nl04= 0.8e20 /m^2, USN
result: plasma
D: ran 0.85 MJ
E: ran 0.71 MJ
J: 5 faults 0.11 MJ
cryo cold

Dec 13 2007 11:53:30:517AM1071213006Steve Wukitch006 Bt=5.4 T, Ip=0.8 MA, nl04= 0.8e20 /m^2, USN
result: plasma
D: ran 0.91 MJ
E: ran 0.6
J: 8 faults 0.74
cryo cold
next: repeat

Dec 13 2007 11:50:28:890AM1071213007Steve Wukitch007 Bt=5.4 T, Ip=0.8 MA, nl04= 0.8e20 /m^2, USN
result: plasma
D: ran 0.91 MJ
E: ran 9 faults 0.5 MJ
J: 7 faults 0.77 MJ
cryo cold
next: increase D pulse and increase E power

Dec 13 2007 12:25:39:280PM1071213008Steve Wukitchr008 Bt=5.4 T, Ip=0.8 MA, nl04= 0.8e20 /m^2, USN
esult: plasma
D: ran 7 faults 1.32 MJ
E: ran 6 faults 0.81 MJ
J: ran 7 faults 0.9 MJ
cryo cold
next: repeat

Dec 13 2007 03:23:01:880PM1071213009Steve Wukitch009 Bt=5.4 T, Ip=0.8 MA, nl04=0.8e20 /m^2, USN, gap 1.5 cm
D: ran 9 faults 0.74 MJ
E: ran max faults 0.03 MJ
J: ran max faults 0.51 MJ
cryo cold

Dec 13 2007 03:22:53:020PM1071213010Steve Wukitch010 Bt=5.4 T, Ip=0.8 MA, nl04=0.8e20 /m^2, USN, gap 1.5 cm
D: ran 1 faults 1.15 MJ
E: ran 4 faults 0.8 MJ
J: ran 9 faults 0.88 MJ
cryo cold

Dec 13 2007 03:22:30:490PM1071213011Steve Wukitch011 Bt=5.4 T, Ip=0.8 MA, nl04=0.8e20 /m^2, USN, gap 1.4 cm
D: ran 1 faults 1.15 MJ
E: ran 4 faults 0.5 MJ
J: ran 15 faults 0.3 MJ
cryo cold

Dec 13 2007 03:10:13:640PM1071213012Steve Wukitch012 Bt=5.4 T, Ip=1.0 MA, nl04=0.8e20 /m^2, LSN, gap 1 cm
D: ran 1 faults 0.8 MJ
E: ran max faults 0.48 MJ
J: ran max faults 0.22 MJ
cryo cold

Dec 13 2007 03:05:44:000PM1071213013Steve Wukitch013 Bt=5.4 T, Ip=1.0 MA, nl04=0.8e20 /m^2, LSN, gap 0.9 cm
D: ran 0.94 MJ
E: ran max faults 0.14 MJ
J: ran max faults 0.25 MJ
cryo cold

Dec 13 2007 03:05:22:233PM1071213014Steve Wukitch014 Bt=5.4 T, Ip=1.0 MA, nl04=0.8e20 /m^2, LSN, gap 0.9 cm
D: ran 1 faults 0.9 MJ
E: ran max faults 0.12 MJ
J: ran max faults 0.13 MJ
cryo off
Dec 13 2007 02:58:04:200PM1071213015Steve Wukitchfizzle
Dec 13 2007 02:57:51:073PM1071213016Steve Wukitchearly disruption

Physics Operator Comments
Dec 13 2007 08:41:26:160AMBill RowanGate valve set to toggle from the first shot.
The closed time is set to 300 s

Loaded shot 1071212029 (1 MA, 5.4 T, 0.8e20/m^2, USN)
Dec 13 2007 09:15:24:050AM1071213001Bill Rowan001. Dud
cryo pump was on


Next shot. Increase PG4 by 5 ms
Dec 13 2007 09:27:02:193AM1071213002Bill Rowan002. good shot.
cryo on. cryo will be on until otherwise noted


Next shot.
LH on at 0.7 s

Dec 13 2007 10:23:32:827AM1071213003Bill Rowan003. Plasma.
Ran through the rampdown

Next shot.
Cell access: 40 minutes

Dec 13 2007 10:40:46:940AM1071213004Bill Rowan004. Dud. EF3 breaker pulled out.

Next shot.
Power room access: 20 minutes

increased prefill by 2 ms to 32 ms.
on the previous two shots the prefill has dropped back to 0.04 mT

Dec 13 2007 10:55:42:587AM1071213005Bill Rowan005. Plasma

Next shot.
No DPCS changes

Dec 13 2007 10:58:39:747AM1071213005Bill Rowanenable ar. bside lower

Dec 13 2007 11:25:43:943AM1071213006Bill Rowan006. Plasma

Next shot.
No PCS changes
Delays due to cooling. TF coil peak stuck at -159

Dec 13 2007 11:57:48:893AM1071213007Bill Rowan007. Plasma

Next shot.
cell access to check cooling: 25 minutes
A thermocouple measurement discrepancy identified

Dec 13 2007 12:23:37:467PM1071213008Bill Rowan008. Plasma

Next shot.
Reduced prefill to 30 ms

Dec 13 2007 12:38:57:487PM1071213009Bill Rowan009. Plasma

Next shot.
No pcs changes

Dec 13 2007 12:51:49:070PM1071213010Bill Rowan010. Plasma

Next shot
No PCS changes

Dec 13 2007 01:06:29:107PM1071213011Bill Rowan011. Plasma

Next shot.
Switch to LSN
Use shot 1071212013 for LSN
Loaded 1071212013
Loaded segment 1 from 1071213011

Dec 13 2007 01:30:14:040PM1071213012Bill Rowan012. Plasma. LSN (5.4T, 1 MA, 0.8e+20)

Next shot.
No pcs changes

Dec 13 2007 01:30:23:710PM1071213013Bill Rowan013. Plasma

Next shot.
No dpcs changes

Dec 13 2007 01:45:09:590PM1071213014Bill Rowan014. Plasma

Next shot.
Cryo pump off to provide comparison discharges
No dpcs changes
Dec 13 2007 02:00:08:533PM1071213015Bill Rowan015. Fizzle

Next shot.
prefill to 16 ms
gate valve closed 1200 s after the shot

Dec 13 2007 02:11:50:070PM1071213016Bill Rowan016. Plasma.
Disruption at 0.6 s

Last shot.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:02:22:123AMPlasmaOk
209:16:38:643AMPlasmaOk
309:29:31:117AMPlasmaOk
410:17:45:510AMPlasmaOkEF-3 breaker opened in pulse
510:45:57:303AMPlasmaOk
611:07:07:030AMPlasmaOk
711:29:09:070AMPlasmaOk
812:12:22:307PMPlasmaOk
912:30:25:810PMPlasmaOk
1012:43:11:723PMPlasmaOk
1112:59:40:573PMPlasmaOk
1201:13:11:157PMPlasmaOk
1301:26:19:850PMPlasmaOk
1401:39:31:387PMPlasmaOk
1501:54:11:860PMPlasmaOk
1602:08:43:287PMPlasmaOk

System Availability
Dec 13 2007 09:01:57:293AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi still in the same poor condition as last campaign. Outboard miidplane AXUV fine. Midplane foils working fine, but need calibration. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 09 2007 06:51PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesDetectors cooled 12/4. Signals on all but Chs 9. Recalibrated 12/4.Dec 05 2007 09:29AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesDetectors cooled 12/5. Most channels operational.Dec 05 2007 09:30AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, low speed to start out.Dec 04 2007 09:27AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem offSep 14 2007 02:46PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled following manned access. Availablity during pre-physics phase will be limited.Nov 26 2007 02:58PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSystem being reassembled following manned access. Availability will be limited during pre-physics portion of campaign.Nov 26 2007 02:59PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnocPCI digitzer problems being debuggedDec 09 2007 06:49PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke