Alcator C-Mod Run 1071219 Information

Back to runs

Miniproposals
Miniproposal:473
Date Filed: 3/9/2007
Title:Lower Hybrid System Check-out and Initial operation
First Author:J. Randall Wilson
Session Leader:Greg Wallace (shots 1-6)
Miniproposal:518
Date Filed:11/30/2007
Title:LH_B and LH_D NINJA Capillary Testing
First Author:Greg Wallace
Session Leader:Greg Wallace (shots 7-32)

Operators
Session leader(s):Greg Wallace,Greg Wallace
Physics operator(s):Earl Marmar
Engineering operator(s):Andy Pfeiffer,Gary Dekow

Engineering Operator Run Comment
MP#473: LH check-out and initial operation MP#518: LH_B and LH_D NINJA C

Session Leader Plans
Entered: Dec 18 2007 02:32:14:563PM
Author: Greg Wallace
Session Leader plan for 1071219
SL: G. Wallace
PO: E. Marmar


This run will be a combination of MP's 473 (LH Conditioning) and 518 (LH NINJA
Puffing). The gameplan is to start with MP473, bringing up the
power level to at least 700kW. After bringing up the LH power level we will switch
to MP 518.

LH system setup: Phase shifters at 90 degrees current drive direction, 1.5mm
behind LH limiter. Start at 40kV beam voltage. 500ms shot starting at 700ms.

Plasma setup: Start with 1071207027. Overnight ECDC. Cryopump in afternoon.

Shot Plan:
Start with 500ms pulse at 80kW per klystron. Increase power each shot in
20kW/klystron incriments up to 700kW without arcing. After an arc, reduce power
then continue raising in 10kW incriments. Operate NINJA LH_B and LH_D
capillaries in piggyback mode after LH turns off at 1.2 seconds. Start at
5psi plenum fill and look at local density increase at LH grill. Adjust
pressure up and down to see effect of different gas rates.

Switch to MP 518 at 700kW net without arcs.

Reduce power back to 20kW per klystron, 500ms pulse starting at 700ms. Set
NINJA such that LH_B hits plasma at 900ms and LH_D hits plasma at 1100ms.

Increase power in 10kW incriments, making sure we do not see flashes or
breakdown in the waveguides. If possible, decrease programmed nl_04 to keep
edge density near constant for good coupling. Gas puff rates may need to be
adjusted if ionization increases with LH power level. Cryopump and upper null may
be required for density control if all goes well.

Physics Operators Plans
Entered: Dec 18 2007 04:24:39:857PM
Author: Earl Marmar
Engineering setup for Wednesday 19 Dec 2007

MP#473: LH check-out and initial operation
MP#518: LH_B and LH_D NINJA Capillary Testing

SL: G. Wallace
PO: E. Marmar

ECDC overnight in D2 and bake at 60 C. Stop ECDC by 7:00 am.

Run will start at 09:00 and end at 17:00.

Power systems as on 1071207027

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 INITIALLY DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, Z-bolo (Do not enable DNB gate valve.)

Torvac setup: gate valves open

Specific diagnostics: standard set

-------------------------------------------------------------------------------
ICRF Setup: not required for MP

LH Setup: Set launcher to 1.5mm behind LH limiter. Phase shifters set to 90 deg current drive direction. Start with 80 kW per klystron, 500 ms.

DNB: no

Cryopump: yes, in afternoon
-------------------------------------------------------------------------------
Run plan: Start with 1071207027 and go from there.
nl_04~0.8e20, outer gap~1cm.

tune as required, including density

upper-null with cryopump may be used in latter half of the run

Session Leader Summaries
Entered: Dec 20 2007 03:36:39:627PM
Author: Greg Wallace
Session Leader Summary for 1071219
Session Leader: G. Wallace
Physics Operator: E. Marmar

The majority of this run day was spent testing the newly installed LH NINJA gas
capillaries as part of MP 518. Shots 1 through 6 were conditioning shots (MP
473) to make sure the LH system was operating as expected. Piggyback gas puff
tests on these early shots confirmed 5psi plenum pressure as a good starting
point for MP 518.

Gas puffing during the LH pulse started with shot 7. The plan was to start at
low power in LSN and slowly increase shot to shot to make sure we did not see
arcing in the vacuum side of the guides. The NINJA capillaries were set to
trigger at 700ms at first, then changed to 650ms starting with shot 10. A delay
of ~150ms is observed between the NINJA trigger and when the puff hits the
plasma.

Operation in LSN at up to 700kW at 5.6psi plenum fill was successful without any
arcing in the waveguides on the vacuum side. This is one of the key points of
the MP since there was some experience at JET that placing a gas capillary close
to the LH antenna would cause arcing in the waveguides due to the ionization of
neutral gas. This does not seem to be a problem in LSN at up to 700kW and 5psi.

The reduction in reflections was quite pronounced at low power levels with power
reflection coefficients falling from >35% to <25% for less than 300kW net LH
power. As the power level increased, the reduction in reflections seemed to
lessen, although the noise level in the reflections did still noticably
decrease. A reduction in noise on the reflected signals does help prevent
nuisance trips since sudden spikes in the reflected power often trip out the LH
system when no arc is present.

On shot 19 we switched to USN with the cryopump on, keeping the plenum at 5.6psi
and ~700kW net LH power. This caused arcing on all four rows of the LH antenna
starting when the gas puff hit at ~.8s. This seems to be the cause for a
disruption at 1.05s. After this we reduced the LH net power ~500kW and the
plasma density to nl_04~5.5e19 and did not see any more evidence of arcing on
the LH camera.

In upper null at ~500kW the effect of the gas puffing seemed to reduce
reflections on the top of the grill while causing them to rise of the bottom of
the grill. A comparison between shots 29 (7psi B and D side) and 30 (7psi D
side only) show similar results, with reflections decreasing over time on the
top of the grill and incraesing over time on the bottom of the grill.

Overall, this run day was quite a success. We were able to run at 700kW with
5psi plenum fill without arcing in LSN. We were also able to run without arcing
at 7psi plenum fill and 500kW net LH power in upper null. Unfortunately we lost
much of the day due to a slow start and then disruptions and fizzles in the
afternoon. Another day should allow us to explore the safe operational range a
bit more, particularly to investigate the effect of increasing the outer gap and
pulling the launcher back further behind the limiter.

Physics Operator Summaries
Entered: Dec 19 2007 05:41:03:400PM
Author: Earl Marmar
A reasonably good run from the Physop point of view. We struggled with startup runaways for much of the run, mostly correlated with fast intitial current rise. I kept increasing the prefill pressure, eventually getting close to 0.1 mTorr. There were also tweaks to RCUR offset and BR_0.

We ran LSN shots without cryopumping, and then switched to USN with cryopumping for shot 19 and subsequent.

We got into the afternoon fizzle cycle, starting with shot 22. Eventually we got the plasmas back (shot 26), perhaps because of aggressive prefill puffing and the wirehead tweaks.

2 shots were lost to the ef3 breaker pulling before t=0.

One shot (14) hung in init (no power shot)

Shot 2 disrupted early with errors on BP25_BC; the coil was ok for the rest of the run.

Scorecard:
Plasmas 24
Fizzles 4
P.S. Duds 2
Test/nopower 2

Session Leader Comments
Dec 19 2007 09:26:35:803AM1071219001Greg WallaceLH shot ran clean at ~40kW per klystron. Some strange behavior on the setpoints for the LH system, Atma is investigating.

NINJA fired at 1.2s, hit the plasma around 1.35s on the LH camera view. Small density increase at LH grill visible as well as small increase in nl_04.
Dec 19 2007 09:47:55:343AM1071219002Greg WallaceDisruption at 0.48s.
Dec 19 2007 10:38:33:220AM1071219003Greg WallaceTest shot, no plasma.
Dec 19 2007 10:38:20:753AM1071219004Greg WallaceAnother disruption.
Dec 19 2007 11:00:36:057AM1071219005Greg WallaceFull length plasma, LH ran clean although still putting out much less than the demand power. Will try one more time to get the system to work properly before going on to gas puffing experiments.
Dec 19 2007 11:12:09:030AM1071219006Greg WallaceFunny behavior on 6B again caused some trips, but the klystrons are now giving the demanded power. Next shot will decrease to 30kW per klystron and fire NINJA at 700ms, which should cause the density to rise around 850ms.
Dec 19 2007 11:23:02:130AM1071219007Greg WallaceSeems like the gas puffing works at 30kW per klystron!!!! The LH reflection coeffecient goes down significantly from ~35% to ~25% when the gas hits the plasma. The effect is more noticable on the top half of the grill. No signs of arcing on the LH camera. Next shot will keep the gas the same and increase LH power to 40kW per klystron.
Dec 19 2007 11:38:21:040AM1071219008Greg WallaceIt still works! No arcing on the vacuum side visible on camera, and the reflections decrease during the puff. Unfortunately nl_04 increases from 5.5-7e19 during the LH pulse. Next shot will turn down the puff from 5psi to 3psi and increase the power to 50kW per klystron.
Dec 19 2007 11:51:22:920AM1071219009Greg WallaceNo signs of arcing on the vacuum side. Still a significant effect on the reflections at 3.6psi with less increase in nl_04. Will increase to 60kW per klystron and move NINJA to 650ms firing for the next shot.
Dec 19 2007 12:02:59:783PM1071219010Greg WallaceReflections get "quieter" although less reduction in overall magnitude. Next shot will increase power to 70kW per klystron.
Dec 19 2007 12:16:46:697PM1071219011Greg WallaceNot much decrease in reflections at 3.6psi. Will keep power at 70kW per klystron and increase fill to 5.6psi.
Dec 19 2007 12:32:26:610PM1071219012Greg WallaceNINJA pressure increase didn't take. Next shot will keep power at 70kW and increase to 5.6psi for real.
Dec 19 2007 12:40:28:520PM1071219013Greg WallaceSignificant decrease in reflection, although nl_04 rose from 5.5 to 6.5e19. No arcing visible on the LH camera. Next shot will increase to 85kW per klystron.
Dec 19 2007 01:09:49:717PM1071219015Greg WallaceDecrease in reflections during gas puffing is getting less obvious as the power increases. Still no sign of breakdown on the antenna. Will increase to 100kW per klystron and 50kV beam voltage.
Dec 19 2007 01:42:12:557PM1071219017Greg WallaceShot ran clean, still no arcing on the LH camera. Will increase to 135kW per klystron.
Dec 19 2007 01:47:33:060PM1071219018Greg WallaceEffect of the puffing seems to be decreasing with power still, although still no arcing on vacuum side at 700kW net. Will change to upper null with cryopump on to see if we can decrease line averaged density while still keeping reflections down.
Dec 19 2007 02:12:26:570PM1071219019Greg WallaceLooks like some sparking on the LH grill caused the disruption. For the next shot we will:
Decrease LH power to 100kW per klyston
Decrease programmed density from 8 to 5e19 on nl_04
Turn off LH gas puff to get a baseline

Saw some glowing after the disruption in the normal place between the C and D rows of the LH coupler. Not surprising given the very high Isat on the LH probes.
Dec 19 2007 03:22:17:660PM1071219021Greg WallaceLH ran clean with no gas puffing. Grill density still quite high (>1e18) despite no puff. Will try decreasing nl_04 to 4e19 while turning puff back on and keeping power level at 100kW/klystron, 500kW net.
Dec 19 2007 02:43:07:533PM1071219022Greg WallaceFizzle.
Dec 19 2007 03:43:07:447PM1071219026Greg WallaceClean shot with coupling getting a bit noisier after the gas turns on. Seems like we need more gas so we'll increase the fill to 7psi on the NINJA. Keeping the LH power and plasma the same.
Dec 19 2007 04:21:22:400PM1071219026Greg WallaceClean shot with coupling getting a bit noisier after the gas turns on. Seems like we need more gas so we'll increase the fill to 7psi on the NINJA. Keeping the LH power and plasma the same.
Dec 19 2007 04:24:11:810PM1071219029Greg WallacePuff seems to help on top of grill but hurt on bottom. Next shot will turn off B side (bottom) capillary, keeping the LH power and plasma shape the same.
Dec 20 2007 02:07:57:687PM1071219030Greg WallaceThis shot had puffing only on the top of the grill. The reflections on the top of the grill come down from ~30% to ~20%, although on the bottom they rise from ~20% to ~30%.
Dec 20 2007 02:09:00:313PM1071219031Greg WallacePlasma disrupts at 1s. Prior to disruption the gas seems to make the reflections quieter although not reduce the magnitude.
Dec 19 2007 05:09:47:530PM1071219032Greg WallaceAnother good shot. Effect of gas puffing in this shot is unclear since the reflections are relatively constant over the shot. This is the last shot of the day.

Physics Operator Comments
Dec 19 2007 09:30:04:163AM1071219001Earl Marmarload from 1071207027
import segment 1 from 1071218003 (20 msec prefill puff)

plasma
P_LH = 200 kW net, no perceptible change in Vloop
Dec 19 2007 09:55:24:140AM1071219002Earl Marmarno pcs changes

plasma
early disruption (.48)
problems with plasma control
large errors on efit reconstruction (chisq > 400)

Wolfe reports that BP25_BC flatlines shortly after breakdown; this one is used for both control and EFIT.
Dec 19 2007 10:18:50:963AM1071219003Earl Marmar10 kA OH1 test, to see if the BP coil has recovered
Dec 19 2007 10:48:43:833AM1071219004Earl Marmartry for plasma

BP25_BC looks ok
plasma
disrupt .43 sec, looks like an injection
early marfe
Dec 19 2007 10:48:57:333AM1071219005Earl Marmarreduce segment 1 gas puff (after 30 msec)
tweak nl_04 programming in segment 2

plasma
full length shot
Dec 19 2007 11:37:36:887AM1071219006Earl Marmarno pcs changes

plasma, full length
Dec 19 2007 05:41:29:480PM1071219007Earl Marmarno pcs changes

plasma, full length
Dec 19 2007 11:38:06:057AM1071219008Earl Marmarno pcs changes

plasma, full length
Dec 19 2007 11:49:09:467AM1071219009Earl Marmarno pcs changes

plasma, full length
Dec 19 2007 12:06:57:757PM1071219010Earl Marmarno pcs changes

plasma, full length
Dec 19 2007 12:12:10:413PM1071219011Earl Marmarno pcs changes

plasma, full length
early hards
startup looing ratty
Dec 19 2007 12:42:22:877PM1071219012Earl MarmarEF4 20 A more negative prior to t=0 (now -1350 A)

plasma, full length
startup looks a bit better, still early hards
Dec 19 2007 12:42:38:423PM1071219013Earl Marmarno pcs changes

plasma, full length
early hards
Dec 19 2007 12:51:35:867PM1071219014Earl Marmaradd 3 msec to prefill puff (now 23 msec)

hang during init, no power shot
Dec 19 2007 01:09:43:467PM1071219015Earl Marmarno additional pcs changes

plasma, full length
hesitation during early current rise, early hards
Dec 19 2007 01:21:41:300PM1071219016Earl Marmaradd 2 msec to prefill puff (now 25 msec)

plasma, full length,
startup the same, early hards
Dec 19 2007 01:39:05:167PM1071219017Earl Marmaradd 2 msec to prefill puff (now 27 msec)

plasma, full length
nice breakdown, no hards
Dec 19 2007 02:05:32:800PM1071219018Earl Marmarno pcs changes

plasma, full length

big bounce, worst early hards yet
Dec 19 2007 02:15:12:773PM1071219019Earl Marmaradd 12 msec to prefill puff (now 39 msec) (cryopump should be cold)

import segment 3 from 1071218015, 0.8 MA upper single null
turn off segment 2
turn on segment 3

plasma
nice startup, but then hards come up in first .5 seconds
disrupt 1.05 seconds - LH grill spewing just before
Dec 19 2007 02:23:56:387PM1071219020Earl Marmarnl_04 target to 5e19

no EF3, dud
Dec 19 2007 02:39:31:703PM1071219021Earl Marmarno pcs changes

plasma, full length
early hards are better
Dec 19 2007 02:48:13:537PM1071219022Earl Marmaradd 6 msec to prefill puff (now 45 msec)
nl_04 target to 4e19
tweak feedback gains for nl_04

fizzle (Ip/Bz too high early)
Dec 19 2007 02:59:37:150PM1071219023Earl Marmarprefill puff to 40 msec
ef4 20 A less negative (now -1320 A)

fizzle
Dec 19 2007 03:18:26:890PM1071219024Earl Marmarprefill puff to 50 msec

fizzle
Dec 19 2007 03:24:47:830PM1071219025Earl MarmarBR_0 offset to -.005T (from 0.000)

fizzle, late breakdown
(actually wanted -.0005T)
Dec 19 2007 03:38:13:180PM1071219026Earl MarmarBR_0 to -0.0005 (from -0.005)

plasma
1 bounce during startup
a lot of hards through most of the shot
Dec 19 2007 03:51:20:247PM1071219027Earl Marmarprefill puff to 70 msec

power supply dud, ef3 breaker pulled
Dec 19 2007 04:08:25:613PM1071219028Earl Marmarno pcs changes

plasma
bounce, runaways, disrupt at 0.36 seconds
Dec 19 2007 04:28:49:437PM1071219029Earl MarmarRCUR offset to 1500 (from 1000)

plasma
nice startup, no hards until LH
Dec 19 2007 04:35:15:610PM1071219030Earl Marmarno pcs changes

plasma
1 bounce, lots of hards
disrupt near end of flattop
Dec 19 2007 04:51:47:367PM1071219031Earl MarmarRCUR offset to 2000 (from 1500)
prefill puff to 80 msec (from 70 msec)

nl_04 target to 3.5e19

plasma
nice startup
hards during LH only
disrupt during LH pulse (1.0 second)
Dec 19 2007 05:39:03:447PM1071219032Earl MarmarLPI gate valve enabled

plasma, full length
good startup (no bounce, but close to being squashed on the inner wall)
got the pellet at 1.7 seconds

G, G, T A F.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:10:27:140AMPlasmaOk
209:28:17:117AMPlasmaBadOH1 self powered
310:18:21:340AMTestOkOH1 10KA FWD Bridge
410:30:40:233AMPlasmaBadOH1 self powered
510:46:59:037AMPlasmaOk
611:00:36:183AMPlasmaOk
711:14:52:500AMPlasmaOk
811:28:31:223AMPlasmaOk
911:42:34:323AMPlasmaOk
1011:55:25:343AMPlasmaOk
1112:07:55:927PMPlasmaOk
1212:20:52:057PMPlasmaOk
1312:33:21:517PMPlasmaOk
1412:46:00:490PMPlasmaBadlost pcdaqeng1, no power shot
1501:02:02:027PMPlasmaOk
1601:14:38:720PMPlasmaOkEF3 breaker pulled after shot
1701:28:16:380PMPlasmaOk
1801:40:59:947PMPlasmaOk
1902:01:27:330PMPlasmaOk
2002:15:38:587PMPlasmaBadEF3 breaker opened in pulse
2102:28:13:717PMPlasmaOk
2202:41:13:987PMPlasmaOk
2302:53:49:490PMPlasmaOk
2403:06:24:543PMPlasmaOk
2503:18:52:173PMPlasmaOk
2603:31:32:710PMPlasmaOk
2703:44:09:137PMPlasmaOk
2803:59:52:987PMPlasmaOk
2904:15:06:133PMPlasmaOk
3004:29:36:000PMPlasmaOk
3104:42:08:207PMTestBad
3204:57:54:587PMPlasmaOk

System Availability
Dec 19 2007 09:10:09:280AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi still in the same poor condition as last campaign. Outboard miidplane AXUV fine. Midplane foils working fine, but need calibration. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 09 2007 06:51PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAvailable, but Chs 1, 9 still have preamp problems. Dec 18 2007 09:21AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesDetectors cooled 12/5. Most channels operational.Dec 05 2007 09:30AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, low speed to start out.Dec 04 2007 09:27AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled during pre-physics phase of campaign. Lasers are operable and coarsely aligned. Collection optics are in place. Data acquisition is being tested. Full operation expected after Jan 1.Dec 19 2007 09:01AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSee entry for core TSDec 19 2007 09:02AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnocPCI digitzer problems being debuggedDec 09 2007 06:49PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Dec 19 2007 11:25:47:160AM
NINJA D2 puff at inner wall (B16) trigger at 1.35 for 150 ms. He 1+ CX 468 nm
Dec 19 2007 11:28:12:473AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi still in the same poor condition as last campaign. Outboard miidplane AXUV fine. Midplane foils working fine, but need calibration. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 09 2007 06:51PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAvailable, but Chs 1, 9 still have preamp problems. Dec 18 2007 09:21AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesDetectors cooled 12/5. Most channels operational.Dec 05 2007 09:30AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, low speed to start out.Dec 04 2007 09:27AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoSystem is being reassembled during pre-physics phase of campaign. Lasers are operable and coarsely aligned. Collection optics are in place. Data acquisition is being tested. Full operation expected after Jan 1.Dec 19 2007 09:01AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoSee entry for core TSDec 19 2007 09:02AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOnocPCI digitzer problems being debuggedDec 09 2007 06:49PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke