Alcator C-Mod Run 1080104 Information

Back to runs

Miniproposals
Miniproposal:355
Date Filed:11/12/2003
Title:ICRF Testing & Conditioning
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-31)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Earl Marmar
Engineering operator(s):Sam Pierson,Bill Parkin,Gary Dekow

Engineering Operator Run Comment
MP 355 ICRF Conditioning, MP LH NINJA Capillary Testing

Session Leader Plans
Entered: Jan 3 2008 05:15:15:453PM
Author: Greg Wallace
Session Leader Plan for 1080104

Session Leader: G. Wallace
Physics Operator: E. Marmar

MP518 LH_B and LH_D NINJA Capillary Testing

This will be a 1/2 day (morning) run to continue testing the new LH NINJA
capillaries. Since we already confirmed on 1071219 that the system can operate
at up to 700kW without arcing we will now move on to see if gas injection can
help with coupling over long distances between the grill and the seperatrix.

Plasma Setup:
Overnight ECDC. Cryopump on all shots. Start with 1071219032.

LH Setup:
2.5mm behind limiter, start at 40kV beam voltage and 85kW per klystron, firing
from .7 to 1.3 seconds.

Shot Plan:
1) Start at 85kW per klystron. NINJA off and outer gap constant at 1.5cm during
LH pulse for the first shot to get a baseline for the coupling. Repeat shot
with different control gains if density varies by more than +/-10%.

2) Repeat shot 1 with ~10psi NINJA puff on B and D side with puff triggering
from 0.55s to 1.25s.

3) Increase outer gap to 2.5cm.

4) If waves are able to couple at 2.5cm, increase outer gap to 3.5cm.

5) If waves are able to couple at 3.5cm outer gap, increase outer gap to a
maximum of 4.5cm during LH pulse.

6) Sweep outer gap from 1.5cm at .7s to 4.5cm at 1.3s. Keep NINJA off.

7) Repeat shot 6 with ~5psi NINJA puff on B and D side with puff triggering from
0.55s to 1.25s.

8) Repeat shot 6 with ~10psi NINJA puff on B and D side with puff triggering
from 0.55s to 1.25s.


Entered: Jan 4 2008 09:30:10:907AM
Author: Steve Wukitch
SL Plan for high power ICRF

Start with 1080103029 (LSN). We may later switch to USN (1080103005).

Continue with high power conditioning focusing on J antenna and
H/D.

1. Using LSN discharges, obtain high power RF pulses till H/D has saturated or we run out of time
- scan current to investigate voltage limits on antenna

We will modify discharge parameters as deemed necessary.

will be monitoring voltage and power limits
will adjust density and current to avoid J neutral pressure limit

Physics Operators Plans
Entered: Jan 3 2008 06:16:23:650PM
Author: Earl Marmar
Plan for Friday, January 4, 2008

Engineering Setup
-----------------

MP355 ICRF Conditioning Wukitch/Lin
MP518 Lower Hybrid NINJA Capillary Testing Wallace

We will start by continuing where we left off on 1080103, with high ICRF power, high plasma current conditioning. The main purpose is to reduce hydrogen fractions in anticipation of the first boronization next week. If we make sufficient progress, the latter ~half of the run will switch over to Lower Hybrid, MP518.

Run begins at 09:00 and ends at 17:00

Power systems as on: 1080103029

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo

Torvac gatevalve toggle (yes/no): yes, 300 s

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): after ICRF part of the run
DNB(yes/no): if possible
Cryopump (yes/no): yes, if we have helium, but not cold at the start of the run

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Jan 5 2008 12:19:05:630AM
Author: Steve Wukitch
Run Summary:

Succeeded obtaining high power (>4 MW) ICRF discharges throughout the day. We operated J antenna up to 3 MW and ran into FMIT #4 power supply current limits due to low plate impedance. Thus, the coupled power was limited by the power supply as opposed to the antenna or transmission line. We need to understand why the overload gives an indication but did not trip the high voltage. This is likely because the supply can provide current in excess of its maximum for short pulses as they were today. There is a current squared times time overload and xbar to limit to prevent damage to the supply. We also successfully tested real time antenna phase control and found the matching did vary but was relatively benign. The H/D level appeared to routinely increase from ~0.1 to 0.2 throughout the discharge but did not ratchet up from discharge to discharge.

Physics Operator Summaries
Entered: Jan 4 2008 05:49:11:637PM
Author: Earl Marmar
In spite of losing about 2 hours chasing a TF crow-bar issue, the run accomplished much of the main goal, injecting high power ICRF and monitoring hydrogen fraction evolution. Close to 6 MW were injected on some shots, and 4 MJ ICRF energy was exceeded on several shots. We also tried turning on the cryopump with LSN plasmas, scanning zcur upward in an attempt to increase coupling to the pump. This reduced midplane neutral pressure, but had no obvious effect on h fraction.

Near the end of shot 3, a type 1 fault was generated, pulling all the breakers and crow-barring the TF magnet. There was no evidence of a ground fault on any digitized signals, nor on the ground-fault latch in the power room. After various tests, including a 100 kA TF only pulse, the run continued without further problems in this regard.

2 shots were lost to EF3 breaker pulls early in pulse.
1 shot was a dud because the cryopump burped at just the wrong time.
There were 2 post-disruption fizzles.

Scorecard:

Plasmas: 21
PS Duds: 2
Cryo-Dud: 1
Tests: 5
Fizzles: 2

Total cycles: 31


Session Leader Comments
Jan 4 2008 09:33:15:810AM1080104001Steve Wukitch001 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.1 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (0.9 MJ) 2 faults
E: ran 1.25 MW (0.9 MJ) 1 faults
J: ran 2-2.5 MW (1.2 MJ) 17 faults

Jan 4 2008 09:32:02:750AM1080104002Steve Wukitch002 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.1 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (0.9 MJ) 4 faults
E: ran 1.25 MW (0.9 MJ) 3 faults
J: ran 2 MW (1.2 MJ) 20 faults

Jan 4 2008 10:52:40:767AM1080104003Steve Wukitch003 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.1 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (0.85 MJ) 5 faults
E: ran 1.25 MW (0.9 MJ) 3 faults
J: ran 2-2.5 MW (1.2 MJ) 18 faults
note: TF xbar
next: lengthen RF pulse to 1 s
Jan 4 2008 10:57:55:700AM1080104004Steve Wukitchno power
Jan 4 2008 11:15:11:600AM1080104005Steve Wukitchno power
Jan 4 2008 11:27:07:160AM1080104006Steve Wukitchno power
Jan 4 2008 11:59:54:743PM1080104010Steve Wukitch010 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.4 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (1 MJ)
E: ran 1.25 MW (1 MJ) 3 faults
J: ran 2.5 MW (1.9 MJ) 17 faults
note: J phase programmed to scan to 90deg from 0.85-1.05
next: J phase to -90deg from 1.05-1.25 s

Jan 4 2008 11:59:36:573PM1080104011Steve Wukitch011 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (1.1 MJ)
E: ran 1.25 MW (1.1 MJ)
J: ran 2.5 MW (1.6 MJ) 7 faults
note: J phase to -90deg from 1.05-1.25
next: heating phase

Jan 4 2008 11:58:34:090PM1080104012Steve Wukitch012 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.5 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (1.1 MJ)
E: ran 1.25 MW (1.1 MJ) 1 fault
J: ran 2.5 MW (1.75 MJ) 4 faults

Jan 4 2008 11:57:16:137PM1080104013Steve Wukitch013 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (1 MJ) 7 faults
E: ran 1.25 MW (1.1 MJ) 1 fault
J: ran 3 MW (1.4 MJ) 14 faults
note: FMIT#3 screen overload
FMIT#4 HVPS DC fault (HV was not lifted)

Jan 4 2008 11:57:01:043PM1080104014Steve Wukitch014 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1.5 MW (1.1 MJ) 1 fault
E: ran 1.5 MW (1.1 MJ) 1 fault
J: ran 2.5 MW (2.1 MJ) 3 faults
note: FMIT#4 HVPS DC fault (HV was not lifted)

Jan 4 2008 11:56:47:637PM1080104015Steve Wukitch015 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (1.1 MJ)
E: ran 1.25 MW (1.1 MJ)
J: ran 2.7 MW (1.9 MJ) 12 faults
note: HVPS DC overload indication on #4
next: J at 90deg phase lower power

Jan 4 2008 11:56:30:963PM1080104016Steve Wukitch016 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (1 MJ)
E: ran 1.25 MW (1 MJ)
J: ran 2.4 MW (1.2 MJ) 17 faults
note: J at 90 deg phasing at 1.6 MW

Jan 4 2008 11:56:12:777PM1080104017Steve Wukitch017 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (0.5 MJ) 2 faults
E: ran 1.25 MW (0.5 MJ) 3 faults
J: ran 2.7 MW (1 MJ) 3 faults
note: disruption 1 s

Jan 4 2008 11:55:56:933PM1080104018Steve Wukitch018 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (0.5 MJ)
E: ran 1.25 MW (0.5 MJ)
J: ran 2.7 MW (1 MJ) 4 faults
note: disruption 1 s
HVPS DC overload indication on #4
J off until understood

Jan 4 2008 11:55:42:717PM1080104019Steve Wukitchfizzle
Jan 4 2008 11:55:29:433PM1080104020Steve Wukitch020 5.4 T, 0.9 MA, nl04=0.9e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: max faults 1.25 MW (0.14 MJ)
E: ran 1.25 MW (1.1 MJ) 1 fault

Jan 4 2008 11:55:12:510PM1080104021Steve Wukitch021 5.4 T, 0.9 MA, nl04=0.9e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: max faults 1.25 MW (0.04 MJ)
E: ran 1.25 MW (1.1 MJ) 1 fault
note: lower D to recovering from faulting

Jan 4 2008 11:54:57:263PM1080104022Steve Wukitch022 5.4 T, 0.9 MA, nl04=0.9e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1 MW (0.14 MJ) 9 faults
E: ran 1.25 MW (1.1 MJ) 1 fault
note: remain at lower power for D

Jan 4 2008 05:08:03:310PM1080104023Steve Wukitch023 5.4 T, 0.9 MA, nl04=0.9e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1 MW (0.8 MJ) 2 fault
E: ran 1.25 MW (1.1 MJ) 1 fault

Jan 4 2008 05:06:21:090PM1080104024Steve Wukitchfizzle
Jan 4 2008 05:06:05:497PM1080104025Steve Wukitchfizzle
Jan 4 2008 05:05:43:530PM1080104026Steve Wukitch26 5.4 T, 0.9 MA, nl04=0.9e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (1 MJ) 1 fault
E: ran 1.25 MW (1 MJ) 1 fault
next: return J to service

Jan 4 2008 05:03:56:610PM1080104027Steve Wukitch027 5.4 T, 0.9 MA, nl04=0.9e20 /m^2, LSN, gap 1.3 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (1 MJ)
E: ran 1.25 MW (1.1 MJ)
J: ran 2.5 MW (1.56 MJ) 13 faults
cryo cold
H/D~0.0.19 @1.5 sec

Jan 4 2008 04:58:03:017PM1080104028Steve Wukitch028 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.1 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (1 MJ) 5 faults
E: ran 1.25 MW (1.1 MJ)
J: ran 2.5 MW (1.9 MJ) 7 faults
cryo cold
H/D~0.26 @1.5 sec

Jan 4 2008 04:52:25:863PM1080104029Steve Wukitch029 5.4 T, 0.9 MA, nl04=0.8e20 /m^2, LSN, gap 1.1 cm.
in and out of H-modes during RF.
D: ran 1.25 MW (0.7 MJ) 2 faults
E: ran 1.25 MW (0.7 MJ)
J: ran 2.5 MW (1.3 MJ) 4 faults
cryo warm
disruption @1.2
next: cryo cold
Jan 4 2008 04:52:43:877PM1080104030Steve Wukitchearly disruption

Physics Operator Comments
Jan 4 2008 09:37:40:263AM1080104001Earl Marmarstart from the last shot yesterday, 1080103029
0.8 MA, LSN
cryopump warm

gate valves toggled closed during and for 5 minutes after the shot

plasma
early hards, fill pressure lower than the loaded shot (cryopump might have still been pumping a bit?)
h/(h+d) .04 rising to .12 during ICRF
Jan 4 2008 09:23:24:317AM1080104002Earl Marmar0.9 MA
plasma, hards are gone
Jan 4 2008 09:33:24:687AM1080104002Earl Marmar0.9 MA
plasma, hards are gone
late-ish breakdown, no bounce

h/(h+d) starts at .07, rises to .14 during ICRF
Jan 4 2008 09:36:02:810AM1080104003Earl Marmarno pcs changes

hirex sr. gate valve enabled
Jan 4 2008 09:48:00:010AM1080104003Earl Marmarno pcs changes

hirex sr. gate valve enabled

plasma
earlier breakdown

h/(h+d) starts at .08, rises to .14 during ICRF

TF crowbar at 1.9 seconds, no sign of a ground fault
Jan 4 2008 10:58:49:687AM1080104004Earl Marmarno power test shot for instrumentation checkout
Jan 4 2008 11:14:47:570AM1080104005Earl Marmarno power test shot
Jan 4 2008 11:23:35:973AM1080104006Earl Marmarno power test shot
Jan 4 2008 11:35:59:703AM1080104007Earl Marmarno power test shot
Jan 4 2008 11:54:06:100AM1080104008Earl Marmar100 kA TF only test
Jan 4 2008 12:12:33:123PM1080104009Earl Marmarplasma attempt

no pcs changes from shot 3

power supply dud, EF3 breaker pulled before the shot

about 3 minutes after the shot, a type 2 fault pulled the TF breakers
Jan 4 2008 12:30:08:760PM1080104010Earl Marmaranother plasma attempt

plasma

h/(h+d) starts at .08 and rises to .17 during ICRF
Jan 4 2008 12:42:56:490PM1080104011Earl Marmarno pcs changes

plasma

h/(h+d) starts at .08 and rises to .19 during ICRF
Jan 4 2008 12:55:09:077PM1080104012Earl Marmarno pcs changes

plasma

h/(h+d) starts at .09 and rises to .2 during ICRF
Jan 4 2008 01:09:46:180PM1080104013Earl Marmarno pcs changes

plasma

h/(h+d) starts at .1 and rises to .19 during ICRF
Jan 4 2008 01:20:32:960PM1080104014Earl Marmarno pcs changes

plasma

h/(h+d) starts at .1 and rises to .22 during ICRF

disrupt in rampdown (600 kA) after a density rise
Jan 4 2008 02:52:34:080PM1080104015Earl Marmarno pcs changes

plasma

h/(h+d) starts at .1 and rises to .22 during ICRF (5 to 5.5 MW)
Jan 4 2008 01:46:51:370PM1080104016Earl Marmarreduce prefill puff by 2 msec (now 17 msec)
change rcur and clearin programming to stay diverted longer during rampdown

plasma
stayed diverted until about 1.8 sec, ramped nearly all the way down

h/(h+d) starts at .1 and rises to .21 during ICRF
Jan 4 2008 01:54:46:600PM1080104017Earl Marmarno pcs changes

plasma
disrupt at 1.05 seconds (900 kA)
Jan 4 2008 02:08:26:503PM1080104018Earl Marmarno pcs changes

plasma
disrupt at 1.05 seconds (900 kA), just like shot 17
Jan 4 2008 02:17:39:610PM1080104019Earl Marmarraise nl_04 target to 9e19

fizzle
Jan 4 2008 02:50:59:800PM1080104020Earl Marmarreduce prefill puff by 2 msec (now 15 msec)

enable argon (100 msec puff starting at .3 seconds)
enable LPI gate valve

plasma
early hards
h/(h+d) starts at .09 and rises to .16 during ICRF (2.5 to 3 MW)

Jan 4 2008 03:03:13:497PM1080104021Earl Marmarno pcs changes

plasma
disrupts at 1.64 s, shortly after Li pellet

h/(h+d) starts at .09 and rises to .12 during ICRF (1 to 1.5 MW)
Jan 4 2008 03:19:48:443PM1080104022Earl Marmarno pcs changes

plasma
another post-pellet disruption

h/(h+d) starts at .07 and rises to .12 during ICRF (mostly 1 to 1.5 MW)
Jan 4 2008 03:28:15:020PM1080104023Earl Marmarno pcs changes

plasma
survived the pellet this time, ramped all the way down

h/(h+d) starts at .07 and rises to .12 during ICRF (2 to 2.5 MW)
Jan 4 2008 03:35:47:377PM1080104024Earl Marmarcryopump on for this shot
prefill puff to 35 msec
dud
cryopump burped just before the shot

Jan 4 2008 03:47:04:700PM1080104025Earl Marmarno pcs changes

power supply dud
ef3 breaker pulled just before the shot
Jan 4 2008 04:10:00:200PM1080104026Earl Marmarno pcs changes

plasma

h/(h+d) starts at .07 and rises to .12 during ICRF (2.5 MW steady)
Jan 4 2008 04:24:21:480PM1080104027Earl Marmarmove zcur 5 mm less negative (raise the plasma)

plasma
more ICRF power (~5 MW)

h/(h+d) starts at .08 and rises to .17 during ICRF (~5 MW for much of the pulse)
Jan 4 2008 04:35:32:650PM1080104028Earl Marmarmove zcur another 5 mm up, now at +.001 meter

plasma
ICRF power ~5 MW

h/(h+d) starts at .08 and rises to .2 during ICRF
Jan 4 2008 04:48:30:690PM1080104029Earl Marmarcryopump off
prefill puff to 15 msec

plasma
disrupt during ICRF (1.21 seconds)
mostly 5 MW ICRF

h/(h+d) starts at .11 and rises to .18 during ICRF
Jan 4 2008 04:55:59:940PM1080104030Earl Marmarcryopump on
prefill puff to 35 msec
LPI disabled

plasma
some early hards
significant impurity influx starting at .43 s, disrupt at .47 s
Jan 4 2008 05:17:57:180PM1080104031Earl Marmarno pcs changes

fizzle

Engineering Operator Comments
ShotTimeTypeStatusComment
109:05:38:620AMPlasmaOkNo Faults
209:18:46:253AMPlasmaOkNo Faults
309:34:50:560AMPlasmaBadTF Type 1 fault
410:53:48:390AMTestBadJorway inhibit 'On' ans Reset 'Off
511:12:56:930AMTestBadGF circuit test camac not enabled
611:22:51:317AMTestOkGF circuit test
711:32:44:250AMTestOkGF circuit test
811:54:04:460AMTestOk100KA TF test PLC ctrl
912:06:54:457PMPlasmaBadEF3 breaker pulled going into "pulse"
1012:20:18:530PMPlasmaOk
1112:32:59:523PMPlasmaOk
1212:45:38:783PMPlasmaOk
1312:58:25:873PMPlasmaOk
1401:10:59:947PMPlasmaOk
1501:23:35:740PMPlasmaOk
1601:36:52:157PMPlasmaOk
1701:49:21:777PMPlasmaOk
1802:02:08:397PMPlasmaOk
1902:14:52:563PMPlasmaOk
2002:40:47:180PMPlasmaOk
2102:53:29:987PMPlasmaOk
2203:06:12:840PMPlasmaOk
2303:18:49:147PMPlasmaOk
2403:31:18:080PMPlasmaOk
2503:44:19:967PMPlasmaOk
2603:56:51:260PMPlasmaOk
2704:13:36:617PMPlasmaOk
2804:25:47:857PMPlasmaOk
2904:38:00:757PMPlasmaOk
3004:50:23:113PMPlasmaOk
3105:02:46:623PMPlasmaOk

System Availability
Jan 4 2008 09:05:15:807AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is uncalibrated. Jan 03 2008 08:31AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoFibers will be installed soon.Jan 03 2008 08:31AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesData being collected in digitizers and SIGNALS nodes updated. Still playing switch-a-roo with cPCI digitizers, but data should be available.Dec 19 2007 07:14PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Jan 4 2008 10:55:26:623AM
This is a ground fault Pearson system test.
Jan 4 2008 11:12:38:883AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. Two of 10 channels are dead.Nov 20 2007 08:26PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is uncalibrated. Jan 03 2008 08:31AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoFibers will be installed soon.Jan 03 2008 08:31AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesData being collected in digitizers and SIGNALS nodes updated. Still playing switch-a-roo with cPCI digitizers, but data should be available.Dec 19 2007 07:14PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Jan 4 2008 01:23:19:270PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. 5 photo detectors have been shipped out for repair, so currently only 5 channels are available. We expect the full channels will be available late in Jan 08.Jan 04 2008 01:11PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is uncalibrated. Jan 03 2008 08:31AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoFibers will be installed soon.Jan 03 2008 08:31AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesData being collected in digitizers and SIGNALS nodes updated. Still playing switch-a-roo with cPCI digitizers, but data should be available.Dec 19 2007 07:14PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke