Alcator C-Mod Run 1080109 Information

Back to runs

Miniproposals
Miniproposal:518
Date Filed:11/30/2007
Title:LH_B and LH_D NINJA Capillary Testing
First Author:Greg Wallace
Session Leader:Greg Wallace (shots 1-30)

Operators
Session leader(s):Greg Wallace
Physics operator(s):Joseph Snipes
Engineering operator(s):Andy Pfeiffer,Ed Fitzgerald,Bill Parkin

Engineering Operator Run Comment
Session Leader: G. Wallace Physics Operator: J. Snipes MP518 LH_B and LH

Session Leader Plans
Entered: Jan 9 2008 08:33:49:213AM
Author: Greg Wallace
Session Leader Plan for 1080109

Session Leader: G. Wallace
Physics Operator: J. Snipes

MP518 LH_B and LH_D NINJA Capillary Testing

This will be a full day run to continue testing the new LH NINJA
capillaries. Since we already confirmed on 1071219 that the system can operate
at up to 700kW without arcing we will now move on to see if gas injection can
help with coupling over long distances between the grill and the seperatrix.

Plasma Setup:
Overnight ECDC. Cryopump on all shots. Start with 1071219032.

LH Setup:
90 degree current drive phasing, 1.5mm behind limiter, start at 40kV beam voltage and 85kW per klystron, firing
from .7 to 1.3 seconds.

Shot Plan:
1) Start at 90kW per klystron. NINJA off and outer gap constant at 1.5cm during
LH pulse for the first shot to get a baseline for the coupling. Repeat shot
with different control gains if density varies by more than +/-10%.

2) Repeat shot 1 with ~5psi NINJA puff on B and D side with puff triggering
from 0.55s to 1.25s.

2a) Repeat shot 1 with ~5psi NINJA puff on B and D side but LH turned off.

3) Increase outer gap to 2.5cm with NINJA and LH on.

4) If waves are able to couple at 2.5cm, increase outer gap to 3.5cm with NINJA
and LH on.

5) If waves are able to couple at 3.5cm outer gap, increase outer gap to a
maximum of 4.5cm during LH pulse with NINJA and LH on.

6-9) Repeat shots 2-5 with ~10psi NINJA puff on B and D side.

10) Sweep outer gap from 1.5cm at .7s to 4.5cm at 1.3s. Keep NINJA off.

11) Repeat shot 10 with ~5psi NINJA puff on B and D side with puff triggering from
0.55s to 1.25s.

12) Repeat shot 10 with ~10psi NINJA puff on B and D side with puff triggering
from 0.55s to 1.25s.

13) Cell access to move launcher to 5mm behind limiter. Repeat shot 1 to get a baseline at this grill location.

14-21) Repeat shots 2-9 with launcher at 5mm behind limiter.

If time allows: Increase power to maximum available.

Physics Operators Plans
Entered: Jan 8 2008 03:00:45:400PM
Author: Joseph Snipes
Physop Run Plan for Wednesday, 9 January 2008; 1080109

MP518 LH_B and LH_D NINJA Capillary Testing

Session Leader: G. Wallace
Physics Operator: J. A. Snipes


-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1071219032 upper single null, 5.4 T, 0.8 MA

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 5 psi D2 Disabled

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo

Overnight ECDC in deuterium and 60 C bake
------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

ICRF: not required
LH: required with 90 degree current drive phasing
DNB: not required but may operate
Cryopump: on and cold for the first shot
Vessel temperature: 35/35/35

Session Leader Summaries
Entered: Jan 11 2008 03:57:51:937PM
Author: Greg Wallace
Session Leader Summary for 1080109


MP518: LH_B and LH_D NINJA Capillary Testing
Session Leader: G. Wallace
Physics Operator: J. Snipes


This was the second day of operation for MP518. The first run day, 1071219,
was cut short due to the so-called "Wallace Phenomenon," better known as the
afternoon fizzles. Initial results from 1071219 showed that the
combination of a gas puff from the LH NINJA capillaries and LH power levels in
excess of 500kW produced higher density at the LH grill for the same line
integrated density in lower null, however the LH coupling did not improve as
dramatically as we would have hoped. Unfortunately we were unable to keep
core densities as low as we wished in lower null, hence the move to upper null
with cryopump to control the density during puffing.
Overall, the machine performed well in the afternoon with only 3 fizzles, 2
early disruptions, and 1 no power shot. Not bad for an LH run.

Given the low densities (nl_04=3.5-4e19m^-2) we were flirting with the locked
mode threshold for much of the day and needed to repeat several shots due to
locked modes. An interesting phenomenon was observed during these locked
modes in shots 6, 8, and 11. Despite very low line integrated density and
upwards of 0.5MW of LH power, there were no signs of current drive on the loop
voltage. HXR and ECE diagnostics still show significant signs of fast
electrons during these shots, however. Sudden spikes followed by slow decays
in the non-thermal ECE signal (similar to inverted sawteeth but not of the
correct frequency) during the LH are seen as well.

The coupling experiments at the core of this run had some very surprising
results. The first surprising result was that the LH system was able to
couple into low density (nl_04=3.5-4e19m^-2) upper null plasmas with outer
gaps of up to 3.5cm and a grill position of 1.5mm behind the LH limiter. This
was totally unexpected due to the experience from the 2007 campaign that
showed a need for outer gaps of 0.5cm or less to obtain good coupling in low
density plasmas. Edge densities of 4-5e17m^-3 as measured by the LH Langmuir
probes are consistent with the observed reflection coefficients. NINJA
puffing under these conditions did little to effect the edge density or the LH
wave coupling, which was already reasonable (20-30% reflected power).

The second result came as we moved the LH launcher further behind its limiter.
After getting great coupling with large outer gaps at a 1.5mm distance from
the launcher to the limiter, we moved the launcher back to 5mm. As expected,
coupling without the NINJA at this position was poor (80-100% reflected
power). As we increased the NINJA puff to 10psi and decreased the outer gap
to 0.5cm, we found that coupling improved only slightly, despite increasing
the density measured by the LH probes around twice the cutoff density of
2.6e17m^-3. Why exactly this is happening is unclear however this indicates
that there may be a change in the density gradient which is causing the higher
reflections.

Due to lack of time, we were unable to manually move the launcher to an
intermediate position of 3.5mm behind the limiter. This run clearly showed
the importance of the future upgrade to a remote launcher position system.

As a follow on to the results of this run, we will be conducting experiments
on long distance LH coupling into ICRF heated upper null L-mode plasmas on
1080115. It is hoped that the large outer gap plasmas developed on this day
will allow us to avoid the glowing seen on the LH antenna during ICRF
operation with grill to limiter distances in the range 1.5-2.5mm.

Physics Operator Summaries
Entered: Jan 9 2008 05:16:13:330PM
Author: Joseph Snipes
There were a few problems today that cost some run time, but overall the machine ran pretty well. There were a few disruptions in flattop first with LHCD and then a couple late in the day early in the pulse before LHCD turned on. There were also a number of fizzles, sometimes due to the preceding disruption, but other times because the cryopump warmed up just before INIT so that the neutral pressure at breakdown was too high. Bill Parkin also noticed after shot 21 that one of the TF converters was not working properly and had not been working properly since last Friday. So, we had an hour delay to replace six fuses on the TF. Still, the main physics program of the run was achieved. See the session leader summary for the physics details. There were 30 shots, 26 plasmas, 3 fizzles, and one TF test shot. Of the plasma shots, there were three that disrupted before the LHCD pulse and one during the LHCD pulse. The startup was ugly for almost all shots today despite multiple changes in prepuff duration, Br0, EF4, and even RCUR offset. However, the startup was surprisingly robust to these changes except when the cryopump was too warm and led to very high neutral pressure at breakdown or there was a preceding disruption that led to high carbon level.

Shot,Duration(s),Ipmax(MA),Result Shot,Duration(s),Ipmax,Result
| 01 0.794 0.831 Plasma | 02 1.971 0.825 Plasma |
| 03 1.972 0.824 Plasma | 04 1.971 0.817 Plasma |
| 05 1.971 0.822 Plasma | 06 1.969 0.815 Plasma |
| 07 1.973 0.823 Plasma | 08 1.967 0.813 Plasma |
| 09 1.971 0.816 Plasma | 10 1.971 0.820 Plasma |
| 11 1.968 0.815 Plasma | 12 1.972 0.820 Plasma |
| 13 1.972 0.822 Plasma | 14 1.680 0.817 Plasma |
| 15 0.000 0.054 Fizzle | 16 1.971 0.817 Plasma |
| 17 1.971 0.820 Plasma | 18 1.969 0.809 Plasma |
| 19 1.794 0.811 Plasma | 20 1.970 0.814 Plasma |
| 21 0.411 0.798 Plasma | 22 0.000 0.003 Dud |
| 23 0.000 0.038 Fizzle | 24 0.315 0.789 Plasma |
| 25 1.970 0.813 Plasma | 26 0.412 0.786 Plasma |
| 27 0.000 0.048 Fizzle | 28 1.970 0.815 Plasma |
| 29 1.970 0.814 Plasma | 30 1.970 0.814 Plasma |

Date 1080109: 30 shots. 26 plasmas. 3 fizzles. 1 test shot.
(Plasma = Ip gt 60.0 kA Dud = H_alpha lt 0.40 V)
Total plasma duration: 44.82 s (exceeding -83 kA)

Session Leader Comments
Jan 9 2008 09:23:32:977AM1080109001Greg WallaceDisruption at .787 due to an injection from the LH grill. Will retry on next shot.

Interesting spike in the nonthermal ECE right as LH is about to trip out.
Jan 9 2008 09:31:19:410AM1080109002Greg WallaceGood shot! Lots of nonthermal ECE, good .4V reduction in Vloop, lots of hard xrays. Coupling pretty noisy around 25-30% with edge density around 4-5e17 on mid and bottom probes. Density data from top probe looks missing/unreliable. nl_04 3.2-3.5e19.

Next shot will repeat with NINJA on at a 5psi puff from .55s to 1.25s.
Jan 9 2008 09:48:26:153AM1080109003Greg WallaceOne trip at 1.155s due to a small vacuum breakdown on the D row near column 20.

Otherwise the shot looked good and retried successfully. Density increase not obvious on the LH probes. Next shot will repeat without LH on to get a baseline with gas puff and no power.
Jan 9 2008 09:55:32:340AM1080109004Greg WallaceLine averaged density looked same as for shot 3 but the edge density on the LH probes was higher by a factor of 2 with the LH turned off? Next shot will increase outer gap to 2.5cm and turn LH back on.
Jan 9 2008 10:10:33:443AM1080109005Greg WallaceLH ran clean at larger outer gap with the NINJA on. Next shot will repeat but with NINJA off.

Coupling around 25% reflected power with edge density around 3-5e17 on mid and 2-4e17 on bottom. Top probe still doesn't look reliable. nl_04 slightly higher around 4.2-4.4e19.
Jan 9 2008 10:25:12:967AM1080109006Greg WallaceVery interesting shot. Looks like we went into a locked mode which possibly killed any signs of current drive. We see a "sawtooth" nonthermal ECE signal and the loop voltage stays completely flat.

Despite the NINJA being off, lots of edge density. nl_04=3.7e19 and the mid probes at 1e18 and bottom probes at .6-1e18. LH coupling at 30% reflected power.

Will repeat while trying to eliminate the locked mode.
Jan 9 2008 10:39:14:383AM1080109007Greg WallaceNo locked mode, lots of current drive. Coupling was quite good (25% reflected power) despite no NINJA puff. nl_04 dropping from 4.3 to 3.8e19. Grill density around 3-4e17.

Next shot will keep NINJA on but turn off the LH power.
Jan 9 2008 11:00:11:703AM1080109008Greg Wallacenl_04 stayed steady around 3.9 to 4.2e19 with LH off and NINJA on. LH probes measured around 1e18 with no LH power.

Steve Wolfe reports a locked mode during this shot so that may be the source of the high edge density.

Next shot will repeat (NINJA on, LH off) trying to eliminate the locked mode.
Jan 9 2008 11:07:42:497AM1080109009Greg WallaceNo locked mode on this shot but density was a bit higher ~4-4.5e19 on nl_04. Probe density a bit lower around 8e17 but still pretty high for this large outer gap with no LH power.

Next shot will move to 3.5cm outer gap with LH and NINJA on.
Jan 9 2008 11:22:26:180AM1080109010Greg WallaceCryo "burped" and was not working correctly on this shot. Will retry on the next shot with the cryo on to keep the density down.

Coupling did not look great at beginning of shot but improved by .8s as the line averaged density rose to nearly 5.4e19.
Jan 9 2008 11:41:02:233AM1080109011Greg WallaceAnother locked mode, again with no current drive. LH ran clean with so-so coupling. More "sawtooth" activity on the non-thermal ECE.

Will try again to see if we can make the locked mode go away.
Jan 9 2008 11:50:21:827AM1080109012Greg WallaceNo locked mode. Good signs of current drive with density factor of 2 lower than previous shot at the LH probes (~4e17). Coupling improved during shot as density increased from 4.5 to 5e19 on nl_04. Next shot will disable NINJA and keep LH on.
Jan 9 2008 12:10:46:067PM1080109013Greg WallaceNo NINJA on this shot with the LH turned on. Coupling was pretty good towards the end of the shot although the line averaged density decreased from .7 to 1.1s. Next shot will turn on NINJA and turn off LH.
Jan 9 2008 12:21:09:783PM1080109014Greg WallaceLocked mode at .5s according to Steve Wolfe. This shot had NINJA but no LH. Will retry to eliminate the locked mode.

nl_04 between 3.8 and 4.2e19, mid and bottom probes between .5 and 1e18.
Jan 9 2008 12:32:56:683PM1080109015Greg WallaceFizzle.
Jan 9 2008 12:40:32:697PM1080109016Greg WallaceShot ran well without locked mode. nl_04 steady around 4.8e19 and LH probes 4-5e17.

Next shot will be cryo off, NINJA off, LH on.
Jan 9 2008 01:23:31:167PM1080109017Greg WallaceShot ran well with no cryo and no NINJA. LH coupling pretty good despite falling line integrated density. nl_04 falling from 4.5 to 4e19 and LH probes between 3 and 4e17.

Cell access to move launcher to 5mm behind the LH limiter. Hopefully this will cause coupling to get worse without the NINJA???

Next shot will be a repeat of shot 1 with the grill moved farther back.
Jan 9 2008 01:46:25:297PM1080109018Greg WallaceNo feedback on the density control. Will repeat with TCI fixed.

LH could not couple without the NINJA on. Density is around 1-5e16 on the LH probes.
Jan 9 2008 01:58:46:370PM1080109019Greg WallaceAnother locked mode. Will repeat one more time to get a baseline before turning on NINJA.
Jan 9 2008 02:09:17:680PM1080109020Greg WallaceThis shot worked as requested. LH could not couple with the low edge density (<1e17 on LH probes) and nl_04 was steady around 4-4.2e19.

Scopes show LH launcher at 5.5mm behind the grill.

Next shot will turn on NINJA and keep LH on.
Jan 9 2008 02:20:28:133PM1080109021Greg WallaceDisruption at .4s. Will repeat.
Jan 9 2008 03:35:03:540PM1080109022Greg WallaceTest shot.
Jan 9 2008 03:35:09:370PM1080109023Greg WallaceFizzle
Jan 9 2008 03:50:32:817PM1080109024Greg WallaceDisruption at 0.31s.
Jan 9 2008 04:06:21:890PM1080109025Greg WallaceLH was not able to couple with the NINJA on. No appreciable increase in density measured at the LH grill despite seeing the ionization on the LH camera. Density at the grill is 1.5-2e16 on top, 5-8e16 on mid, and .6-1.2e17 on bottom.

Next shot will increase puff to 10psi from 5psi.
Jan 9 2008 04:09:18:043PM1080109026Greg WallaceAnother early disruption.
Jan 9 2008 04:25:11:647PM1080109027Greg WallaceFizzle.
Jan 9 2008 04:44:57:513PM1080109028Greg WallaceStill no coupling during early part of pulse when LH was restriking. After restrikes ended density at the grill continued to rise. Next shot will move NINJA puff earlier.

NINJA puff will trigger at .35s on the next shot.
Jan 9 2008 04:58:38:213PM1080109029Greg WallaceStill no coupling although the grill density is where it was this morning where we had good coupling (3-4e17). Next shot will decrease outer gap to 0.5cm.
Jan 9 2008 05:53:40:207PM1080109030Greg WallaceMany trips mostly due to big spikes in reflection, maybe from breakdown in the region in front of the grill. Nothing on the LH camera looks like breakdown in a guide but there are bright lines across the grill along the field lines.

This is the only shot at 5mm behind the limiter where there was any coupling at all. Between trips the coupling was not good (~50% reflected power) although the density at the grill was ~5-6e17. This is actually greater than the density at which we had good coupling than with the 3.5cm outer gap (~4e17 for shot 17).

Physics Operator Comments
Jan 9 2008 09:14:14:853AM1080109001Joseph SnipesShot 1: Loaded shot 1071219032 and then reloaded segment 1 from shot 1080108022, which has prepuff ending at -0.4 s with a 35 ms long pulse for cryopump operation.
Note that the live segment is segment 3 for an upper null 0.8 MA, 5.4 T discharge.
nl04 is programmed to 3.5 x 10^19 m^-2. NINJA is off for the first shot. Disrupted at 0.79 s during the LHCD. There are bright flashes on the LH grill just before the disruption indicating a plasma surface interaction with the grill that probably caused the disruption. The startup does not look very good either.

Jan 9 2008 09:27:30:100AM1080109002Joseph SnipesShot 2: Repeat. Good shot.
Jan 9 2008 09:39:53:000AM1080109003Joseph SnipesShot 3: Repeat with NINJA puffing deuterium from 0.55 - 1.25 s. Runaways early.
Startup does not look good. Otherwise it was a good shot.
Jan 9 2008 09:50:45:277AM1080109004Joseph SnipesShot 4: Increased prepuff by 5 ms to 40 ms duration. Repeat without LHCD to see the effect of the NINJA puff. Good shot.
Jan 9 2008 10:03:35:477AM1080109005Joseph SnipesShot 5: Reduced Br0 by 0.5 mT to -0.0005 T. Reduced RCUR by 0.5 cm to increase the outer gap by 1 cm. LHCD turned back on. Good shot.
Jan 9 2008 10:16:54:330AM1080109006Joseph SnipesShot 6: Reduced EF4 current from -1340 to -1325 A to raise Bz more positive at breakdown. Good shot. Breakdown has improved.
Jan 9 2008 10:33:50:323AM1080109007Joseph SnipesShot 7: Repeat. Breakdown is worse but the shot is good.
Jan 9 2008 11:43:09:657AM1080109008Joseph SnipesShot 8: Increased prepuff by 3 ms to 43 ms duration. Turned off LHCD. Good shot. Turned on argon puff at 50 ms duration. Startup is still bad.
Jan 9 2008 11:04:09:970AM1080109009Joseph SnipesShot 9: Try reducing the prepuff to 35 ms duration. Redo this shot to try to get it without the locked mode. Good shot. Startup is still bad.
Jan 9 2008 11:20:52:807AM1080109010Joseph SnipesShot 10: Increased EF4 current from -1325 to -1345 A. Decreased RCUR by 5 mm to get a 3.5 cm outer gap. Good shot. Startup is no better. Cryopump warmed up just before the shot so it was not pumping during the shot and the prepuff pressure was very high.
Jan 9 2008 11:28:49:850AM1080109011Joseph SnipesShot 11: Repeat with the cryopump cold. Good shot. Startup still looks bad.
Jan 9 2008 11:44:31:920AM1080109012Joseph SnipesShot 12: Increased RCUR offset in segment 1 from 1000 to 1500 to try to improve the startup. Increased Argon puff by 50 ms to 100 ms duration. Good shot. Startup still looks bad.
Jan 9 2008 11:59:34:307AM1080109013Joseph SnipesShot 13: Increased EF4 current by 10 A to -1355 A to reduce Bz at breakdown. Good shot.
Jan 9 2008 12:12:43:443PM1080109014Joseph SnipesShot 14: Increased prepuff by 4 ms to 39 ms duration. Startup is still not looking very good. Disrupted in rampdown at about 1.67 s.
Jan 9 2008 12:26:54:000PM1080109015Joseph SnipesShot 15: Decreased prepuff to 33 ms duration. Cryopump warmed up just before the shot so the pressure was too high. Fizzle!
Jan 9 2008 12:38:27:400PM1080109016Joseph SnipesShot 16: Repeat with cryopump cold. Good shot.
Jan 9 2008 12:53:07:490PM1080109017Joseph SnipesShot 17: Turned cryopump off. Reduced prepuff to 17 ms duration. Good shot.
Jan 9 2008 12:53:48:083PM1080109017Joseph SnipesCell access to move the LH launcher back from -1.5 to -5 mm behind the LH limiter.

Jan 9 2008 01:41:42:330PM1080109018Joseph SnipesShot 18: Cryopump back on. Increased prepuff to 38 ms duration taking into account an extra 5 ms because the DNB will be opening for the next shot and it pumps on the machine. Increased RCUR by 1 cm to reduce the outer gap to 1.5 cm. Good shot. TCI failed to provide density feedback but the density remained low.
Jan 9 2008 01:56:45:950PM1080109019Joseph SnipesShot 19: Repeat with density feedback. Good shot. Locked mode leading to disruptions in the rampdown ending at 1.79 s.
Jan 9 2008 02:11:56:583PM1080109020Joseph SnipesShot 20: Repeat without locked mode. Cryopump was warming up just before the shot but the shot went nonetheless amazingly. Indeed, the breakdown looks good at this high pressure 0.098 mTorr. Good shot.
Jan 9 2008 02:21:27:177PM1080109021Joseph SnipesShot 21: Increased prepuff to 44 ms duration. NINJA puff on. Disrupted at 0.405 s.
Jan 9 2008 02:39:37:290PM1080109021Joseph SnipesIt seems 6 fuses have been blown on the TF since last Friday and Bill Parkin just noticed that one of the TF converters is not working properly. So, we are stopping to replace the fuses. It will mean about an hour delay at least.
Jan 9 2008 03:29:29:920PM1080109022Joseph SnipesShot 22: Test shot for TF. OK.
Jan 9 2008 03:31:19:590PM1080109023Joseph SnipesShot 23: Increased prepuff to 50 ms duration. Fizzle!
Jan 9 2008 04:29:25:240PM1080109024Joseph SnipesShot 24: Decreased prepuff to 45 ms duration. Increased EF4 current by 10 A to -1360 A. Disrupted at 0.31 s.
Jan 9 2008 04:29:36:333PM1080109025Joseph SnipesShot 25: Br0 changed by -2 mT on shot 23. Add 1 mT to make Br0 = +0.5 mT. Good shot. Startup looks good finally.
Jan 9 2008 04:30:04:147PM1080109026Joseph SnipesShot 26: Raised NINJA pressure to 10 psi. LH has difficulty operating at -5 mm behind the limiter. Perhaps, more pressure will help. Disrupted at 0.41 s.
Jan 9 2008 04:32:00:050PM1080109027Joseph SnipesShot 27: Repeat without the disruption. Cryopump was apparently too warm as the neutral pressure was rather high around 0.09 mTorr. Fizzle!
Jan 9 2008 04:37:20:893PM1080109028Joseph SnipesShot 28: Repeat with plasma and without the disruption and with the cryopump cold. Good shot.
Jan 9 2008 04:47:58:560PM1080109029Joseph SnipesShot 29: NINJA puff start time changed to 0.35 s so that the puff should enter the plasma around 0.5 s. Increased prepuff by 4 ms to 49 ms duration. Reduced Br0 offset to 0. Good shot.
Jan 9 2008 05:02:03:070PM1080109030Joseph SnipesShot 30: Increased RCUR by 4 mm to decrease the outer gap to about 0.5 cm. Decreased abs(EF4) current by 15 A to -1350 A. Good shot.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:09:20:577AMPlasmaOk
209:22:05:460AMPlasmaOk
309:36:23:660AMPlasmaOk
409:49:00:467AMPlasmaOk
510:01:50:680AMPlasmaOk
610:14:42:347AMPlasmaOk
710:27:15:310AMPlasmaOk
810:39:50:197AMPlasmaOk
911:01:51:720AMPlasmaOk
1011:14:20:370AMPlasmaOk
1111:26:38:303AMPlasmaOk
1211:41:56:860AMPlasmaOk
1311:57:06:713AMPlasmaOk
1412:09:38:257PMPlasmaOk
1512:22:45:940PMPlasmaOk
1612:35:12:637PMPlasmaOk
1712:47:38:647PMPlasmaOk
1801:37:52:130PMPlasmaOk
1901:51:16:810PMPlasmaOk
2002:03:44:477PMPlasmaOk
2102:16:56:583PMPlasmaOk
2203:17:15:953PMTestOk100KA TF test PLC control
2303:29:37:123PMPlasmaOk
2403:42:16:587PMPlasmaOk
2503:55:03:160PMPlasmaOk
2604:07:25:797PMPlasmaOkPF breaker pulled after plasma disrupted
2704:20:19:790PMPlasmaOk
2804:32:57:753PMPlasmaOk
2904:46:19:577PMPlasmaOk
3004:59:36:040PMPlasmaOk

System Availability
Jan 9 2008 09:08:57:543AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIno Oct 12 2007 12:41PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. 5 photo detectors have been shipped out for repair, so currently only 5 channels are available. We expect the full channels will be available late in Jan 08.Jan 04 2008 01:11PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is uncalibrated. Jan 03 2008 08:31AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Alignment w.r.t. YAG is not optimized yet, so measurements may be noisy. Density is uncalibrated. Jan 09 2008 09:07AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesData being collected in digitizers and SIGNALS nodes updated. Still playing switch-a-roo with cPCI digitizers, but data should be available.Dec 19 2007 07:14PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Jan 9 2008 03:29:22:623PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. 5 photo detectors have been shipped out for repair, so currently only 5 channels are available. We expect the full channels will be available late in Jan 08.Jan 04 2008 01:11PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is uncalibrated. Jan 03 2008 08:31AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Alignment w.r.t. YAG is not optimized yet, so measurements may be noisy. Density is uncalibrated. Jan 09 2008 09:07AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesData being collected in digitizers and SIGNALS nodes updated. Still playing switch-a-roo with cPCI digitizers, but data should be available.Dec 19 2007 07:14PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke