Alcator C-Mod Run 1080110 Information

Back to runs

Miniproposals
Miniproposal:489
Date Filed: 4/30/2007
Title:Damping Rate of Toroidal Alfvén Eigenmodes at the Threshold of Stability in the Presence of ICRF He
First Author:Jason Sears
Session Leader:Jason Sears (shots 1-32)

Operators
Session leader(s):Jason Sears
Physics operator(s):Robert Granetz
Engineering operator(s):Andy Pfeiffer,Bill Byford,Gary Dekow

Engineering Operator Run Comment
MP489: Damping of TAEs at the threshold of stability in the presence of

Session Leader Plans
Entered: Jan 9 2008 05:24:15:250PM
Author: Jason Sears
Run Plan for 1080110

MP#489 "Damping rate of TAEs near stability threshold with ICRF fast ions"

Goal
****
Observe the stability of moderate n (~6-14) TAEs as the ICRF power is increased from shot to shot. Confirm effect of energetic tail profile on TAE stability.

Run Preparation
***************
* Prepare argon for HIREX
* Setup GPC2 gratings for -5.9 T
* Set CNPA aperture to 208, bias voltage to 45V
* Operate DNB during interval:
* Operate Thomson
* Observe CXRS for core boron density measurements
* Operate PCI if available
* Enable the dpcs_ftae2 procedure in DPCS
* Turn on Active MHD and set qAE to 1.5, AE_order to 2

Plasma Conditions
*****************
* load equilibrium from 1080109025
* this shot is L-mode, upper single null
* change outer gap to 8mm
* change to Bt=-5.9T
* change to nl04=7e19
* change to Ip=-600MA
* leave argon puffing for HYREX

Shot Sequence
*************
Increment RF power by 0.5MW, starting at 0MW. At each power, excite the upper Active MHD antenna first at the q=1.5 frequency, then in a second shot at the q=1 frequency. If unstable TAEs are observed at higher RF powers, repeat shot to attempt to reproduce the mode. Continue incrementing by 0.5MW to highest RF power that can be achieved, even if H-mode is encountered.

If RF power scan is completed, return to moderate power (eg 2MW). Execute a series of shots at -5.9T, -5.7T, -5.4T and -5.1T, to look for the radial distribution of the ion tail with the CNPA as a benchmark for modeling codes.

Physics Operators Plans
Entered: Jan 9 2008 05:25:02:470PM
Author: Robert Granetz
Engineering setup for Thursday 10 Jan 2008

MP489:  Damping of TAEs at the threshold of stability in the presence
        of ICRF-heated fast ions

Session leader: Sears
Physics operator: Granetz

ECDC overnight in D2 and bake at 60 C.

Run will start at 09:00 and end at 17:00.

Power systems as on 1080109025

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
   fill B-Top            with  6 psi D2  Hybrid enabled  (PG4)
   fill B-side lower     with  1 psi Ar  Hybrid DISABLED (PG1)
  leave B-side upper     as is           Hybrid DISABLED (PG2)   
   fill B-main (C-side)  with 40 psi D2  Hybrid enabled  (PG3)
  leave NINJA            as is           DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
  ECE, VUV, Z-bolo, DNB
 
Torvac setup: keep gate valves open

Specific diagnostics: Mirnov probes

-------------------------------------------------------------------------------
ICRF Setup: all transmitters in run-on by 08:30

LH Setup: no

DNB: yes, 7 x (100 ms on / 100 ms off)

Cryopump: yes, although it may not be needed for the first shot
-------------------------------------------------------------------------------
Run plan: Load all segments from 1080109025, which had SEGMENT 3 as the
          active segment.  Make the following changes IN SEGMENT 3:
            Change Ip to 0.6 MA
            Change Btor in segment 3 to 5.9 T (164 kA)
            Change nl_04 to 0.7e20 m-2
            Move RCUR out by 3.5 mm (decrease outer gap by 7 mm)
            Load the """"dpcs_ftae2"""" routine into DPCS

          See the session leader's run plan for more details.


Session Leader Summaries
Entered: Jan 10 2008 05:07:44:493PM
Author: Jason Sears
This was a very successful scan to high RF powers to hunt for the TAE stability threshold. L mode was maintained in these USN configurations above the usual H mode threshold by injecting large amounts of argon to increase radiated power. Unstable TAEs were observed at RF powers above 3.5MW. The ICRF functioned brilliantly and powers up to 5.5MW for 0.5s were achieved.

Other diagnostics also contributed to a successful run. All three channels of the cnpa were operational, giving a spatial and energy distribution of the energetic particles at each RF power level. The neutral beam worked most of the time which will improve the number of particle counts and the resolution. The PCI was up for the first day this campaign and observed both unstable modes and the Active MHD perturbation in some cases.

Shot summary
01: fizzle
02: 0MW
03: 0.5MW
04: 1MW
05: 1.5MW
06: 2MW
07: 2.5MW
08: 2.5MW
09: fizzle
10: fizzle
11: 2.5MW
12: 1MW
13: 2MW
14: 1.5MW
15: 0.5MW
16: 3MW
17: fizzle
18: 3.5MW, disrupt at 0.93
19: 3.5MW
20: dud
21: 4MW
22: 4.5MW
23: dud
24: 2.5MW
25: 4MW
26: 5.5MW, disrupt at 0.84
27: 5.5MW, disrupt at 0.9
28: fizzle
29: 4.5MW, late disruption
30: no power
31: 3MW
32: -5.1T to compare spatial resolution of cnpa

Physics Operator Summaries
Entered: Jan 10 2008 06:02:54:300PM
Author: Robert Granetz
Run summary for Thursday 10 Jan 2008

MP#489 Damping of TAEs at the threshold of stability in the presence
of ICRF-heated fast ions

Session leader: J. Sears
Physics operator: R. Granetz

Plasma operation was pretty reliable today. We ran upper null, low current
(0.6 MA) discharges at 5.9 tesla today, and got the ICRF power up to 5.5 MW
for 0.4 s, and 4.5+ MW for 1 second. Shot 22 had a total of 4.4 MJ of ICRF
energy injected, which may be a new record for C-Mod. At these high
powers, even the upper null plasmas were going into H-mode, so we
effectively avoided this during the latter part of the run by puffing very
large amounts of argon, in conjunction with running the cryopump. This was
very effective and kept the plasma from disrupting for the most part. For
most of the day we had only a 5 mm outer gap, to aid the Mirnov pickup
signals. However, at the 5.5 MW level this resulted in overheating of
something (G/H limiter?) on shots 26 and 27. We then increased the outer
gap to 10 mm for the remainder of the run, and decreased the RF power.

There were two shots which failed because the EF3 breaker pulled out
before the shot, and we also had one shot that blew a TF fuse
(1080110011).

See the session leader's run summary for results on the TAE measurements.

Scorecard: 24 plasmas
2 duds
5 fizzles
0 power supply tests
1 no-power MDS shot cycles
--------------
Total: 32 shot cycles

Session Leader Comments
Jan 10 2008 10:41:16:440AM1080110007Jason Sears2.5 MW attempt

plasma, 2.5MW

next shot try, 2.5 MW, and q=1.3 (higher Active MHD frequency)

Jan 10 2008 10:53:27:153AM1080110008Jason Sears2.5 MW attempt

plasma, 2.5MW, qAE=1.3

next shot try, 2.5 MW, and q=1.2 (higher still Active MHD frequency)

Jan 10 2008 11:43:45:493AM1080110009Jason Searsfizzle
Jan 10 2008 11:43:51:557AM1080110010Jason Searsfizzle
Jan 10 2008 11:43:21:273AM1080110011Jason Sears2.5 MW attempt

plasma, 2.5MW, qAE=1.2

next shot try 2 MW
Jan 10 2008 12:04:44:203PM1080110012Jason Sears2 MW attempt

plasma, 1MW, qAE=1.2

next shot try 2 MW again
Jan 10 2008 12:20:01:400PM1080110013Jason Sears2 MW attempt

plasma, 2MW, qAE=1.2

next shot try 1.5 MW
Jan 10 2008 12:35:15:583PM1080110014Jason Sears1.5 MW attempt

plasma, 1.5MW, qAE=1.2

next shot try 0.5 MW
Jan 10 2008 12:57:52:997PM1080110015Jason Sears0.5 MW attempt

plasma, 0.5MW, qAE=1.2

next shot try 3.0 MW
Jan 10 2008 01:06:07:727PM1080110016Jason Sears3.0 MW attempt

plasma, 3.0MW, qAE=1.2

next shot try 3.5 MW
Jan 10 2008 01:14:57:113PM1080110017Jason Sears3.5 MW attempt

fizzle

try again next shot
Jan 10 2008 01:29:53:513PM1080110018Jason Sears3.5 MW attempt

plasma, 3.5MW until disruption at 0.93


Jan 10 2008 01:46:54:663PM1080110019Jason Sears3.5 MW attempt

plasma, 3.5MW, H mode


Jan 10 2008 02:20:34:573PM1080110020Jason Sears4 MW attempt.
Argon puffing for 500ms to increase radiation and avoid Hmode.
Cryopump on to control density with so much argon.
Increase qAE to 1.3 to compensate increased mass density.

Dud

Try again next shot
Jan 10 2008 02:34:21:380PM1080110021Jason Sears4 MW attempt.
Argon puffing for 500ms to increase radiation and avoid Hmode.
Cryopump on to control density with so much argon.
Increase qAE to 1.3 to compensate increased mass density.

Plasma, very constant 4MW

Jan 10 2008 03:02:18:683PM1080110022Jason Searsplasma, 4.5 MW, very constant RF power
Jan 10 2008 03:02:32:230PM1080110023Jason Searsdud
Jan 10 2008 03:15:12:473PM1080110024Jason Searsplasma, 2.5MW
Jan 10 2008 03:28:08:517PM1080110025Jason Searsplasma, 4MW
Jan 10 2008 04:16:45:640PM1080110028Jason Searsfizzle
Jan 10 2008 04:30:15:867PM1080110029Jason Sears4.5MW, late disruption
Jan 10 2008 04:52:13:670PM1080110030Jason Sears3MW attempt, qAE=1.5

GPC2 grating set for -5.4T
Bt remains at -5.9T

no power
Jan 10 2008 04:52:57:187PM1080110031Jason Sears3MW attempt, qAE=1.5

GPC2 grating set for -5.4T
Bt remains at -5.9T

3MW
Jan 10 2008 05:07:19:040PM1080110032Jason Sears3MW attempt, qAE=1.5

-5.1T

3MW

Physics Operator Comments
Jan 10 2008 09:06:47:803AM1080110001Robert GranetzShot 01 -- Fizzle. Pre-fill pressure was 0.12 mTorr. Pre-fill pulse was 45 ms! I grabbed
this startup from yesterday...don't know why the pre-fill pulse was so long.
DNB is firing into the plasma, but it doesn't need this much extra pre-fill.

Next shot: set pre-fill pulse to 28 ms.
Jan 10 2008 09:26:23:250AM1080110001Robert GranetzSteve Wukitch reminded me that yesterday the cryopump was being used, which explains
the long pre-fill pulse.
Jan 10 2008 09:23:36:420AM1080110002Robert GranetzShot 02 -- Plasma. Good shot. 0.6 MA, 5.9 T, upper null, nl_04=6.6e19 m-2. Outer gap = 8-9 mm.
RF faulted a lot.

Next shot: turn on argon; decrease outer gap to 4 mm (increase RCUR by 2 mm); retry for better RF.
Jan 10 2008 09:43:18:740AM1080110003Robert GranetzShot 03 -- Plasma. Good shot. Outer gap varies from 6 mm down to 4 mm during the flattop.
Got good 0.5 MW pulse from D-port. Video cameras don't show any overheating of
D or J antenna edges.

Next shot: Tweak RCUR programming to get a more constant 4 mm outer gap.
Jan 10 2008 09:54:11:253AM1080110004Robert GranetzShot 04 -- Plasma. Good shot. Prf=1 MW. (We're stepping up the ICRF power by 0.5 MW
on a shot-to-shot basis for this MP.) Outer gap is now very constant, but for
some reason it's shrunk to just 2 mm.

Next shot: increase outer gap to 4 mm (move RCUR in by 1 mm). Try for 1.5 MW ICRF power.
Jan 10 2008 10:02:55:907AM1080110005Robert GranetzShot 05 -- Plasma. Good shot. Prf=1.5 MW (as requested). Outer gap jumped to 6 mm, not 4.

Next shot: Another RCUR tweak. Prf=2 MW.
Jan 10 2008 10:24:35:710AM1080110006Robert GranetzShot 06 -- Plasma. Good shot. Prf=2 MW (as requested). Outer gap = 4-5 mm except
early in the flattop. I don't think I can control it better than this.

Next shot: no DPCS changes. Prf=2.5 MW
Jan 10 2008 10:36:30:097AM1080110007Robert GranetzShot 07 -- Plasma. Good shot. Prf=2.44 MW, as requested. Still no overheating
seen on the D and J video views.

Next shot: no DPCS changes. Prf will stay at 2.5 MW.
Jan 10 2008 10:52:40:653AM1080110008Robert GranetzShot 08 -- Plasma. Good shot. Prf=2.5 MW. Outer gap = 4 mm.
H/(H+D) is saying 2-3%.

Next shot: no DPCS changes. Prf staying at 2.5 MW.
Jan 10 2008 11:00:09:650AM1080110009Robert GranetzShot 09 -- Fizzle.

Next shot: reduce pre-fill by 3 ms.
Jan 10 2008 11:16:22:567AM1080110010Robert GranetzShot 10 -- Fizzle. This one also should have gone.

Next shot: add -0.2 mT to Br0; add 1 ms to pre-fill.
Jan 10 2008 11:35:26:340AM1080110011Robert GranetzShot 11 -- Plasma. Good shot. Good startup. Prf=2.5 MW.

There was a ""glitch"" in TF converter #1 which will require a
power room access.

Next shot: no DPCS changes.
Jan 10 2008 12:00:35:753PM1080110011Robert GranetzThere was a long break between shots 11 and 12 to replace a fuse in the TF cabinet
and high-pot it.
Jan 10 2008 12:16:05:463PM1080110013Robert GranetzShot 12 -- Plasma. Good shot. D-port failed though. Lithium pellet was injected at t=1.45 s.

Next shot: no DPCS changes.
Jan 10 2008 12:23:45:273PM1080110013Robert GranetzShot 13 -- Plasma. Good shot. Prf=2 MW, as requested.

Next shot: no DPCS changes
Jan 10 2008 12:38:02:253PM1080110014Robert GranetzShot 14 -- Plasma. Good shot. Prf=1.4 MW, as requested. Li pellet at 1.45 s.

Next shot: no DPCS changes
Jan 10 2008 12:54:41:823PM1080110015Robert GranetzShot 15 -- Plasma. Good shot. Prf=0.5 MW. The DANT camera caught the lithium
pellet streaking into the plasma (frame 43).

Next shot: no DPCS changes
Jan 10 2008 01:14:45:880PM1080110017Robert GranetzShot 17 -- Fizzle. Everything looks fine.

Next shot: reduce Br0 by another 0.2 mT (to 0.0000 T)
Jan 10 2008 02:30:00:913PM1080110017Robert GranetzShot 16 -- Plasma. Good shot. Prf=3 MW, as requested.

Next shot: no DPCS changes
Jan 10 2008 01:38:15:777PM1080110018Robert GranetzShot 18 -- Plasma. Disrupted at t=0.93 s. Prf=3.5 MW, which caused this upper null plasma to
go into H-mode. It looks like an injection killed the plasma.

Next shot: no DPCS changes
Jan 10 2008 02:08:47:843PM1080110019Robert GranetzShot 19 -- Plasma. Good shot. 3.5 MW, long pulse. H/(H+D)=4-5%.

Cell access granted for various people

Next shot: increase argon puff to 0.5 s (t=0.3 to 0.8 s) and turn on cryopump.
This is to try and keep us out of H-mode.
Jan 10 2008 02:21:22:540PM1080110020Robert GranetzShot 20 -- Dud. I forgot to increase the pre-fill to compensate for turning on the cryopump.

Next shot: increase pre-fill by 15 ms.
Jan 10 2008 02:43:37:627PM1080110021Robert GranetzShot 21 -- Plasma. Good shot. Prf=4+ MW, long pulse. The argon kept us in L-mode, as
desired. The cryopump kept the argon from killing the shot. Trophy shot.
H/(H+D) = 5%

Next shot: increase argon puff duration to 1.0 s (t=0.3 to 1.3 s). Cryopump on again.
Prf=4+ MW again. Also add 2 more ms to pre-fill.
Jan 10 2008 02:53:47:950PM1080110022Robert GranetzShot 22 -- Plasma. Good shot. Prf=4.5+ MW for 1.0 s. Total RF energy = 4.4 MJ (a record?).
Stayed in L-mode due to massive argon puff; Cryopump kept the argon from disrupting
the plasma.

Next shot: repeat same shot. Cryopump on, Prf=4.5+ MW, argon puff = 1.0 s.
Jan 10 2008 02:59:39:387PM1080110023Robert GranetzShot 23 -- Dud. EF3 failed. Breaker pulled just before the shot.

Next shot: try again
Jan 10 2008 03:21:20:877PM1080110024Robert GranetzShot 24 -- Plasma. Good shot. D-port antenna faulted out. Prf=2.5 MW.

Next shot: try again with all antennas
Jan 10 2008 03:36:13:170PM1080110025Robert GranetzShot 25 -- Plasma. Good shot. Prf=4.1 MW for 1+ s. H/(H+D)=6%

Next shot: more RF power (5+ MW)
Jan 10 2008 03:45:04:290PM1080110026Robert GranetzShot 26 -- Plasma. Disrupted at t=0.83 s. Prf=5.5+ MW.

Next shot: increase the argon plenum pressure to 2 psi (from 1 psi). Keep the pulse
length at 1.0 s.
Jan 10 2008 04:01:05:393PM1080110027Robert GranetzPower room access was needed after shot 27 to look again at TF converter cabinet #1.
We may have blown another fuse.
Jan 10 2008 04:09:42:000PM1080110027Robert GranetzShot 27 -- Plasma. Disrupted at t=0.91 s. Prf=5.5 MW for 0.4 s !!! Something's getting
hot on the outer wall near G/H; probably the G/H limiter. Outer gap is 5 mm.

Next shot: increase outer gap to 1.0 cm (decrease RCUR by 2.5 mm). Also move
the outboard strikepoint in by 5 mm to get it inboard of the slots in
ceiling. (Move RXU in by 5 mm.)
Jan 10 2008 04:16:59:467PM1080110028Robert GranetzShot 28 -- Fizzle. Fill pressure was somewhat higher, but not by a big factor, so I
think the cryopump still has helium in it.

Next shot: decrease pre-fill by 4 ms
Jan 10 2008 04:32:19:850PM1080110029Robert GranetzShot 29 -- Plasma. Disrupted at t=1.42 s. Prf=4.5 MW for 0.9 s.

Next shot: turn off cryopump and decrease pre-fill to 26 ms to compensate. Also
reduce argon plenum pressure back to 1 psi and reduce the argon puff
back to 100 ms.
Jan 10 2008 04:40:53:957PM1080110030Robert GranetzShot 30 -- No-power shot because the EF3 breaker pulled out in CHECK state.

Next shot: try again. The RF power will be 3 MW.
Jan 10 2008 04:57:46:433PM1080110031Robert GranetzShot 31 -- Plasma. Good shot. Prf=3 MW, as requested.

Next shot: Set Btor = 5.1 tesla.
Jan 10 2008 05:07:55:307PM1080110032Robert GranetzShot 32 -- Plasma. Good shot. Prf=3 MW, as requested. This shot had lots of short
H-modes because the massive argon puffing is no longer being done (just the
usual 100 ms puff). Btor=5.1 tesla.

End of run.

Engineering Operator Comments
ShotTimeTypeStatusComment
108:58:33:663AMPlasmaOk
209:11:32:990AMPlasmaOk
309:26:17:140AMPlasmaOk
409:44:08:100AMPlasmaOk
509:58:07:737AMPlasmaOk
610:11:10:403AMPlasmaOk
710:30:30:960AMPlasmaOk
810:44:57:827AMPlasmaOk
910:57:28:277AMPlasmaOk
1011:10:36:710AMPlasmaOk
1111:24:07:673AMPlasmaOk
1212:01:26:063PMPlasmaOk
1312:14:09:043PMPlasmaOk
1412:29:33:680PMPlasmaOk
1512:42:17:737PMPlasmaOk
1612:55:00:387PMPlasmaOk
1701:07:59:540PMPlasmaOk
1801:20:32:783PMPlasmaOk
1901:38:42:637PMPlasmaOk
2002:16:56:777PMPlasmaOk
2102:29:26:943PMPlasmaOk
2202:43:46:267PMPlasmaOk
2302:56:41:997PMPlasmaOk
2403:11:14:040PMPlasmaOk
2503:23:44:190PMPlasmaOk
2603:36:29:170PMPlasmaOk
2703:48:57:087PMPlasmaOk
2804:11:28:797PMPlasmaOk
2904:23:49:993PMPlasmaOk
3004:38:02:350PMPlasmaOk
3104:49:13:577PMPlasmaOk
3205:01:38:370PMPlasmaOk

System Availability
Jan 10 2008 08:58:07:150AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. 5 photo detectors have been shipped out for repair, so currently only 5 channels are available. We expect the full channels will be available late in Jan 08.Jan 04 2008 01:11PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is uncalibrated. Jan 03 2008 08:31AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Alignment w.r.t. YAG is not optimized yet, so measurements may be noisy. Density is uncalibrated. Jan 09 2008 09:07AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesData being collected in digitizers and SIGNALS nodes updated. Still playing switch-a-roo with cPCI digitizers, but data should be available.Dec 19 2007 07:14PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Jan 10 2008 12:01:11:690PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyesChs 17-32 working - low freq. mixer being repairedNov 26 2007 11:41AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. 5 photo detectors have been shipped out for repair, so currently only 5 channels are available. We expect the full channels will be available late in Jan 08.Jan 04 2008 01:11PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is uncalibrated. Jan 03 2008 08:31AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Alignment w.r.t. YAG is not optimized yet, so measurements may be noisy. Density is uncalibrated. Jan 09 2008 09:07AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operationalJan 10 2008 11:41AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Jan 10 2008 01:20:14:987PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEnoProblem with LO'sJan 10 2008 01:17PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. 5 photo detectors have been shipped out for repair, so currently only 5 channels are available. We expect the full channels will be available late in Jan 08.Jan 04 2008 01:11PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is uncalibrated. Jan 03 2008 08:31AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Alignment w.r.t. YAG is not optimized yet, so measurements may be noisy. Density is uncalibrated. Jan 09 2008 09:07AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operationalJan 10 2008 11:41AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke