Alcator C-Mod Run 1080125 Information

Back to runs

Miniproposals
Miniproposal:514
Date Filed: 7/27/2007
Title:Influence of magnetic topology on the H-mode pedestal
First Author:Jerry Hughes
Session Leader:Jerry Hughes (shots 1-29)

Operators
Session leader(s):Jerry Hughes
Physics operator(s):
Engineering operator(s):Andy Pfeiffer,Bill Parkin,Gary Dekow

Engineering Operator Run Comment
MP514: Influence of magnetic topology on the H-mode pedestal SL: Hughes

Session Leader Plans
Entered: Jan 25 2008 08:19:11:763AM
Author: Jerry Hughes
This experiment will continue to examine the modification of pedestal
parameters and consequent H-mode performance by modulating magnetic
balance. It will follow on work done on 1070821, but will expand to
additional values of plasma current and will utilize the cryopump.

SETUP:

**Overnight boronization:
Use most recent recipe

**Diagnostics desired
Edge and core Thomson, ECE diagnostics, CXRS, bolometer and
Lyman-alpha arrays, PCI, reflectometry, Hirex, scanning probes

**DNB
Would like it, if and only if current can be kept at >5.5A.
Fast modulation for CXRS; McDermott should choose the timing.

**Gas
NINJA plenum loaded with 10psi D2
Argon puff: 50ms at 0.3s (Argon at 1psi)

**ICRF
3MW needed by 10:00, flat from 0.6 to 1.5s. First few discharges
will be Ohmic, ICRF can use the time after 1.2s for
conditioning/boronization recovery. Will want to go to >4MW
later in the day.

Tentative shot sequence:

A. (4 shots) Ohmic SSEP scans to calibrate the magnetic balance. Load
shot 1070821015, an 800kA shot with an SSEP scan from -5mm (<1s) to
5mm (@1.25s) and back to -5mm (@1.5s). Change timing of SSEP scan from
[1.0, 1.25, 1.5] to [0.6, 0.9, 1.2]. ICRF can run as needed after 1.2s
in order to recover from boronization. Cryopump will be warm on these
shots.

1. Run this 800kA discharge, with nl04=1e20m-2
2. IP=1.0MA. nl04=1.2e20m-2
3. IP=0.6MA. nl04=8e19m-2
4. IP=0.4MA. nl04=6e19m-2

For each current, determine the best estimate for the offset that
should be applied to the SSEP value reported by EFIT, for applying to
subsequent shot programming.

***Before proceeding, we will probably want a cell access to adjust edge TS
fiber placement.***

B. (16 shots) H-modes with 3MW of ICRF from 0.6s to 1.5s, cryopump
cold. SSEP during flattop is to be flat, except for the ramps defined
below. Starting SSEP (@t=0.6s) will be -5mm for all discharges.

1. IP=1.0MA. nl04=1.0e20m-2.

a. As in part A., ramp SSEP [-5mm --> 5mm] from [0.60s --> 0.90s], then
[5mm --> -5mm] from [0.90s --> 1.20s]

b. Ramp SSEP [-5mm --> -2mm] from [1.10s --> 1.20s]

c. Ramp SSEP [-5mm --> 0mm] from [0.70s --> 0.85s], then [0mm --> 2mm]
from [1.10s --> 1.20s]

d. Ramp SSEP [-5mm --> 4mm] from [0.70s --> 0.90s], then [4mm --> 6mm]
from [1.15s --> 1.25s]

2. IP=0.8MA. nl04=0.8e20m-2. Repeat SSEP scans a--d at this condition.

3. IP=0.6MA. nl04=0.6e20m-2. Repeat SSEP scans a--d at this condition.

4. IP=0.4MA. nl04=0.4e20m-2. Repeat SSEP scans a--d at this condition.

C. (5 shots) Return to the most promising low density, low nu* H-mode
targets from part B., and apply increased ICRF power. In each of these
discharges, there will be only one target SSEP. The ramp will be from
-5mm to the target SSEP over [0.7 --> 0.9], after which SSEP will stay
flat. ICRF will be a constant 3MW from 0.6--0.9s, ramp to the
maximum available power at 1.2s, then hold fixed until 1.5s.

D. (5 shots) Repeat some desirable low nu* H-mode targets from parts
B. and C. with the cryopump warm. These can be used to evaluate the
effectiveness of the pump in lowering the pedestal density.


Physics Operators Plans
Entered: Jan 23 2008 06:34:08:480PM
Author: Ron Parker
Physop Run Plan for Tuesday, 25-Jan-2008; 1080125

Purpose:
MP514: Influence of magnetic topology on the H-mode pedestal

SL: Hughes
PO: Parker

-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1080123001

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo

Diagnostics:

Required: Edge Thomson,ECE, toroidal and poloidal LFS CXRS, inner wall CXRS,
TCI, PCI, reflectometry.

Desirable: X-ray Ti, rotation diagnostics

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): yes, overnight

ICRF(yes/no): yes
LH(yes/no): no
DNB(yes/no): yes if available
Cryopump (yes/no): yes, standby

Vessel temperature: 35/35/35

Shot setup and sequence: See SL Plan

Session Leader Summaries
Entered: Jan 25 2008 05:25:59:083PM
Author: Jerry Hughes
This experiment examined the modification of pedestal parameters and
consequent H-mode performance by modulating magnetic balance,
following on work begun on 1070821. The plan was expanded to include
additional values of plasma current and use of the cryopump.

Despite some minor delays we completed a fair fraction of the run
plan. ICRF performed very well today, requiring relatively little time
to come to 3MW, despite an overnight boronization. We obtained a fair
number of H-mode pedestals in near double null configuration, while
modulating the value of SSEP values from -5mm to +5mm. We reproduced
the previously observed pump-out of the density pedestal as magnetic
balance shifts toward USN, and saw that this trend continued as we
went to higher q discharges (Ip=600kA). We had difficulties producing
steady EDA-like H-modes at lower q (Ip=1MA), which is consistent with
our usual experience, particularly when approaching unfavorable ion
grad-B drift direction. Despite the good pump-out for SSEP>0, the
collisionality was generally lower for SSEP between about -4mm and
-2mm. Our best confinement was achieved in this range of magneitc
balance, with relatively high edge beta_pol, and the appearance of
high-frequency small ELMs.

Several shots were devoted to ohmic SSEP scans, which were used to
"calibrate" the value that EFIT gives for SSEP. Based on measurements
of divertor neutral pressures, particle fluxes to upper and lower
targets, and wide angle video images, it appears that EFIT is
calculating SSEP correctly to within about 1mm.





Physics Operator Summaries
Entered: Jan 25 2008 05:27:10:850PM
Author: Ron Parker
The run started on time and the shots went off with regularity. One exception occured when there was a problem with the cryopump, traced to a faulty limitswitch. Once repaired, or by passed, the run proceeded without further delays. The physics plan of the run was centered on examining the the dependence of H-Mode parameters and pedestals on magnetic geometry, in particular ssep.

Most of the run plan was accomplished, although many shots ended in disruption particularly at high RF power. Of note is the good reliability of the startup, except just after the crypump was turned off for the last shot.

See SL summary for physics progress.

Scorecard: 29 plasma attempts, 3 duds (due to cryopump problems), 13 full length shots, 12 disruptions (all but one late enough to provide useful data), 1 fizzle.

Session Leader Comments
Jan 25 2008 10:46:01:320AM1080125001Jerry HughesFirst shot is on ohmic SSEP sweep at 800kA, cryo WARM.
Shape looks reasonable. Upper strike is in the right place. Left and right gap are
relatively large, and growing during the sweep. Ron will try to fix this and
repeat shot. Got divertor pressure measurements. Not sure about the probes.
Lower plenum pressure begins to drop when SSEP increases through ~-2mm. On the
way back down, the upper chamber holds its pressure until SSEP drops through
~-1.5mm.
However, calculated flux to outer divertor drops at around 0.74s, when SSEP is close to zero.
Next: Repeat with gap change and lower target nl04 to 8e19.
Jan 25 2008 09:33:23:673AM1080125002Jerry HughesNo plasma. Retry.
Jan 25 2008 10:52:03:013AM1080125003Jerry HughesShot 1 repeated, with right gap kept under better control. Also, the SSEP scan
down was smoother. Pressures are lower because of the lower target density.
You can see the lower chamber start to pump out when SSEP crosses thorugh ~-1mm.
Outer divertor flux trace suggests DN begins later, at SSEP~2mm.
D+E got in >2MW for a late H-mode.
Next shot: Raise Ip to 1MA, nl04=1e20.
Jan 25 2008 10:00:44:800AM1080125004Jerry HughesNo plasma.
Next shot: Retry.
Jan 25 2008 10:22:04:683AM1080125005Jerry Hughes1MA, nl04~1.1--1.2e20. Decent shot, plenty of density. Lower chamber begins
to pump out at SSEP~-1mm.
Next shot: 600kA, nl04~8e19
Jan 25 2008 10:35:36:777AM1080125006Jerry Hughes600kA, nl04~9e19. Too much density.
Next shot. Lower request to 6e19.
Jan 25 2008 10:45:49:210AM1080125007Jerry HughesCryopump seems to have gone cold unexpectedly. Frank is putting it in shutdown
mode until we really need it.
Next shot. Retry.
Jan 25 2008 11:04:12:217AM1080125008Jerry Hughes600kA. nl04~6--7e19. Decent shot.

Next: Lets move on to part B., pumped H-modes.
Reload shot 3 (ron will try to stabilize the midplane gaps somewhat).
Want cryo COLD. Request 3MW ICRF from 0.6 to 1.5s.

Jan 25 2008 02:13:01:730PM1080125009Jerry HughesShot 3 was not loaded. Rather we got the 600kA shot repeated. The left gap
is under better control. The right gap thrashes a bit. Overall not a bad
target. Pedestal coverage seems ok.
QCM is present, but vanishes when SSEP gets close to +5mm
Next: Try to get the 800kA target.

Jan 25 2008 02:14:53:357PM1080125010Jerry HughesThat was more or less what we wanted. 800kA with a nice SSEP sweep. Gaps look ok.
RF performed admirably. We see the pedestal pump out as we move to USN.
PCI shows QCM present throughout the scan, though amplitude and frequency do
change.
Next: Lower target nl04 to 7e19 and insert periods of flat SSEP. (-5mm, -2mm)
Jan 25 2008 12:02:03:987PM1080125011Jerry Hughes800kA, lower target nl04. We got SSEP flats of -5mm and ~0mm. ne,ped seems to be
the same at the SSEP change, but Te (and H-factor) drops.
Next shot: New SSEP program. Try for -2mm, 2mm.
Jan 25 2008 12:17:14:660PM1080125012Jerry Hughes800kA, lower target nl04. We got SSEP flats of ~ -3mm and ~ +2mm.
Prad rises before the USN phase.
Next shot: New SSEP program. Try to raise the SSEP platforms.
Jan 25 2008 03:20:27:620PM1080125013Jerry Hughes800kA. We got SSEP flats of ~ 0mm and ~ +4mm.
ne,ped drops in the USN case, as we saw before. No real improvement in
performance, though. High H-factor initially, and maybe some ELMs while still in
LSN!
QCM is present throughout, though weakest when exactly DN.
Next shot: We're having cryopump problems. While they try to fix it, repeat
shot 10 without RF, no cryo.
Jan 25 2008 01:36:12:673PM1080125014Jerry HughesOhmic shot with SSEP sweep from -5mm to 5mm and back.
At t=0.74--0.76s, The Isats rise abruptly on the probes at the pumping slots,
and the lower divertor starts to pump out. EFIT SSEP is going from
-0.8mm to +0.7mm during that period. This suggests EFIT is pretty accurate.
Jan 25 2008 01:47:41:030PM1080125015Jerry HughesShot went basically as programmed. Two separate H-modes, nominally at +2mm and
+5mm. Lower density as we go more USN, as before. Confinement is nothing special
once we get away from the LSN early in the first H-mode. Prad is high.
Next shot: Reload shot 011 and raise Ip to 1MA.

Jan 25 2008 01:58:13:637PM1080125016Jerry Hughes3 unpleasantly radiative H-modes. ICRF has trouble with the tune. Let's retry
with full power.
Power room access due to a breaker pull.
Jan 25 2008 02:05:07:113PM1080125017Jerry HughesEarly injection and disruption.
Jan 25 2008 02:30:23:343PM1080125018Jerry HughesRF problems. Shot went anyway, and disrupted mysteriously at 1.27.

Jan 25 2008 02:46:04:690PM1080125019Jerry HughesThat shot looked better. On the TV, anyway. No data are coming in.
. . . There they are. Clearly higher RF was not the magic bullet we needed for
this shot. H-modes are still radiative. The first H-mode has a transiently
high H-factor (>1.7), but it quickly degrades. What happens if we slip SSEP
quickly after the L-H transition?
Next: Repeat shot 13 with 1MA current.

Jan 25 2008 03:09:52:827PM1080125020Jerry HughesE-port is unhappy, and cuts out at t=0.64. Two radiative H-modes initiated at
SSEP 0f -4mm and -2mm, and a third dithering H-mode at +4mm.
Probably not worth continuing at this condition.
Next: Lower Ip to 600kA.
Jan 25 2008 03:42:42:850PM1080125021Jerry Hughes600kA. Radiation is much happier. H-mode is maintained until disruption at ~1.3s.
Two distinct pedestal punp-outs, each associated with an SSEP upward jog, are
seen at t~0.85s and t~1.2s. SSEP plateaus are at ~0mm and ~+4mm
Next shot: Raise SSEP plateaus to bias more USN.
Jan 25 2008 03:41:27:660PM1080125022Jerry Hughes600kA. SSEP plateaus of +4mm and +6mm. By the end ne,ped is <1e20 m^-3.
Ends in a disruption, unfortunately.
Next shot: Try to lower SSEP plateaus.
Jan 25 2008 03:56:08:943PM1080125023Jerry Hughes600kA. Due to a miscommunication, the ZCUR plateaus from shot 21 were raised
instead of lowered, so basically we got a repeat of shot 22. (SSEP of +4, +6)
Next shot: Try to lower SSEP plateaus to -2mm, +2mm
Jan 25 2008 04:08:14:880PM1080125024Jerry Hughes600kA. near DN through most of the H-mode.
How much boron have we worn off, exactly?
Next shot: Go back to 800kA, Try two SSEP plateaus of about -5mm, -2mm. 3MW RF.
(Almost a repeat of shot 11.)
Jan 25 2008 04:22:50:503PM1080125025Jerry HughesBack to 800kA. Two SSEP plateaus of about -5mm, -2mm. 3MW RF.
Fairly radiative H-modes. Clearly the boronization has deteriorated since shot 11.
However, early in the first H-mode, the Te, and ELMy characteristics are pretty
similar.
Next: Ramp the power up to 4MW and see what happens.
Jan 25 2008 04:46:24:440PM1080125026Jerry HughesInteresting shot. Prad got under control at 0.87, and as more RF ramped to
4MW, the H-mode persisted. As the SSEP swept closer to DN, the H-mode
recovered back to its original stored energy (albeit with more RF).
Next shot: Ramp RF to 5MW instead of 4MW.
Jan 25 2008 05:03:13:910PM1080125028Jerry HughesIt's looking a lot like the boronization is shot. 5 H-modes with ELM-free
characteristics. SSEP was flat at -5mm. E-port stopped after 1s.
NExt shot: Retry with pump WARM.
Jan 25 2008 05:09:07:337PM1080125029Jerry HughesNo plasma. End of run.

Physics Operator Comments
Jan 25 2008 09:02:50:590AM1080125001Ron ParkerGood morning! All systems go at 9:00, first shot coming up.
Jan 25 2008 09:13:09:230AM1080125001Ron ParkerShot 1 started up OK and had the programmed ZCUR, but disrupted at t = 1.2 s.
Jan 25 2008 09:27:03:853AM1080125001Ron ParkerRight gap seems to be too large, reduce by 1 cm on next shot.
Jan 25 2008 09:35:13:897AM1080125002Ron ParkerShot 2 was a dud, not enough fill gas following disruption.

Increase pulsed gas by 20 ms for next shot.
Jan 25 2008 09:56:41:793AM1080125003Ron ParkerShot 3 ran well. Next: Moving on to point 2, 1 MA, 1.0e20 m-2.
Jan 25 2008 10:17:56:397AM1080125004Ron ParkerShot 4 fizzled, way too much gas (X2).
Jan 25 2008 10:19:20:650AM1080125005Ron ParkerShot 5 ran as programmed. Now we're having fun.

On to shot 3 in run plan, 600 kA, 8e19 m-2.
Jan 25 2008 10:33:32:977AM1080125006Ron ParkerShot 6 ran well, but density was ~0.9e19 instead of 0.8e19.

Fussy SL! Try again with density programming set at 0.6e19.
Jan 25 2008 10:47:54:230AM1080125007Ron ParkerShot 7 was a dud, it turned out that cryopump was pumping, although not intended.

Try again, no change in pulsed gas, cryopump off.
Jan 25 2008 11:05:17:470AM1080125008Ron ParkerShot 8 ran well, producing the requested conditions.

Next: Reload shot 3, cryopump on so pulsed gas pulse up to 38 ms
Jan 25 2008 11:24:52:053AM1080125009Ron ParkerShot 9 ran, but disrupted. Shot 3 was not loaded as shot called for.
Jan 25 2008 11:43:07:887AM1080125010Ron ParkerShot 10 ran, but also disrupted at 1.42 s.

Next: Target density decreased to 0.7e20 m-2. Ssep according to shot B2b in Run Plan
Jan 25 2008 12:19:05:583PM1080125011Ron ParkerShot 11 ran well, as requested. Full length.
Jan 25 2008 12:19:40:070PM1080125012Ron ParkerShot 12 ran well, full length.
Jan 25 2008 12:20:25:307PM1080125013Ron ParkerShot 13 ran well, good shot. Cryopump not pumping as well as it did earlier.
Jan 25 2008 12:50:29:730PM1080125014Ron ParkerShot 14 was an Ohmic shot, taken while waiting for cryopump repairs.
Jan 25 2008 01:30:37:493PM1080125014Ron ParkerCryopump is repaired. Shot 15 will be with cryo on.
Jan 25 2008 01:38:06:097PM1080125015Ron ParkerShot 15 ran full length. Double H-Modes.
Jan 25 2008 01:50:53:770PM1080125016Ron ParkerShot 16 ran full length, triple H-Modes.
Jan 25 2008 01:58:20:103PM1080125016Ron ParkerShort delay while the cause of a breaker pulling out is investigated.
Jan 25 2008 02:06:37:770PM1080125017Ron ParkerShot 17 had an early disruption -- 28 ms.
Jan 25 2008 02:16:23:720PM1080125018Ron ParkerThe shot will be a no-power shot.
Jan 25 2008 02:29:43:407PM1080125018Ron ParkerOnly kidding, shot 18 was run with full Plasma power but without ICRF.

Shot disrupted at 1.28 s.
Jan 25 2008 02:33:46:957PM1080125019Ron ParkerWell, shot ran (full length, I think) but data not coming up.

Jan 25 2008 02:38:16:277PM1080125019Ron ParkerShot 19 data came up. Periodic H modes.
Jan 25 2008 02:47:14:960PM1080125019Ron ParkerShot 19 ran full length. Next: Reload shot 13 and set current to 1 MA.
Jan 25 2008 02:57:31:843PM1080125020Ron ParkerShot 20 ran full length, triple H-modes.
Jan 25 2008 03:07:23:357PM1080125020Ron ParkerNext: repeat shot 20, lower current (600 kA)
Jan 25 2008 03:11:23:843PM1080125021Ron ParkerShot 21 ran well until t ~ 1.35 ms, then disrupted.
Jan 25 2008 03:43:37:553PM1080125022Ron ParkerShot 22 ran well until disrupting at ~ 1.3 ms.
Jan 25 2008 03:55:54:130PM1080125023Ron ParkerShot 23 was OK, disrupted again at ~ 1.4 s.
Jan 25 2008 04:07:05:503PM1080125024Ron ParkerShot 24 looked pretty much the same, disrupting at ~ 1.3 s.

For shot 25, return to shot 11 with less ramp in ZCUR.
Jan 25 2008 04:23:10:210PM1080125025Ron ParkerShot 25 ran well, full length. Next: Same shot, more ICRF power.
Jan 25 2008 04:30:32:157PM1080125026Ron ParkerShot 26 ran, but disrupted at ~ 1.3 s. Next: same shot, more RF power.
Jan 25 2008 04:40:55:027PM1080125027Ron ParkerShot 27 disrupted again
Jan 25 2008 05:01:15:363PM1080125028Ron ParkerShot 28 disrupted, but made it to 1.55 s.

Next and last: Same shot, no cryopump.
Jan 25 2008 05:30:29:037PM1080125029Ron ParkerShot fizzled, probably due to cryo having been turned off after shot 28. Pulsed gas pulse was reduced to 18 ms (from ~ twice that with cryo) and H alpha had normal peak, but shot fizzled anyway.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:02:47:043AMPlasmaOk
209:27:08:167AMPlasmaOk
309:39:38:243AMPlasmaOk
409:56:04:217AMPlasmaOk
510:08:36:823AMPlasmaOk
610:22:31:247AMPlasmaOk
710:35:19:230AMPlasmaOk
810:48:53:400AMPlasmaOk
911:08:15:690AMPlasmaOk
1011:21:59:753AMPlasmaOk
1111:41:57:510AMPlasmaOk
1212:02:06:643PMPlasmaOk
1312:15:25:767PMPlasmaOk
1412:47:21:727PMPlasmaOk
1501:34:45:733PMPlasmaOk
1601:47:35:373PMPlasmaOk
1702:02:01:263PMPlasmaOk
1802:14:32:763PMPlasmaOk
1902:30:46:800PMPlasmaOk
2002:54:29:763PMPlasmaOk
2103:07:56:717PMPlasmaOk
2203:28:06:457PMPlasmaOk
2303:44:27:757PMPlasmaOk
2403:56:54:117PMPlasmaOk
2504:09:23:770PMPlasmaOk
2604:24:00:040PMPlasmaOk
2704:38:26:103PMPlasmaOk
2804:53:55:590PMPlasmaOk
2905:06:24:833PMPlasmaOk

System Availability
Jan 25 2008 09:02:27:263AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEnoProblem with LO'sJan 10 2008 01:17PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. 5 photo detectors have been shipped out for repair, so currently only 5 channels are available. We expect the full channels will be available late in Jan 08.Jan 04 2008 01:11PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is calibrated for YAG2. YAG1 is not calibrated yet. Jan 17 2008 11:51PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Density is derived with last year's calibration, and should be good to within ~20%. Jan 18 2008 07:27AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operationalJan 10 2008 11:41AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke