Alcator C-Mod Run 1080131 Information

Back to runs

Miniproposals
Miniproposal:523
Date Filed: 1/23/2008
Title:Effect of Lower Hybrid Current Drive on Rotation profile
First Author:Alex Ince-Cushman
Session Leader:Alex Ince-Cushman (shots 1-13)

Operators
Session leader(s):Alex Ince-Cushman
Physics operator(s):Jim Irby
Engineering operator(s):Bill Parkin,Gary Dekow

Engineering Operator Run Comment
MP 523: Effect of Lower Hybrid Current Drive on Rotation Profile Sessio

Session Leader Plans
Entered: Jan 30 2008 07:12:50:640PM
Author: Alex Ince-Cushman
MP 523: Effect of Lower Hybrid Current Drive on Rotation Profile

Session Leader: Alex Ince-Cushman
PhysOp: Jim Irby

The goal of this experiment is to conduct a LH phase scan at fix power, to see the effect of LHCD on rotation profile evolution.

Diagnostics: Hirex-sr, Thomson, Edge Thomson, Bolometer arrays, McPherson, PCI, Hard X-ray Camera

Step 1: Reproduce trophy shot of LH induce rotation (1-2 shots)
- shot 1080123022
- LH phase of 90, start at 0.8s for 500ms

Step 2: Repeat baseline shot with no LH (1-2 shots)

Step 3: Phase Scan
- Perform phase scan at: 60, 90, 120 (4-5 shots)
- Cell access: Switch LH hardware for phasing from -120 to -60
- Perform phase scan at: -60, -75, -90, -120 (5-6 shots)
- Cell access: Switch LH hardware for phasing from 150 to 210
- Perform phase scan at: 150, 180, 210 (4-5 shots)

Step 4: Locked mode discharge (time permitting) for Hirex-Sr calibration
- Repeat discharge 108016016

Physics Operators Plans
Entered: Jan 30 2008 05:32:59:913PM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:30

******
We will take two test shots for the OH protection system following the run.
******

Power systems as on: 1080123022

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): no
LH(yes/no): yes
DNB(yes/no): no
Cryopump (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/60 s

Session Leader Summaries
Entered: Jan 31 2008 05:16:13:167PM
Author: Alex Ince-Cushman
We had a total of 2 plasma discharges, neither of which had any LH. As a result no progress was made on the MP.

Physics Operator Summaries
Entered: Feb 1 2008 09:42:05:277AM
Author: Jim Irby
We got our first plasma today at 10:00 after a debug of the alternator field supply control circuitry. Turned out to be a failed local/remote switch on the supply. Then on shot 01 we had a TF crowbar and a ground fault indication. This problem was eventually tracked down to a bad MC14538B one Shot for the TF Crowbar (5 cents worth of hardware did us in for the day). The crowbar also resulted in a metal fluorescent light cover in the TF crowbar cabinet coming loose and possibly contacting the TF bus (ground faults?).

After several no power or TF only test shots, we got another plasma on shot 008. Since the TF inversion time was still set at 100 ms, the TF ramped down throughout the discharge, and we ended up with a q95 of 2. Finally, we got a full length discharge into rampdown on shot 009. No TF faults during either shot.

We were able to request and maintain very low densities today with nl_04 at 3e19/m^2 and a few Torr-l/s of gas required most of the shot.

From shot 10 on we were doing tests of the new OH protection computer. Steve Wolfe's summary of that work:

Following the successful tests of Willy Burke's oh2 force computer on 31-Jan-2008 (shots #1080131011,012,013), I have disabled the dpcs_type2_fault procedure. The afol receiver used to receive this fault signal has been removed and the wiring in the fault chain modified to accept the Burke circuit (see Willy and Bill Cochran for details).

For the time being I will leave the software procedure loaded but disabled
in \hybrid::top.hardware.dpcs.loadables.procedures:output_pros:procedure_00
and will not reassign the output fiber associated with this function, so the software option will be available on demand. I hope it is not needed again.

The secondary function that sets all dpcs power system outputs to zero on detection of out of range inputs remains active, as a backup feature.

DPCS is no longer checking for out of range inputs during the pulse. The backup feature mentioned in the last sentence refers to the baseline checking routine which operates at t=-2sec, prior to power supply turn on times. If a bus rogowski signal is out of normal range at that time, dpcs will not issue waveform commands to any supplies and an error is flagged in the dpcs log file. This feature would have prevented the control problem last March which initiated the concerns over coil stresses with opposing oh currents, etc.

Session Leader Comments

Physics Operator Comments
Jan 31 2008 09:14:22:047AMJim IrbyGary and Andy have found an offset problem with D-Right Vertical. It is 10C colder than indicated in control room. Problem likely solder joint or reed relay. Joe will take care of offset in software until we can debug next week. We will watch D-Top and -Bottom today to make sure no other issues arise.



Jan 31 2008 12:08:50:420PM1080131001Jim Irby09:10 ---- Delay as we wait for alternator field supply to come back online

09:40 ---- Probably a control issue with supply, but nothing found as yet

10:02 --- Fixed --- failed local/remote switch

Loaded 1080123022 into PCS: Ip 750 kA, nl_04 3e19/m^2, LSN
I have left prepuff unchanged at 23 ms --- startup shot had no hards
loaded

plasma --- lost all breakers ---- TF crowbar

The metal cover to a lamp in the TF crowbar cabinet came loose and was probably in contact with the TF bus possibly generating enough noise in the cabinet to cause erratic firing on the crowbar. The fluorescent lamp was shattered and pieces spread around the cabinet. We are cleaning up the cabinet, checking fuses, etc...




Jan 31 2008 11:58:31:143AM1080131002Jim Irbyfuses checked --- okay
TF resistance to ground checked --- clear --- no fault indication

We will try a 50 kA TF test under hybrid control:

50 kA at t=-1.0
rampdown starting at +50 ms


TF crowbared again (at low current). So we still have a problem; but it's in the crowbar cabinet!

No indication of TF groundfault








Jan 31 2008 12:44:07:867PM1080131003Jim IrbyNo power test to check crowbar circuits


Jan 31 2008 12:57:39:757PM1080131004Jim IrbyTF crowbar test --- no power


Jan 31 2008 02:03:23:943PM1080131005Jim IrbyAnother TF test is next --- setup scope to look at gates

25kA under PLC control

Crowbar again --- spurious gate signals seen
Jan 31 2008 04:19:09:850PM1080131006Jim IrbyGates to data system
master control cabinet signals going to crowbar are also now being digitized
alt phase imbalance fault signal checked out okay

16:15 --- possible bad chip found in master control cabinet


25 kA test ---- no crowbar --- current trace looks good





Jan 31 2008 04:39:04:187PM1080131007Jim Irby150 kA TF only test under PLC control

good TF pulse ---- no ground faults



Jan 31 2008 05:08:25:233PM1080131008Jim Irbyloaded from 1080131001
loaded

argon enabled for 125 ms from 0.3 s

try for plasma

plasma for 1 s as TF field ramped down --- operator error
no ground faults

q95 of 2 or so --- TF down to 1.99T
Jan 31 2008 05:17:32:807PM1080131009Jim Irbydpcs repeat
Eng OPS loaded from shot 1

plasma into rampdown --- all set for tomorrow
Jan 31 2008 05:24:58:740PM1080131010Jim IrbyWilly goes into power room to setup OH protection computer...
Remainer of shots today will be tests of this new system



Engineering Operator Comments
ShotTimeTypeStatusComment
110:03:25:670AMPlasmaOkAll P.S. crowbared after the shot
211:48:32:913AMTestBadTF 50KA Hybrid ctrl
312:44:23:040PMTestOkTf No Power Shot
412:56:30:977PMTestOkTF No Power Test Shot
501:41:51:420PMTestOk
604:15:48:300PMTestOkTF PLC test
704:34:47:243PMTestOkTF 150 KA PLC Test
804:54:52:330PMPlasmaBadEngineering Operator Error Loading the shot
905:07:44:407PMPlasmaOk
1005:38:29:190PMTestOkState Operator Error No Excitation
1105:49:28:437PMTestBadOH2 Supply Voltage was set to zero
1206:11:17:527PMTestOkOH force test
1306:26:07:323PMTestOkOH force test

System Availability
Jan 31 2008 10:03:04:760AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEnoProblem with LO'sJan 10 2008 01:17PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. 5 photo detectors have been shipped out for repair, so currently only 5 channels are available. We expect the full channels will be available late in Jan 08.Jan 04 2008 01:11PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is calibrated for YAG2. YAG1 is not calibrated yet. Jan 17 2008 11:51PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Density is derived with last year's calibration, and should be good to within ~20%. Jan 18 2008 07:27AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operationalJan 10 2008 11:41AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke