Alcator C-Mod Run 1080211 Information

Back to runs

Miniproposals
Miniproposal:473
Date Filed: 3/9/2007
Title:Lower Hybrid System Check-out and Initial operation
First Author:J. Randall Wilson
Session Leader:Greg Wallace (shots 1-10)

Operators
Session leader(s):Greg Wallace
Physics operator(s):Robert Granetz
Engineering operator(s):Andy Pfeiffer

Engineering Operator Run Comment
MP473: LH Checkout and Conditioning Session Leader: G. Wallace Physics O

Session Leader Plans
Entered: Feb 8 2008 03:09:50:590PM
Author: Greg Wallace
SL Plan for 1080211
MP473: LH Checkout and Conditioning

Session Leader: G. Wallace
Physics Operator: R. Granetz

The purpose of this 1/2 day run will be to determine if the gasket changes in
the LH launcher have helped improve the power handling of the system. The
Parker seals on phase shifters 3, 11, and 15 have been replaced with copper
gaskets, which seemed on bench tests to increase the power required to create an
arc.

Plasma setup:
Overnight ECDC. Start with a repeat of 1080123025.

LH Setup:
Phase shifters at 90 degrees current drive direction, 0.5mm behind LH limiter.
Start at 40kV beam voltage. 500ms shot starting at 800ms.

Start with 85kW per klystron. If no arcing or glowing is seen on the LH video,
move launcher to be flush with limiter. Increase power each shot in
20kW/klystron incriments up to maximum available without arcing. After an arc,
reduce power by 25% then continue raising in 10kW incriments.

After reaching maximum power, we will have two trial shots with different shapes
to determine the density gradient in front of the LH launcher.
Entered: Feb 11 2008 09:35:25:890AM
Author: Alex Ince-Cushman
MP 520: Sawtooth Evolution Studies

Session Leader: Alex Ince-Cushman (afternoon)
PhysOp: Bob Granetz

The goal of this experiment is to measure the evolution of the toroidal rotation and ion temperature profiles within a single sawtooth oscillation.

Diagnostics: Hirex, Thomson, Edge Thomson, GPC, Bolometer arrays, McPherson, Chromex, FRC

TURN CRYOPUMP ON

Establish USN, 1 MA, pumped L-mode with 2 MW ICRF at nl04 = 1.0e20.
- Load 1080116021. Argon pressure @ 1.5 psi, 1.0s puff @ 0.3s, 2MW RF
- Adjust RF Phasing to optimize sawtooth period.
- If time permits: Locked mode shots for velocity calibration. Based on Shot 1080116016. Ip = 0.8, nl04=0.4e20. Argon puff 200ms @ 0.3s

Physics Operators Plans
Entered: Feb 11 2008 08:52:00:040AM
Author: Robert Granetz
Engineering setup for Monday 11 Feb 2008

am: MP473 LH checkout of gasket changes
 and if time permits:
pm: MP520 Rotation and Ti during sawteeth

Session leader: G. Wallace (am); A. Ince-Cushman (pm)
Physics operator: R. Granetz

ECDC overnight in D2 and bake at 60 C.

Run will start at 09:00 and end at 17:00.

Power systems as on 1080123025 (0.8 MA, 5.4 T, LSN, high LH power).

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
   fill B-Top            with  6 psi D2  Hybrid enabled  (PG4)
   fill B-side lower     with  1 psi Ar  Hybrid DISABLED (PG1)
  leave B-side upper     as is           Hybrid DISABLED (PG2)   
   fill B-main (C-side)  with 40 psi D2  Hybrid enabled  (PG3)
  leave NINJA            as is           DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
  ECE, VUV, Z-bolo
 
Torvac setup: keep gate valves open

Specific diagnostics: HIREX-SR for the 2nd MP

-------------------------------------------------------------------------------
ICRF Setup: All transmitters, but not needed until 1st MP is finished, which
  could be at midday or later.
LH Setup: yes
DNB: no
Cryopump: Yes, but not needed until 1st MP is finished, which could be at
  midday or later.

-------------------------------------------------------------------------------
Run plan:
  am: This LH run will be specifically to check out the new gaskets.  This
      run has priority for today, and operation will not change over to the
      2nd MP until this one is finished.

  pm: The afternoon run will involve using ICRF to get long sawteeth,
      coupled with HIREX spectra using lots of argon.  The cryopump will be
      used to help the plasma survive the large argon load.

Session Leader Summaries
Entered: Feb 13 2008 04:05:05:793PM
Author: Greg Wallace
Session Leader Summary for 1080211

Session Leader: G. Wallace
Physics Operator: R. Granetz

The run started late due to the power glitch over the weekend which took several
systems offline. The purpose of these experiments was to determine if changing
the Parker Seals on the phase shifters to copper gaskets increased power handling
of the Jungle Gym. LH power was increased from 85kW per klystron up to a maximum
of 145kW per klystron, at which point arcs occured in the Jungle Gym between the
Pant Leg and Magic T. Previous run days showed the power limit to be in the range
of 140-150kW per klystron. Swapping the gaskets did not appear to greatly change
the power handling of the launcher. Additional tests will take place on 1080215
with a new fixed phase shifter on column 15.

Physics Operator Summaries
Entered: Feb 11 2008 12:27:55:393PM
Author: Robert Granetz
Run summary for Monday 11 Feb 2008

am: MP473 LH checkout of gasket changes
and if time permits:
pm: MP520 Rotation and Ti during sawteeth

Session leader: G. Wallace (am); A. Ince-Cushman (pm)
Physics operator: R. Granetz

The LH run was successful in the sense that we were able to show that the
faulting problems at P_LH > 800 kW are not due to the gaskets. The
afternoon MP was not run because of a problem in the J-port transmitters
due to a water leak over the weekend. We decided to end the run early in
order to get a head start on the ICRF repairs. This will probably take at
least a day.

The tokamak ran extremely well today, with no problems other than a minor
EF1 fault after shot 01.

Scorecard: 9 plasmas
0 dud
1 fizzle
0 power supply tests
0 no-power MDS shot cycles
--------------
Total: 10 shot cycles

Session Leader Comments
Feb 11 2008 09:46:30:260AM1080211001Greg WallaceClean shot at 85kW per klystron. Coupling not so great due to low density. Next shot will be 105kW per klystron and increase to nl_04=3.5e19.
Feb 11 2008 10:21:52:100AM1080211002Greg WallacePoor coupling and high reflections caused all trips. Will retry with a bit more density.
Feb 11 2008 10:27:13:057AM1080211003Greg WallaceAgain, poor coupling caused many trips. Next shot will increase nl_04 to 7e19 to improve coupling.
Feb 11 2008 10:42:14:153AM1080211004Greg WallaceClean shot with better coupling. B-side LH probes seem to be malfunctioning. Increasing to 125kW per klystron.
Feb 11 2008 11:02:07:837AM1080211005Greg WallaceClean shot at 125kW per klystron, although possibly a crossguide arc on vacuum side #22A at 1.22s. Next shot will move up to 145kW per klystron.
Feb 11 2008 11:18:18:580AM1080211007Greg WallaceLH ran without trips, although looks like arcs on the vacuum side at .94s and 1.26s. Next shot will increase to 135kW per klystron.
Feb 11 2008 11:40:28:840AM1080211009Greg WallaceFizzle.

Physics Operator Comments
Feb 11 2008 09:32:12:637AMRobert GranetzLoaded all segments from shot 1080123025 (0.8 MA, 5.4 T, LSN).
Reduced pre-fill pulse to 20 ms.
Feb 11 2008 09:33:57:560AMRobert GranetzThe start of the run will be delayed 30-60 minutes to accommodate a delay in
getting the alternator up to temperature.
Feb 11 2008 09:55:57:507AM1080211001Robert GranetzShot 01 -- Plasma. Good shot. 0.77 MA, 5.4 T, nl_04=3.2e19 m-2. P_LH=200 kW.
Lots of fast electrons. EF1 had a fault after the shot.

Next shot: raise nl_04 to 3.5e19 m-2.
Feb 11 2008 09:56:52:383AM1080211001Robert GranetzAfter shot 01 we had a cell access for TCI and for Jim Terry, and
a power room access to check on EF1.
Feb 11 2008 10:16:46:513AM1080211002Robert GranetzShot 02 -- Plasma. Good shot. Had early hard x-rays (i.e. not due to LH).
nl_04=3.3e19 m-2. P_LH=300-400 kW, but lots of faulting.

Next shot: increase nl_04 to 4.0e19 m-2; increase pre-fill by 3 ms.
Feb 11 2008 10:28:41:980AM1080211003Robert GranetzShot 03 -- Plasma. Good shot. nl_04=4e19 m-2. LH faulted badly. Still
had early hard x-rays.

Next shot: raise nl_04 to 7e19 m-2; add 1 ms to pre-fill.
Feb 11 2008 10:45:58:550AM1080211004Robert GranetzShot 04 -- Plasma. Good shot. P_LH=600 kW, with no faults. There were still some early
hard x-rays.

Next shot: increase pre-fill another 1 ms
Feb 11 2008 10:55:07:940AM1080211005Robert GranetzShot 05 -- Plasma. Good shot. Finally got rid of the early hard x-rays. P_LH=700 kW with
no faults.

Next shot: no DPCS changes
Feb 11 2008 11:13:28:140AM1080211006Robert GranetzShot 06 -- Plasma. Good shot. LH faulted alot at the new gasket, which answers the
primary question for today's run.

Next shot: no DPCS changes
Feb 11 2008 11:22:23:460AM1080211007Robert GranetzShot 07 -- Plasma. Good shot. P_LH=700 kW with no faults.

Next shot: turn on 100 ms argon puff to test HIREX.
Feb 11 2008 11:37:48:120AM1080211008Robert GranetzShot 08 -- Plasma. Disrupted at t=1.05 due to impurity radiation. It looks like a high-Z
impurity (shows up on x-ray arrays), perhaps from LH grill.

Next shot: no DPCS changes; might be last shot for today
Feb 11 2008 11:41:25:390AM1080211009Robert GranetzShot 09 -- Fizzle. disruption recovery?

Next shot: drop pre-fill by 2 ms
Feb 11 2008 11:57:24:627AM1080211010Robert GranetzShot 10 -- Plasma. Good shot. P_LH= 800 -> 750 kW. An impurity injection at
t=1.19 s almost killed the plasma.

End of run.
Feb 11 2008 11:57:59:157AM1080211010Robert GranetzWe have stopped tokamak operations for the day in order to begin repairs
on ICRF transmitter 4.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:37:42:440AMPlasmaOkEF1 low AC phase sequence
210:08:38:177AMPlasmaOk
310:21:24:003AMPlasmaOk
410:33:52:173AMPlasmaOk
510:47:43:050AMPlasmaOk
611:00:17:890AMPlasmaOk
711:12:47:780AMPlasmaOk
811:25:16:870AMPlasmaOk
911:38:26:900AMPlasmaOk
1011:50:44:633AMPlasmaOk

System Availability
Feb 11 2008 09:37:26:767AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEnoProblem with LO'sJan 10 2008 01:17PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking fine.Nov 29 2007 01:36PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK. 5 photo detectors have been shipped out for repair, so currently only 5 channels are available. We expect the full channels will be available late in Jan 08.Jan 04 2008 01:11PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth CO2 and HeNe Lasers are disabled----- safe for machine entry.Sep 14 2007 03:21PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometeryes50, 60, 75 and 88GHz channels are connected and being tested for the campaignDec 18 2007 10:28AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes8 polychromators, 1 laser. Density is calibrated for YAG2. YAG1 is not calibrated yet. Jan 17 2008 11:51PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Density is derived with last year's calibration, and should be good to within ~20%. Jan 18 2008 07:27AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operationalJan 10 2008 11:41AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke