Alcator C-Mod Run 1080310 Information

Back to runs

Miniproposals
Miniproposal:491
Date Filed: 5/25/2007
Title:MSE Calibrations
First Author:Steve Scott
Session Leader:Steve Scott (shots 1-15)

Operators
Session leader(s):Steve Scott
Physics operator(s):
Engineering operator(s):

Engineering Operator Run Comment
MP491 MSE-DNB Angle Calibration

Session Leader Plans
Entered: Mar 10 2008 01:50:59:510PM
Author: Steve Scott
MSE-DNB angle calibration

* MP491.

* All shots: DNB fired into a gas-filled torus with no magnetic fields.

* Reference shot = 1070816025.

* 6 PSI gas pressure, deuterium.

* Close torus valves except for DNB.

* Desired torus pressure = 3 mTorr.

* DNB: modulated. Objective of modulation is to get a DNB current waveform that is constant in time,
and as high in current as possible. Hope to get 5+ amps.

* MSE fibers from various channels will be connected to Bill Rowan's spectrometer, to measure the
wavelength of the Halpha line. From this we can infer the Doppler shift and thus the angle
between the DNB and the MSE sightlines.

* Number of shots: in neighborhood of 7-20.

* DNB timing (for short-pulse beam): starting at 0.5 sec.

Physics Operators Plans

Session Leader Summaries
Entered: Mar 10 2008 05:48:59:100PM
Author: Steve Scott
We carried out a successful calibration of the MSE-DNB relative angle.
Fired the DNB into gas-filled torus while various MSE fibers were
inserted into the spectrometer to measure the Doppler shift.
the nominal pressure for this expt is 3.0 mTorr. We varied it a little
at the request of Igor to facilitate evaluations of the BES
absolute calibration.

It turns out that 1.0 mTorr is too low, so we had to re-take the
last two channels.

shot chan dnb pressure spect comment

001 0 ok ok xxx spectrometer not working
002 0 ok ok ok reduced torus pressure a little
003 0 2+ ok* ok only two good dnb pulses. torus pressure a little low
004 0 4+ ok ok only one small fault on dnb. pressure like 002
005 1 ok ok ok
006 2 ok ok ok
007 3 4+ ok ok only one small early dnb fault
008 4 ok ok ok
009 5 4+ ok ok only one small dnb fault
010 6 ok reduced ok pressure reduced to 2.0 on purpose
011 7 4 reduced ok 4 pulses, one of which had small fault
012 8 2.5 1.0 weak only 2 good dnb pulses. pressure reduced again
013 9 ok 1.0 weak
014 8 ok 1.9-2.0 ok
015 9 ok 1.9-2.0 ok

Physics Operator Summaries

Session Leader Comments
Mar 10 2008 01:50:20:027PMSteve ScottStatus 1:45 PM

1. Logic problem with DNB.
2. Other miscellaneous computer issue, being investigated by Josh.

Run is on hold pending resolution of these problems.
Mar 10 2008 03:12:44:300PM1080310001Steve ScottGood shot.
MSE spatial channel 0 into spectometer.
DNB = 0.5 to 1.0 sec, modulated.
G-side MKS = 3.0-3.2 mTorr.

Alas, no signal was observed on the spectrometer.


Mar 10 2008 03:30:41:677PM1080310002Steve ScottRepeat shot 001: MSE spatial channel 0 into spectrometer.
Also, try to reduce the torus pressure by about 15%.

result: same dnb as shot #1: good.
torus pressure is 2.9-3.0 mTorr: good
spectrometer: good. signal level is OK, but might benefit from
increasing the slit width.

So next shot: increase slit width, otherwise same conditions
Mar 10 2008 03:36:57:677PM1080310003Steve ScottMSE spatial channel 0.
DNB: only two good pulses.
something wierd happened to torus values. torus pressure a little
lower than previous shot: P_torus = 2.6 - 2.8 this shot.
will have to repeat this shot once more ...
Mar 10 2008 03:49:54:490PM1080310004Steve Scottmse spatial channel 0
dnb: pretty good (one small fault)
torus pressure: identical to shot 2. good
Mar 10 2008 04:02:12:333PM1080310005Steve ScottMSE spatial channel 1
dnb: good. torus pressure: good.
Mar 10 2008 04:15:02:443PM1080310006Steve ScottMSE spatial channel #2. dnb good. pressure good.
Mar 10 2008 04:27:45:097PM1080310007Steve Scottmse spatial channel 3.
dnb good. torus pressure good.
Mar 10 2008 04:41:40:130PM1080310008Steve Scottmse spatial channel 4. dnb good. torus pressure good.
Mar 10 2008 05:22:35:287PM1080310009Steve Scottmse spatial channel 5. one small fault on dnb. good torus pressure
Mar 10 2008 05:03:43:707PM1080310010Steve Scottmse spatial channel 6. dnb = good.

torus pressure: at Igor's request, torus pressure was reduced to 2.0 mTorr. It will remain
at this value for the remainder of the afternoon.
Mar 10 2008 05:12:31:910PM1080310011Steve Scottmse spatial channel 7. dnb had 4 pulses, one of which had small fault.
pressure = 2.0 mTorr again
Mar 10 2008 05:34:16:350PM1080310012Steve Scottmse spatial channel 8.
dnb was poor. just 2 clean pulses. Later, we realized that the torus
pressure is insufficient. So we will have to repeat this shot.
Mar 10 2008 05:34:37:397PM1080310013Steve Scottmse spatial channel 9
dnb is good.
torus pressure 1.0 mTorr as requested.
But torus pressure is really insufficient. Will have to repeat this
shot.
Mar 10 2008 05:40:20:800PM1080310014Steve Scottmse spatial channel 8
dnb good.
pressure raised successfully to 2.0 mtorr
Mar 10 2008 05:49:54:723PM1080310015Steve Scottmse spatial channel 9.
dnb good. torus pressure = 1.9-2.0 = ok

***** this is the end of tonight's experiment ******

Physics Operator Comments
Mar 10 2008 02:57:12:113PM1080310001Steve Wolfe
Loaded shot #1070816025 (beam into gas no field) for Steve Scott
Load at 10-Mar-2008 14:55:30.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done


Mar 10 2008 03:16:24:897PM1080310001Steve Wolfe
For shot #2, reduce gas puff from 1.13 to 1.0sec
Load at 10-Mar-2008 15:16:02.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done


Mar 10 2008 05:09:04:707PM1080310011Steve Wolfe
For shot #12, reduce gas puff from 0.667 sec to 0.333 sec
(Bob made the change to .667)
Load at 10-Mar-2008 17:08:27.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done



Mar 10 2008 05:33:36:410PM1080310013Steve Wolfe
For shot #14, increase gas puff from .333 back to 0.667 sec
Load at 10-Mar-2008 17:32:54.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done
 



Engineering Operator Comments
ShotTimeTypeStatusComment
103:05:49:067PMTestOk
203:23:13:893PMTestOk
303:32:19:380PMTestOkdnb test
403:46:34:753PMTestOkdnb test
503:59:31:380PMTestOkdnb test
604:12:20:410PMTestOkdnb test
704:24:08:457PMTestOkdnb test
804:37:15:927PMTestOkdnb test
904:46:20:800PMTestOkdnb test
1004:56:00:707PMTestOkdnb test
1105:06:06:830PMTestOkdnb test
1205:16:18:567PMTestOkdnb test
1305:25:50:410PMTestOkdnb test
1405:37:12:347PMTestOkdnb test
1505:46:12:863PMTestOkdnb test

System Availability
Mar 10 2008 03:05:41:363PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyes16 Channels now working - low freq. side - outer RmidsFeb 19 2008 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoProblems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible.Feb 15 2008 02:07PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK.Feb 21 2008 08:51AM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesworkingFeb 29 2008 07:00PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesStarting on 1080227 All low freq. channels have been connected 50,60,75,88, 88l,88u and 110GHz. The variable freq. channel as well as the 140 have been connected and are being tested. (On 1080306, 75GHz has been disconnected because the rcvr mixer has been obsolete for the last run days)Mar 06 2008 09:11AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes12 polychromators (#1~8,9,11,13,15), 1 laser. Density is calibrated for YAG2 on polychromator 1~8. YAG1 is not calibrated yet. Density calibration hasn't been performed on ploychromator 9~16.Feb 21 2008 11:19AM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Density is derived with last year's calibration, and should be good to within ~20%. Jan 18 2008 07:27AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operationalJan 10 2008 11:41AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Mar 10 2008 03:23:08:863PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyes16 Channels now working - low freq. side - outer RmidsFeb 19 2008 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoProblems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible.Feb 15 2008 02:07PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK.Feb 21 2008 08:51AM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesworkingFeb 29 2008 07:00PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesStarting on 1080227 All low freq. channels have been connected 50,60,75,88, 88l,88u and 110GHz. The variable freq. channel as well as the 140 have been connected and are being tested. (On 1080306, 75GHz has been disconnected because the rcvr mixer has been obsolete for the last run days)Mar 06 2008 09:11AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes12 polychromators (#1~8,9,11,13,15), 1 laser. Density is calibrated for YAG2 on polychromator 1~8. YAG1 is not calibrated yet. Density calibration hasn't been performed on ploychromator 9~16.Feb 21 2008 11:19AM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Density is derived with last year's calibration, and should be good to within ~20%. Jan 18 2008 07:27AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operationalJan 10 2008 11:41AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke