Alcator C-Mod Run 1080314 Information

Back to runs

Miniproposals
Miniproposal:537
Date Filed: 2/21/2008
Title:Momentum impulse from rapid ssep changes
First Author:Kenneth Marr
Session Leader:Kenneth Marr (shots 1-31)

Operators
Session leader(s):Kenneth Marr
Physics operator(s):Jim Irby
Engineering operator(s):Bill Parkin,Ed Fitzgerald,Gary Dekow

Engineering Operator Run Comment
MP 537: Momentum impulse from rapid SSEP changes

Session Leader Plans
Entered: Mar 13 2008 04:08:11:203PM
Author: Kenneth Marr
Session Leader Plan 1080314 - KMarr
MP 537: Momentum impulse from rapid SSEP changes.

The purpose of this run is to capture the effect of the 'edge event'
generated when the plasma is moved from LSN to USN (or vice versa)
in a very short amount of time (~10ms). Recent results imply there
is a propagation of momentum in the core region. The measurements
in the pedestal region show some indication that this edge event
might not propagate through the pedestal but rather cause a re-
arrangement of flows there.

Requested systems:
*Cryopump available
*Enable NINJA with 10psi D2, for diagnostic gas puffing.
*Scanning probes; WASP
*Argon for Hirex family.
*DNB request: at least 6A, 30/15ms ON/OFF, starting at 0.5s.

A. Ip = 0.8MA nl_04 = 8.0e19m-2, lgap = 10mm
Basic shot from 1080227032
Load whatever startup works best.

Additional changes to this shot are:
Move first sweep (LSN to USN) to 0.7s.
2nd sweep (USN to LSN) at 1.0s still but increase to 10mm shift in
10ms.
Add 3rd sweep at 1.3s back to USN.

Maintain 1cm gap. Compensate for shift in Lgap at sweeps with a forced
gap reduction/increase?

Cryopump on to maintain density during sweep.
Expected 6-8 shots to get all the systems together.
Once this shot is achieved to satisfaction, repeat for scanning
probe participation. Likely 3 shots to get probes plunging correctly to capture flows before the sweep, then another 3 shots for flows after the sweep.

B. Ip = 0.8MA nl_04 = 8.0e19m-2 lgap = 7mm
Repeat A. but put the IW gap at 7mm rather than 10. The location that
shows little velocity change with the ssep sweep might be fixed in space or a
fixed distance from the separatrix. (2 shots or 7 w/ probes)

C. Ip = 0.8MA nl_04 = 8.0e19m-2 lgap = 13mm
Similar to A, B. Complete gap scan. (2 shots or 7 w/ probes)

D. Ip = 1.0MA nl_04 = 8,0e19m-2 lgap = 10mm
Drive hotter plasmas to explore the effect of pedestal temperature on the
momentum transport. (8 shots including probes.)

E. Ip = 0.6MA nl_04 = 8,0e19m-2 lgap = 10mm
Similar to D. (8 shots including probes)

If there's still time explore changing the momentum by changing the density:
F. Ip = 0.8MA nl_04 = 1e20 m-2
G. Ip = 1.0MA nl_04 = 1e20 m-2

Physics Operators Plans
Entered: Mar 13 2008 03:27:14:203PM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1080227032

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid ENABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 ENABLED

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): no
DNB(yes/no): yes
Cryopump (yes/no): yes

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s
Entered: Mar 13 2008 05:30:01:627PM
Author: Jim Irby
Loaded from 1080227032
loaded

Session Leader Summaries
Entered: Mar 14 2008 05:48:18:777PM
Author: Kenneth Marr
Tough crowd today for this run. We managed a struggling start after a busted capacitor. Two shots disrupted from a too quick sweep back to LSN (004,006) and were each followed by fizzles. Shot 009 was the first full length plasma that served as the target for Part A. After this the probes were activated and finally saw a shot at 015. By the end we'd measured the LSN (021) and the USN (029) with probes. All the rest of the shots but 026 were fizzles.

The run was successful at incorporating the DNB CXRS and the Mach probes into the sweeping ssep experiment. The flows were seen to change at the first sweep and generally recover their original velocity at the 2nd sweep. The marfe on shot 026 supressed flow modification during the return to LSN. Despite a disappointingly small amount of actual plasmas, there was likely enough data collected to make some statements about flows and flow profiles. Also we will have a better understanding of what to look for when this run is repeated for the other parts.

Shot summary:
1-3: no power.
004: Plasma disrupts after 1.0s
006: Plasma disrupts after 1.0s
009: Plasma - No probes.
015: Plasma - Probes in LSN portion. Could be deeper
021: Plasma - Probes in LSN portion. Satisfactory
026: Plasma - Cryopump off, Probes in USN portion. MARFE. Unsatisfactory.
029: Plasma - Cryopump on. Beam off. Probes in USN portion. Marginally satisfactory.
All other shots to 031: Fizzle.

Physics Operator Summaries
Entered: Mar 14 2008 05:47:18:527PM
Author: Jim Irby
This was a very painful run. We spent two hours in the morning fixing a shorted cap in the ef1 commutation bank and then testing the bank. Finally on shot 04 we got our first plasma which disrupted at 1.05 s. The next plasma, shot 06, also disrupted around 1 s, probably because of the speed of the 2nd jog programmed for 1.0 s. We increased the jog time from 10 to 20 ms, and when we got a plasma on shot 09, it ran into rampdown. However, we continued to have problems the rest of the day with startup. A couple of shots were lost because the cryopump was not running effectively, and the prefill pressure was too high. Other shots may have been lost because the dnb was firing into the wall during fizzles. During plasma discharges light and injections around the location where the dnb hits the wall during fizzles could be seen. We plan to fix this problem on Monday by reinstalling the fizzle detector for the dnb. It was generally very difficult to adjust the prefill without either having too much gas or too little. This effect may have been caused by variations in the cryopump pumping speed. Adjustments in rcur were made on shot 29 that may have helped keep the startup plasma off the wall over a larger range of prefill pressures.

ef1 com bank fault 01
tests 02,03
plasma 04, 06, 09, 15, 21, 25, 29
rest fizzles

Session Leader Comments
Mar 14 2008 09:13:38:210AM1080314001Kenneth MarrNo power shot.
Mar 14 2008 10:38:01:837AM1080314002Kenneth MarrNo power shot.
Mar 14 2008 10:50:59:447AM1080314003Kenneth MarrNo power shot.
Mar 14 2008 11:14:18:073AM1080314004Kenneth MarrFirst plasma. Disrupts on 2nd jog perhaps. 1st jog looks okay.

Next: Repeat but move gas puff.
Mar 14 2008 11:14:33:090AM1080314005Kenneth MarrFizzle
Mar 14 2008 11:46:18:290AM1080314006Kenneth MarrPlasma - Disrupts on the 2nd sweep.

Some velocity changes seen on puff views. DNB CXRS does not see change in velocity. CXRS on main ion sees velocity change.

Next shot. Single probe plunge before 1st sweep. Slow 2nd ramp to control plasma after.
Mar 14 2008 11:54:01:383AM1080314008Kenneth MarrPost disruption fizzle.
Mar 14 2008 12:37:31:680PM1080314009Kenneth MarrGood shot. Clear changes in velocity on Hirex Sr. and DNB and GPI CXRS in core. Interesting indications at the separatrix and SOL.

Next repeat for probe participation.
Mar 14 2008 12:36:03:090PM1080314010Kenneth MarrFizzle
Mar 14 2008 12:52:29:480PM1080314011Kenneth Marrre-fizzle
Mar 14 2008 01:48:40:447PM1080314015Kenneth MarrPlasma. Showing similar effects as shot 9. Probes participated.

Next shot: Repeat. Probes deeper.
Mar 14 2008 03:01:33:417PM1080314021Kenneth MarrPlasma. Probes got sufficient signal.

Next shot: Repeat shot. Move probes to USN time.
Mar 14 2008 04:39:32:743PM1080314025Kenneth MarrPlasma. Cryopump off. Marfe in the lower divertor area affect flows in the USN configuration. Possibly interesting but not quite what we want. Probe measurements limited by marfe.

Next shot: Repeat shot with cryo on.
Mar 14 2008 04:57:43:120PM1080314029Kenneth MarrPlasma. Good shot. I believe we've hit the key points with the probes. Unfortunately we are almost out of time. We'll creep halfway into part B and reduce the IW gap. Probes timidly poking at it since we can't take a target and then a real one.

Next shot: Reduce the inner gap by 3mm.
Mar 14 2008 05:19:20:243PM1080314031Kenneth MarrFinal fizzle of the day. Thanks to all.

Physics Operator Comments
Mar 14 2008 10:32:23:167AM1080314001Jim Irbyprepuff to 60 ms --- cryopump for 1st shot
800 kA, 5.4 T, 7e19/m^2, sweeping zcur 1 cm in 10 ms
zcur: lsn to usn sweep at 0.8 s --- 10 mm in 10 ms
zcur: usn to lsn sweep at 1.0 s --- 10 mm in 10 ms
clearin: zxa=0.39, rxa=0.544 at 0.7 s
clearin: back to standard reference at 1.0 s
loaded

no-power shot --- EF1 commutation bank faulted condition
good thing --- I had a bad start-up loaded (4 T)

EF1 commutation faulted last shot yesterday

cell entry to check out bank

~20 min: Found bad cap in bank at easy to get to location. Replacing

~70 min: Cap replaced. Connections being double checked

~83 min: started no power shot


Mar 14 2008 10:37:31:167AM1080314002Jim Irbyimported seg 1 from 1080313031 into seg 1
prepuff from 20 to 60 ms
loaded

this will be a no power shot to test the cap bank

had DNB

plenty of prepuff gas --- no cryopump

ef1 commutation bank charged okay

will need one more no power shot at full bank voltage


Mar 14 2008 10:47:11:010AM1080314003Jim Irbyno power shot --- bank to full voltage

test okay --- ready for plasma


Mar 14 2008 05:25:00:573PM1080314004Jim Irbytry for plasma --- total delay approx 2:00

jog at 0.7 s look okay
plasma for 1.05 s, just at 2nd jog time --- ssep seems to have overshot badly

injection at 0.98 s caused disruption, not the jog...

density request was only 7e19/m^2. Should have loaded 8e19/m^2

need fast efit set to new jog times (.7 and 1. s)






Mar 14 2008 11:14:20:680AM1080314005Jim Irbynl_04 request from 7 to 8 e19/m^2

fizzle --- guess cryopump doesn't help fizzles


Mar 14 2008 11:34:12:197AM1080314006Jim Irbytry again

plasma for 1.05 s

big overshoot in zcur/ssep


Mar 14 2008 11:52:56:307AM1080314007Jim Irbynl_04 request from 8 to 8.5 e19/m^2
argon puff to 200 ms (from 300 to 500 ms)
usn to lsn from 1.00 to 1.02 s --- sweep time increased from 10 to 20 ms
clearin from -0.002 to -.004 from 0.700 to 1.0 s

fizzle ---
Mar 14 2008 12:10:59:197PM1080314008Jim Irbytry again

fizzle --- not good

carbon after 0.01 s

no RATIOMATIC data --- turned off
Mar 14 2008 12:23:09:917PM1080314009Jim Irbyprepuff from 60 to 50 ms

plasma into rampdown
Mar 14 2008 12:30:49:790PM1080314010Jim Irbyslowed down usn to lsn again from 20 to 30 ms
argon from 300 to 550 ms --- cryopump eats argon
loaded

Brian will try probe scans this shot

fizzle???
Mar 14 2008 12:48:25:383PM1080314011Jim Irbyprepuff to 55 ms
loaded

fizzle
Mar 14 2008 01:04:30:917PM1080314012Jim IrbyNESOX gatevalve disabled
DNB requested to be off for this shot

basepressue before shot almost a factor of two better

fizzle ---


Mar 14 2008 01:11:16:493PM1080314013Jim Irbyno nesox
no dnb

basepressure 6.8e-8 Torr

no TF!

PLC reset problem --- should be good for next shot


Mar 14 2008 01:22:53:790PM1080314014Jim Irbyno nesox
no dnb

basepressure 6.2e-8 Torr

fizzle
Mar 14 2008 01:40:24:680PM1080314015Jim IrbyBr0 from 0.0 to -.0002T
loaded
no dnb
no nesox

prepuff from 55 to 65 ms
loaded

plasma into rampdown
Mar 14 2008 02:00:11:133PM1080314016Jim Irbydnb back online

fizzle

prefill pressure nearly a factor of two high compared to shot 15
breakdown late


Mar 14 2008 02:06:25:027PM1080314017Jim Irbytry again.
basepressure is high --- 2.7e-7 Torr

fizzle

prefill very high again --- close to no cryopump value as seen during no power tests earlier today

Brian noted that the last regen indicated very little gas is being pumped
Investigating



Mar 14 2008 02:18:12:650PM1080314019Jim Irbytry again with the cryopump running

fizzle

pressure much better but still have thrashing around
Mar 14 2008 02:39:10:150PM1080314019Jim Irbyprepuff to 70 ms
loaded

cryopump looks good

fizzle

Mar 14 2008 02:50:47:853PM1080314020Jim Irbyprepuff to 60 ms to bracket

fizzle

thrashing back, but breakdown time better


Mar 14 2008 02:58:38:103PM1080314021Jim Irbyprefill to 65 ms

plasma into rampdown --- had a small cii spike/thrash

fill pressure good overlay of shot 15; breakdown a little later
current rise a little slower


Mar 14 2008 03:19:46:103PM1080314022Jim Irbyargon puff to 350 ms from 250 ms (from 300 to 650 ms)
loaded

fizzle --- no ratiomatic, so I don't know the fill pressure

mks indicated high pressure
Mar 14 2008 03:33:27:620PM1080314023Jim Irbyno change again

cryopump seems to be pumping ---- 7.9e-8 Torr

fizzle --- pressure overlay on shot 21


Mar 14 2008 03:39:29:980PM1080314024Jim Irbyno cryopump
prefill to 20 ms

fizzle --- pressure low
Mar 14 2008 03:57:47:680PM1080314025Jim Irbyprefill to 23 ms
loaded

if this doesn't work we will change rcur from 1000 to 1800.

plasma into rampdown -- 1.65 s --- no density control



Mar 14 2008 04:07:48:370PM1080314026Jim Irbycryopump back on
prefill to 65 ms

fizzle --- pressure slightly high compared to 21


Mar 14 2008 04:21:54:930PM1080314027Jim Irbyno changes

no plasma

dnb will be off for next shot
Mar 14 2008 04:29:05:603PM1080314028Jim Irbydnb off --- probably only useful for next shot

fizzle

Mar 14 2008 04:48:29:590PM1080314029Jim Irbyprefill to 56 ms
rcur from 1000 to 1800
dnb off

plasma into rampdown


Mar 14 2008 05:06:39:947PM1080314030Jim Irbyrcur in seg 2 decreased by 1.5 mm
clearin in seg 2 decreased by 3.0 mm

fizzle --- pressure high (cryopump?)
Mar 14 2008 05:12:04:587PM1080314031Jim Irbyprefill to 52 ms

fizzle --- go home


Engineering Operator Comments
ShotTimeTypeStatusComment
109:04:39:880AMPlasmaBadEF1L cap bank did ncharge
210:32:12:430AMTestOkEF1L cap bank test
310:41:51:040AMTestOkEF1L cap bank test
410:52:52:527AMPlasmaOk
511:08:15:040AMPlasmaOk
611:20:59:353AMPlasmaOk
711:49:04:260AMPlasmaOk
812:01:36:713PMPlasmaOk
912:14:17:650PMPlasmaOk
1012:28:50:447PMPlasmaOk
1112:41:13:870PMPlasmaOk
1212:53:32:057PMPlasmaOk
1301:05:55:917PMPlasmaBadTF did not fire, PLC trigger may not have occured
1401:18:33:837PMPlasmaOk
1501:34:03:883PMPlasmaOk
1601:46:57:527PMPlasmaOk
1702:00:10:680PMPlasmaOk
1802:12:42:073PMPlasmaOk
1902:25:10:010PMPlasmaOk
2002:37:40:820PMPlasmaOk
2102:51:22:260PMPlasmaOk
2203:04:03:650PMPlasmaOk
2303:18:42:180PMPlasmaOk
2403:32:38:493PMPlasmaOk
2503:45:09:230PMPlasmaOk
2603:59:42:230PMPlasmaOk
2704:14:20:963PMPlasmaOk
2804:27:01:963PMPlasmaOk
2904:41:12:430PMPlasmaOk
3004:57:35:180PMPlasmaOk
3105:10:00:667PMPlasmaOk

System Availability
Mar 14 2008 09:04:31:693AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyes16 Channels now working - low freq. side - outer RmidsFeb 19 2008 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoProblems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible.Feb 15 2008 02:07PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK.Feb 21 2008 08:51AM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesworkingFeb 29 2008 07:00PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesStarting on 1080227 All low freq. channels have been connected 50,60,75,88, 88l,88u and 110GHz. The variable freq. channel as well as the 140 have been connected and are being tested. (On 1080306, 75GHz has been disconnected because the rcvr mixer has been obsolete for the last run days)Mar 06 2008 09:11AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes12 polychromators (#1~8,9,11,13,15), 1 laser. Density is calibrated for YAG2 on polychromator 1~8. YAG1 is not calibrated yet. Density calibration hasn't been performed on ploychromator 9~16.Feb 21 2008 11:19AM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Density is derived with last year's calibration, and should be good to within ~20%. Jan 18 2008 07:27AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operationalJan 10 2008 11:41AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Mar 14 2008 10:32:06:383AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV fine. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Dec 19 2007 07:16PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyes16 Channels now working - low freq. side - outer RmidsFeb 19 2008 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoProblems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible.Feb 15 2008 02:07PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK.Feb 21 2008 08:51AM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesworkingFeb 29 2008 07:00PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesStarting on 1080227 All low freq. channels have been connected 50,60,75,88, 88l,88u and 110GHz. The variable freq. channel as well as the 140 have been connected and are being tested. (On 1080306, 75GHz has been disconnected because the rcvr mixer has been obsolete for the last run days)Mar 06 2008 09:11AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes12 polychromators (#1~8,9,11,13,15), 1 laser. Density is calibrated for YAG1 based on ECE cutoff data taken on Mar11. YAG2 is offline. Mar 14 2008 09:59AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Density is derived with last year's calibration, and should be good to within ~20%. Jan 18 2008 07:27AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operationalJan 10 2008 11:41AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke


Mar 14 2008 11:20:54:167AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Mar 14 2008 11:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyes16 Channels now working - low freq. side - outer RmidsFeb 19 2008 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoProblems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible.Feb 15 2008 02:07PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK.Feb 21 2008 08:51AM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesworkingFeb 29 2008 07:00PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesStarting on 1080227 All low freq. channels have been connected 50,60,75,88, 88l,88u and 110GHz. The variable freq. channel as well as the 140 have been connected and are being tested. (On 1080306, 75GHz has been disconnected because the rcvr mixer has been obsolete for the last run days)Mar 06 2008 09:11AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes12 polychromators (#1~8,9,11,13,15), 1 laser. Density is calibrated for YAG1 based on ECE cutoff data taken on Mar11. YAG2 is offline. Mar 14 2008 09:59AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working. Density is derived with last year's calibration, and should be good to within ~20%. Jan 18 2008 07:27AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operational, but channels have been dying...stay tuned.Mar 14 2008 11:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke