Alcator C-Mod Run 1080326 Information

Back to runs

Miniproposals
Miniproposal:534
Date Filed: 2/21/2008
Title:Foil/AXUV Bolometer Calibration in Helium
First Author:Matt Reinke
Session Leader:Matt Reinke (shots 1-12)

Operators
Session leader(s):Matt Reinke
Physics operator(s):Ian Hutchinson
Engineering operator(s):Bill Parkin,Gary Dekow,Ed Fitzgerald

Engineering Operator Run Comment
MP 534: Foil/AXUV Bolometer Calibration in Helium (1/2-day AM) MP#517 "E

Session Leader Plans
Entered: Mar 25 2008 03:03:51:973PM
Author: Matt Reinke
MP 534: Foil/AXUV Bolometer Calibration in Helium (1/2-day AM)

SL: ML Reinke
PO: IH Hutchinson

The main purpose of this experiment is create radiative plasmas with a variety of impurities to cross-calibrate the foil and AXUV bolometers. A second goal is to evaluate the effectiveness of N V emission in polluting the edge lyman alpha measument.

Diagnostics: All Te and n_e profile diagnostics (GPC1 and GPC2, edge/core TS, TCI, FRC). All impurity spectroscopy (HIREXSR, NeSOX, bolometry, VUV, CHROMEX)

DNB: 150 ms on 150 ms off at max beam current.
Cryopump: Needed on first shot
ICRF: 0.4-1.5 seconds @ 3 MW (first few shots to tune up)

Plan (all gas puffs use B-SIDE lower):

A) establish USN ICRF heated L-mode like 1080116014. ICRF up to max power 0.4-1.5 seconds. No gas puffing. Measure Mo-dominated emissivity from foils and AXUV.

B) turn on Ne gas puff from 0.3-1.3 seconds at 3.0 psi. Adjust pressure as necessary to get steady, radiative discharge.

C) switch to Ar gas puff at 1.5 psi. Adjust pressure as necessary to get steady, radiative discharge.

D) switch to Kr gas puff at 0.5 psi. Adjust pressure as necessary to get steady, radiative discharge.

****CELL ACCESS TO SWITCH GAS BOTTLES IF ON SCHEDULE****

E) switch to Xe gas puff at 0.25 psi. Adjust pressure as necessary to get steady, radiative discharge.

F) switch to N gas puff at 4.0 psi. Adjust pressure as necessary to get steady, radiative discharge.
Entered: Mar 25 2008 04:37:16:630PM
Author: Marco Ferrara
Detailed instructions for the second half run, MP#517 "Experimental test of a Kalman filter for the vertical position"

1) load shot 1071211009 as the target equilibrium (k=1.7, control gains to their
nominal values P=4 D=6, one of the shots from the similar experiment run in
December).

2) Click on OBSERVERS, then on dpcs_kalmanfull2_zcur. A widget will open. Remove
this procedure.

3) Click on OBSERVERS, then on New. Choose dpcs_kalman_zcur from the scroll-down
menu.

4) Click on OBSERVERS, then on dpcs_kalman_zcur. A widget will open. Fill out
the fields like follows:
- write {ZCUR_phys_noise:16e6,Chopper_Gain:200.} in Parameters. Check the box
for IDL Value.
- write [0.8,2.0] in Switch Times.
- write 10 in Wires.
Then click Apply and Dismiss. Double-check that it took the inputs by re-opening
the widget.

5) Run the shot. In this case the Kalman will output on wire 10 so that we can
monitor the output before operating the filter in the loop (1-2 shots).

6) Change the number in Wires from 10 to 3. This will switch the output of the
filter to the fast vertical control wire: the Kalman is now in the loop.

7) Run the shot and check the results (1-2 shots).

8) If everything looks fine, push the elongation, until disruption (1-2 shots).

9) Now increase the derivative gain from D=6 to 8 or 10. The rationale here is
that without noise we might be able to increase the derivative gain and maybe
control higher elongations (2-3 shots).

10) Go back to the initial derivative gain (D=6) and lower the proportioanl gain
(P=2.5) to excite the low frequency vertical resonance. Here we want to see how the filter behaves when the real system follows a dynamic that is not included in the model of the filter (2-3 shots).

11) End of the half run. Total 7-12 shots.

Physics Operators Plans
Entered: Mar 25 2008 02:04:24:617PM
Author: Ian Hutchinson
Run begins at 09:00 and ends at 17:00
Power systems as on: 1080325
Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid ENABLED (PG4)
fill B-side lower with 3 psi Neon Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi Helium 4 Hybrid ENABLED (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): no
DNB(yes/no): yes
Cryopump (yes/no): yes

Vessel temperature: 35/35/35

---------------
ECDC Parameters
---------------

gas and pressure: Helium at 5e-5 Torr
sweep: 44/45/103 cm
scan: 20/120 s


Session Leader Summaries
Entered: Mar 26 2008 09:36:41:200AM
Author: Alex Graf
As of shot 2. Vispec is looking at Ne VIII at 433 nm. The view is the outerwall poloidal (4 channels spread evenly inside the separatrix)

Clear Stark broadening on D-gamma during RF. So much that the wing may contribute to the Ne line when present.
Entered: Mar 26 2008 01:22:20:403PM
Author: Matt Reinke
We got the the target discharge developed and one neon shot before everything went wrong. After a massive disruption on shot 005 there was nothing but fizzles. The outgassing from the antennnas makes the little data that was collected suspect. See the PL_SUMMAY for the post-mormtem. By the time the run switchover came around, a full length plasma had yet to be made.

Physics Operator Summaries
Entered: Mar 26 2008 04:07:14:200PM
Author: Ian Hutchinson
Summary
_______

Started ok with He plasmas. At or about shot 4 a leak opened up. Shot 4 had a
disruption caused by a big injection. Shot 5 was a very ugly runaway shot that
saturated the cameras and crunched on the inner wall. Thereafter we had nothing
but fizzles. ECDC in He or D2 was unavailing. The last attempt, shot 24, gave
a current up to nearly 100 kA for about .1s, with lots of runaways. At that
point the run was terminated and a visual inspection called for.

Scorecard:
__________
6 plasmas 18 fizzles. (Average shot to bits.)

Session Leader Comments
Mar 26 2008 09:15:27:823AM1080326001Matt ReinkeFirst shot, loading 1080116014 and tweaking for He plasma. No impurity puff, trying to get the Mo background and make sure everything is working.

RESULT: RF=3 MW, a little hashy. Density WAY overshoots early and SS nl04=1.3. Radiation seems low for 3 MW.

NEXT: Repeat

Mar 26 2008 09:29:56:027AM1080326002Matt ReinkeBetter. The density is more controlled, but still higher than desired. E-Port trips. LYMID during RF pulse is 10 kW/m^2, likely ANT outgassing.

Next: try and lower density, and get RF working.
Mar 26 2008 09:42:28:290AM1080326003Matt ReinkeGood shot minus the injections. RF is great at 3.3 MW out of just D & E. Start on the impurity puffing.

NEXT: 3.1 psi of Ne from 0.3-1.3
Mar 26 2008 10:00:36:150AM1080326004Matt ReinkeStarts to get steady, but appears that a high-Z injection at 0.76 (on x-rays) kills the plasma. Doesn't appear to be Mo based on HIREXSR. Probably not Ne puff, which seems about right.

NEXT: Repeat.
Mar 26 2008 10:11:58:540AM1080326005Matt ReinkeHorrible runaway shot with pyrotechnics (K-Port LIM?)

NEXT: Repeat 004

Physics Operator Comments
Mar 26 2008 09:04:31:167AMIan HutchinsonLoad from 1080116014.
Load segment 1 from 1080325030.
Segment 4 is the active segment. That says it is upper null.

Remove Pulse Gas 1 and 2 puffs in PCS.
Remove the step from the nl04 program.
Load.
Matt announces he wants cryopump. Increase fill to 50ms.
Load
Mar 26 2008 09:26:01:353AM1080326001Ian HutchinsonPlasma to rampdown. Crazy high density but it survives.

Delay early nl04 rise.
Mar 26 2008 09:43:28:933AM1080326002Ian HutchinsonPlasma to rampdown. Avoided marfe. Only 1.7MW RF.

Lower nl04 to .9 from 1.1.
Mar 26 2008 09:52:08:073AM1080326003Ian HutchinsonPlasma to rampdown. 3.3MW. NL04 got 1.1e20. Injections but otherwise good.

Program in gas puff PG1 from .3 to 1.3s.
Fill puff to 46ms.
Mar 26 2008 10:01:02:167AM1080326004Ian HutchinsonPlasma disrupts at .76s. Looks like a big injection.
Mar 26 2008 10:15:33:183AM1080326005Ian HutchinsonPlasma to .7s. Horrid runaway shot provoked by very strange startup.

Don't know what to do. Do nothing.
Mar 26 2008 10:58:10:040AM1080326006Ian HutchinsonFound there is a leak. Possibly the cause of the past shot problem.
Regen the cryopump. Base pressure at 1.5e-6 prior to recool.
Don't understand the various pressures we are seeing. Eventually
gets to 5e-7 so try a shot.

Fizzle. Lots of Carbon light and very little current.

Br offset to -.0003 from zero.
Mar 26 2008 11:11:04:450AM1080326007Ian HutchinsonFizzle. Very little current.

Fill puff to 40ms.
Mar 26 2008 11:42:35:917AM1080326008Ian HutchinsonFizzle. Fill was even higher, presumably because the pump was not working
at full speed.

ECDC in He for ten minutes. Purge cryopump nitrogen (as well as He).
Recool pump.
Mar 26 2008 11:57:22:307AM1080326009Ian HutchinsonFizzle. Cryopump did not pump so fill was way too high.

Turn off cryopump. Disable b-side lower (neon). No RF.
Br offset to -.0005
Mar 26 2008 12:10:24:323PM1080326010Ian HutchinsonFizzle.

Fill puff to 13ms. Br offset to 0.
Mar 26 2008 01:17:41:340PM1080326011Ian HutchinsonFizzle.

30 minute ECDC in Deuterium.
We will now give up on Helium plasmas because the first half of the
run is just about done with.

Br offset now zero. Fill puff 13ms.
nl04 demand to .8e20.
Mar 26 2008 01:36:57:903PM1080326012Ian HutchinsonFizzle. Weak current. No pump-out.

ICEF4 to -1350 from -1340A.
Mar 26 2008 01:45:38:293PM1080326013Ian HutchinsonFizzle.

ICEF4 to -1355 from -1350.
Mar 26 2008 01:56:51:810PM1080326014Ian HutchinsonFizzle. CII light is just over .02. This is higher than the first shot of the
campaign on Mar 16 2007.

Br offset to -.0003
Mar 26 2008 02:10:25:107PM1080326015Ian HutchinsonFizzle. Somewhat more gas current.

Rcur offset to 700 from 1000.
Mar 26 2008 02:21:05:793PM1080326016Ian HutchinsonFizzle. Breakdown slightly later.

ICEF4 to -1345 from -1355. Rcurr offset to 500.
Mar 26 2008 02:36:20:730PM1080326017Ian HutchinsonFizzle.

ICEF4 to -1335 from -1345. rcur offset to 700.
Mar 26 2008 02:51:20:123PM1080326018Ian HutchinsonFizzle.

ICEF4 to -1345. rcur offset to 800.
Mar 26 2008 02:56:42:077PM1080326019Ian HutchinsonFizzle.

Br offset to zero, from -.0003.
Mar 26 2008 03:11:43:077PM1080326020Ian HutchinsonFizzle.

Br offset to -.0005
Fill puff to 11ms.
Mar 26 2008 03:25:29:950PM1080326021Ian HutchinsonFizzle.

Fill puff to 20ms.
Mar 26 2008 03:42:56:433PM1080326022Ian HutchinsonFizzle. Base pressure is about 7e-7, not very low. Carbon still high.

Reload segment 1 from shot 1, in interests of showing I haven't done something
stupid.

Set fill puff to 14ms.
Mar 26 2008 03:53:50:637PM1080326023Ian HutchinsonFizzle.

Br offset to -.0007
Mar 26 2008 04:01:27:497PM1080326024Ian HutchinsonPlasma to .1s. Extremely ugly 100kA shot with runaways.


Engineering Operator Comments
ShotTimeTypeStatusComment
109:03:46:620AMPlasmaOk
209:17:57:730AMPlasmaOk
309:33:00:823AMPlasmaOk
409:50:05:183AMPlasmaOk
510:02:53:213AMPlasmaOk
610:39:19:950AMPlasmaOk
710:55:22:450AMPlasmaOk
811:08:15:713AMPlasmaOk
911:38:32:073AMPlasmaOk
1011:51:48:667AMPlasmaOk
1112:04:14:650PMPlasmaOk
1201:12:44:013PMPlasmaOk
1301:25:14:013PMPlasmaOk
1401:38:00:903PMPlasmaOk
1501:52:41:403PMPlasmaOk
1602:04:59:467PMPlasmaOk
1702:17:39:840PMPlasmaOk
1802:29:57:123PMPlasmaOk
1902:42:19:090PMPlasmaOk
2002:54:44:607PMPlasmaOk
2103:07:12:137PMPlasmaOk
2203:19:33:310PMPlasmaOk
2303:32:15:387PMPlasmaOk
2403:44:42:090PMPlasmaOk

System Availability
Mar 26 2008 09:03:38:103AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Mar 14 2008 11:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyes16 Channels now working - low freq. side - outer RmidsFeb 19 2008 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoProblems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible.Feb 15 2008 02:07PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK.Feb 21 2008 08:51AM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesworkingFeb 29 2008 07:00PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSystem is connected....there have been problems with getting data on the week of 3/18-3/20, but the system seems to be OK for 3/21. channels 50,60,88 and 110 are connected.Mar 21 2008 08:12AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes12 polychromators (#1~8,9,11,13,15), 1 laser. Density is calibrated for YAG1 based on ECE cutoff data taken on Mar11. YAG2 is offline. Mar 14 2008 09:59AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014).Mar 17 2008 10:26AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operational, but channels have been dying...stay tuned.Mar 14 2008 11:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke