| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change |
| Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes |
| BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec,rowan |
| Bolometers | yes | Diode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration. | Mar 14 2008 11:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke |
| Boronization | no | First Boronization 5/9/07 Bottle has been removed from the cell | Sep 14 2007 12:42PM (dekow) | Jim Irby | Boronization | dekow,irby |
| CNPA | yes | Single channel CNPA available as of 12/1707 | Dec 17 2007 05:48PM (parker) | Ron Parker | Compact Neutral Analyzer | parker |
| Cryopump - Upper Divertor | yes | Cryopump is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard |
| CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Nov 27 2007 10:21AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan |
| D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Nov 26 2007 04:23PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe |
| Dalsa | yes | optics repaired, camera re-installed, and view has been re-calibrated | Nov 27 2007 09:54AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar |
| Disruption Mitigation | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte |
| Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry |
| Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry |
| DNB | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | beals,granetz |
| FRC-ECE | yes | 16 Channels now working - low freq. side - outer Rmids | Feb 19 2008 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips |
| G-Side Ratiomatic | yes | Gauge is operational and calibrated against G-side MKS on shot#1071127002 | Nov 27 2007 01:25PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland |
| GPC | yes | All 9 channels operational as of new year. | Jan 03 2008 09:31AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt |
| GPC2 | yes | Most channels operational. | Jan 02 2008 12:22PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt |
| GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben |
| H/D | yes | Should be operational for the FY08 campaign | Nov 27 2007 09:54AM (marmar) | Earl Marmar | H/D Ratio | marmar |
| Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice |
| Hirex Sr | no | Be Window has a leak and so the gate valve is closed | Nov 23 2007 12:50PM (ince) | John Rice | High Resolution X-Ray | ince,rice |
| HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt |
| ICRF D-Antenna | yes | available (quarter-wave transformer for pre-matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin |
| ICRF E-Antenna | yes | available (with FFT for automatical matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin |
| ICRF J-Antenna | yes | normally in [0,pi,pi,0] phase for heating. current drive phase available if requested. | Dec 11 2007 09:03AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin |
| Lower Hybrid | yes | Body I Fault Circuits Repaired and tested. High power tests completed | Dec 05 2007 06:40PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker |
| LPI | yes | 1/9/08 | Jan 09 2008 03:23PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar |
| Ly-alpha | yes | Midplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree. | Dec 09 2007 06:53PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke |
| McPherson | no | Problems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible. | Feb 15 2008 02:07PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry |
| Michelson | yes | Working, moderate speed for now. | Jan 02 2008 01:19PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt |
| MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard |
| MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard |
| MSE | no | We are basically awaiting the DNB & its new aperture. MSE itself is OK. | Feb 21 2008 08:51AM (jinseok) | Steve Scott | Motional Stark Effect | jinseok,sscott |
| Neutrons | yes | Voltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts. | Nov 26 2007 08:31AM (fiore) | Catherine Fiore | Neutron Detectors | fiore |
| Neuts and Hards | yes | calibration unchanged from 2007 campaign | Dec 04 2007 08:56PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby |
| NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. | Nov 26 2007 04:26PM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry |
| PCI | yes | working | Feb 29 2008 07:00PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab |
| Penning Gauges | yes | All gauges except B_DivL are operating | Nov 27 2007 01:31PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard |
| Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Nov 26 2007 04:27PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe |
| Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby |
| Probe Array - ISD | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard |
| Probe Array - LH | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard |
| Probe Array - OSD | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard |
| Probe Array - UDIV | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard |
| Reflectometer | yes | 50, 60, 88 and 110 are connected (75 is being repaired). variable freq. and 140 are also connected but not functioning properly | Apr 03 2008 12:20PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar |
| Scanning Probe - ASP | yes | Operational, but needs to be checked with plasma. | Nov 27 2007 01:45PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard |
| Scanning Probe - FSP | yes | FSP is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard |
| Scanning Probe - WASP | yes | A- and K-port WASP electrodes have been replaced/tested. | Nov 27 2007 01:44PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick |
| TCI | yes | CO2 Laser is on --- initial alignment complete | Nov 16 2007 01:23PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray |
| TS - Core | yes | 12 polychromators (#1~8,9,11,13,15), 1 laser. Density is calibrated for YAG1 based on ECE cutoff data taken on Mar11. YAG2 is offline. | Mar 14 2008 09:59AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma |
| TS - Edge | yes | System is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014). | Mar 17 2008 10:26AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma |
| Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
| XTOMO | yes | system operational, but channels have been dying...stay tuned. | Mar 14 2008 11:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |