Alcator C-Mod Run 1080415 Information

Back to runs

Miniproposals
Miniproposal:538
Date Filed: 2/21/2008
Title:Er Profile Studies
First Author:Rachael Mcdermott
Session Leader:Rachael Mcdermott (shots 1-30)

Operators
Session leader(s):Rachael Mcdermott
Physics operator(s):Earl Marmar
Engineering operator(s):Bill Cochran,Bill Byford

Engineering Operator Run Comment
MP 538 Radial Electric Field Profile Studies SL: R. McDermott Po: E. Mar

Session Leader Plans
Entered: Apr 15 2008 12:03:10:317PM
Author: Rachael Mcdermott
MP 538 day two
Requires good boronization and good beam performance 6A+ and fast modulation (40ms high/20ms low)
Use same boronization recipe as was used for 4/14

This run day will test the reproducibility of a few phenomena observed on Day 1 of MP 538 as well as completing the target discharges that were not obtained due to the loss of J, on 3/21/08.

Goal: The purpose of this experiment is to study th radial and temporal behavior of the edge radial electric field before and during L-H transistions in order to characterize the role the field plays in the transition and the effect the structure of the field has on H-mode confinement.

Sections:
1) High power EDA and changing stored energy in a given EDA
2) USN shots and slow transition dynamics
3) Triangularity scan
4) DIII-D matching discharges

1.1 LSN, Equilibrium=1080321010, Ip=800kA, nl04=0.8x1020m-2, ICRF=2MW steady
1.2 LSN, Equilibrium=1080321010, Ip=800kA, nl04=0.8x1020m-2, ICRF=3.5+MW steady
1.3 LSN, Equilibrium=1080321010, Ip=800kA, nl04=0.8x1020m-2, ICRF=ramp 1.5MW to Max available
1.4 LSN, Equilibrium=1080321010, Ip=800kA, nl04=0.8x1020m-2, ICRF=two tiers, 2MW to 3.5MW

2.1 USN, Equilibrium=1070830012, but δU=0.53 (instead of 0.63), Ip=800kA, nl04=0.8x1020m-2, ICRF=ramp to find threshold power 1MW to 3MW?
2.2 USN, equilibrium=1070830012, δU=0.53Ip=800kA, nl04=0.8x1020m, ICRF=flat pulse just at threshold power
2.3 USN, equilibrium=1070830012, δU=0.53, Ip=800kA, nl04=0.8x1020m, ICRF=two tier pulse just at threshold power, and then max power
2.4 USN, equilibrium=1070830012, δU=0.53, Ip=800kA, nl04=0.8x1020m, ICRF=max available steady power
2.5 USN, equilibrium=1070830012, δU=0.75, Ip=800kA, nl04=0.8x1020m-2, ICRF=ramp to find threshold power 1MW to 3MW?
2.6 USN, equilibrium=1070830012, δU=0.75, Ip=800kA, nl04=0.8x1020m-2, ICRF=flat pulse at threshold power

3.1 LSN, Equilibrium=1080321010, δU=0.53, Ip=800kA, nl04=0.8x1020m-2, ICRF=2-2.5MW
3.2 LSN, Equilibrium=1080321010, δU=0.75, Ip=800kA, nl04=0.8x1020m-2, ICRF=2-2.5MW

4.1 LSN, Equilibrium=1080321013, tweak elongation until best match to DIII-D equilibrium is obtained, IP=1.1MA, nl04=1.1x1020m-2, ICRF=2.75MW flat pulse, Want Ne pedestal=~3e20 m^-3 and Te pedestal~450eV


Physics Operators Plans
Entered: Apr 14 2008 05:31:57:663PM
Author: Earl Marmar
Tuesday, 15 April
MP 538 Radial Electric Field Profile Studies

SL: R. McDermott
Po: E. Marmar

-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1080321010

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid enabled(PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA 10 psi deuterium, enabled

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): yes
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes, ready for first shot, all 4 transmitters; minimum 3.5 MW total for some shots in the plan, up to max available
LH(yes/no): no
DNB(yes/no): yes
Cryopump (yes/no): no

Overnight boronization using the same recipe as for 1080414:

20% diborane/80% helium
TC6 foreline pressure: 50 mTorr
rmin/rdwell/rmax: 44/75/80 cm
tdwell/tsweep: 60 /120s
EF4 current: 200 A
Pressure change in the bottle: 60 psi

Post boronization ECDC
----------------------------
1st Gas Setup:
Gas: helium
sweep: 44/103/45 cm
tdwell/tsweep 20/120 s
Pressure: 5e-5 Torr
Duration: 1 hr

2nd Gas Setup
Gas: d2
sweep: 44/103/45cm
tdwell/tsweep: 20/120 s
Pressure: 2e-4 Torr
Duration: 1hr

------------------------------------------

Session Leader Summaries
Entered: Apr 15 2008 07:59:26:213PM
Author: Rachael Mcdermott
This was a good run day in terms of machine, RF, and beam performance, and yet still didn't quite get all data we wanted! Total of 30 shots, 2 fizzles, no disruptions. Beam behaved itself well at ~6amps, 40ms/20ms modulation all day. The ICRF cleaned up to 2-3MW quickly, in the morning, but it took until the afternoon to get steady operation at higher powers.

There were 4 sections to this run.
1) High power EDA and changing stored energy in a given EDA
2) USN shots and slow transition dynamics
3) Triangularity scan
4) DIII-D matching discharges

Section one was only partially completed, due to the inability to get steady 3.5+MW of ICRF in the morning, we moved on to get some of section 2, instead of dwelling on this too long. However, several beam pulses were obtained in steady ICRF portions between trips, and will hopfully give the desired comparison. Aditionally, more data at higher ICRF powers was collected in LSN EDA's at the end in a very similar shape.

The USN section was acutally quite successful, although it took a while to obtain the desired data, and we only ran a single triangularity. The L-H transition in USN seemed to be VERY sensitive to density and v. small changes in density changed the threshold significantly, from unobtainable 4+MW to obtainable 2.75MW. This phenomena, although not what we wanted to see, was quite interesting, and unexplored. Some enhanced L-modes were obtained as well as both ELM-free and steady EDA H-modes in USN.

Section 3, the triangularity scan was dropped, there was not enough time to comlete this section

Section 4 was a plasma shape and parameter match to an Alcator discharge from 2000 that was used in pedestal comparision studies with DIII-D, the idea being to repeat this discharge as closely as possible, and compare the edge rotation velocities and and Er well structure between the two machines. The shape was easy to reproduce, only took 2 discharges, however we were unable to reproduce our own density and temperature profiles! perhaps due to the changes in divertor configuration between then and now? The pressure profiles between then and now matched very well, but typically the density from today was too high, and the temperature was too low. There were shots where either the density or temperature profiles were matched, but not both simultaneously. There were also significant differences in SOL electron density between the two sets of data.


CXRS data was generally good today. Poloidal data, as usual, better than toroidal. Also, LSN data seemed in general to be better and produce less scatter in the results than USN data even for similar stored energies and pedetsal parameters /?? why? I don't know.

Physics Operator Summaries

Session Leader Comments
Apr 15 2008 09:12:15:710AM1080415001Rachael McdermottFizzle. CXRS cameras are fine, and Datx worked
Apr 15 2008 09:27:22:363AM1080415002Rachael McdermottPlasma, no RF. density/pressure too high.

next to no CXRS signal, beam attenuation too high from edge pressure?
Apr 15 2008 09:41:28:577AM1080415003Rachael McdermottPlasma.
Little bit of ICRF, no H-mode.
Edge pressure very high. Still no CXRS signal, barely seeing the beam, edge pressure is still too high.
next shot, same thing, try to outgas the walls.



Apr 15 2008 09:52:55:743AM1080415004Rachael Mcdermottfizzle-ish


Apr 15 2008 10:09:04:113AM1080415005Rachael Mcdermottplasma. H-mode, but not steady.
CXRS signal is a little better, target density is right on before the H-mode. edge pressure still v. high once RF comes on.
try again.

Apr 15 2008 10:24:38:800AM1080415006Rachael Mcdermottplasma. Good steady H-mode
Got the CXRS profiles I need in the 2MW EDA
need to condition the ICRF for higher powers.
move the ICRF timing for the second tier up to 1s.
enabling ninja again next shot
turning down argon puff to 85ms

Apr 15 2008 10:41:52:890AM1080415007Rachael Mcdermottplasma, H-mode, good cx data in first half, but can't pull anything out of the second half when the ICRF is tripping. repeat until for steadier high power RF

beam current dropping, moving beam timing to 60ms high, and 20ms low, edge pressure much better until the end of the shot

Apr 15 2008 10:57:18:667AM1080415008Rachael Mcdermottplasma, H-mode, good cx data in first half, but can't pull anything out of the second half when the ICRF is tripping.
repeat, asking for only 3.5MW from ICRF instead of 4.

Apr 15 2008 11:17:38:197AM1080415009Rachael Mcdermottmysterious loss of RF data?
still not steady RF. v. little CX past 1s

Apr 15 2008 11:49:03:990AM1080415010Rachael McdermottYay. two beam pulses in the solid portion of the 3.5+MW
repeat this shot, but flat pulse 3.5MW of ICRF.

Apr 15 2008 12:43:16:643PM1080415013Rachael McdermottStill no H-mode, threshold power is higher than it was for the original shot last summer. Try going back to original triangularity ~0.63 and see if that affects H-mode threshold
Apr 15 2008 12:58:25:000PM1080415014Rachael McdermottStill no H-mode.
lowering the density a bit, turning off ninja, and trying again!
Apr 15 2008 01:14:14:653PM1080415015Rachael McdermottGot an H-mode. good, but odd. went in at 2.5MW, when it didn't go in before at 4MW and the densities were similar!

Repeat this shot, with ICRF=2.5MW flat
Apr 15 2008 02:24:53:880PM1080415016Rachael McdermottGood shot, nice EDAish H-mode at the end.
Apr 15 2008 02:24:20:080PM1080415017Rachael McdermottDropped RF power just a little bit, trying to extend super L-mode phase. worked, and plasma returns to enahnced L-mode after the ELM-free H-mode.
Apr 15 2008 02:23:12:317PM1080415018Rachael McdermottIncreased RF 3-4MW during H-mode, did not see much of an effect
Apr 15 2008 02:22:07:237PM1080415019Rachael McdermottGood shot, but trying to get a higher stored energy point for comparison to the 100kJ, and not getting it.

Next shot, increase the target density just al ittle bit, and RF=flat 4MW.
Apr 15 2008 03:17:16:623PM1080415022Rachael McdermottStarting trying to match te DIII-D discharge
Ip needs to increase to 1.1 next shot. Density pedestal is very close, temperature pedestal needs to be increased a bit.

The shape is close, elongation needs to be reduced a little bit more.
Next shot increase RF to 3.5MW
Apr 15 2008 03:51:15:650PM1080415024Rachael McdermottGood match on the shape, the density pedestal is still a little high and the tmperature pedestal a little low. Dropping the target density from 0.95 to 0.8x10^20 and keeping the RF the same.
Apr 15 2008 07:43:34:763PM1080415026Rachael Mcdermottdropping the density didn't help, pedestal just as high. dropping RF power next shot, to better match original shot
Apr 15 2008 07:42:21:357PM1080415027Rachael Mcdermotttarget density 1e20 from 03.9e20. good shot, still not quite what we want, but beautiful EDA especially for the end of the day. great beam performance
dropped RF to 2.7MW actually improved confinement.

Apr 15 2008 07:39:12:810PM1080415028Rachael McdermottIncrease the target density to try and match 1000616004, see if this adjusts the density pedestal height.

funny droop in the density, stored energy, etc... what's causing that?

Apr 15 2008 07:37:55:993PM1080415029Rachael McdermottTry this time increasing the RF power mid EDA to try and increase the temperature pedestal, but keeping the starting EDA conditions the same.

Apr 15 2008 07:36:44:650PM1080415030Rachael McdermottGood last shot Temperature profiles finally coming up, to match 1000616004, but density is high, still should be in the range of matchability with the DIII-D data set.

Physics Operator Comments
Apr 15 2008 09:11:46:587AM1080415001Earl Marmarload 1080321010
import segment 1 from 1080409010 into segment 1

fizzle
Apr 15 2008 09:29:49:350AM1080415002Earl MarmarBR_0 offset to 0.0000 from -.0005 T
reduce prefill puff 3 msec (to 19 msec)

plasma
breakdown looks ok
early marfe, high neutral pressure, lots of wall fueling

usual suspects on the RGA after the shot (boron, fluorine)
Apr 15 2008 09:47:29:927AM1080415003Earl Marmarreduce prefill puff 2 msec to 17 msec

plasma
neutral pressure a bit lower before ICRF, then rises during
Apr 15 2008 09:57:03:667AM1080415004Earl Marmarnl_04 target to 7e19

gets to 140kA and then dies (35 msec)
looks like it lurches up vertically, and then takes a dive
Apr 15 2008 10:11:24:540AM1080415005Earl MarmarBR_0 offset to -.0005 T

plasma
bounce to the outside on startup

H-modes
neutral density still high during ICRF
Apr 15 2008 10:21:24:763AM1080415006Earl Marmarno dpcs changes

plasma
startup looks ok
early marfe
first H-mode is steady, 2 MW ICRF
Apr 15 2008 10:50:20:723AM1080415007Earl Marmarreduce argon puff to 85 msec (from 100), starting at .3 seconds

plasma
rediated power in H-mode reduced by about 30%
Apr 15 2008 10:50:39:177AM1080415008Earl Marmarno dpcs changes

plasma
Apr 15 2008 11:29:14:503AM1080415009Earl Marmarreduce argon puff to 75 msec (from 85 msec), starting at .3 seconds

plasma

trouble with ICRF data acquisition computer, no data
Apr 15 2008 11:31:06:770AM1080415010Earl Marmarno dpcs changes

small mass 28 excursion about 15 minutes after shot 9, then came down in about 5 minutes

delay before the shot for ICRF data acquisition
Apr 15 2008 11:48:31:053AM1080415010Steve Wolfe
Filling in for Earl as Physop while he goes to Post Office
Shot#10: plasma, steady EDA, looks good. 
E-port still faulting, D and J steady. 

Next: repeat with RF flat (we hope) at 3.5MW

Apr 15 2008 12:07:24:867PM1080415011Steve Wolfe
Shot#11: repeat with RF flat (we hope) at 3.5MW
Preparing for USN (step 2.1):
Imported segment 3 from 1070830012 (USN) and recalculated
predictors. Loaded with seg3 still OFF; need to move rxu to get reduced
triangularity when we're ready for that. 

plasma, steady H-mode. RF a little choppy after 1sec
Bouncy startup; almost lost it. 

Next: pg4 from 17 to 19msec, move seg3 rxu from -.02 to -.01 

Apr 15 2008 12:16:24:107PM1080415012Steve Wolfe
Shot#12:  pg4 from 17 to 19msec, 
move seg3 rxu from -.02 to -.01 
Go to USN case 2.1 (seg2 off seg3 on)

plasma full length, looked like upper null. 
Earl's back. 


Apr 15 2008 12:43:42:957PM1080415013Earl Marmarincrease RXU 8 mm
increase prefill puff 2 msec to 21 msec

plasma
startup looks ok

delta_upper ~ .52
Apr 15 2008 12:58:39:797PM1080415014Earl MarmarRXU to -.02 (from -.002)

plasma

delta_upper ~ .61
Apr 15 2008 01:15:10:827PM1080415015Earl Marmarlower nl_04 target to 5.5e19 (from 6e19)
turn off ninja

plasma

H-modes this time
short ELM-freeish period, brief L, then EDA H-mode.
Apr 15 2008 01:43:22:393PM1080415016Earl Marmarno dpcs changes

plasma
Apr 15 2008 01:43:05:970PM1080415017Earl Marmarno dpcs changes

plasma
short H-mode
Apr 15 2008 02:01:13:750PM1080415018Earl Marmarturn off the pg3 preprogram voltage (was ~20) after .3 seconds

plasma
2 H-modes, first ELM-freeish, then EDA
Apr 15 2008 02:15:24:887PM1080415019Earl Marmarno dpcs changes

plasma
Apr 15 2008 02:37:10:467PM1080415020Earl Marmarnl_04 target to 6.5e19

plasma

first H-mode is a contender, but tends toward ELM-free
Apr 15 2008 03:34:35:603PM1080415021Earl Marmarnl_04 target to 7.2e19

plasma
Apr 15 2008 03:09:07:070PM1080415022Earl Marmarload from 1080321013 (LSN 1 MA)
import segment 1 from 1080415021 into segment1
nl_04 target to .95e20
ZXU increased 1 cm
argon puff to 75 msec, starting at .3 seconds

plasma
Apr 15 2008 03:26:10:580PM1080415023Earl MarmarIp to 1.1MA
ZXU decrease 1 cm
ZCUR down 5 mm (now -.015 m)
RXU decrease 1 cm

camac init failures, no power shot

Apr 15 2008 04:08:11:207PM1080415024Earl Marmarno additional dpcs changes

plasma
Apr 15 2008 04:06:32:270PM1080415025Earl Marmarnl_04 target to 8e19

plasma
Apr 15 2008 04:26:31:003PM1080415027Earl Marmarnl_04 target to 1e20

plasma

steady EDA H-mode
Apr 15 2008 04:43:16:563PM1080415028Earl Marmarnl_04 target to 1.1e20

plasma
Apr 15 2008 05:06:14:957PM1080415029Earl Marmarno dpcs changes

plasma
Apr 15 2008 05:05:45:143PM1080415030Earl Marmarno dpcs changes

plasma

Engineering Operator Comments
ShotTimeTypeStatusComment
109:07:37:050AMPlasmaOk
209:20:17:200AMPlasmaOk
309:33:08:760AMPlasmaOk
409:48:30:287AMPlasmaOk
510:01:05:250AMPlasmaOk
610:13:37:913AMPlasmaOk
710:29:57:473AMPlasmaOk
810:43:13:983AMPlasmaOk
910:56:38:323AMPlasmaOk
1011:43:57:040AMPlasmaOk
1111:58:29:627AMPlasmaOk
1212:13:56:653PMPlasmaOk
1312:29:09:023PMPlasmaOk
1412:45:06:960PMPlasmaOk
1501:01:57:503PMPlasmaOk
1601:17:32:047PMPlasmaOk
1701:32:56:667PMPlasmaOk
1801:49:40:960PMPlasmaOk
1902:05:08:177PMPlasmaOk
2002:24:17:770PMPlasmaOk
2102:49:12:117PMPlasmaOk
2203:06:33:380PMPlasmaOk
2303:24:43:923PMPlasmaBadCritical Failure during countdown
2403:39:06:780PMPlasmaOk
2503:52:38:540PMPlasmaOk
2604:09:24:537PMPlasmaOk
2704:22:45:703PMPlasmaOk
2804:35:30:807PMPlasmaOk
2904:50:19:130PMPlasmaOk
3005:02:47:780PMPlasmaOk

System Availability
Apr 15 2008 09:07:27:863AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Mar 14 2008 11:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoFirst Boronization 5/9/07 Bottle has been removed from the cellSep 14 2007 12:42PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyes16 Channels now working - low freq. side - outer RmidsFeb 19 2008 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoProblems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible.Feb 15 2008 02:07PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesWorking, moderate speed for now.Jan 02 2008 01:19PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK.Feb 21 2008 08:51AM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesworkingFeb 29 2008 07:00PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoSystem has been disconnected on 1080410000Apr 10 2008 11:57AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesCO2 Laser is on --- initial alignment completeNov 16 2007 01:23PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOne laser operational, 12 spatial channelsApr 11 2008 10:36AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014).Apr 11 2008 10:36AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operational, but channels have been dying...stay tuned.Mar 14 2008 11:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke