| Session Leader Comments |
| Apr 29 2008 07:57:20:673AM | 1080429001 | Greg Wallace | Starting with conditions from 1080424003 for LH system.
|
| Apr 29 2008 09:43:36:613AM | 1080429003 | Greg Wallace | Great shot! Plasma until rampdown, clean LH pulse. Will move on to density ramp at 75 degree phasing.
|
| Apr 29 2008 10:11:50:637AM | 1080429004 | Greg Wallace | Clean shot. Density ramp looked great, 3.6-5.8e19 on nl_04. Will repeat at 105 phasing with 80ms of argon puffing.
|
| Apr 29 2008 10:20:06:407AM | 1080429005 | Greg Wallace | Early trips caused by 6T. Will switch to 90 degree phasing where we have usually have more luck as the second phase.
|
| Apr 29 2008 10:37:08:857AM | 1080429006 | Greg Wallace | Clean shot at 90 degrees, density ramp from 3.8-6e19. Looking back at processed HXR data from shot 4, seems like we started the density ramp quite close to the edge of the drop in HXR emission. Will go back and repeat the low density ramp at 75 and 90 degrees, delaying the ramp until .75s and requesting a bit lower density before the LH comes on.
|
| Apr 29 2008 10:49:02:570AM | 1080429007 | Greg Wallace | Clean shot, but density is still 3.7e19 at .75s. Will try one more time to go lower in density by programming lower and turning off the argon.
|
| Apr 29 2008 11:23:43:020AM | 1080429008 | Greg Wallace | Arcing in 23 bottom waveguides. Will turn down power on klystron 12 to 100kW.
|
| Apr 29 2008 11:35:55:027AM | 1080429009 | Greg Wallace | Clean shot, got the density scan we wanted at 75 degrees. Moving on to same shot at 90 degrees.
|
| Apr 29 2008 11:52:02:493AM | 1080429010 | Greg Wallace | Clean shot at 90 degrees, got the density ramp we want. Will move on to 6.2T at 75 degrees.
|
| Apr 29 2008 12:07:26:270PM | 1080429011 | Greg Wallace | Clean shot at 75 degrees, 6.0T. Moving on to 90 degrees at 6.0T.
|
| Apr 29 2008 12:28:59:913PM | 1080429012 | Greg Wallace | Locked mode? LH ran clean but Ip takes a dive around .85s. Will repeat to see if we can avoid the locked mode.
|
| Apr 29 2008 12:46:53:943PM | 1080429013 | Greg Wallace | One trip late in the shot, but otherwise clean at 90 degrees. No sign of locked mode. Going back to 75 degrees, but ramping density down instead of up.
|
| Apr 29 2008 01:00:15:377PM | 1080429014 | Greg Wallace | Density ramp didn't go quite as low as I would have liked and one trip early but otherwise clean. Will retry with ramp starting at a lower density.
|
| Apr 29 2008 01:16:32:683PM | 1080429015 | Greg Wallace | Density scan goes deeper, still not quite as low as we wanted, but moving on to higher power at 5.4T with the rising density.
|
| Apr 29 2008 01:30:35:180PM | 1080429016 | Greg Wallace | 17T caused one trip early in the pulse. Will increase the power for klystron 9 to 110kW and try again.
|
| Apr 29 2008 01:39:25:320PM | 1080429017 | Greg Wallace | One trip early, but otherwise clean. Will try next shot at ~450kW, then go on to the PM run.
|
| Apr 29 2008 01:59:15:270PM | 1080429018 | Greg Wallace | Clean shot around 500kW. Next shot will move on to MP541. LH will fire at 0.15s, 500kW.
|
| Apr 29 2008 02:19:56:270PM | 1080429019 | Greg Wallace | Many trips. ICRF doesn't seem to be helping with the coupling. Will try turning up klystron 9 a little to see if that helps with the high reflections on that channel. Going up to 2MW ICRF.
|
| Apr 29 2008 02:29:40:140PM | 1080429020 | Greg Wallace | Some overlap of LH and ICRH. Moving on to 3MW from J.
|
| Apr 29 2008 02:44:54:337PM | 1080429021 | Greg Wallace | Sustained LH + ICRF after .43s. Next shot will move on to 4MW ICRH.
|
| Apr 29 2008 03:07:25:167PM | 1080429022 | Greg Wallace | Te around 4keV from .45-.65s with LH on. Will try changing the He3 puff for next shot.
|
| Apr 29 2008 03:33:33:517PM | 1080429023 | Greg Wallace | First few trips 23bottom, later trips 17bottom. Nice hot plasma, though. Going on to 120 degrees.
|
| Apr 29 2008 03:38:38:130PM | 1080429024 | Greg Wallace | 120 doesn't look like it's going to work. Trying 105 phasing on next shot.
|
| Apr 29 2008 03:58:24:847PM | 1080429025 | Greg Wallace | Nothing but trips on the LH again, even at 105 phasing. Will attempt to increase the plasma density a bit to see if that helps.
|
| Apr 29 2008 04:17:26:020PM | 1080429026 | Greg Wallace | Shot looked much better with a little more density. Two sustained periods of LH with Te~3keV. Moving on to 3MW ICRF from J.
|
| Apr 29 2008 04:34:02:170PM | 1080429027 | Greg Wallace | Poor coupling caused many trips. Will try raising the density and keeping ICRF at 3MW.
|
| Apr 29 2008 04:51:34:060PM | 1080429028 | Greg Wallace | LH clean after trip at initial turn on. Next shot will go to 4MW and 1.2MA to try to increase the temperature as much as possible.
|
| Apr 29 2008 05:16:15:970PM | 1080429029 | Greg Wallace | Last shot of the day. Disruption at .55s. LH on rom .25 to .55s. ICRF tripped at .25s so Te never made it up very high.
|
| Physics Operator Comments |
| Apr 29 2008 08:09:28:980AM | | Joseph Snipes | It seems there is a problem with the backup UPS power supply for the power room. If it cannot be fixed soon we may delay or cancel the run depending on Jim Irby's decree.
|
| Apr 29 2008 08:51:55:403AM | 1080429001 | Joseph Snipes | Shot 1: Test shot to test the data system.
|
| Apr 29 2008 09:02:12:190AM | 1080429002 | Joseph Snipes | Shot 2: EF4 test shot.
|
| Apr 29 2008 09:40:11:330AM | 1080429003 | Joseph Snipes | Shot 3: Loaded shot 1080424003, which uses segment 3 as the main segment and has a SNU plasma at 0.8 MA, 5.4 T, with nl04 = 4 x 10^19 m^-3. Increased prepuff to 54 ms duration. Good shot!
|
| Apr 29 2008 09:57:58:250AM | 1080429004 | Joseph Snipes | Shot 4: Changed nl04 programming to ramp down to 3 x 10^19 m^-2 at 0.6 s and then begin ramping up at 0.7 s and reach 6 x 10^19 m^-2 by 1.2 s and then begin ramping the density down at 1.3 s to zero by 1.5 s. Good shot.
|
| Apr 29 2008 10:12:19:200AM | 1080429005 | Joseph Snipes | Shot 5: Repeat with argon puff from 0.3 to 0.38 s. Good shot except the LH tripped.
|
| Apr 29 2008 10:26:59:257AM | 1080429006 | Joseph Snipes | Shot 6: Increased prepuff by 2 ms to 56 ms duration. Good shot.
|
| Apr 29 2008 10:58:43:187AM | 1080429007 | Joseph Snipes | Brief delay to inspect EF4 power supply due to an I^2t limit that is not resetting.
|
| Apr 29 2008 11:01:53:487AM | 1080429007 | Joseph Snipes | Shot 7: Reloaded shot 5 and changed nl04 to start a ramp at 2.8 x 10^19 m^-2 at 0.75 s and ramp up to 6 x 10^19 m^-2 at 1.2 s. Good shot. The cryopump apparently burped and doubled the pressure at breakdown to nearly 0.13 mTorr and yet miraculously we still got breakdown and a decent current rise!
|
| Apr 29 2008 11:21:14:877AM | 1080429008 | Joseph Snipes | Shot 8: Disabled argon puff and changed nl04 to start a ramp at 2.2 x 10^19 m^-2 at 0.75 s and ramp up to 6 x 10^19 m^-2 at 1.2 s. Extended PG3 to 0.14 s at 65 V to avoid early runaways. Good shot but LH tripped.
|
| Apr 29 2008 11:34:08:700AM | 1080429009 | Joseph Snipes | Shot 9: Repeat without LH trips. Good shot.
|
| Apr 29 2008 11:59:58:250AM | 1080429010 | Joseph Snipes | Shot 10: Increased PG3 gas from 0.02 to 0.1 s in segment 1 to try to eliminate the early runaways. Good shot.
|
| Apr 29 2008 12:15:43:573PM | 1080429011 | Joseph Snipes | Shot 11: Raised TF current to 172 kA to go to 6.2 T until 1.25 s. Slightly changed the Ip rampdown as well. Good shot but the TF did not reach 6.2 T because the current limit is set to 165 kA. We'll stick with this TF to avoid having to repeat this shot.
|
| Apr 29 2008 12:29:33:867PM | 1080429012 | Joseph Snipes | Shot 12: Repeat at 90 degree phasing. Nearly locked mode (QSM quasi-stationary mode) from 0.85 - 0.99 s visible on the fast magnetic pick-up coils. Otherwise a good shot.
|
| Apr 29 2008 12:38:59:153PM | 1080429013 | Joseph Snipes | Shot 13: Repeat without the QSM. Good shot without the QSM.
|
| Apr 29 2008 12:55:58:543PM | 1080429014 | Joseph Snipes | Shot 14: Return to 150 kA TF current in segments 1 and 3. Set nl04 to 5 x 10^19 m^-2 until 0.75 s then negative to turn off the gas and ramp down the density during the LHCD. Good shot.
|
| Apr 29 2008 01:14:14:993PM | 1080429015 | Joseph Snipes | Shot 15: Reduced nl04 to 4 x 10^19 m^-2 and turn it off at 0.7 s. Good shot.
|
| Apr 29 2008 01:33:20:633PM | 1080429016 | Joseph Snipes | Shot 16: Reloaded shot 9 and then reloaded segment 1 from shot 15. Good shot.
|
| Apr 29 2008 01:40:17:940PM | 1080429017 | Joseph Snipes | Shot 17: Repeat with higher LHCD power. Good shot. The ratiomatic is again showing very high neutral pressure at breakdown above 0.09 mTorr. Apparently, the cryopump is not pumping as it should. It is surprising that we get a decent current rise at this high pressure.
|
| Apr 29 2008 02:05:25:510PM | 1080429018 | Joseph Snipes | Shot 18: Repeat with higher LHCD power and with some ICRF after 1.2 s. Good shot.
|
| Apr 29 2008 02:16:48:347PM | 1080429019 | Joseph Snipes | Shot 19: Now going to the ICRF+LHCD part of the day for MP541. Loaded segment 3 from shot 3 into segment 3 and changed PG2 in both segments 1 and 3 to have a 100 V He3 gas puff from 0.02 to 0.22 s. ICRF from 0.1 s to 0.6 s and LHCD from 0.15 s to 0.65 s. Both RF systems tripped but were on for some of the time. Otherwise it is a good shot.
|
| Apr 29 2008 02:32:27:907PM | 1080429020 | Joseph Snipes | Shot 20: Repeat to try to keep the RF from tripping. Good shot but the RF still tripped.
|
| Apr 29 2008 02:44:08:993PM | 1080429021 | Joseph Snipes | Shot 21: Repeat. Good shot.
|
| Apr 29 2008 02:57:25:643PM | 1080429022 | Joseph Snipes | Shot 22: Repeat. Good shot.
|
| Apr 29 2008 03:14:55:300PM | 1080429023 | Joseph Snipes | Shot 23: Reduced He3 puff to end at 0.15 s. Good shot.
|
| Apr 29 2008 03:33:20:563PM | 1080429024 | Joseph Snipes | Shot 24: Returned He3 puff to end at 0.22 s. Good shot.
|
| Apr 29 2008 03:52:58:983PM | 1080429025 | Joseph Snipes | Shot 25: Enabled argon gas and programmed the puff from 0.2 to 0.3 s. Turned off dpcs_ftae2, which has been on all day but is not being used. Disrupted at 1.65 s.
Hard x rays from 0.03 s until 1 s. Lots of runaways.
|
| Apr 29 2008 04:19:46:503PM | 1080429026 | Joseph Snipes | Shot 26: Increased argon to 140 ms duration out to 0.34 s. Increased prepuff by 5 ms to 61 ms duration. Increased PG3 in both segments 1 and 3 from 0.011 s through 0.28 s. Disrupted at 1.15 s. Mode clearly locks at 0.38 s on the fast magnetics data.
|
| Apr 29 2008 04:29:00:713PM | 1080429027 | Joseph Snipes | Shot 27: Raised nl04 to 6 x 10^19 m^-2 after 0.7 s. Granetz says there is some serious problem with the DNB but he is unable to tell exactly what the problem is without going into the cell. Disabled the DNB gate valve. Much better shot but the LHCD tripped early.
|
| Apr 29 2008 04:50:29:027PM | 1080429028 | Joseph Snipes | Shot 28: Increased nl04 to 6 x 10^19 m^-2 from 0.28 s until 1.5 s. Good shot.
|
| Apr 29 2008 05:09:00:463PM | 1080429029 | Joseph Snipes | Shot 29: Increased Ip to 1.2 MA to reach flattop by 0.56 s. Disrupted at 0.55 s.
|
| System Availability |
| Apr 29 2008 08:54:34:640AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec,rowan | | Bolometers | yes | Diode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration. | Mar 14 2008 11:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | First Boronization 5/9/07 Bottle has been removed from the cell | Sep 14 2007 12:42PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Single channel CNPA available as of 12/1707 | Dec 17 2007 05:48PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Cryopump is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Nov 27 2007 10:21AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Nov 26 2007 04:23PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | optics repaired, camera re-installed, and view has been re-calibrated | Nov 27 2007 09:54AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | beals,granetz | | FRC-ECE | yes | 16 Channels now working - low freq. side - outer Rmids | Feb 19 2008 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge is operational and calibrated against G-side MKS on shot#1071127002 | Nov 27 2007 01:25PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | All 9 channels operational as of new year. | Jan 03 2008 09:31AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jan 02 2008 12:22PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | Should be operational for the FY08 campaign | Nov 27 2007 09:54AM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Be Window has a leak and so the gate valve is closed | Nov 23 2007 12:50PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | available (quarter-wave transformer for pre-matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | available (with FFT for automatical matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | normally in [0,pi,pi,0] phase for heating. current drive phase available if requested. | Dec 11 2007 09:03AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | Body I Fault Circuits Repaired and tested. High power tests completed | Dec 05 2007 06:40PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | 1/9/08 | Jan 09 2008 03:23PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree. | Dec 09 2007 06:53PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Problems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible. | Feb 15 2008 02:07PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Dewar warm. | Apr 23 2008 09:04AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | We are basically awaiting the DNB & its new aperture. MSE itself is OK. | Feb 21 2008 08:51AM (jinseok) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Voltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts. | Nov 26 2007 08:31AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | calibration unchanged from 2007 campaign | Dec 04 2007 08:56PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. | Nov 26 2007 04:26PM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | working | Feb 29 2008 07:00PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | All gauges except B_DivL are operating | Nov 27 2007 01:31PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Nov 26 2007 04:27PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | System is fully connected except for the 75GHz channel. System was connected on 1080422. | Apr 22 2008 08:26AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational, but needs to be checked with plasma. | Nov 27 2007 01:45PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | FSP is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A- and K-port WASP electrodes have been replaced/tested. | Nov 27 2007 01:44PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | CO2 Laser is on --- initial alignment complete | Nov 16 2007 01:23PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | One laser operational, 12 spatial channels | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | System is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014). | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | system operational, but channels have been dying...stay tuned. | Mar 14 2008 11:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Apr 29 2008 11:47:12:427AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec,rowan | | Bolometers | yes | Diode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration. | Mar 14 2008 11:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | First Boronization 5/9/07 Bottle has been removed from the cell | Sep 14 2007 12:42PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Single channel CNPA available as of 12/1707 | Dec 17 2007 05:48PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Cryopump is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Nov 27 2007 10:21AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Nov 26 2007 04:23PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | optics repaired, camera re-installed, and view has been re-calibrated | Nov 27 2007 09:54AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | beals,granetz | | FRC-ECE | yes | 16 Channels now working - low freq. side - outer Rmids | Feb 19 2008 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge is operational and calibrated against G-side MKS on shot#1071127002 | Nov 27 2007 01:25PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | All 9 channels operational as of new year. | Jan 03 2008 09:31AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jan 02 2008 12:22PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | Should be operational for the FY08 campaign | Nov 27 2007 09:54AM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Be Window has a leak and so the gate valve is closed | Nov 23 2007 12:50PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | available (quarter-wave transformer for pre-matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | available (with FFT for automatical matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | normally in [0,pi,pi,0] phase for heating. current drive phase available if requested. | Dec 11 2007 09:03AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | Body I Fault Circuits Repaired and tested. High power tests completed | Dec 05 2007 06:40PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | 1/9/08 | Jan 09 2008 03:23PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree. | Dec 09 2007 06:53PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Problems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible. | Feb 15 2008 02:07PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Dewar recooled 4/29/08. Te may be unreliable until detector stabilizes. | Apr 29 2008 11:34AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | We are basically awaiting the DNB & its new aperture. MSE itself is OK. | Feb 21 2008 08:51AM (jinseok) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Voltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts. | Nov 26 2007 08:31AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | calibration unchanged from 2007 campaign | Dec 04 2007 08:56PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. | Nov 26 2007 04:26PM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | working | Feb 29 2008 07:00PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | All gauges except B_DivL are operating | Nov 27 2007 01:31PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Nov 26 2007 04:27PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | System is fully connected except for the 75GHz channel. System was connected on 1080422. | Apr 22 2008 08:26AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational, but needs to be checked with plasma. | Nov 27 2007 01:45PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | FSP is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A- and K-port WASP electrodes have been replaced/tested. | Nov 27 2007 01:44PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | CO2 Laser is on --- initial alignment complete | Nov 16 2007 01:23PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | One laser operational, 12 spatial channels | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | System is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014). | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | system operational, but channels have been dying...stay tuned. | Mar 14 2008 11:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Apr 29 2008 02:40:01:100PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec,rowan | | Bolometers | yes | Diode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration. | Mar 14 2008 11:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | First Boronization 5/9/07 Bottle has been removed from the cell | Sep 14 2007 12:42PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Single channel CNPA available as of 12/1707 | Dec 17 2007 05:48PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Cryopump is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Nov 27 2007 10:21AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Nov 26 2007 04:23PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | optics repaired, camera re-installed, and view has been re-calibrated | Nov 27 2007 09:54AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | beals,granetz | | FRC-ECE | yes | 16 Channels now working - low freq. side - outer Rmids | Feb 19 2008 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge is operational and calibrated against G-side MKS on shot#1071127002 | Nov 27 2007 01:25PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | All 9 channels operational as of new year. | Jan 03 2008 09:31AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jan 02 2008 12:22PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | Should be operational for the FY08 campaign | Nov 27 2007 09:54AM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Be Window has a leak and so the gate valve is closed | Nov 23 2007 12:50PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | available (quarter-wave transformer for pre-matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | available (with FFT for automatical matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | normally in [0,pi,pi,0] phase for heating. current drive phase available if requested. | Dec 11 2007 09:03AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | Body I Fault Circuits Repaired and tested. High power tests completed | Dec 05 2007 06:40PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | 1/9/08 | Jan 09 2008 03:23PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree. | Dec 09 2007 06:53PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Problems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible. | Feb 15 2008 02:07PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational | Apr 29 2008 02:30PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | We are basically awaiting the DNB & its new aperture. MSE itself is OK. | Feb 21 2008 08:51AM (jinseok) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Voltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts. | Nov 26 2007 08:31AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | calibration unchanged from 2007 campaign | Dec 04 2007 08:56PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. | Nov 26 2007 04:26PM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | working | Feb 29 2008 07:00PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | All gauges except B_DivL are operating | Nov 27 2007 01:31PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Nov 26 2007 04:27PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | System is fully connected except for the 75GHz channel. System was connected on 1080422. | Apr 22 2008 08:26AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational, but needs to be checked with plasma. | Nov 27 2007 01:45PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | FSP is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A- and K-port WASP electrodes have been replaced/tested. | Nov 27 2007 01:44PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | CO2 Laser is on --- initial alignment complete | Nov 16 2007 01:23PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | One laser operational, 12 spatial channels | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | System is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014). | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | system operational, but channels have been dying...stay tuned. | Mar 14 2008 11:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Apr 29 2008 03:30:35:013PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec,rowan | | Bolometers | yes | Diode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration. | Mar 14 2008 11:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | System Operational | Apr 29 2008 03:29PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Single channel CNPA available as of 12/1707 | Dec 17 2007 05:48PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Cryopump is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Nov 27 2007 10:21AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Nov 26 2007 04:23PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | optics repaired, camera re-installed, and view has been re-calibrated | Nov 27 2007 09:54AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | beals,granetz | | FRC-ECE | yes | 16 Channels now working - low freq. side - outer Rmids | Feb 19 2008 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge is operational and calibrated against G-side MKS on shot#1071127002 | Nov 27 2007 01:25PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | All 9 channels operational as of new year. | Jan 03 2008 09:31AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jan 02 2008 12:22PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | Should be operational for the FY08 campaign | Nov 27 2007 09:54AM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Be Window has a leak and so the gate valve is closed | Nov 23 2007 12:50PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | available (quarter-wave transformer for pre-matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | available (with FFT for automatical matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | normally in [0,pi,pi,0] phase for heating. current drive phase available if requested. | Dec 11 2007 09:03AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | Body I Fault Circuits Repaired and tested. High power tests completed | Dec 05 2007 06:40PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | 1/9/08 | Jan 09 2008 03:23PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree. | Dec 09 2007 06:53PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Problems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible. | Feb 15 2008 02:07PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational | Apr 29 2008 02:30PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | We are basically awaiting the DNB & its new aperture. MSE itself is OK. | Feb 21 2008 08:51AM (jinseok) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Voltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts. | Nov 26 2007 08:31AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | calibration unchanged from 2007 campaign | Dec 04 2007 08:56PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. | Nov 26 2007 04:26PM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | working | Feb 29 2008 07:00PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | All gauges except B_DivL are operating | Nov 27 2007 01:31PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Nov 26 2007 04:27PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | System is fully connected except for the 75GHz channel. System was connected on 1080422. | Apr 22 2008 08:26AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational, but needs to be checked with plasma. | Nov 27 2007 01:45PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | FSP is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A- and K-port WASP electrodes have been replaced/tested. | Nov 27 2007 01:44PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | CO2 Laser is on --- initial alignment complete | Nov 16 2007 01:23PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | One laser operational, 12 spatial channels | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | System is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014). | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | system operational, but channels have been dying...stay tuned. | Mar 14 2008 11:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Apr 29 2008 03:48:51:107PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec,rowan | | Bolometers | yes | Diode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration. | Mar 14 2008 11:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | System Operational | Apr 29 2008 03:29PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Single channel CNPA available as of 12/1707 | Dec 17 2007 05:48PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Cryopump is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Nov 27 2007 10:21AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Nov 26 2007 04:23PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | optics repaired, camera re-installed, and view has been re-calibrated | Nov 27 2007 09:54AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | beals,granetz | | FRC-ECE | yes | 16 Channels now working - low freq. side - outer Rmids | Feb 19 2008 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge is operational and calibrated against G-side MKS on shot#1071127002 | Nov 27 2007 01:25PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | All 9 channels operational as of new year. | Jan 03 2008 09:31AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jan 02 2008 12:22PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | Should be operational for the FY08 campaign | Nov 27 2007 09:54AM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Be Window has a leak and so the gate valve is closed | Nov 23 2007 12:50PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | available (quarter-wave transformer for pre-matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | available (with FFT for automatical matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | normally in [0,pi,pi,0] phase for heating. current drive phase available if requested. | Dec 11 2007 09:03AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | Body I Fault Circuits Repaired and tested. High power tests completed | Dec 05 2007 06:40PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | 1/9/08 | Jan 09 2008 03:23PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree. | Dec 09 2007 06:53PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Problems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible. | Feb 15 2008 02:07PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational | Apr 29 2008 02:30PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | We are basically awaiting the DNB & its new aperture. MSE itself is OK. | Feb 21 2008 08:51AM (jinseok) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Voltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts. | Nov 26 2007 08:31AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | calibration unchanged from 2007 campaign | Dec 04 2007 08:56PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. | Nov 26 2007 04:26PM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | working | Feb 29 2008 07:00PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | All gauges except B_DivL are operating | Nov 27 2007 01:31PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Nov 26 2007 04:27PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | System is fully connected except for the 75GHz channel. System was connected on 1080422. | Apr 22 2008 08:26AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational, but needs to be checked with plasma. | Nov 27 2007 01:45PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | FSP is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A- and K-port WASP electrodes have been replaced/tested. | Nov 27 2007 01:44PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | Operational | Apr 29 2008 03:33PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | One laser operational, 12 spatial channels | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | System is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014). | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | system operational, but channels have been dying...stay tuned. | Mar 14 2008 11:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|