| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Greg Wallace |
| Physics operator(s): | Earl Marmar |
| Engineering operator(s): | Bill Cochran |
| Engineering Operator Run Comment |
| Run MP551 "Penetration of Accessible LH Waves." Session Leader: G. Wal |
| Session Leader Plans |
| Entered: May 9 2008 11:56:23:207AM |
| Author: Greg Wallace |
| Session Leader plan for 1080512 (am)
Session Leader: G. Wallace Physics Operator: E. Marmar This will be a run for MP551, "Penetration of Accessible LH Waves." This will complete the scans not finished on 1080429. LH Setup: Launcher 1.0mm behind limiter, 75 and 90 degree current-drive phasing. 700kW net power, LH on from 0.7 to 1.2s. Reference shot: 1080429003 Shot plan: 1. Bring up LH power to 700kW at 75 degree phasing with nl_04 steady at 3e19 (or as low as possible), 5.4T,800kA. (2 shots) 2. Scan density from 3e19 (or as low as possible without locked modes) to 6e19 nl_04 between 0.7 and 1.2 seconds at 5.4 T, 1.1MA, 75 degrees. Cryopump and/or inner wall puffing may be required for density control. Repeat at 90 degrees. (2 shots) 3. Scan density from 5e19 to 1e20 nl_04 between 0.7 and 1.2 seconds at 5.4 T, 800kA, 75 degrees. Cryopump and/or inner wall puffing may be required for density control. Repeat at 90 degrees. (2 shots) 4. Repeat 3 at 5.4T, 1.1MA. (2 shots) 5. Repeat 3 at 6.0T, 800kA. (2 shots) Total of 10 shots. If time allows: 6. Repeat 2 at 5.4T, 500kA. (2 shots) 7. Repeat 2 at 5.0T, 800kA. (2 shots) |
| Physics Operators Plans |
| Entered: May 12 2008 11:42:18:693AM |
| Author: Earl Marmar |
| Engineering Setup for Monday 12 May, 2008
----------------- Physop: E. Marmar Session Leader: G. Wallace MP551 Penetration of Accessible LH Waves Run begins at 12:00 and ends at 17:00 Power systems as on: 1080429003 Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled Gas setup: Fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) fill NINJA with 10 psi D2 DISABLED Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo Torvac gatevalve toggle (yes/no): NO Boronization(yes/no): no Pre-run ECDC (yes/no): YES (~2 hours, stopping at least 1 hour before first plasma attempt) ICRF(yes/no): NO LH(yes/no): YES DNB(yes/no): not available Cryopump (yes/no): YES, starting with first plasma shot, if available Vessel temperature: 35/35/35 ------------------------------ ECDC Parameters (if requested) ------------------------------ gas and pressure: D2 at 2e-4 Torr sweep: 44/45/103 cm scan: 20/120 s |
| Session Leader Summaries |
| Entered: May 13 2008 08:14:19:537AM |
| Author: Greg Wallace |
| Session Leader summary for 1080512:
No results from today. One dirty shot mid afternoon, then run was scrubbed after NSTAR gas main broke. |
| Physics Operator Summaries |
| Entered: May 12 2008 04:39:06:737PM |
| Author: Earl Marmar |
| Today's run had several issues which prevented us from making progress on the MP.
The day started with ~1 hour of delays for computer problems. After 2 successful OH2 tests, taken because of some OH2 issues from 1080502, we had another computer delay, and then the only plasma shot of the day (shot 5). The plasma shot was very resistive, and disrupted at .3 seconds. After that, construction crews broke a high pressure gas main on Albany street, and NW21 was evacuated for about an hour. By 3:30, we considered continuing the run, but instead decided to stop so that people could work on an ICRF control problem (high voltage for transmitter 3, not directly related to today's run). J-port is needed for tomorrow's planned run. Summary: No power: 2 OH tests: 2 plasma: 1 total cycles: 5 |
| Session Leader Comments |
| Physics Operator Comments | |||
| May 12 2008 12:05:21:370PM | 1080512001 | Earl Marmar | Starting with an OH2 test (PLC control)
critical failure during init no power |
| May 12 2008 12:58:09:940PM | 1080512002 | Earl Marmar | try for another OH2 test (PLC control)
still having computer problems no power |
| May 12 2008 01:03:57:680PM | 1080512003 | Earl Marmar | once more with feeling
OH2 test shot looks ok |
| May 12 2008 01:34:08:670PM | 1080512004 | Earl Marmar | reverse current OH2 PLC test
looks ok |
| May 12 2008 04:40:22:817PM | 1080512005 | Earl Marmar | try for plasma
load from 1080429003 turn off dpcs_ftae2 prefill puff is 54 msec (cryopump should be at liquid He temp) 800 kA USN plasma startup looks good looks very resistive, disrupt at .3 seconds |
| May 12 2008 04:44:59:693PM | 1080512005 | Earl Marmar | Following shot 5, there was a long delay to investigate cooling problems with a TF leg.
Around 2:15 pm, construction crews working on Albany St outside the loading dock at 190 Albany hit a gas main and NW21 was evacuated. We were allowed back into the building around 3:15 pm. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 12:00:02:350PM | Test | Bad | No power shot, camac failure |
| 2 | 12:20:53:490PM | Test | Bad | No power, Camac failure |
| 3 | 12:57:08:127PM | Test | Ok | OH2U-L Forward PLC Test |
| 4 | 01:10:10:327PM | Test | Ok | OH2U-L Reverse PLC Test |
| 5 | 01:51:36:247PM | Plasma | Ok | |
| System Availability | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| May 12 2008 12:00:02:130PM | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||