Alcator C-Mod Run 1080516 Information

Back to runs

Miniproposals
Miniproposal:454a
Date Filed: 7/27/2007
Title:Low Ip H+ITB Plasmas, Their Modulation and Interaction with LH
First Author:Chuck Kessel
Session Leader:Chuck Kessel (shots 12-32)
Miniproposal:501
Date Filed: 7/12/2007
Title:Fluctuations in ITB Plasmas
First Author:Catherine Fiore
Session Leader:Catherine Fiore (shots 1-11)

Operators
Session leader(s):Catherine Fiore,Chuck Kessel
Physics operator(s):Ron Parker
Engineering operator(s):Bill Parkin,Ed Fitzgerald,Bill Byford

Engineering Operator Run Comment
MP454: Low Ip H+ITB modes, their modulation and combination with LH

Session Leader Plans
Entered: May 15 2008 02:26:14:940PM
Author: Chuck Kessel
MP454: Low Ip H+ITB modes, their modulation and combination with LH


4.1 Machine and Plasma Parameters

Give values or range for:

Toroidal Field: 5.4 T
Plasma Current: 0.450 MA
Working Gas Species: D, H-minority.
Density: Target 5e19 m-2 cryopump on
Equilibrium configuration (if possible, refer to database equilibria): 1080221009, change Ip ramp up time from 500 ms to 150 ms

4.2 Auxiliary Systems

ICRF Power, pulse length, phasing: J-port , maximum power. D and E maximum power, all for full pulse (up to 2.5 s)
LHCD Power, pulse length, phasing: maximum power, 90 deg (maybe higher), longest pulse available.
Pellet Injection (species): no
Impurity blow-off injection: no
Diagnostic Neutral Beam: Highly desirable
Special gas puffing: NINJA (with D2) should be available.
Non-axisymmetric Coils (Connections, Current); Yes; optimized to reduce locked modes.
Other:


4.3 Diagnostics
List required diagnostics, and any special setup or configuration, e.g. non-standard digitization rate.

Essential: Thomson, Magnetics, Hard x-rays, ECE, TCI, probes in LH grill, Hirex (rotation data)
Desirable: MSE, CXRS, SOL probes.


Experimental Plan:



1. Establish BT = 5.4T, 450 kA plasma with 150 ms ramp, use 1080221009 as reference

2. Setup ICRF for 2+ MW off-axis beginning at 250 ms (70 MHz, J port) to make H+ITB mode, establish density, and H-mode onset and ITB onset timing (use 4.5 T if difficulties with 5.4 T)

3. With 2+ MW of ICRF off-axis power, scan injected ICRF on-axis power and its timing to stabilize ITB

4.Inject LH power into stabilized ICRF ITB plasma
ā?¢ LH on time after ITB stabilization, maximum power, 90 deg phasing
ā?¢ Try higher n|| if accessibility problems are a possibility

5.Using case from above step, after in stabilized ITB mode, raise on-axis power slightly to return to H-mode or ITB with weaker density peaking ---> determine how much power to increase on-axis source

6.Using case from above step, in stabilized ITB mode, raise on-axis power slightly to return to H-mode or ITB with weaker density peaking, then reduce on-axis power to recover original ITB density peaking (this may require dropping on-axis power to zero first) ---> this probably requires flattop extension, end of Ip flattop extended from 1.5 to 2.5 s


Physics Operators Plans
Entered: May 15 2008 06:22:23:370PM
Author: Ron Parker
------------------------------------------------------------------------ --

Engineering Setup for Friday 16 May 2008
-----------------
MP454: Low Ip H+ITB modes, their modulation and combination with LH

SL: C. Kessel
PO: R. Parker
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1080514031

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo



Post boronization ECDC
----------------------------
1st Gas Setup:
Gas: helium
sweep: 44/103/45 cm
tdwell/tsweep 20/120 s
Pressure: 5e-5 Torr
Duration: 1 hr

2nd Gas Setup
Gas: d2
sweep: 44/103/45cm
tdwell/tsweep: 20/120 s
Pressure: 2e-4 Torr
Duration: 1hr


Torvac gatevalve toggle (yes/no):

Boronization(yes/no): yes
Overnight ECDC (yes/no): no
ICRF(yes/no): yes
LH(yes/no): yes
DNB(yes/no): if available
Cryopump (yes/no): yes

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

--------------------------------------
Boronization Parameters (if requested)
--------------------------------------

20% diborane/80% helium
TC6 foreline pressure: 50 mTorr
rmin/rdwell/rmax: 44/75/80 cm
tdwell/tsweep: 60 /120s
EF4 current: 200 A
Pressure change in the bottle: 60 psi


-------------------------------
Note: we'll start with a few shots to complete Liang Lin's run on the 14th.

Then switch to Chuck's run

-----------------------------

Session Leader Summaries
Entered: May 16 2008 09:00:43:200AM
Author: Catherine Fiore
The first few shots will be to complete the run from 1080514, to get PCI data with central ICRF in an ITB.
Entered: May 16 2008 09:08:20:957AM
Author: Catherine Fiore
Nice target shot but not enough ICRF power to make the EDA H-mode with ITB. Yijun says the neutral density is too high for J-port to operate, as is usual right after boronization.
Entered: May 16 2008 09:23:12:420AM
Author: Catherine Fiore
Nice ITB. The neutral density is too high for J-port to operate. The RF group expects the neutral density to come down shot to shot if we keep conditions steady. Argon for Hirex_SR was added this shot, 0.6 ms.
Entered: May 16 2008 09:48:21:657AM
Author: Catherine Fiore
ITB developed. J-port came on at 1.1s and stopped the further growth of the density, then the plasma disrupted. J-port will be fire at 1.2 s next shot.
Entered: May 16 2008 09:49:31:423AM
Author: Catherine Fiore
Nice ITB. The neutral density is too high for J-port to operate.
Entered: May 16 2008 09:59:59:243AM
Author: Catherine Fiore
Perfect shot,ITB developed. J-port came on at 1.2s and stopped the further growth of the density. We need a repeat to get the PCI data with a second masking.
Entered: May 16 2008 10:11:10:300AM
Author: Catherine Fiore
Disruption early.
Entered: May 16 2008 10:22:33:760AM
Author: Catherine Fiore
Disruption early.
Entered: May 16 2008 10:45:52:657AM
Author: Catherine Fiore
Good ITB, stabilized by J-port but disrupted shortly after it came on. We'll try one more time.
Entered: May 16 2008 10:51:23:957AM
Author: Catherine Fiore
Good ITB,J-port had no power so the density rose until it disrupted.
Entered: May 16 2008 11:04:02:653AM
Author: Catherine Fiore
ITB with multiple back transitions,J-port had no power so the density rose until it disrupted.
Entered: May 16 2008 11:15:16:880AM
Author: Catherine Fiore
This looks like a perfect shot. We're turning it over to Chuck Kessel now
Entered: May 16 2008 02:53:29:737PM
Author: Catherine Fiore
The first few shots will be to complete the run from 1080514, to get PCI
data with central ICRF in an ITB.

This was highly successful, with ITBs on the majority of shots. Liang will
be able to use PCI data from shots 5 and 11 as ITBs stabilized with
central heating to support his thesis work.


1080516001 Nice target shot but not enough ICRF power to make the EDA H-mode
with ITB. Yijun says the neutral density is too high for J-port to
operate, as is usual right after boronization.


1080516002 Nice ITB. The neutral density is too high for J-port to operate.
The RF group expects the neutral density to come down shot to shot if we
keep conditions steady. Argon for Hirex_SR was added this shot, 0.6 ms.

1080516003 Nice ITB. The neutral density is too high for J-port to operate.

1080516004 ITB developed. J-port came on at 1.1s and stopped the further
growth of the density, then the plasma disrupted. J-port will be fire at
1.2 s next shot.



1080516005 Perfect shot,ITB developed. J-port came on at 1.2s and stopped
the further growth of the density. We need a repeat to get the PCI
data with a second masking.


1080516006 Disruption early.

1080516007 Disruption early.

1080516008 Good ITB, stabilized by J-port but disrupted shortly
after it came on. We'll try one more time.

1080515009 Good ITB,J-port had no power so the density rose until it disrupted.

1080516010 ITB with multiple back transitions,J-port had no power so the
density rose until it disrupted.

1080516011 Perfect shot, reproducing 1080516005 with masking set correctly
for PCI. We're turning the run over to Chuck Kessel now.

Entered: May 19 2008 09:05:24:997AM
Author: Chuck Kessel
MP454: SL Summary

The first 11 shots were given to another ITB experiment, causing this experiment to begin about 11:45 am.

It then took until shot 017 to get the discharge set up. Here we were ramping up to 450 kA in about 170 ms. The toroidal field was 5.4 T, with J-port providing the off-axis ICRF power on the low field side. For most of the shots LH was applied in the later half of the flattop to condition up.

018, 019: off-axis ICRF injected at 350 ms, about 2 MW. Density request was about nel = 7e19. ITBā??s forming after H-modes in the flattop. The peaking region is smaller (than those at 4.5 T) presumably due to higher Bt. Densities are low for H-modes although these are low Ip discharges, at nel = 8.5-9e19. These ITBs were self-stabilizing, no on-axis ICRF was necessary.

021: used 0.4 MW of on-axis power, seemed similar to those without on-axis power

024: tried 0.25 MW of on-axis power, E-port did not fire, so there was a no on-axis power

025: used 0.75 MW of on-axis power, also looks like the no on-axis power shots

026-030: tried injecting LH into H+ITB discharges. This was not successful. Shot 030 with 0.75 MW of on-axis ICRF power, shows a stronger Te peaking than normal on the Thomson scattering, is it an ITB in Te??

Did not get to ITB turn on and off phase of MP.


Physics Operator Summaries
Entered: May 16 2008 05:00:08:020PM
Author: Ron Parker
The run had two parts, the first to complete yesterday's run for Liang Lin, the second to undertake a run with Chuck Kessel as SL. Chuck graciously conceded 5-6 shots for Lin's run, but in the event 11 shots were required. This was because of poor machine operating conditions leading to frequent disruptions.

Chuck took over at shot 12, and shots 12-14 disrupted, continuing the trend. Shots 16-21 were OK, and hopefully some useful data were obtained. After a few more decent shots, shots 27-31 disrupted. After 31, an indication of a transformer cooling problem materialized, and only one more shot could be run, which alas fizzled.

Scorecard: 33 plasma attempts, 16 useful plasms, 14 disruptions,1 no power shot, 1 fizzle (the last "shot" of course.)

Session Leader Comments
May 16 2008 11:46:24:327AMChuck Kessel012: use same Ip ramp as in previous shots today, not a good choice. Bt to 5.4 T, J-port to 2 MW at 250 ms, density request to 6e19. H-mode attempts, ICRF pretty choppy from 250-750 ms. Will go to original Ip ramp request in next shot.
May 16 2008 11:46:45:920AM1080516012Chuck Kessel012: use same Ip ramp as in previous shots today, not a good choice. Bt to 5.4 T, J-port to 2 MW at 250 ms, density request to 6e19. H-mode attempts, ICRF pretty choppy from 250-750 ms. Will go to original Ip ramp request in next shot.
May 16 2008 11:52:12:097AM1080516013Chuck Kessel013: Trying original Ip request from MP using shot 1080221009. Ip ramp didn't finish, ugh.
May 16 2008 12:09:11:500PM1080516014Chuck Kessel014: not good, mixing segments from old shot 1080221009 and recent shots today. Correct in next shot.
May 16 2008 12:37:04:710PM1080516016Chuck Kessel016: discharge ran thru. Ip ramp to 450 kA from reference shot 1080221009, need to make faster, so Ip reaches 450 kA by 150 ms in next shot. density coming up too slow and too low for H-mode. ICRF J-port looks wobbly but in a good range.
May 16 2008 12:50:20:593PM1080516017Chuck Kessel017: Ip ramp is very good now, 450 kA by 170 ms. density is rising but is pumped out by ICRF turning on at 200 ms. No real H-mode.
May 16 2008 01:35:37:707PM1080516019Chuck Kessel019: better density trajecotry in ramp. J-port at 2.2 MW, good shot. have ITB peaking in core and is self-stabilized, no on-axis ICRF seems to be required.
May 16 2008 01:38:12:927PM1080516020Chuck Kessel020: tried to add 0.5 MW of on-axis ICRF to ITB case in 019, J-port didn't stay on. try again next shot.
May 16 2008 01:49:20:077PM1080516021Chuck Kessel021: repeat 020 with J-port staying on, slightly lower power on J-port. good discharge, long H+ITB. slow density peaking thru flattop. 0.4 MW on axis power.
May 16 2008 02:34:18:673PM1080516024Chuck Kessel024: trying low on-axis ICRF power, not working well. Getting H+ITB, longer H-modes in flattop. E-port did not come on. again shows ITBs that do not require on-axis stabilization.
May 16 2008 02:51:46:140PM1080516025Amanda Hubbard750 kW E-port. Long ITB, but Te gets rather cool. LH on late again, kils H-mode though.

May 16 2008 02:52:08:220PM1080516025Chuck Kessel025: tried 0.75 MW on axis, E-port worked well. not clear what on-axis power is doing, ITB still appears to peak during H-modes.
May 16 2008 03:44:41:350PM1080516028Chuck Kessel028: trying LH into H+ITB plasmas. J-port 2 MW 350-1500 ms, E-port 0.5 MW 600-1500 ms, LH 0.5 MW 850-1350 ms. ICRF wobbly and LH tripping alot. decent ITB 600-800 ms. when LH goes steady H+ITB returns very briefly.

Physics Operator Comments
May 16 2008 09:16:27:807AM1080516001Ron ParkerFirst shot OK
May 16 2008 09:32:15:020AM1080516002Ron ParkerShot 2 was fine
May 16 2008 09:31:09:173AM1080516003Ron ParkerShot 3 ran OK
May 16 2008 09:53:15:960AM1080516004Ron ParkerShot 4 ran, but disrupted shortly after J-port was powered.
May 16 2008 09:58:44:587AM1080516005Ron ParkerShot 5 was "really good" according to Catherine.
May 16 2008 10:11:17:737AM1080516006Ron ParkerOh, oh. Early disruption.
May 16 2008 10:46:54:920AM1080516007Ron ParkerShot 7 disrupted early
May 16 2008 10:46:36:610AM1080516008Ron Parkershot 8 was better, but also disrupted, this time at 1.37 s.
May 16 2008 10:48:55:517AM1080516009Ron ParkerShot 9 was similar to shot 8, disrupting around 1.4 s.
May 16 2008 11:34:54:443AM1080516010Ron ParkerIntermittent ITB's, no J port
May 16 2008 11:35:52:693AM1080516011Ron ParkerFinally, success! Similar to shot 5
May 16 2008 11:40:46:010AM1080516012Ron ParkerNow on Chuck's run plan. Shot 12 disrupted
May 16 2008 11:47:48:903AM1080516013Ron ParkerEarly disruption
May 16 2008 12:10:15:440PM1080516014Ron ParkerShot 14 disrupted early again. We'll load entire shot from 21080221009
May 16 2008 12:15:22:600PM1080516015Ron ParkerThis was a no power shot, because PO thought pulse gas was not set for cryopump. Actually, the programmed shot had cryo on.
May 16 2008 12:36:25:397PM1080516016Ron ParkerShot 16 ran, density a bit low. Next: density set 6e19 m-2, faster ip ramp.
May 16 2008 12:50:01:513PM1080516017Ron ParkerShot 17 ran well, as programmed. Locked modes are troublesome.
May 16 2008 12:56:18:660PM1080516018Ron ParkerShot 18 ran, fairly good sot with H-modes.
May 16 2008 01:17:21:410PM1080516019Ron ParkerEarl Marmar taking over as physop for 1 hour.

Increase prefill 4 msec (now 59 msec)

Try to get to nl_04 target a bit sooner

Plasma

2 low density H-modes, with quite peaked density profiles
May 16 2008 01:32:20:690PM1080516020Ron Parkerno dpcs changes

plasma

startup is bouncing pretty hard to the outside at 23 msec
May 16 2008 01:46:01:793PM1080516021Ron Parkeradd 4 msec to prefill puff

plasma
startup looks a bit smoother
long-lived ITB with on axis (.5 MW) and off-axis (2 MW) ICRF

When LH comes on, density peaking decreases
May 16 2008 01:54:38:313PM1080516022Ron Parkerno dpcs changes

plasma
early disruption (0.19 seconds)
looks something large fell in, radiated power spikes to 5 MW
May 16 2008 02:10:25:640PM1080516023Ron Parkerno dpcs changes

plasma
May 16 2008 02:21:29:193PM1080516024Ron ParkerShot 24 ran OK. Parker back, expect trouble.
May 16 2008 02:51:55:703PM1080516025Ron ParkerShot 25 was OK.
May 16 2008 02:58:23:817PM1080516026Ron ParkerShot 26 was OK

May 16 2008 03:07:34:183PM1080516027Ron ParkerDisruption
May 16 2008 03:25:52:153PM1080516028Ron ParkerShot ran, disrupted around 1.25 s. Pretty ratty discharge.
May 16 2008 03:36:16:673PM1080516028Ron ParkerDensity at grill is too high for LH coupling. Increased outer gap by 1 cm to try to improve coupling.
May 16 2008 03:44:47:100PM1080516029Ron Parkeranother disruption, this one at 0.6 s.
May 16 2008 04:04:34:053PM1080516030Ron ParkerShot 30 ran, but disrupted at 1.27 s.
May 16 2008 04:35:13:983PM1080516031Ron ParkerShot 31 had an early disruption.

Short delay due to cooling problem.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:02:50:293AMPlasmaOk
209:16:30:867AMPlasmaOk
309:28:59:440AMPlasmaOk
409:41:22:917AMPlasmaOk
509:54:27:613AMPlasmaOk
610:06:53:297AMPlasmaOk
710:19:16:650AMPlasmaOk
810:32:59:207AMPlasmaOk
910:45:28:967AMPlasmaOk
1010:58:02:133AMPlasmaOk
1111:10:37:250AMPlasmaOk
1211:32:52:783AMPlasmaOk
1311:45:14:967AMPlasmaOk
1411:59:41:553AMPlasmaOk
1512:12:09:830PMPlasmaBadNo power shot requested by PO
1612:25:11:043PMPlasmaOk
1712:39:28:430PMPlasmaOk
1812:53:04:923PMPlasmaOk
1901:06:29:107PMPlasmaOk
2001:23:00:073PMPlasmaOk
2101:36:05:660PMPlasmaOk
2201:48:50:577PMPlasmaOk
2302:01:50:273PMPlasmaOk
2402:15:33:550PMPlasmaOk
2502:35:49:190PMPlasmaOk
2602:49:48:937PMPlasmaOk
2703:05:08:040PMPlasmaOk
2803:17:41:437PMPlasmaOk
2903:39:45:660PMPlasmaOk
3003:57:30:890PMPlasmaOk
3104:11:30:293PMPlasmaOk
3204:55:45:000PMPlasmaOk

System Availability
May 16 2008 09:02:42:903AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec,rowan
BolometersyesDiode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration.Mar 14 2008 11:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesSystem OperationalApr 29 2008 03:29PM (irby)Jim IrbyBoronizationdekow,irby
CNPAyesSingle channel CNPA available as of 12/1707Dec 17 2007 05:48PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesCryopump is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Nov 27 2007 10:21AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableNov 26 2007 04:23PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayesoptics repaired, camera re-installed, and view has been re-calibratedNov 27 2007 09:54AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Nov 20 2007 10:47PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBno Nov 20 2007 10:47PM (granetz)Robert GranetzDiagnostic Neutral Beambeals,granetz
FRC-ECEyes16 Channels now working - low freq. side - outer RmidsFeb 19 2008 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge is operational and calibrated against G-side MKS on shot#1071127002Nov 27 2007 01:25PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesAll 9 channels operational as of new year.Jan 03 2008 09:31AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jan 02 2008 12:22PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/DyesShould be operational for the FY08 campaignNov 27 2007 09:54AM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoBe Window has a leak and so the gate valve is closedNov 23 2007 12:50PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesavailable (quarter-wave transformer for pre-matching)Dec 11 2007 09:01AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesavailable (with FFT for automatical matching)Dec 11 2007 09:01AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesnormally in [0,pi,pi,0] phase for heating. current drive phase available if requested.Dec 11 2007 09:03AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesBody I Fault Circuits Repaired and tested. High power tests completedDec 05 2007 06:40PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes1/9/08Jan 09 2008 03:23PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree.Dec 09 2007 06:53PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoProblems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible.Feb 15 2008 02:07PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperationalApr 29 2008 02:30PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoWe are basically awaiting the DNB & its new aperture. MSE itself is OK.Feb 21 2008 08:51AM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts.Nov 26 2007 08:31AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsyescalibration unchanged from 2007 campaignDec 04 2007 08:56PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. Nov 26 2007 04:26PM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesworkingFeb 29 2008 07:00PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesAll gauges except B_DivL are operatingNov 27 2007 01:31PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Nov 26 2007 04:27PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesOperationalNov 27 2007 01:40PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperationalNov 27 2007 01:40PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperationalNov 27 2007 01:41PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSystem is fully connected except for the 75GHz channel. System was connected on 1080422.Apr 22 2008 08:26AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational, but needs to be checked with plasma.Nov 27 2007 01:45PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesFSP is operationalDec 11 2007 10:13AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA- and K-port WASP electrodes have been replaced/tested.Nov 27 2007 01:44PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesOperational Apr 29 2008 03:33PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOne laser operational, 12 spatial channelsApr 11 2008 10:36AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesSystem is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014).Apr 11 2008 10:36AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyessystem operational, but channels have been dying...stay tuned.Mar 14 2008 11:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke