| Session Leader Plans |
| Entered: May 21 2008 02:38:50:363PM |
| Author: Yijun Lin |
SL-plan for Run: 1080522, 1st half day
MP378: mode conversion flow drive at 50 MHz
SL: ylin
PO: rowan
Boronization: overnight
ICRF: all antennas. J at 50 MHz.
Argon puff enabled (from shot 1) for spectroscopy measurement.
He3 puff enabled (from shot 3), starts at 0.2 sec, length specified below.
Plasma: start with 1080422026, USN, 0.8 MA, nl = 0.7e20 m^-2
J port waveforms: Starts at 0.75 sec, 5 steps, 0.3, .8, 1.5, 2.2, and 3 MW. 150 ms per step.
SHOT-BY-SHOT PLAN:
A-list: (11 shots)
-------Check out baseline D/E and J FWEH
A1. RELOAD SHOT 1080422026, D+E minority. 5-step power.
To establish base line rotation in minority heating.
Check Ti and rotation scaling. (Condition up J power before D/E pulse)
------- He3 concentration scan.
A2. B = 5.1 T, No He3, FWEH, J 270 degree. 5-step power.
A3. B = 5.1 T, He3 puff 50 ms. minority heating, J 270 degree. 5-step power.
A4. B = 5.1 T, He3 puff 150 ms. mode conversion, J 270 degree. 5-step power.
A5. B = 5.1 T, He3 puff 300 ms. mode conversion, J 270 degree. 5-step power.
(decision point: more He3 scan? repeat shots?)
------ toroidal field effect
A6. B = 5.3 T, 150 ms puff. J 270 degree. 5-step power.
(MC on-axis, IC LFS. Little MCICW?)
A7. B = 4.9 T, 150 ms puff. J 270 degree. 5-step power.
(MC HFS, IC on-axis.)
A8. B = 4.6 T, 150 ms puff. J 270 degree. 5-step power.
(MC HFS, IC HFS) (IC same flux surface as 5.3 T. different MC location)
A9. B = 5.5 T, 150 ms puff. J 270 degree. 5-step power.
(MC LFS, IC LFS)
(decision point: more Bt scan? repeat shots?)
------Combining D/E/J
A10: B and He3 from best shot above, Heat D+E 1 MW, starting at 0.6 sec,
then add J 5-step power (270 deg)
A11: B and He3 from best shot above, Heat D+E 2.5 MW, starting at 0.6 sec,
then add J 5-step power (270 deg)
(decision point: how many shots left? and re-prioritize the B-list.)
B-list: (5 shots)
------ antenna phase effect (I have some data already)
B1. B = 5.1 T, He3 150 ms, at J heating phase, 5-step power.
B2. B = 5.1 T, he3 150 ms, at J 90 phase, 5-step power.
B3: B and he3 for best rotation. Heat D+E 2.5 MW, starting 0.6 sec
then J 270 deg phase, flat 2.5 MW starting 0.75 sec.
B4: If no H-mode in B3, run a repeat at LSN.
B5: Re-run shot A1, and have more data on D+E MH case.
|
| Entered: May 22 2008 11:25:57:887AM |
| Author: Ron Parker |
MP:515 Effect of launched nll spectrum on current profile (Continued)
Session Leader: R. Parker
Physop: W. Rowan
Engineering Setup
-----------------
Run begins at ****~ 12:00*** and ends at 17:00 (Half Day Run)
Power systems as on: 1080320002
Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled
Gas setup:
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid enabled(PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED
Enable gatevalves and shutters: ECE, VUV, DNB, Z-bolo
Torvac gatevalve toggle (yes/no): NO
All "standard" diagnostics (e.g., Thomson and ECE) are needed, and MSE is crucial.
Machine state as for morning run.
Goals:
Fill in LHCD current profiles (MSE) for 90 and 120 degree phasing (Virulent MHD again?)Ohmic only.
If time permits:
Try to force voltage to 0 by decreasing current during LH pulse
Approach:
Check if MHD reappears under conditions similar to 1080320020 and higher. If so, increase density to get rid of MHD and make MSE profile measurements for 90 and 120 degree phasing.
If time, try to get zero loop voltage by decresing I during LH pulse.
Also, run 7 T shots for Greg Wallace's study of hard x-ray emission vs. density
|
| Entered: May 22 2008 12:56:21:563PM |
| Author: Ron Parker |
Shot 14 looked good, 800 kW. Interesting injection caused ECE Ch 9 to saturate!
|
| Entered: May 22 2008 01:20:28:943PM |
| Author: Ron Parker |
Good LH shot, no trips, voltage reversed
|
| Entered: May 22 2008 01:22:07:240PM |
| Author: Ron Parker |
Another good shot, no trips, vloop reversed, 900 kW.
Next: try 60 deg phasing
|
| Entered: May 22 2008 01:31:41:170PM |
| Author: Ron Parker |
60 deg phasing, but density rose reducing efficeincy.
|
| Entered: May 22 2008 01:47:31:293PM |
| Author: Ron Parker |
LH dropped out early , did not retry.
|
| Session Leader Comments |
| May 22 2008 09:20:34:977AM | 1080522001 | Yijun Lin | reload 1080422026, USN, 0.8 MA, 0.7 nl, 5.1 T.
D+E, 5 steps to max power. starting 0.75 sec. J conditioning after 1.5 sec.
Ar puff enabled. No He3 puff.
Result: density was too high (too much gas from wall). Only E ran. No rotation change.
Next: repeat. and hope to get D.
|
| May 22 2008 09:36:07:410AM | 1080522002 | Yijun Lin | early disruption.
|
| May 22 2008 09:48:18:703AM | 1080522003 | Yijun Lin | another early disruption
|
| May 22 2008 10:26:22:917AM | 1080522004 | Yijun Lin | good shot. baseline for D+E. Not much change in rotation. (less then nominal scaling).
next: J port. No He3. FWEH case.
Delay in power supply interlock. decide to skip the FWEH case.
Try 50 ms He3 next.
|
| May 22 2008 10:40:23:447AM | 1080522005 | Yijun Lin | J ran to 2 MW (co-current wave phase). 50 ms He3 puff.
Not much rotation.
next: 150 ms puff.
|
| May 22 2008 10:49:13:107AM | 1080522006 | Yijun Lin | early disruption.
|
| May 22 2008 02:40:10:457PM | 1080522007 | Yijun Lin | good shot. dV to 100 km/sec at 3 MW J power. Break-in-slope in Te signal?
Mo Ti higher than Te.
PCI data are not that great.
Possibly break-in-slope from ECE measurement.
And, sadly, FMIT #3 FPA lost vacuum right after the shot.
next: repeat shot 4, use D+E only.
|
| May 22 2008 11:15:37:597AM | 1080522008 | Yijun Lin | early disruption.
|
| May 22 2008 11:41:14:383AM | 1080522009 | Yijun Lin | Good data. D+E. No rotation change. L-mode. USN. density was not the same as shot 4.
next: same RF. LSN, and see rotation in H-mode.
|
| May 22 2008 11:54:25:470AM | 1080522010 | Yijun Lin | good data. D+E. LSN. H-mode. rotation. good comparison shot.
repeat shot 9. D+E only, USN, and hope the density is right.
|
| May 22 2008 11:58:58:223AM | 1080522011 | Yijun Lin | disrupted at 0.95 sec. D+E, USN. No rotation
Next: repeat. Try to get a full plasma.
|
| May 22 2008 01:01:14:020PM | 1080522012 | Yijun Lin | nice shot. Little rotation change with D+E in USN, L-mode. large stored energy change, but not much rotation change.
Clean comparison with shot 7. Mo Ti less than Te.
End of MP378 half-day run.
|
| May 22 2008 12:42:44:460PM | 1080522013 | Ron Parker | Shot 13 was a good LH shot, Vloop ~ 0.5 V, 75 deg phasing.
|
| May 22 2008 02:10:18:903PM | 1080522019 | Ron Parker | Interesting shot, loop voltage ~ 0 for ~ 100 ms, but then reflected power begins to rise as does loop voltage.
|
| May 22 2008 02:28:15:353PM | 1080522020 | Ron Parker | Shot 20 has another klystron fault.
|
| May 22 2008 02:46:12:493PM | 1080522021 | Ron Parker | Another trip. Cell entry to check faulting klystron.
|
| May 22 2008 03:35:38:220PM | 1080522021 | Ron Parker | Klystron 2 seems to be non-fuctional due to high beam current. We are going to
bypass it (filament off) in order to continue running.
|
| May 22 2008 04:41:20:957PM | 1080522022 | Ron Parker | Shot 22 was very interesting. Vloop = 0 for ~ 200 ms, but little change in li
or j according to MSE, until unlocking occurs, at which time li decreases and rotation rapidly spins up (ctr current direction).
|
| May 22 2008 04:42:56:693PM | 1080522023 | Ron Parker | No LH, trips
|
| May 22 2008 04:43:44:083PM | 1080522024 | Ron Parker | LH into dummy load, not into plasma
|
| May 22 2008 05:04:41:263PM | 1080522025 | Ron Parker | No dropouts, still can't hold the loop voltage at 0, it rises to ~ 200 mV.
|
| May 22 2008 05:05:23:730PM | 1080522026 | Ron Parker | A nice 7 T shot for Greg!
|
| Physics Operator Comments |
| May 22 2008 08:08:28:000AM | | Bill Rowan | Logged in as physop
Load from 1080422026
0.8 MA, nl_04 = 0.7e_20, USN
nl_04 demand is forced to 0 just before 1 s
Load segment 1 from 1080520001 (non-cryo pump startup)
|
| May 22 2008 08:46:15:560AM | | Bill Rowan | DNB is conditioning. Disabled GV just to be certain that it does not open until we are ready for it.
|
| May 22 2008 09:44:44:213AM | | Bill Rowan | Lockup a few minutes early so that Jerry can do TS tests before the run
Short delay for cell access for TeTS
|
| May 22 2008 09:57:22:710AM | 1080522001 | Bill Rowan | 001. Plasma
nl_04 = 1.2e+20 -- well over the demand
Next shot.
Rice asked for increase in argon from 100 ms to 150 ms
Enable DNB gate valve
DNB is operating at 5A. That is low.
Short delay due to a door interlock on a power supply.
|
| May 22 2008 09:57:08:550AM | 1080522002 | Bill Rowan | 002. Plasma
Disruption at 0.14 s
D-alpha off scale before bolometer.
Maybe a big puff from wall?
Next shot.
No pcs changes
|
| May 22 2008 09:56:50:787AM | 1080522003 | Bill Rowan | 003. Plasma
Disruption at 0.21 s
Next shot.
No dpcs changes.
The first few shots yesterday disrupted. Looked much like these with current perturbed by injections.
|
| May 22 2008 10:05:25:450AM | 1080522004 | Bill Rowan | 004. Plasma
Disruption during rampdown.
nl_04 = .7e+20
nl_04 rising after 0.8 s -- correlated with rf power stepwise increases
nl_04 has the same steps
|
| May 22 2008 10:28:53:750AM | 1080522004 | Bill Rowan | Next shot.
Enabled PG2, b-side upper, He3. on at 0.2 and off after 50 ms
Ninja puff at 1 s
Delay for door interlock on ps. As earlier in the day.
|
| May 22 2008 10:40:15:900AM | 1080522005 | Bill Rowan | 005. Plasma
Disruption at 1.2 s. correlated with last step for RF
Next shot.
Increase he3 puff to 150 ms
|
| May 22 2008 10:54:53:613AM | 1080522006 | Bill Rowan | 006. Plasma
Disruption at 0.58
Injection.
Next shot.
Reduce ar puff back to 100 ms from 150 ms
|
| May 22 2008 11:11:26:017AM | 1080522007 | Bill Rowan | 007. Plasma
Plasma through rampdown
Next shot.
Cell access for RF fault
Transmitter 3 failed due to tube losing vacuum
Disable B-side lower: He3
|
| May 22 2008 11:21:01:553AM | 1080522008 | Bill Rowan | 008. Plasma
Disruption at 1.8 s
occurred before diverted
next shot.
No dpcs changes
|
| May 22 2008 11:39:55:583AM | 1080522009 | Bill Rowan | 009. Plasma
Next shot.
LSN
segment 3 off and segment 2 on
disable B-side upper
enable B-side lower
|
| May 22 2008 11:46:03:213AM | 1080522010 | Bill Rowan | 010. Plasma
Next shot
repeat shot 009
reloaded 1080522009
|
| May 22 2008 11:59:50:973AM | 1080522011 | Bill Rowan | 11. Plasma.
Disruption at 0.95 s
Next shot.
No dpcs changes
|
| May 22 2008 12:51:47:140PM | 1080522013 | Bill Rowan | 013. Plasma
Next shot.
No DPCS changes
|
| May 22 2008 12:51:59:827PM | 1080522014 | Bill Rowan | 014. Plasma
Injection near 1.0 s
|
| May 22 2008 12:59:13:800PM | 1080522014 | Bill Rowan | 014. Plasma
Injection near 1.0 s
Next shot.
Reduced nl_04 demand from 2.5 to 2.0 in the flat-top
|
| May 22 2008 01:08:50:747PM | 1080522015 | Bill Rowan | 015. Plasma
nl_04 reduced. Varies from 2 to 4 in the current flat top
right gap = 0.5 cm
Next shot.
Reduced rcur by 0.002 m to open up the outer gap
|
| May 22 2008 01:17:17:673PM | 1080522016 | Bill Rowan | 016. Plasma
right gap averages approx 0.75 cm
Next shot
No DPCS changes
|
| May 22 2008 01:33:00:170PM | 1080522017 | Bill Rowan | 017. Plasma
Next shot.
No dpcs changes
|
| May 22 2008 01:53:23:827PM | 1080522018 | Bill Rowan | 018. Plasma
Next shot.
Increased IP 10% at 1.8 s
|
| May 22 2008 02:05:47:603PM | 1080522019 | Bill Rowan | 019. Plasma
Disruption at 1.0 s
Next shot.
No DPCS changes
|
| May 22 2008 02:12:47:043PM | 1080522019 | Bill Rowan | 019. Plasma
Disruption at 1.0 s
Next shot.
Increased the TF flat top by 100 ms from 1.4 s to 1.5 s
|
| May 22 2008 02:16:43:737PM | 1080522020 | Bill Rowan | 020. Plasma
Plasma through the ramp down.
|
| May 22 2008 02:25:07:947PM | 1080522020 | Bill Rowan | Next shot.
No DPCS changes
|
| May 22 2008 03:34:52:267PM | 1080522021 | Bill Rowan | 021. Plasma
Disruption during rampdown
Next shot.
Cell access for LH
Visual inspection following failure of a test shot.
1 hour delay including waiting for O2 level in cell.
|
| May 22 2008 04:04:15:570PM | 1080522023 | Bill Rowan | 022. Plasma
Next shot.
No DPCS changes
|
| May 22 2008 04:23:19:677PM | 1080522023 | Bill Rowan | 023. Plasma
Next shot.
No DPCS changes
|
| May 22 2008 04:28:23:227PM | 1080522024 | Bill Rowan | 024. Plasma
No LH. LH signaled ready when they were not
Next shot.
No DPCXWS changes.
|
| May 22 2008 04:38:35:983PM | 1080522024 | Bill Rowan | 024. Plasma
No LH. LH signaled ready when they were not
Next shot.
No DPCS changes.
|
| May 22 2008 04:51:24:000PM | 1080522025 | Bill Rowan | 025, Plasma
Next shot.
TF = 7.0 T (-194000)
changed engineering limits to 205000
|
| May 22 2008 04:58:21:193PM | 1080522025 | Bill Rowan | 025, Plasma
Next shot.
TF = 7.0 T (-194000)
changed engineering limits to 205000
nl_04 ramp
2.0 at 0.7 to 6.0 at 1.2
|
| May 22 2008 05:05:11:200PM | 1080522026 | Bill Rowan | 026, Plasma
TF = 6.95 T
nl_04 ramp is as requested
Last shot
|
| System Availability |
| May 22 2008 09:08:57:623AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec,rowan | | Bolometers | yes | Diode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration. | Mar 14 2008 11:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | System Operational | Apr 29 2008 03:29PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Single channel CNPA available as of 12/1707 | Dec 17 2007 05:48PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Cryopump is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Nov 27 2007 10:21AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Nov 26 2007 04:23PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | optics repaired, camera re-installed, and view has been re-calibrated | Nov 27 2007 09:54AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | beals,granetz | | FRC-ECE | yes | 16 Channels now working - low freq. side - outer Rmids | Feb 19 2008 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge is operational and calibrated against G-side MKS on shot#1071127002 | Nov 27 2007 01:25PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | All 9 channels operational as of new year. | Jan 03 2008 09:31AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jan 02 2008 12:22PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | Should be operational for the FY08 campaign | Nov 27 2007 09:54AM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Be Window has a leak and so the gate valve is closed | Nov 23 2007 12:50PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | available (quarter-wave transformer for pre-matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | available (with FFT for automatical matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | normally in [0,pi,pi,0] phase for heating. current drive phase available if requested. | Dec 11 2007 09:03AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | Body I Fault Circuits Repaired and tested. High power tests completed | Dec 05 2007 06:40PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | yes | 1/9/08 | Jan 09 2008 03:23PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree. | Dec 09 2007 06:53PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Problems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible. | Feb 15 2008 02:07PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational | Apr 29 2008 02:30PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | We are basically awaiting the DNB & its new aperture. MSE itself is OK. | Feb 21 2008 08:51AM (jinseok) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Voltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts. | Nov 26 2007 08:31AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | calibration unchanged from 2007 campaign | Dec 04 2007 08:56PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. | Nov 26 2007 04:26PM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | working | Feb 29 2008 07:00PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | All gauges except B_DivL are operating | Nov 27 2007 01:31PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Nov 26 2007 04:27PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | System is fully connected except for the 75GHz channel. System was connected on 1080422. | Apr 22 2008 08:26AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational, but needs to be checked with plasma. | Nov 27 2007 01:45PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | FSP is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A- and K-port WASP electrodes have been replaced/tested. | Nov 27 2007 01:44PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | Operational | Apr 29 2008 03:33PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | One laser operational, 12 spatial channels | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | System is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014). | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | system operational, but channels have been dying...stay tuned. | Mar 14 2008 11:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| May 22 2008 09:33:17:877AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec,rowan | | Bolometers | yes | Diode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration. | Mar 14 2008 11:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | System Operational | Apr 29 2008 03:29PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Single channel CNPA available as of 12/1707 | Dec 17 2007 05:48PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Cryopump is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Nov 27 2007 10:21AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Nov 26 2007 04:23PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | optics repaired, camera re-installed, and view has been re-calibrated | Nov 27 2007 09:54AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | beals,granetz | | ECDC | yes | Operational | May 22 2008 09:29AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | 16 Channels now working - low freq. side - outer Rmids | Feb 19 2008 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge is operational and calibrated against G-side MKS on shot#1071127002 | Nov 27 2007 01:25PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Being Prepared for diborane cleanup | May 22 2008 09:26AM (irby) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | All 9 channels operational as of new year. | Jan 03 2008 09:31AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jan 02 2008 12:22PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | Should be operational for the FY08 campaign | Nov 27 2007 09:54AM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Be Window has a leak and so the gate valve is closed | Nov 23 2007 12:50PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | available (quarter-wave transformer for pre-matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | available (with FFT for automatical matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | normally in [0,pi,pi,0] phase for heating. current drive phase available if requested. | Dec 11 2007 09:03AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | Body I Fault Circuits Repaired and tested. High power tests completed | Dec 05 2007 06:40PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | yes | 1/9/08 | Jan 09 2008 03:23PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree. | Dec 09 2007 06:53PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Problems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible. | Feb 15 2008 02:07PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational | Apr 29 2008 02:30PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | We are basically awaiting the DNB & its new aperture. MSE itself is OK. | Feb 21 2008 08:51AM (jinseok) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Voltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts. | Nov 26 2007 08:31AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | calibration unchanged from 2007 campaign | Dec 04 2007 08:56PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. | Nov 26 2007 04:26PM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | working | Feb 29 2008 07:00PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | All gauges except B_DivL are operating | Nov 27 2007 01:31PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Nov 26 2007 04:27PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power Systems | yes | | May 22 2008 09:27AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | System is fully connected except for the 75GHz channel. System was connected on 1080422. | Apr 22 2008 08:26AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational, but needs to be checked with plasma. | Nov 27 2007 01:45PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | FSP is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A- and K-port WASP electrodes have been replaced/tested. | Nov 27 2007 01:44PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | Operational | Apr 29 2008 03:33PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | One laser operational, 12 spatial channels | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | System is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014). | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | system operational, but channels have been dying...stay tuned. | Mar 14 2008 11:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| May 22 2008 09:45:46:887AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec,rowan | | Bolometers | yes | Diode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration. | Mar 14 2008 11:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | System Operational | Apr 29 2008 03:29PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Single channel CNPA available as of 12/1707 | Dec 17 2007 05:48PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Cryopump is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Nov 27 2007 10:21AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Nov 26 2007 04:23PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | optics repaired, camera re-installed, and view has been re-calibrated | Nov 27 2007 09:54AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | beals,granetz | | ECDC | yes | Operational | May 22 2008 09:29AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | 16 Channels now working - low freq. side - outer Rmids | Feb 19 2008 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge is operational and calibrated against G-side MKS on shot#1071127002 | Nov 27 2007 01:25PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Being Prepared for diborane cleanup | May 22 2008 09:26AM (irby) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | All 9 channels operational as of new year. | Jan 03 2008 09:31AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jan 02 2008 12:22PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | Should be operational for the FY08 campaign | Nov 27 2007 09:54AM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Be Window has a leak and so the gate valve is closed | Nov 23 2007 12:50PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | available (quarter-wave transformer for pre-matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | available (with FFT for automatical matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | normally in [0,pi,pi,0] phase for heating. current drive phase available if requested. | Dec 11 2007 09:03AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | Body I Fault Circuits Repaired and tested. High power tests completed | Dec 05 2007 06:40PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | yes | 1/9/08 | Jan 09 2008 03:23PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree. | Dec 09 2007 06:53PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Problems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible. | Feb 15 2008 02:07PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational | Apr 29 2008 02:30PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | We are basically awaiting the DNB & its new aperture. MSE itself is OK. | Feb 21 2008 08:51AM (jinseok) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Voltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts. | Nov 26 2007 08:31AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | calibration unchanged from 2007 campaign | Dec 04 2007 08:56PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. | Nov 26 2007 04:26PM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | working | Feb 29 2008 07:00PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | All gauges except B_DivL are operating | Nov 27 2007 01:31PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Nov 26 2007 04:27PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power Systems | yes | | May 22 2008 09:27AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | System is fully connected except for the 75GHz channel. System was connected on 1080422. | Apr 22 2008 08:26AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational, but needs to be checked with plasma. | Nov 27 2007 01:45PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | FSP is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A- and K-port WASP electrodes have been replaced/tested. | Nov 27 2007 01:44PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | no | | May 22 2008 09:43AM | Jim Irby | | irby | | TCI | yes | Operational | Apr 29 2008 03:33PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | One laser operational, 12 spatial channels | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | System is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014). | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | system operational, but channels have been dying...stay tuned. | Mar 14 2008 11:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| May 22 2008 10:33:51:720AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec,rowan | | Bolometers | yes | Diode 2pi working fine, foil 2pi being low-pass filtered to remove noise. Outboard miidplane AXUV has a grounded channel which is disrupting the whole array OFFLINE for now. Midplane foils working fine, but need to fill tree with calibrations. 2D AXUV arrays are being digitized but need further debugging and calibration. | Mar 14 2008 11:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | System Operational | Apr 29 2008 03:29PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Single channel CNPA available as of 12/1707 | Dec 17 2007 05:48PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Cryopump is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Nov 27 2007 10:21AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Nov 26 2007 04:23PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | optics repaired, camera re-installed, and view has been re-calibrated | Nov 27 2007 09:54AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | | Nov 20 2007 10:47PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | beals,granetz | | ECDC | yes | Operational | May 22 2008 09:29AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | 16 Channels now working - low freq. side - outer Rmids | Feb 19 2008 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge is operational and calibrated against G-side MKS on shot#1071127002 | Nov 27 2007 01:25PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Being Prepared for diborane cleanup | May 22 2008 09:26AM (irby) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | All 9 channels operational as of new year. | Jan 03 2008 09:31AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jan 02 2008 12:22PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | Should be operational for the FY08 campaign | Nov 27 2007 09:54AM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Be Window has a leak and so the gate valve is closed | Nov 23 2007 12:50PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | available (quarter-wave transformer for pre-matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | available (with FFT for automatical matching) | Dec 11 2007 09:01AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | normally in [0,pi,pi,0] phase for heating. current drive phase available if requested. | Dec 11 2007 09:03AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | Body I Fault Circuits Repaired and tested. High power tests completed | Dec 05 2007 06:40PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | yes | 1/9/08 | Jan 09 2008 03:23PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane working fine, emissivity profiles being stored in tree, but still need to apply in-vessel calibrations to data. WB1-LY being digitized, but not processed in tree. | Dec 09 2007 06:53PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Problems with detector. No quantitative line brightnesses possible. Qualitative tasks like impurity identification possible. | Feb 15 2008 02:07PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational | Apr 29 2008 02:30PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | We are basically awaiting the DNB & its new aperture. MSE itself is OK. | Feb 21 2008 08:51AM (jinseok) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Voltage is on for the He3 bank. Voltage will be turned on for the global system at the first plasma attempts. | Nov 26 2007 08:31AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | calibration unchanged from 2007 campaign | Dec 04 2007 08:56PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. | Nov 26 2007 04:26PM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | working | Feb 29 2008 07:00PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | All gauges except B_DivL are operating | Nov 27 2007 01:31PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Nov 26 2007 04:27PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power Systems | yes | | May 22 2008 09:27AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational | Nov 27 2007 01:40PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational | Nov 27 2007 01:41PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | System is fully connected except for the 75GHz channel. System was connected on 1080422. | Apr 22 2008 08:26AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational, but needs to be checked with plasma. | Nov 27 2007 01:45PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | FSP is operational | Dec 11 2007 10:13AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A- and K-port WASP electrodes have been replaced/tested. | Nov 27 2007 01:44PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | | May 22 2008 09:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | Operational | Apr 29 2008 03:33PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | One laser operational, 12 spatial channels | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | System is working with 3 out of 4 spectral channels and should be believable for Te>50eV, ne>3e19. Density is calibrated from both Raman scattering in D2 (3/2/08) and from edge ECE cutoffs in high-density H-modes (1080228014). | Apr 11 2008 10:36AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | system operational, but channels have been dying...stay tuned. | Mar 14 2008 11:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|