| Entered: Jul 13 2009 06:17:48:150PM |
| Author: Ron Parker |
|
Engineering setup for Tuesday 2009/14/08 MP355 - ICRF testing and conditioning Session leaders: S. Wukitch/Y. Lin Physics operator: R. Parker Standard overnight ECDC and 60 C bake Run will start at 09:00 and end at 17:00. Power systems as on 1090707018 (Bt=5.4T, Ip=0.9 MA, nl04=0.9-1e20 m-2) A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard configuration) Gas Setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) leave NINJA as is DISABLED Enable the following gate valves and shutters, assuming no vacuum problems: ECE, Z-bolo Torvac setup: keep gate valves open during PULSE Specific diagnostics: magnetics, ECE, TCI ------------------------------------------------------------------------------ ICRF Setup: conditioning of D & E LH Setup: no DNB: no Cryopump: no ------------------------------------------------------------------------------ Run plan: see session leader's run plan |
| Entered: Jul 13 2009 06:18:42:323PM |
| Author: Ron Parker |
| Engineering setup for Tuesday 2009/14/08
MP355 - ICRF testing and conditioning Session leaders: S. Wukitch/Y. Lin Physics operator: R. Parker Standard overnight ECDC and 60 C bake Run will start at 09:00 and end at 17:00. Power systems as on 1090707018 (Bt=5.4T, Ip=0.9 MA, nl04=0.9-1e20 m-2) A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard configuration) Gas Setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) leave NINJA as is DISABLED Enable the following gate valves and shutters, assuming no vacuum problems: ECE, Z-bolo Torvac setup: keep gate valves open during PULSE Specific diagnostics: magnetics, ECE, TCI ------------------------------------------------------------------------------ ICRF Setup: conditioning of D & E LH Setup: no DNB: no Cryopump: no ------------------------------------------------------------------------------ Run plan: see session leader's run plan |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments | |||
| Jul 13 2009 06:20:36:650PM | Ron Parker | Engineering setup for Tuesday 2009/14/08
MP355 - ICRF testing and conditioning Session leaders: S. Wukitch/Y. Lin Physics operator: R. Parker Standard overnight ECDC and 60 C bake Run will start at 09:00 and end at 17:00. Power systems as on 1090707018 (Bt=5.4T, Ip=0.9 MA, nl04=0.9-1e20 m-2) A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard configuration) Gas Setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) leave NINJA as is DISABLED Enable the following gate valves and shutters, assuming no vacuum problems: ECE, Z-bolo Torvac setup: keep gate valves open during PULSE Specific diagnostics: magnetics, ECE, TCI ------------------------------------------------------------------------------ ICRF Setup: conditioning of D & E LH Setup: no DNB: no Cryopump: no ------------------------------------------------------------------------------ Run plan: see session leader's run plan | |
| Physics Operator Comments | |||
| Jul 13 2009 06:19:51:073PM | Ron Parker | Engineering setup for Tuesday 2009/14/08
MP355 - ICRF testing and conditioning Session leaders: S. Wukitch/Y. Lin Physics operator: R. Parker Standard overnight ECDC and 60 C bake Run will start at 09:00 and end at 17:00. Power systems as on 1090707018 (Bt=5.4T, Ip=0.9 MA, nl04=0.9-1e20 m-2) A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard configuration) Gas Setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) leave NINJA as is DISABLED Enable the following gate valves and shutters, assuming no vacuum problems: ECE, Z-bolo Torvac setup: keep gate valves open during PULSE Specific diagnostics: magnetics, ECE, TCI ------------------------------------------------------------------------------ ICRF Setup: conditioning of D & E LH Setup: no DNB: no Cryopump: no ------------------------------------------------------------------------------ Run plan: see session leader's run plan | |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |