Alcator C-Mod Run 1080714 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):
Engineering operator(s):

Engineering Operator Run Comment

Session Leader Plans

Physics Operators Plans
Entered: Jul 13 2009 06:17:48:150PM
Author: Ron Parker

Engineering setup for Tuesday 2009/14/08

MP355 - ICRF testing and conditioning

Session leaders: S. Wukitch/Y. Lin
Physics operator: R. Parker

Standard overnight ECDC and 60 C bake

Run will start at 09:00 and end at 17:00.

Power systems as on 1090707018 (Bt=5.4T, Ip=0.9 MA, nl04=0.9-1e20 m-2)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, Z-bolo

Torvac setup: keep gate valves open during PULSE

Specific diagnostics: magnetics, ECE, TCI
------------------------------------------------------------------------------
ICRF Setup: conditioning of D & E
LH Setup: no
DNB: no
Cryopump: no
------------------------------------------------------------------------------
Run plan: see session leader's run plan

Entered: Jul 13 2009 06:18:42:323PM
Author: Ron Parker
Engineering setup for Tuesday 2009/14/08

MP355 - ICRF testing and conditioning

Session leaders: S. Wukitch/Y. Lin
Physics operator: R. Parker

Standard overnight ECDC and 60 C bake

Run will start at 09:00 and end at 17:00.

Power systems as on 1090707018 (Bt=5.4T, Ip=0.9 MA, nl04=0.9-1e20 m-2)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, Z-bolo

Torvac setup: keep gate valves open during PULSE

Specific diagnostics: magnetics, ECE, TCI
------------------------------------------------------------------------------
ICRF Setup: conditioning of D & E
LH Setup: no
DNB: no
Cryopump: no
------------------------------------------------------------------------------
Run plan: see session leader's run plan

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments
Jul 13 2009 06:20:36:650PMRon ParkerEngineering setup for Tuesday 2009/14/08

MP355 - ICRF testing and conditioning

Session leaders: S. Wukitch/Y. Lin
Physics operator: R. Parker

Standard overnight ECDC and 60 C bake

Run will start at 09:00 and end at 17:00.

Power systems as on 1090707018 (Bt=5.4T, Ip=0.9 MA, nl04=0.9-1e20 m-2)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, Z-bolo

Torvac setup: keep gate valves open during PULSE

Specific diagnostics: magnetics, ECE, TCI
------------------------------------------------------------------------------
ICRF Setup: conditioning of D & E
LH Setup: no
DNB: no
Cryopump: no
------------------------------------------------------------------------------
Run plan: see session leader's run plan

Physics Operator Comments
Jul 13 2009 06:19:51:073PMRon ParkerEngineering setup for Tuesday 2009/14/08

MP355 - ICRF testing and conditioning

Session leaders: S. Wukitch/Y. Lin
Physics operator: R. Parker

Standard overnight ECDC and 60 C bake

Run will start at 09:00 and end at 17:00.

Power systems as on 1090707018 (Bt=5.4T, Ip=0.9 MA, nl04=0.9-1e20 m-2)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, Z-bolo

Torvac setup: keep gate valves open during PULSE

Specific diagnostics: magnetics, ECE, TCI
------------------------------------------------------------------------------
ICRF Setup: conditioning of D & E
LH Setup: no
DNB: no
Cryopump: no
------------------------------------------------------------------------------
Run plan: see session leader's run plan

Engineering Operator Comments
ShotTimeTypeStatusComment