Alcator C-Mod Run 1090624 Information

Back to runs

Miniproposals
Miniproposal:298a
Date Filed: 5/20/2002
Title:C-Mod Plasma Startup
First Author:Jim Irby
Session Leader:Steve Wolfe (shots 1-33)

Operators
Session leader(s):Steve Wolfe
Physics operator(s):Jim Irby
Engineering operator(s):Andy Pfeiffer,Bill Cochran,Bill Byford

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Jun 24 2009 07:59:25:990AM
Author: Steve Wolfe
Plan for Wed. 1090624:
1) Get a plasma
2) Then get another plasma
3) Repeat (2)


Physics Operators Plans
Entered: Jun 24 2009 08:37:58:553AM
Author: Jim Irby
Run 1090624 --- Plasma Startup

Plan: Continue testing of magnetics if required. Make start-up plasmas as possible.

-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1090623009

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): no
LH(yes/no): no
DNB(yes/no): no
Cryopump (yes/no): no

Vessel temperature: 60/60/60 overnight

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Jun 24 2009 05:38:25:647PM
Author: Steve Wolfe
SL summary for Wed 24-jun-2009

MP#298a C-Mod startup
SL: wolfe
PO: irby
EO: Pfeiffer, Cochran, Byford

We successfully completed part 1 of the run plan: we got over 500ka plasma
lasting 120msec plasma on shot#18. This exceeds the specification 
for the first ITER plasma in 2018. 

The density was rising uncontrollably to nebar~1e20 before the disruption.
Zave claimed to be ~5, and the loop voltage was nearly flat at about 6V. 
The disruption occurred shortly after segment switch, but I don't think
that was the cause. Lots of junk was observed on the rga after the shot,
and it slowly came down for the rest of the day. 

Ian came up with an improved synthesis for the dead f23 and f25 flux 
loops, which I implemented (shot#17) in the expressions for the processed flux_22
and flux_24 signals. This seems to give reasonable mflux plots, and 
improved vacbrbz waveforms for br0 and bz0. See MHD topic for details.

We were not successful in getting a second plasma, although we 
we seemed to be getting close at the end of the day. I think
we need to increase the Bz ramp-rate, either by increasing oh voltage
or increasing rcur offset. The key to getting the plasma on #18 was
an increase in rcur offset from 1000 to 2000. If we continue to have 
difficulty getting past 100msec or so it may be beneficial to reduce
the Ip programming to 600kA or so. It might also help to reduce the
pg3 program in segment 1, but I think most of the density rise on
#18 is coming from the wall. 



Physics Operator Summaries
Entered: Jun 24 2009 05:12:33:590PM
Author: Jim Irby
After adjustments of br0, bz0, and prefill we finally got a 500 kA, 120 ms plasma on shot 18. All attempts up to that point had been fizzles. Following shot 18 we had a couple of duds probably because of the large impurity levels. RGA levels (mass 16, 15, 14, etc) were up factor of 100. m14/m28 went from 0.05 to 0.35 and only came down a little following each fizzle. The ratio did not drop below 0.10 until shot 28. Previous start ups have taken 10 or 15 fizzles to get another extended discharge following the first one with appreciable current.

ECDC was done between shot 29 and 30 (for about 30 minutes), until the mass4 level came up to overnight ecdc levels and leveled off. Shot 30 appeared close to "going". We again had a frozen shutter after shot 30 that prevented us from continuing ECDC. So we just took 3 more shots. Shot 32 was a dud possibly because of a tweak we made to ef4. The last shot of the day, 33, again seemed close to going.

ECDC should clean things up for tomorrow's run and I hope more than one several hundred ms discharge.


Session Leader Comments
Jun 24 2009 09:16:12:693AM1090624001Steve Wolfe
Shot#1: No ef4. Actually got a little flash at 45ms
BR0 is not terrible (-.8mT recon_vac, -2.5vacbrbz)
P0 =.07mTorr

Next shot: try again with all supplies (we hope)

Jun 24 2009 09:43:42:593AM1090624002Steve Wolfe
Shot#1:try again with all supplies (we hope)
Slight delay for cooling on ef2U
Got a flash, looks like some current
Looks to me like it may be moving down and out. 

Jun 24 2009 09:50:38:910AM1090624003Steve Wolfe
Shot#2: Just repeat
Another fizzle, less current, 
less light on halpha, CIII; couple of bounces.

Next: drop the gas

Jun 24 2009 10:05:27:460AM1090624004Steve Wolfe
Shot#3:  drop the gas
Except PO forgot to  load it
Another fizzle, two miniscule current rises, moving out on both
breakdown around 9msec
Next: really drop the gas

Jun 24 2009 10:27:32:267AM1090624005Steve Wolfe
Shot#5: really drop the gas
Got a little more current, one bounce
p0=.05, breakdown at 10msec
I think it's time for a br tweak.

Jun 24 2009 10:39:49:083AM1090624006Steve Wolfe
Shot#6: raise br0 to +.001
Even later than before, 11msec
Offset was actually set to .0001, so no significant change

Next: try that again

Jun 24 2009 10:53:15:540AM1090624007Steve Wolfe
Shot#7: raise br0 to +.001 from +.0001
Br did come up by 1mT. 
breakdown at 10msec, a little less light

Next: raise br0 offset to .002, see if it gets better or worse

Jun 24 2009 11:05:15:193AM1090624008Steve Wolfe
Shot#8: raise br0 offset to .002, see if it gets better or worse
later breakdown, 11 or 12msec on zmeter, later on halpha.
Went too far. 

Next: go the other way

Jun 24 2009 11:18:55:680AM1090624009Steve Wolfe
Shot#9: Try -.001. I predict this will not breakdown.
Well, it did breakdown. Back to 10msec.
Looks like a pretty wide range in Br

Next: raise pressure again

Jun 24 2009 11:40:17:603AM1090624010Steve Wolfe
Shot#10: raise prepuff to 18msec
two bounces, more zmeter signal, still around 10msec

Next: Br0 to .0005, leave pressure here

Jun 24 2009 11:42:16:153AM1090624011Steve Wolfe
Shot#11: Br0 to .0005, leave pressure here
bd similar, maybe a little earlier

Next: More Bz, move icef4 more positive by 50A


Jun 24 2009 11:57:10:910AM1090624012Steve Wolfe
Shot#12: More Bz, move icef4 more positive by 50A
Much earlier breakdown 5ms, then goes in after 22msec or so. 
Seems to hold onto current a little longer.

next: keep going that way

Jun 24 2009 12:12:16:600PM1090624013Steve Wolfe
Shot#13: keep going that way
More current, more CIII light, earlier breakdown.
bounces at 13msec, faster early current rise

Next: raise pressure 



Jun 24 2009 12:21:42:963PM1090624014Steve Wolfe
Shot#14:  raise pressure 
a little better, more a little more current

Next: try raising ef4 again, to -1200

Jun 24 2009 12:37:46:423PM1090624015Steve Wolfe
Shot#15: try raising ef4 again, to -1200
Nearly 50kA, more density, lasts to 20ms before it
snuffs, good halpha burnout
Bz seems too high both from the current setting and
the reconstructed levels, but the plasma likes it. 
Maybe try raising it again before we start hacking at RCUR offset
or OH1 voltage. 

Next: ef4 to -1160

Jun 24 2009 12:47:02:350PM1090624016Steve Wolfe
Shot#16: ef4 to -1160
Much later breakdown, after 20msec, Bz definitely
too high here, probably was on 15 as well. 

Next go back to -1220, then play with the rise rate.

Jun 24 2009 01:05:01:560PM1090624017Steve Wolfe
Shot#17: ef4 to -1160
Note that I've changed the processed flux expressions for 
Flux_22 and Flux_24 prior to this shot, so the vacbrbz and mflux
will be very different (and hopefully closer to correct). 

Raise rcur offset from 1000 to 2000. 
Raise br0 back to .001

Jun 24 2009 01:25:36:973PM1090624018Steve Wolfe
Shot#18: Raise rcur offset from 1000 to 2000. 
Raise br0 back to .001
plasma! Gets to 500ka, gets to just past segment 
switch.


Jun 24 2009 01:56:35:970PM1090624021Steve Wolfe
Shot#21: dud, gas may have been too low. 
Shouldn't have suggested such a big change


Jun 24 2009 02:12:34:413PM1090624022Steve Wolfe
Shot#22: fizzle, bd around 7msec
tiny bit of current. 


Jun 24 2009 02:22:19:480PM1090624023Steve Wolfe
Shot#23: dud

OK, drop Bz0

Jun 24 2009 02:34:24:483PM1090624024Steve Wolfe
Shot#24: ef4 to -1250
fizzle, no current to speak of. 
Better than it's been 

Jun 24 2009 02:48:41:613PM1090624025Steve Wolfe
Shot#25: ef4 to -1280
another fizzle, still not much current but a little higher
zmeter is still ugly, ciii burning out, halpha not burning out.

Going to do ecdc for 10 minutes

Jun 24 2009 03:02:12:493PM1090624026Steve Wolfe
Shot#26: No ecdc, increased the gas instead
fizzle, similar to last shot, maybe less current.


Jun 24 2009 03:21:41:720PM1090624027Steve Wolfe
Shot#27: fizzle, similar to last shot



Jun 24 2009 03:40:48:900PM1090624029Steve Wolfe
Shot#29: fizzle, similar to last shot
Still not burning through. 

Going to have a cell access to free the zbolo shutter, 
then ecdc

Jun 24 2009 04:34:15:640PM1090624030Steve Wolfe
Shot#30:after about 30min of ecdc
fizzle, zmeter is lower, got more current,
2 or 3 bounces, first one clearly outside



Jun 24 2009 04:44:56:627PM1090624031Steve Wolfe
Shot#31: ef4 tweak
more current, got a little further before it hit. 

Next: raise bz again (ef4 to -1220)

Jun 24 2009 04:56:28:337PM1090624032Steve Wolfe
Shot#32: raise bz again (ef4 to -1220)
Dud! Mflux looks pretty much like it did on 18
I guess we went too far. 

Put it back where it was. 

Jun 24 2009 05:22:50:220PM1090624033Steve Wolfe
Shot#33: Put ef4 back where it was. 
fizzle. Rapid current rise to 60kA, hits outside at 19msec
Close, but didn't quite make it. 
Maybe should try even higher on rcur offset, or increase 
the OH1 and OH2 voltages to tune the Bz ramp rate. 

Physics Operator Comments
Jun 24 2009 09:03:16:437AMJim IrbyBad CAMAC crate for EF3 supply being looked into.

Jun 24 2009 09:08:26:313AMJim IrbyEF3 CAMAC fixed ---

Jun 24 2009 09:17:24:363AM1090624001Jim IrbyWill start from 1090623009 --- the flash from yesterday

prepuff from 30 to 20 ms in seg 1 --- open tree done

No EF4 supply

Still got at flash on halpha and ciii at about 45 ms.

pressure at t=0 7e-5 Torr
Jun 24 2009 09:45:50:000AM1090624002Jim IrbyNo DPCS changes.
Try again with EF4 current.

Plasma and a little current --- nl04 at 8e18/m^3





Jun 24 2009 09:50:54:063AM1090624003Jim IrbyNo changes

less density, light, current.

Will drop gas for shot 4
Jun 24 2009 10:04:35:650AM1090624004Jim Irbygas from 20 to 15 ms. ------ forgot to load!

flash -- a little more current
Jun 24 2009 10:36:56:863AM1090624005Jim Irbygas from 20 to 15 ms --- open tree done

flash
Jun 24 2009 10:40:50:320AM1090624006Jim Irbybr0 to +0.001 from 0.000 T

PO screws up again: 0.0001T

flash --- similar to previous shot
Jun 24 2009 10:53:21:527AM1090624007Jim Irbybr0 from 0.0001 T to 0.001 T ---- open tree done

br0 did go up abt 1 mT

plasma very similar to shot 6


Jun 24 2009 11:04:13:000AM1090624008Jim Irbybr0 to 0.002 from 0.001 T --- open tree done

br0 up again, but we may be going the wrong way

breakdown later
Jun 24 2009 11:19:29:180AM1090624009Jim Irbybr0 from +0.002 to -0.001 T --- open tree done

weak plasma, but ealier
Jun 24 2009 11:30:20:883AM1090624010Jim Irbyprefill from 15 to 18 ms. --- open tree done

flash a little stronger but no earlier


Jun 24 2009 11:43:31:230AM1090624011Jim Irbybr0 to +0.0005 T --- open tree done

flash, but no better than earlier shots
Jun 24 2009 12:00:07:173PM1090624012Jim Irbyef4 from -1340 to -1290 A --- open tree done

got more positive Bz0

flash looks better --- breakdown around 6 ms


Jun 24 2009 12:13:37:133PM1090624013Jim Irbyef4 from -1290 to -1240 A --- open tree done

flash, more current, earlier

next try a little more gas
Jun 24 2009 12:24:07:263PM1090624014Jim Irbyprefill from 18 to 25 ms --- open tree done

a little more current
Jun 24 2009 12:38:10:000PM1090624015Jim Irbyef4 from -1240 to -1200 A --- open tree done

better still --- more current, higher nl



Jun 24 2009 12:45:25:177PM1090624016Jim Irbyef4 from -1200 to -1160 A --- open tree done

breakdown very late
Jun 24 2009 12:48:22:567PM1090624017Jim Irbyef4 from -1160 to -1220 A --- open tree done

Jun 24 2009 01:15:09:297PM1090624018Jim Irbybr0 from +0.0005 to +0.001 T
RCUR from 1000 to 2000
open tree done

plasma for 120 ms!
Jun 24 2009 01:40:33:760PM1090624019Jim Irbyrepeat while we figure out what we should do

weak fiz as expected

RGA carbon based lines up factor of 100 or so following shot 18. Still high for shot 19
Jun 24 2009 01:48:13:013PM1090624020Jim Irbyrepeat --- RGA levels lower

no better
Jun 24 2009 02:00:33:253PM1090624021Jim Irbyprefill from 25 to 15 ms --- open tree done

DUD --- too little gas?
Jun 24 2009 02:09:14:117PM1090624022Jim Irbyprefill from 15 to 20 ms

fizzle --- better than a dud
Jun 24 2009 02:20:33:103PM1090624023Jim Irbyrepeat

dud!
Jun 24 2009 02:37:34:890PM1090624024Jim Irbyef4 from -1220 to -1250 A

bzo lower

earlier breakdown than on shot 18


Jun 24 2009 02:48:53:130PM1090624025Jim Irbyef4 from -1250 to -1280 A --- open tree done

bz0 more negative

similar to 24 --- early breakdown
Jun 24 2009 03:04:32:120PM1090624026Jim Irbyprefill from 20 to 25 ms

fizzle. ciii a little lower than shot 25. pressure up to shot 18 level.
Jun 24 2009 03:11:12:467PM1090624027Jim Irbyno changes
Jun 24 2009 03:28:28:943PM1090624028Jim Irbyrepeat

similar to previous shot except ciii light down 20 or 30 %.


Jun 24 2009 03:38:50:870PM1090624029Jim Irbyno changes

enter cell and fix z-bolo shutter so we can ecdc..
Jun 24 2009 04:32:43:250PM1090624030Jim IrbyWe have done ECDC long enough for the mass4 level on the RGA to stop rising, indicating that the evolution of gas off the walls is small relative to the gas valve input. Mass3 down to morning ecdc levels.

IGT at 7e-7 Torr at PULSE

more plasma current
z-meter down a factor of 2 to 3
nel up a factor of 2


Jun 24 2009 04:45:42:830PM1090624031Jim Irbyz_bolo shutter frozen again --- no more ecdc today

ef4 from -1280 to -1250 A

still better, more plasma current, ciii down
Jun 24 2009 04:58:47:850PM1090624032Jim Irbyef4 from -1250 to -1220 A --- same as shot 18

dud...


Engineering Operator Comments
ShotTimeTypeStatusComment
109:10:05:393AMPlasmaBadEF4 aux breaker off
209:32:34:920AMPlasmaOk
309:46:04:737AMPlasmaOk
410:00:16:100AMPlasmaOk
510:22:58:623AMPlasmaOk
610:35:24:787AMPlasmaOk
710:47:55:493AMPlasmaOk
811:00:14:733AMPlasmaOk
911:12:53:220AMPlasmaOk
1011:25:25:833AMPlasmaOk
1111:38:06:980AMPlasmaOk
1211:50:27:187AMPlasmaOk
1312:04:24:630PMPlasmaOk
1412:17:04:057PMPlasmaOk
1512:29:52:500PMPlasmaOk
1612:42:17:677PMPlasmaOk
1712:55:30:743PMPlasmaOk
1801:11:04:780PMPlasmaOk
1901:26:30:397PMPlasmaOk
2001:39:25:353PMPlasmaOk
2101:51:58:670PMPlasmaOk
2202:05:39:253PMPlasmaOk
2302:18:08:370PMPlasmaOk
2402:30:44:390PMPlasmaOk
2502:43:46:880PMPlasmaOk
2602:58:44:260PMPlasmaOk
2703:11:29:123PMPlasmaOk
2803:24:02:033PMPlasmaOk
2903:36:27:570PMPlasmaOk
3004:26:35:323PMPlasmaOk
3104:39:04:110PMPlasmaOk
3204:51:35:723PMPlasmaOk
3305:04:02:103PMPlasmaOk

System Availability
Jun 24 2009 09:09:52:800AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticnoPower supplies are turned off. Gauge is removed.Jun 04 2008 01:24PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers are disabled. The penetration from the YAG lab to the cell is manually shuttered.May 27 2008 10:17AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgenosee aboveMay 27 2008 10:18AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 10:22:53:453AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers are disabled. The penetration from the YAG lab to the cell is manually shuttered.May 27 2008 10:17AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgenosee aboveMay 27 2008 10:18AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 10:35:19:537AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers are disabled. The penetration from the YAG lab to the cell is manually shuttered.May 27 2008 10:17AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgenosee aboveMay 27 2008 10:18AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 11:50:22:313AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers are disabled. The penetration from the YAG lab to the cell is manually shuttered.May 27 2008 10:17AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgenosee aboveMay 27 2008 10:18AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 12:04:19:927PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers are disabled. The penetration from the YAG lab to the cell is manually shuttered.May 27 2008 10:17AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgenosee aboveMay 27 2008 10:18AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 12:16:58:947PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers are disabled. The penetration from the YAG lab to the cell is manually shuttered.May 27 2008 10:17AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgenosee aboveMay 27 2008 10:18AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 12:29:46:890PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers are disabled. The penetration from the YAG lab to the cell is manually shuttered.May 27 2008 10:17AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - Edgenosee aboveMay 27 2008 10:18AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 01:39:20:417PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 01:51:53:763PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 02:05:34:317PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 02:18:03:603PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 02:30:39:327PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 02:43:41:677PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 02:58:39:243PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 03:11:24:060PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 03:23:56:987PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 03:36:22:383PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 04:26:30:370PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 04:38:59:110PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jun 24 2009 04:51:30:723PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.May 30 2008 01:59PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCnoDetector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2noDetector at LN2 temp.Jun 24 2009 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonnoFront end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold.Jun 24 2009 08:31AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and Hardsnodetector removed from machine ---- cables relled back to rackMay 30 2008 01:49PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke