| System Availability |
| Jun 24 2009 09:09:52:800AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | no | Power supplies are turned off. Gauge is removed. | Jun 04 2008 01:24PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Lasers are disabled. The penetration from the YAG lab to the cell is manually shuttered. | May 27 2008 10:17AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | see above | May 27 2008 10:18AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 10:22:53:453AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Lasers are disabled. The penetration from the YAG lab to the cell is manually shuttered. | May 27 2008 10:17AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | see above | May 27 2008 10:18AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 10:35:19:537AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Lasers are disabled. The penetration from the YAG lab to the cell is manually shuttered. | May 27 2008 10:17AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | see above | May 27 2008 10:18AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 11:50:22:313AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Lasers are disabled. The penetration from the YAG lab to the cell is manually shuttered. | May 27 2008 10:17AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | see above | May 27 2008 10:18AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 12:04:19:927PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Lasers are disabled. The penetration from the YAG lab to the cell is manually shuttered. | May 27 2008 10:17AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | see above | May 27 2008 10:18AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 12:16:58:947PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Lasers are disabled. The penetration from the YAG lab to the cell is manually shuttered. | May 27 2008 10:17AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | see above | May 27 2008 10:18AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 12:29:46:890PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Lasers are disabled. The penetration from the YAG lab to the cell is manually shuttered. | May 27 2008 10:17AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | see above | May 27 2008 10:18AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 01:39:20:417PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 01:51:53:763PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 02:05:34:317PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 02:18:03:603PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 02:30:39:327PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 02:43:41:677PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 02:58:39:243PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 03:11:24:060PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 03:23:56:987PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 03:36:22:383PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 04:26:30:370PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 04:38:59:110PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jun 24 2009 04:51:30:723PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Jun 10 2009 10:21AM (twf) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi-diode online only. | Jun 22 2009 10:26AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | external cryopump hardware removed from machine --- system is safe | May 30 2008 01:48PM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | Jul 03 2008 03:06PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | no | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Jun 04 2008 09:17AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | poses no safety hazard for people working around the machine | May 30 2008 01:54PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off, no hazard present. | May 30 2008 01:59PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controlleer is on. | Jun 24 2009 10:00AM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | no | Detector ready, on. But beamline up to air, not fully aligned. Some signals possible, not assured. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | no | Detector at LN2 temp. | Jun 24 2009 08:32AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Neither the Xpt-view nor the midplane-view camera is operational. | Nov 26 2007 04:25PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | Hirex-Sr has been removed from the cell and is in temporary storage | May 30 2008 01:48PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | | Jun 17 2009 03:43PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Rolled back | Jun 17 2009 03:43PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | no | Front end under good vacuum. Beamline installed, but not fully aligned or pumped down. Detector cold. | Jun 24 2009 08:31AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Power to all gauges is turned off. | Jun 04 2008 01:25PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Initial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. | May 30 2007 08:01PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | no | detector removed from machine ---- cables relled back to rack | May 30 2008 01:49PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | System is diabled. House air to all pneumatic valves is disconnected. | Jun 04 2008 01:26PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | no | All HV supplies are turned off and unplugged | Jun 02 2008 01:09PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | no | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jun 04 2008 09:18AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Power supplies are off. All cables are unplugged at the F-port rack. | Jun 02 2008 01:10PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | All power supplies are off. Cables are unplugged at the A-port rack. | Jun 02 2008 01:10PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | no | All power supplies are off. Cables are unplugged at the F-port rack. | Jun 02 2008 01:11PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Disconnected | May 30 2008 01:47PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Probe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack. | Jun 02 2008 01:14PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Probe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack. | Jun 02 2008 01:13PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Probe cables are disconnected at F-port rack. | Jun 02 2008 01:17PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | Expected availability: week of June 29 | Jun 24 2009 01:31PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|