Alcator C-Mod Run 1090629 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):
Engineering operator(s):

Engineering Operator Run Comment
Data system test cycles, JAS

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments

Engineering Operator Comments
ShotTimeTypeStatusComment
111:09:01:783AMTestOk
211:21:29:820AMTestOk
312:12:54:213PMTestOk
412:30:39:140PMTestOk
503:01:59:360PMTestOk

System Availability
Jun 29 2009 11:08:44:483AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphano\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableJun 04 2008 09:17AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoComputer system problem, the lower freq. 16 channels are ready.Jun 26 2009 03:37PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNeither the Xpt-view nor the midplane-view camera is operational. Nov 26 2007 04:25PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoPower to all gauges is turned off.Jun 04 2008 01:25PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoSystem is diabled. House air to all pneumatic valves is disconnected.Jun 04 2008 01:26PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesnoAll HV supplies are turned off and unpluggedJun 02 2008 01:09PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jun 04 2008 09:18AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke