Alcator C-Mod Run 1090707 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):Bill Rowan
Engineering operator(s):Sam Pierson,Bill Cochran,Gary Dekow

Engineering Operator Run Comment
MP 298A, C-Mod Plasma Startup, PO: Rowan, SL: , EO: Pierson

Session Leader Plans

Physics Operators Plans
Entered: Jul 6 2009 05:44:17:770PM
Author: Bill Rowan
Engineering Setup and Physop Plan for Tuesday, July 7, 2009, 1090707

-----------------
Purpose
-----------------

MP 298A, C-Mod Plasma Startup
PhysOp: Rowan
SL: TBD

-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1090701027

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable gatevalves and shutters: ECE, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes, when ICRF operator asks for it
LH(yes/no): no
DNB(yes/no): yes
Cryopump (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s
Vessel temp overnight 60/60/60 if possible

------------------------------
PO Plan
------------------------------

Load DPCS from 1090701027 (900ka, LSN); make sure dpcs_fizzle routine
is turned on.
Recalculate predictors.

The emphasis is on bringing up divertor heat diagnostics, A scanning probe,
DNB, and HIREX

During this run it is very likely that there will be a number of
cell accesses required to debug diagnostics. These have priority
over plasma operation during this run.

Session Leader Summaries

Physics Operator Summaries
Entered: Jul 8 2009 08:20:12:800AM
Author: Bill Rowan
This run included shots for clean-up and for diagnostic development. Note that Martin reported very high triangularity in the later shots compared to earlier ones.
C-Mod ran well throughout the day. Some gas changes were made early in the day, but there were no magnetics changes required until late in the day.
Diagnostic developement: There was frequent cell access for diagnostics. Ar was setup for hirex.
The ratiomatic pressures seem to be reading low. The pressure increment with increase in PG4 pulse length is approximately a factor of two lower than expected. The pressures were lower than expected (compare 1090701) for a given PG4 pulse length.
There was a fault on shot 016. A fault generated by the OH force detection system caused a TF fault. An offset and noise in the force detection system generated this spurious fault. Only the offset could be corrected prior to the next shot. (see Gary's comment under Power Systems for shot 016)
On shot 017, the ZXU proportional gain step at 0.3 s was apparently causing a thrash on EF1U (see Steve's comment on shot 018). On 017 and 018, the proportional gain was removed and then moved later. There were no changes in the DPCS settings for several shots prior to this problem appearing.

Score Card
20 plasmas (4 disruptions before 0.5 s, 001,008,016,017
0 fizzles
0 dud
----------
20 total


Session Leader Comments

Physics Operator Comments
Jul 7 2009 08:36:52:797AMBill RowanLoad from 1090701027
dpcs_fizzle routine is turned on
predictors recalculated

Jul 7 2009 09:16:27:813AM1090707001Bill Rowan001. Plasma
Disruption at 0.342

Next shot. No DPCS changes

Jul 7 2009 09:31:47:080AM1090707002Bill Rowan002. Plasma.
Mostly through ramp down 1.9 s
Early hard x-rays
Pressure is low on this shot and on 001



Cell access: TS and zap f14

Jul 7 2009 10:41:51:610AM1090707003Bill Rowan003.
Increase puff from 10 ms to 12 ms
BR_0 offset reset from 0.0 to 0.001
Delay for PLC repair
Enable PG1 for argon puff for hirex. 25 ms puff.


Plasma through ramp down.
Pressure increased from 0.01 (shot 002) to 0.013 mT
BR_0 at breakdown increased from -0.001 to approx 0.0
Jul 7 2009 10:53:36:813AM1090707004Bill Rowan004.
PG1 (b-side lower) increased from 25 ms to 50 ms
John says that the valve does not open when set as low as 25 ms
Increase puff from 12 ms to 15 ms

Plasma through ramp down
Pressure increased to 0.02 mT

Jul 7 2009 11:00:04:143AM1090707005Bill Rowan005.
No DPCS changes

Plasma through ramp down.

Jul 7 2009 11:40:13:643AM1090707006Bill Rowan006.
Increase pg1 from 15 ms to 17 ms

Plasma
Pressure increased to 0.24 mT at breakdown

Jul 7 2009 11:49:09:017AM1090707007Bill Rowan007.
No DPCS changes.

Plasma through ramp down.

Jul 7 2009 12:17:14:377PM1090707008Bill Rowan008.
No DPCS changes

Plasma but short. 0.45 s
PF breaker pulled
appears to be a spurious fault

Jul 7 2009 12:26:54:563PM1090707009Bill Rowan009.
No DPCS changes

Plasma

Jul 7 2009 12:58:02:750PM1090707010Bill Rowan010.
No DPCS changes

Plasma

Jul 7 2009 12:57:47:890PM1090707011Bill Rowan011.
No DPCS changes

Plasma

Jul 7 2009 01:11:30:267PM1090707012Bill Rowan012.
No DPCS changes

Plasma

Jul 7 2009 01:22:46:703PM1090707013Bill Rowan013
No DPCS changes

Plasma

Jul 7 2009 01:35:16:860PM1090707014Bill Rowan014.
No DPCS changes

Plasma

Jul 7 2009 01:49:20:703PM1090707015Bill Rowan015.
No DPCS changes

Plasma

Jul 7 2009 03:25:18:343PM1090707016Bill Rowan016.
No DPCS changes

Plasma. Disrupted at 0.315
EF3 breaker pulled
type 1 tf fault
type 2 dpcs fault

replaced two tf fuses

Jul 7 2009 03:51:56:530PM1090707017Bill Rowan017.
No DPCS changes

Plasma disrupted at 0.362 s
EF3 breaker pulled again

Jul 7 2009 04:20:54:670PM1090707018Bill Rowan018,
changed the ZXU proportional gain to remove the increase at 0.3 s

Plasma. Through ramp down.

Jul 7 2009 04:51:04:920PM1090707019Bill Rowan019.
changed the ZXU proportional gain. Increase from 2.0 to to 4 at 0.3 s
zapped bp06_jk (cell access)

Plasma through ramp down

Jul 7 2009 05:01:40:280PM1090707020Bill Rowan020.
zapped f14 (cell access)
changed the ZXU proportional gain. Increase from 4.0 to to 6.0 at 0.5s

Plasma. Through the ramp down.

Engineering Operator Comments
ShotTimeTypeStatusComment
108:59:55:330AMPlasmaOk
209:17:21:457AMPlasmaOk
310:24:38:440AMPlasmaOk
410:37:24:343AMPlasmaOk
510:57:21:423AMPlasmaOk
611:29:59:517AMPlasmaOk
711:42:56:813AMPlasmaOk
811:55:47:737AMPlasmaBadOH2 and EF1 Commutation Fault
912:19:28:330PMPlasmaOk
1012:35:10:313PMPlasmaOk
1112:47:59:347PMPlasmaOk
1201:07:31:627PMPlasmaOk
1301:20:21:597PMPlasmaOk
1401:33:10:377PMPlasmaOk
1501:46:10:390PMPlasmaOk
1602:26:27:090PMPlasmaBadAll PF type 2 fault occurred
1703:32:13:110PMPlasmaBadOH1 Self Powered Circuit Fired. Fault maybe results of the plasma disru
1804:18:41:890PMPlasmaOk
1904:46:03:810PMPlasmaOk
2004:58:48:687PMPlasmaOk

System Availability
Jul 7 2009 08:59:38:313AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi-diode online only.Jun 22 2009 10:26AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoComputer system problem, the lower freq. 16 channels are ready.Jun 26 2009 03:37PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphano Jun 17 2009 03:43PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is reading identically zero - probably a CAMAC problem.Jun 30 2009 09:40PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum needs to be baked and tested for leaks.Jun 30 2009 09:41PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jul 7 2009 01:07:12:127PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMost systems collecting data but not calibrated. WB2 and WB1 not attached.Jul 07 2009 01:00PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoComputer system problem, the lower freq. 16 channels are ready.Jun 26 2009 03:37PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is reading identically zero - probably a CAMAC problem.Jun 30 2009 09:40PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum needs to be baked and tested for leaks.Jun 30 2009 09:41PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke