Alcator C-Mod Run 1090708 Information

Back to runs

Miniproposals
Miniproposal:355
Date Filed:11/12/2003
Title:ICRF Testing & Conditioning
First Author:Steve Wukitch
Session Leader:Yijun Lin (shots 1-32)

Operators
Session leader(s):Yijun Lin
Physics operator(s):Robert Granetz
Engineering operator(s):Andy Pfeiffer,Sam Pierson,Bill Byford

Engineering Operator Run Comment
MP355 - ICRF testing and conditoning Session leaders: S. Wukitch/Y. Lin

Session Leader Plans

Physics Operators Plans
Entered: Jul 7 2009 08:42:29:030PM
Author: Robert Granetz

Engineering setup for Wednesday 2009/07/08

MP355 - ICRF testing and conditoning

Session leaders: S. Wukitch/Y. Lin
Physics operator: R. Granetz

Standard overnight ECDC and 60 C bake

Run will start at 09:00 and end at 17:00.

Power systems as on 1090707018 (Bt=5.4T, Ip=0.9 MA, nl04=0.9-1e20 m-2)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
   fill B-Top            with  6 psi D2  Hybrid enabled  (PG4)
   fill B-side lower     with  1 psi Ar  Hybrid DISABLED (PG1)
  leave B-side upper     as is           Hybrid DISABLED (PG2)   
   fill B-main (C-side)  with 40 psi D2  Hybrid enabled  (PG3)
  leave NINJA            as is           DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
  ECE, Z-bolo
 
Torvac setup: keep gate valves open during PULSE

Specific diagnostics: magnetics, ECE, TCI
------------------------------------------------------------------------------
ICRF Setup: conditioning of D & E
LH Setup: no
DNB: no
Cryopump: no
------------------------------------------------------------------------------
Run plan: see session leader's run plan


Session Leader Summaries
Entered: Jul 13 2009 09:02:08:510AM
Author: Yijun Lin
D and E antennas have been both conditioned up to 1 MW level with few faults. The FFT system was working properly on E port.

The RF pulses were set to no more than 300 ms for each antenna, and power no more than 1 MW, in order to avoid the erosion of the boron layer on boron coated tiles.

Some disruptions by injection seemed to be related to E antenna power above 0.8 MW.


Physics Operator Summaries

Session Leader Comments
Jul 8 2009 08:59:56:067AMYijun LinWe will run standard plasmas developed in the last several runs.

nl=0.9, Bt = 5.4 T, Ip = 0.9 MA.

We run D and E antenna from low to high power shot by shot, check out all the signals/arc protection/matching/FFT etc, and aim to get as much power as possible.

(see entries under RF topic for this run).
Jul 8 2009 09:35:19:897AM1090708001Yijun LinE port to plasma, 0.4 MW. All signals/control/FFT worked.
H/(H+D) @ 14%

FMIT #1 failed to come up HV. The cause has been traced to Hi-yard. We will run E antenna only until FMIT#1 is fixed,
Jul 8 2009 10:07:58:067AM1090708002Yijun LinTF test.
Alan and Rick replaced a fuse in Hi-yard.
FMIT#1 should have been fixed.
Jul 8 2009 10:18:17:630AM1090708003Yijun Lindisrupted at 0.5 sec. no RF.
Jul 8 2009 11:09:34:333AM1090708006Yijun LinE port ran at 0.8 MW. 6 faults.

Next: run D also.
Jul 8 2009 11:34:55:927AM1090708007Yijun LinBoth D and E ran. Good.
H/(H+D) was 20%-22%
Next: slightly higher power.
Jul 8 2009 11:43:19:100AM1090708008Yijun LinDisruption at 0.73 sec.
E ran for ~100 ms. Several faults.
Next: repeat
Jul 8 2009 12:12:28:317PM1090708010Yijun LinE ran. faults.
Early disruption.
Next: repeat.
Jul 8 2009 12:20:38:820PM1090708011Yijun Linfizzle
Jul 8 2009 12:38:04:427PM1090708012Yijun LinD and E ran. 1 to 2 faults.
Next: raise power to 1.2 MW. but shorter RF pulse length (0.15 s per ant).
Jul 8 2009 12:57:49:973PM1090708013Yijun LinD and E ran.
many faults on E. 1 fault on D.
(John mentioned high Mo level when D was on).
Next: same E. Raise D, and shorten pulse.
Jul 8 2009 01:00:13:757PM1090708014Yijun Linfizzle
Jul 8 2009 01:16:24:583PM1090708015Yijun Linfizzle
Jul 8 2009 01:27:27:757PM1090708016Yijun LinD and E ran. An injection at 0.85 sec.
Next: no changes.
Jul 8 2009 01:42:37:820PM1090708017Yijun LinE run. disruption at 0.88 sec (due to E antenna?)
next: run D earlier, and see whether the disruption was caused by E antenna
Jul 8 2009 02:01:17:880PM1090708018Yijun LinE was causing disruption.
H/(H+d) = 25%
Next: lower E power a little and see whether we can avoid disruption.
Jul 8 2009 02:08:37:350PM1090708019Yijun LinE caused disruption again (although the power demand is rather low).
D ran well.
Next: delay E more, and also lower power.
Jul 8 2009 02:25:38:490PM1090708020Yijun LinNo disruption. D and E ran.
Next: raise E power.

Jul 8 2009 04:18:43:757PM1090708021Yijun Lindisruption again as soon as E ran at 0.8 MW
FMIT #1 had crowbar event (anode voltage).
Next: increase outer gap, and see whether we can avoid the disruption.

Jul 8 2009 03:00:35:960PM1090708022Yijun LinOuter gap increased to 1.7 cm. But still disrupted when E was on.
next: repeat.
Jul 8 2009 03:09:55:693PM1090708023Yijun LinD run. many faults (due to outer gap increase?)
Disrupted at 1.28 sec. before E was supposed to start.

Jul 8 2009 03:19:42:787PM1090708024Yijun Linfizzle
Jul 8 2009 03:32:14:380PM1090708025Yijun Linfizzle
Jul 8 2009 03:46:36:990PM1090708026Yijun LinD and E ran.
Disrupted during E antenna pulse. (but E ran longer this time at this power level)
Next: repeat.
Jul 8 2009 04:01:15:397PM1090708027Yijun LinD/E ran. No disruption.
Next: raise E to 0.9 MW. Same D.
Jul 8 2009 04:18:58:473PM1090708028Yijun Linfizzle
Jul 8 2009 04:26:13:147PM1090708029Yijun LinD/E ran. E had multiple faults, but no disruption.
Next: move E earlier. same power.
Jul 8 2009 04:39:14:460PM1090708030Yijun Linfizzle
Jul 8 2009 04:51:01:113PM1090708031Yijun LinD and E ran. E had many faults. but it is better.
Next: repeat.
Jul 8 2009 05:02:48:333PM1090708032Yijun Linfizzle.
End of run.

Physics Operator Comments
Jul 8 2009 08:49:47:983AMRobert Granetz
Load shot 1090707020 from the end of yesterday's run.

Jul 8 2009 10:28:45:490AM1090708001Robert Granetz
Shot 01 -- Plasma.  Good shot.  0.9 MA, 5.3 T, nl_04=0.9e20 m-2.  Kappa=1.73, and constant.
           There was a TF ground indication at TF turn-on.  Prf_E=0.4 MW.

           Power room and cell access for RF, TS.

Next shot: Change TF programming so that the demand has a finite ramp, rather than
           an instantaneous jump.  We'll have a TF-only test for shot 02.

Jul 8 2009 10:28:23:647AM1090708002Robert Granetz
Shot 02 -- Test of TF only, under hybrid control, using a finite rampup demand, rather than an instantaneous
           rampup.  Good test; no spikes, no ground indication.

Next shot: go for plasma

Jul 8 2009 10:22:58:380AM1090708003Robert Granetz
Shot 03 -- Plasma.  Disrupted at t=0.54 s.

           Cell access for RF.

Next shot: repeat, no changes.

Jul 8 2009 10:37:21:427AM1090708004Robert Granetz
Shot 04 -- Fizzle.

Next shot: reduce pre-fill by 1 ms (to 16 ms)

Jul 8 2009 10:55:07:083AM1090708005Robert Granetz
Shot 05 -- Fizzle.

Next shot: decrease pre-fill another 2 ms (to 14 ms).

Jul 8 2009 11:25:38:677AM1090708006Robert Granetz
Shot 06 -- Plasma.  Disrupts at t=0.83 s.  Prf_E=0.75 MW, numerous faults.  Lots
           of hard x-rays.  There was some peculiar thing flying past the WIDE2 view
           immediately after the disruption.

Next shot: I'm tempted to reduce the pre-fill some more because of this disruption,
           but I want to avoid the early hard x-rays, so I'll leave the pre-fill as
           is.  We'll probably get a fizzle.

Jul 8 2009 11:38:26:863AM1090708007Robert Granetz
Shot 07 -- Plasma.  Good shot.  Some early hards.  Prf_D=0.6 MW, Prf_E=0.5-0.75 MW.

Next shot: enable argon (50 ms); enable HIREX-SR gate valve; add 1 ms to pre-fill.
           Also increase early PG3 programming in seg 1 a bit.

Jul 8 2009 11:45:52:520AM1090708008Robert Granetz
Shot 08 -- Plasma.  Disrupted at t=0.73 s.  No early hard x-rays though.  E-port faulted a lot.

Next shot: reduce pre-fill by 1 ms.

Jul 8 2009 12:00:57:523PM1090708009Robert Granetz
Shot 09 -- Plasma.  Good shot.  Lots of early hard x-rays again.
           Prf_D=0.9 MW w/faulting, Prf_E=0.75 MW clean.
           H/(H+D)=25%

Next shot: increase pre-fill 2 ms, increase early PG3 programming

Jul 8 2009 12:13:24:490PM1090708010Robert Granetz
Shot 10 -- Plasma.  Disrupted at t=0.78 s.  This time it was clearly an injection that
           can be seen on the xtomo signals.  E-port RF faulted a lot.  No early hard x-rays.

Next shot: reduce pre-fill 2 ms because of this disruption

Jul 8 2009 12:20:32:553PM1090708011Robert Granetz
Shot 11 -- Fizzle.

Next shot: no DPCS changes

Jul 8 2009 12:39:45:193PM1090708012Robert Granetz
Shot 12 -- Plasma.  Good shot.  Huge hard x-ray signal.  Prf_D=1 MW, Prf_E=1 MW.

Next shot: increase pre-fill by 2 ms

Jul 8 2009 12:51:42:613PM1090708013Robert Granetz
Shot 13 -- Plasma.  Good shot.  No hard x-rays.  Prf_D=1 MW, Prf_E faulted a lot.
           H/(H+D)=0.23-0.28

Next shot: add 1 ms to pre-fill

Jul 8 2009 01:02:06:863PM1090708014Robert Granetz
Shot 14 -- Fizzle.  Certainly didn't expect that.

Next shot: reduce pre-fill by 2 ms

Jul 8 2009 01:22:29:677PM1090708015Robert Granetz
Shot 15 -- Dud!  F-side ratiomatic signal is bad; don't know what the breakdown pressure was.
           Null is normal.  No magnetics errors.  Ron Rosati tells me that there was a pressure
           burst several minutes prior to this shot, but it had pumped out when I took the shot.

Next shot: No DPCS changes; what the torus pressure closely

Jul 8 2009 01:28:53:787PM1090708016Robert Granetz
Shot 16 -- Plasma.  Good shot.  No hard x-rays.  There was a big injection of something
           at t=0.85 s, but this time the plasma survived.  E-port antenna was faulting badly
           at that time.

Next shot: no DPCS changes

Jul 8 2009 01:43:25:613PM1090708017Robert Granetz
Shot 17 -- Plasma.  Disrupted at t=0.87, which is almost exactly when the injection occurred on the
           preceding shot.

Next shot: Get the fizzle out of the way.  I've asked Yijun to swap the timing of the D and E
           antennas.  Next shot, D-port will come on first, then E-port.  Let's see if that
           changes the disruption timing.

Jul 8 2009 01:58:58:660PM1090708018Robert Granetz
Shot 18 -- Plasma.  This one disrupted at t=1.1 s.  I think the delayed disruption time is because
           I had Yijun swap the timing of D and E antennas.  Now D-port goes first (Prf_D=1 MW), and
           E-port comes on at t=1.0 s and goes until the disruption.  This is exactly what one
           would see if E-port is causing the disruptions.

Next shot: repeat (probably have to get through a fizzle first though)

Jul 8 2009 02:09:55:210PM1090708019Robert Granetz
Shot 19 -- Plasma.  Disrupts at t=1.1 s again, which is while E-port is on.  Lots of hard x-rays,
           but if I increase the pre-fill, I think I'll get a fizzle.

Next shot: delay E-port turn-on until t=1.4 s

Jul 8 2009 02:32:26:317PM1090708020Robert Granetz
Shot 20 -- Plasma.  Good shot.  This time the E-port power was reduced to 0.6 MW.
           Almost no hard x-rays.

Next shot: repeat, no DPCS changes.  Raise E-port power.

Jul 8 2009 02:51:50:007PM1090708021Robert Granetz
Shot 21 -- Plasma.  Disrupted at t=1.33 s, just after E-port antenna turns on (at slightly higher
           power than on the preceding shot).  A lot of fingers seem to be pointing at E-port as
           the trigger for the disruptions.

Next shot: increase outer gap by 4 mm (from 15 to 19 mm) by reducing RCUR by 2 mm

Jul 8 2009 03:01:34:880PM1090708022Robert Granetz
Shot 22 -- Plasma.  Disrupted at t=1.36 s, again when E-port is on.  The outer gap increase 1-3 mm.

Next shot: tweak RCUR some more to make the outer gap more constant, and to increase it another 1 mm.

Jul 8 2009 03:17:03:787PM1090708023Robert Granetz
Shot 23 -- Plasma.  Disrupted at t=1.28 s, which is before the E-port turn-on time, and well after 
           D-port turned off.  Lots of hard x-rays.  Outer gap = 19 +/- 1 mm.

Next shot: no DPCS changes

Jul 8 2009 03:21:06:710PM1090708024Robert Granetz
Shot 24 -- Fizzle.

Next shot: increase RCUR by 0.5 mm to reduce elongation slightly

Jul 8 2009 03:34:07:020PM1090708025Robert Granetz
Shot 25 -- Fizzle.

Next shot: reduce CLEARIN by 1 mm to further reduce the elongation

Jul 8 2009 03:51:31:427PM1090708026Robert Granetz
Shot 26 -- Plasma.  Disrupted at t=1.45 s.

Next shot: reduce CLEARIN again, this time by 4 mm, to further decrease the elongation 

Jul 8 2009 04:03:53:770PM1090708027Robert Granetz
Shot 27 -- Plasma.  Good shot.  The CLEARIN change reduced kappa to 1.71, and kept n/ncrit at 1.1.
           Prf_D=0.85 MW, Prf_E=0.75 MW.  Some hard x-rays.  H/(H+D)=0.25-0.28

Next shot: increase pre-fill by 1 ms

Jul 8 2009 04:15:25:913PM1090708028Robert Granetz
Shot 28 -- Fizzle.

Next shot: reduce pre-fill by 1 ms

Jul 8 2009 04:26:56:223PM1090708029Robert Granetz
Shot 29 -- Plasma.  Good shot.  Left gap=1.1 cm, right gap=1.6 cm.  kappa=1.71.
           No hard x-rays.

Next shot: no DPCS changes; move E-port earlier

Jul 8 2009 04:38:23:067PM1090708030Robert Granetz
Shot 30 -- Fizzle...our classic alternating pattern.

Next shot: make sure it's an odd shot number

Jul 8 2009 04:53:26:537PM1090708031Robert Granetz
Shot 31 -- Plasma.  Good shot.  Prf_D=1 MW (clean), Prf_E=0.85 MW (faulting).

Next shot: no DPCS changes.  Maybe we should skip the even shot number.

Jul 8 2009 05:02:28:630PM1090708032Robert Granetz
Shot 32 -- Fizzle.  Let's hope that overnight ECDC will get us out of this alternating pattern.

End of run

Jul 8 2009 05:30:09:163PM1090708032Robert Granetz
After the run, I zapped BP17_BC and BP23_BC.  (Neither are being used for anything.)

Engineering Operator Comments
ShotTimeTypeStatusComment
108:59:46:020AMPlasmaOkTF ground fault
209:51:17:240AMTestOkTF ramp
310:11:38:943AMPlasmaOk
410:33:00:880AMPlasmaOk
510:50:07:160AMPlasmaOk
611:03:49:397AMPlasmaOk
711:26:35:397AMPlasmaOk
811:39:14:350AMPlasmaOk
911:52:09:410AMPlasmaOk
1012:05:04:223PMPlasmaOk
1112:17:56:630PMPlasmaOk
1212:30:43:270PMPlasmaOk
1312:43:28:943PMPlasmaOk
1412:58:15:053PMPlasmaOk
1501:11:02:443PMPlasmaOk
1601:23:50:147PMPlasmaOk
1701:36:34:617PMPlasmaOk
1801:49:20:020PMPlasmaOk
1902:02:20:117PMPlasmaOk
2002:21:54:897PMPlasmaOk
2102:38:11:600PMPlasmaOk
2202:52:26:083PMPlasmaOk
2303:05:05:927PMPlasmaOk
2403:17:42:210PMPlasmaOk
2503:30:16:333PMPlasmaOk
2603:42:59:037PMPlasmaOk
2703:56:15:537PMPlasmaOk
2804:08:54:287PMPlasmaOk
2904:21:36:960PMPlasmaOk
3004:34:19:020PMPlasmaOk
3104:47:05:270PMPlasmaOk
3204:59:35:553PMPlasmaOk

System Availability
Jul 8 2009 08:59:21:113AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMost systems collecting data but not calibrated. WB2 and WB1 not attached.Jul 07 2009 01:00PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoComputer system problem, the lower freq. 16 channels are ready.Jun 26 2009 03:37PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is reading identically zero - probably a CAMAC problem.Jun 30 2009 09:40PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum needs to be baked and tested for leaks.Jun 30 2009 09:41PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernoDisconnectedMay 30 2008 01:47PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jul 8 2009 09:50:54:007AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMost systems collecting data but not calibrated. WB2 and WB1 not attached.Jul 07 2009 01:00PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoComputer system problem, the lower freq. 16 channels are ready.Jun 26 2009 03:37PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is reading identically zero - probably a CAMAC problem.Jun 30 2009 09:40PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum needs to be baked and tested for leaks.Jun 30 2009 09:41PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140 and swept are connected and currently being tested but should be available too. The 110 is offlineJul 08 2009 09:47AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jul 8 2009 12:04:41:410PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnovertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Jun 10 2009 10:21AM (twf)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMost systems collecting data but not calibrated. WB2 and WB1 not attached.Jul 07 2009 01:00PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[74.2:86.3]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.Jul 03 2008 03:06PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoComputer system problem, the lower freq. 16 channels are ready.Jun 26 2009 03:37PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is reading identically zero - probably a CAMAC problem.Jun 30 2009 09:40PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum needs to be baked and tested for leaks.Jun 30 2009 09:41PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140 and swept are connected and currently being tested but should be available too. The 110 is offlineJul 08 2009 09:47AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke