Alcator C-Mod Run 1090710 Information

Back to runs

Miniproposals
Miniproposal:556
Date Filed: 6/29/2009
Title:Lower Bt Operation, Breakdown and Discharge Development
First Author:Chuck Kessel
Session Leader:Chuck Kessel (shots 1-35)

Operators
Session leader(s):Chuck Kessel
Physics operator(s):Ian Hutchinson
Engineering operator(s):Andy Pfeiffer,Bill Cochran,Ed Fitzgerald

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Jul 8 2009 04:10:29:863PM
Author: Chuck Kessel
MP 556 Low Bt startup and discharge development

The purpose of this experiment is to establish low Bt (3.0-3.3 T) breakdown and reference ohmic discharges for use in future experiments. Plans below depend heavily on I. Hutchinson's progress and operating.

recover 1080221010, without aux heating, Ip = 450 kA in 500 ms, flattop out to 1.5 s

1) begin with Bt = 3.3 T, establish breakdown, with as close as possible AT rampup with early divert

2) pursue lower voltage startup to enable lower Bt startup and also smooth out transition from ressitors to power supplies in AT rampup, attempting to maintain early divert time

3) pursue higher plasma currents, 600 kA, 750kA, and >850kA (which gives q95 of 3 depending on shape)

4) density scan and ohmic H-mode access at lower Bt, at various Ip values established

5) understand any impacts on diagnostics at lower field



Physics Operators Plans
Entered: Jul 8 2009 04:09:22:007PM
Author: Ian Hutchinson
Shot references:
________________

1090707010 this week's decent start up.
1030515014 no-commutation startup.
1080221010 slow-ramp-up. But has a bouncy startup that whole day.
segment switch is at .08s.

Null adjustment for lowered Bt
______________________________

We plan to do this with EF1 adjustment that adjusts the current in about
the right place.

According to Wolfe, the effects of these currents are (signed)
EF1 gives B_z: 11.4e-6 T/A
TF gives B_z: 5.96e-8 T/A

150kA corresponds to 5.3T. So 3 T is 85kA = 150 - 75kA.
To compensate -75kA TF requires 75x 5.96e-8 / 11.4e-6 = -0.39 kA EF1.
Currently we have currents of about -5.85kA these will have to be
lowered to about -6.25kA. The PLC limits are set at [-.5,7.5] with
irrational sign reversal so there is no need to adjust PLC limits.

Outline Day plan. (What I planned to do)
________________

1.Commutated Startup: (preprepared)

Take shot 1080221010, which Chuck likes, but has hopeless initiation.
Import segment 1 from 1090907010, the present programming.
Lower B_t to 3T throughout segs 1 and 2, I guess.
Adjust EF1 currents downward by 0.4kA.
Move crowbars on all circuits to 40ms otherwise that shot won't
make much sense and will overshoot the current required.
Look at voltage programming and adjust in line with crowbar timing.
Try.

Tweak fields. Simultaneously tweak later voltages as necessary.
Get breakdown, and current ramp. That's step1. Commutated startup.

2.Uncommutated Startup: (preprepared)

Take shot 1080221010.
Import segment 1 from 1030515014.
Lower the effective voltage after 40ms through current and voltage
programming.

Try
Tweak fields to get breakdown and ramp up.
Adjust later ramp-rate, shape, and position.

3. Further Commutated Adjustments:

If 2. is unsuccessful, reload the results of 1 and move the crowbars
to 30ms or even 25ms. Adjust the voltages and currents to make the
Ip ramp slower during the rest of seg 1.


Prepreparation (What I did.)
______________

Early Crowbar at 3T
___________________

Load from 1080221010. Warning to recalculate magnetics predictors.
Do this for segment 2. Top 8 predictors.
RCUR factor needs to be lowered a bit.

Import seg1 from 1090701021. But Wolfe has changed the Bt offsets.
So instead use 1090907010 from Tuesday, which is already fixed.
No popup warning.

Build all.
Save as shot 1001 in scratch.

Restart PCS.
Load from scratch 1001. Get a warning. Why?
PCS config 21-nov-07 does not match hybrid 7-jul-09.
build all. save as shot 1001. quit. pcs(safe). load from 1001.
Warns again.
Wolfe says that is probably ok. Should go away after a load, which I
can't do at the moment.

Set TF current to 85kA in Seg 1, Seg 2.
Set IC_EF1U (was -5887) to -6287
Set IC_EF1L (was -5885) to -6285
Build all. Save as 1001.

Standard crowbar times are 120ms OHs, 200 EFs. There's no voltage
programming steps in PCS that correspond to that. (Seg2)

The Bus Voltage steps at the 40ms crowbar (of OHs only) are about
-100V OH2, and -400V OH1. These need to be compensated.
Nothing was programmed in for the prior shot.

Also we need to crowbar the EF1s (for which we've only got the late
crowbar to read from). It looks as if the crowbar causes a negative
step of about 400V on EF1 bus. Which is consistent with 70mOmh x 6kA.

Suppose we wish to step to about half the total loop voltage at 40ms.
That is to about 3V from about 6V. This is roughly bus voltages
of 240V EF1, 80V OH2, 375V OH1. These voltages must come from the
power supplies. That's what we should have after the crowbar.
Did that.

For EF3 we need to reduce its voltage also by about a factor of 2.
From about 2200V to about 1100V. Did that. That should complete
the prepreparation for step 1. Save as 1001.

However, that might not be enough. Look at the ICs. The following
have zero gain after time t=0: OH1, OH2.
But EF1 does not. It is zero till 60ms. Then comes on again for no
obvious reason. Zero it. Leave others alone.
Build all. Save as 1001.

Uncommutated 3T.
________________

Start from what we now have. Import seg 1 from 1030515014.
PCS configuration warnings. Error opening dpcs tree.
Call all predictors in seg 1.
Make Br offset .001
Build All. Save as 1002.

Zero the IC_EF1 gain in seg1.
Voltage programming. Change nothing prior to 30ms.
Ramp to the 3V equivalent voltages above at 40ms.
Set TF to -85000A.
Build All. Save as 1002.

That's the prepreparation for step 2.

Made logbook entry as PO-Plan. It did not appear in logbook.
Entered: Jul 8 2009 05:40:22:507PM
Author: Ian Hutchinson
Engineering setup for Friday 10 July.

Low Field Startup.

Engineering settings ought to be the same as 07 July 09. (Tuesday this week).
The one exception is that we will have _all_ crowbars (OH1,2 EF1) at 0.04s.

We will start by lowering the TF current to 85kA (for shot 1).

Later in the day, we will probably be going to no commutation startup.
This was implemented in the past (1030515014) by delaying the commutation
(Open) and the switch Crowbar to well after the shot (e.g. 5sec or later).
At that time there won't be any current in the coils, and the charging of the
commutation banks are therefore unnecessary (and possibly undesirable).

I urge that the Engineering Operator do what homework is necessary to know
how to do the change to no-commutation in the middle of the run with no fuss. Thanks.

Session Leader Summaries

Physics Operator Summaries
Entered: Jul 10 2009 05:26:55:147PM
Author: Ian Hutchinson
Overall
_______

Step 1 of the plan was amazingly successful. We got full plasmas with
3T startup at shot 3 and they all but one went from then
on. Considerable adjustment of the crowbar and segment switch
programming was used to get rid of jolts at those switches. Various
flattop plasma currents were explored at the desire of the SL. A few
disruptions were obtained which proved the robustness of the startup
of the next shot. Two ohmic H-modes were obtained by running at qpsi
of 2.8 shots 14, 15.

Use the startup of shot 15 for future low field slow ramp-ups.

The only real disadvantage is that we already reach 200kA by crowbar.

Step2 of the plan was much less successful. Non-commutation shots at
3T proved to be easy to get a fizzle but a current ramp-up was not
found. The coil currents and voltages appeared to be different from
2003 despite a load from prior shots with plasma. The prior attempts
proved difficult because of persistent duds. This time duds were not a
serious problem, but control of the coil currents and voltages during
initial rise was bothersome.

I am convinced that there is a way to get the machine to start without
commutation, at 3T or 5T field. But it's going to take more physoping
to develop it.


Scorecard
---------


  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |   01   0.000   0.030   Dud     |   02   0.000   0.028   Dud     |
  |   03   1.964   0.452   Plasma  |   04   1.963   0.452   Plasma  |
  |   05   0.000   0.039   Fizzle  |   06   1.970   0.453   Plasma  |
  |   07   1.971   0.452   Plasma  |   08   1.964   0.454   Plasma  |
  |   09   1.276   0.602   Plasma  |   10   1.967   0.600   Plasma  |
  |   11   0.609   0.792   Plasma  |   12   0.942   0.694   Plasma  |
  |   13   1.939   0.689   Plasma  |   14   1.918   0.789   Plasma  |
  |   15   1.650   0.789   Plasma  |   16   0.000   0.033   Fizzle  |
  |   17   0.000   0.032   Fizzle  |   18   0.000   0.032   Fizzle  |
  |   19   0.000   0.032   Fizzle  |   20   0.000   0.032   Fizzle  |
  |   21   0.000   0.031   Fizzle  |   22   0.000   0.031   Fizzle  |
  |   23   0.000   0.031   Fizzle  |   24   0.000   0.030   Fizzle  |
  |   25   0.000   0.030   Fizzle  |   26   0.000   0.031   Fizzle  |
  |   27   0.000   0.031   Fizzle  |   28   0.000   0.031   Fizzle  |
  |   29   0.000   0.030   Dud     |   30   0.000   0.032   Fizzle  |
  |   31   0.000   0.030   Fizzle  |   32   0.000   0.031   Fizzle  |
  |   33   0.000   0.030   Fizzle  |   34   0.000   0.030   Fizzle  |
  |   35   0.000   0.030   Dud    
Date 1090710:  35 shots.  12 plasmas.  19 fizzles.   4 duds.   0 System Error.
        (Plasma = Ip gt 60.0 kA   Dud = H_alpha lt  0.40 V)
Total plasma duration: 20.13 s (exceeding -100 kA)



Peculiarity for consideration
-----------------------------
The fizzle programming ramps the field up to 5T even though we are only asking
for 3T. That's a bit bizarre, but we don't know if it is a good idea to change it. The programming is not directly available in the PCS screens, but is under
PCS control.

Session Leader Comments
Jul 10 2009 11:08:35:470AM1090710008Chuck Kesselshots 003, 004, 006, 006, 007, 008 all good discharges at Bt = 3.42-3.5
Ip = 450 kA at 500 ms
good reproductions of last years discharges with several improvements from Ian
early diverts are preserved
Jul 10 2009 11:40:59:440AM1090710010Chuck Kesselgood shot at 600 kA by 500 ms, Bt at 3.42 T, all the way thru
Jul 10 2009 12:12:48:143PM1090710012Chuck Kessel011 and 012 targeting higher Ip to get close to q95=3
011 750 kA too high
012 700 kA looks like vertical stability, q95 OK, higher density
good startup and rampup, but disruptions in flattop

Jul 10 2009 12:27:42:753PM1090710013Chuck Kesselexcellent, 700 kA, q95 = 3.2 ish, good shot all the way thru, Bt = 3.42
Jul 10 2009 12:35:02:610PM1090710014Chuck KesselYES! 800 kA, q95 = 2.8, H-modes late in flattop, Bt = 3.42
Great day for low Bt expt
Thanks Ian!

Physics Operator Comments
Jul 10 2009 08:58:49:893AMIan HutchinsonLoad from /home/hutch/scratch/1001 build all, load. Ok.

Tell engineering operators to start TF at -0.5s.
Draw TF curve that takes us through 88kA at 0s.
EF1U to -6187A EF1L to -6185A.
PG4 Gas prefill is 17ms. Leave alone.

Bus Currents in this shot at t=0 were (L,U):
EF1 -5825 -5874
EF2 -1951, -2000
EF4 -1265
OH1 -19700
OH2 -25710 26237

Load
Jul 10 2009 09:26:46:250AM1090710001Ian HutchinsonPressures are 6 psi in B-top, 40psi in B-main.
We've lost the ratiomatic. There's a short. We're running blind.
Problem with EF3 upper cooling delays us slightly.
Let's go!

Dud.
Null fairly open.
At times t=0 and t=10ms
Bz=-2.3 +4.3 mT
Br=-.5 -.5mT
Slow the Bz ramp: EF3 to 2400V.
EF1s to -608. from -618.A
Load.
Jul 10 2009 09:44:03:767AM1090710002Ian HutchinsonDud.
Null opened up as expected however Bz rose too much.
Bz= -.8, +4.2 Br=-.5,-.5

TF demands to 89000 99000 at -20, +20ms because we are not getting what
we are asking for.
ICEF4 to -1340 from -1290
Load
Jul 10 2009 10:06:10:410AM1090710003Ian HutchinsonPlasma to Rampdown.
Breakdown at 5.2ms. Very nice open null.
Plasma seems high by 2.5cm initially then comes down.
Nothing visible on bounce scope.


Reaches 200kA at 40ms. The crowbar crunches the plasma on inner wall.
EF3 voltage to 900V from 1100V at crowbar.
Tweak TF current in seg1. Set to 93500 in seg2.
Load
Jul 10 2009 10:19:42:957AM1090710004Ian HutchinsonPlasma to rampdown.
Breakdown at 4.9ms. Slight bounce early.
Still big inward thrash at crowbar. Better than it was but still bad.
Z-thrash at segment switch.

TF to 96kA in seg1.
Ef3 to 700V at 41ms.
Zcur to 0 vs -1cm in seg2 at 80ms.
Jul 10 2009 10:31:14:893AM1090710005Ian HutchinsonFizzle. Bounce at 15ms not survived this time. Probably on outside.

EF3V to 2600 from 2400 at 13ms.
Load.
Jul 10 2009 10:46:32:440AM1090710006Ian HutchinsonPlasma to rampdown.
Breakdown at 5.1ms
Still a pretty severe bounce.

EF3V to 2800 at 13ms.
Move OH transition programming 2ms earlier.
Jul 10 2009 11:01:08:910AM1090710007Ian HutchinsonPlasma till rampdown.
Breadown at 5.2ms. Bounce still present at 12ms.
Crowbar excursion substantially reduces.

Move EF3 crowbar programming step 2ms earlier.
Raise EF1 voltage during 50-80ms. Load.
Add 7ms EF3V point at 2800V. Load.
Jul 10 2009 11:17:29:393AM1090710008Ian HutchinsonPlasma to rampdown. Early bounce gone.


Put a point in seg1 at 30ms to reduce the TF.
Enable Hirex Sr. Enable Ar puff 30ms.
Current to 0.6MA at .5s
RCUR to .65 at 50ms.
EF1 voltage increase initial point of seg2.
Jul 10 2009 11:38:39:533AM1090710009Ian HutchinsonPlasma disrupts at 1.27s. Growing vertical oscillation.

Add 3mm to rcur late, and 2mm to rcur at .25s to fix vertical oscillations.
Add 5mm to rcur at 80ms in seg 2 to fix the excursion at seg switch.
Jul 10 2009 11:43:12:097AM1090710010Ian HutchinsonPlasma to rampdown.
Late oscillation fixed. 0.2s still a bit problematic.

Ip to 0.75MA
EF3V to 1000 in seg2 start.
Tweak rcur out a bit in seg2.
Load
Jul 10 2009 12:02:46:893PM1090710011Ian HutchinsonPlasma disrupts at .6s.
Getting several minor disruptions as go through qpsi of 3.

Ip to .7MA. nl04 to .6e20.
Jul 10 2009 12:24:06:190PM1090710012Ian HutchinsonPlasma disrupts at .92s. Signs of vertical stability problems.


EF1V to 50V from 100V at .1s in seg2.
Move plasma out 2mm at .8s onwards.
Tweak OH1 crowbar programming.
Jul 10 2009 12:30:37:660PM1090710013Ian HutchinsonPlasma to rampdown.


Ip to 0.8MA.
Move Rcur out another 1mm.
Move Rcur out 5mm in seg1.
EF1V to 0 at 80ms in seg2.
Disable Argon.
Jul 10 2009 12:45:10:017PM1090710014Ian HutchinsonPlasma till rampdown. H-mode at 1.3s. qpsi=2.8

Rcur to .66 in seg2.
Jul 10 2009 01:05:22:377PM1090710015Ian HutchinsonPlasma till rampdown. Disruption at 1.65s. H-mode from 1.1s on.

Move to uncommutated startup.
Call for commutation to be turned off.
Load segment4 from shot 15 segment1 to get TF programming.
Copy and paste.
Move rcur out in seg1.
ICEF1s are -6000A. And that's pretty much what we got. We need to subtract
about 0.4kA from each because of the lowered field.
Set both to -6400A.
Load.
Jul 10 2009 01:16:36:753PM1090710016Ian HutchinsonBreakdown at 20ms. Bad null till too late. No Bz ramp.
I guess a bit too negative EF1.

ICEF1 to -6300 from -6400A
ICEF4 to -1340 from -1320A
EF3V to 1500 from 1300V.
Load
Jul 10 2009 01:29:18:330PM1090710017Ian HutchinsonFizzle. Breakdown at 11ms. Gas current ~10kA.

ICEF1s to -6100A
ICEF4 to -1370A
EF1V to 1800V
Load
Jul 10 2009 01:42:33:910PM1090710018Ian HutchinsonFizzle. Open null. Breakdown at 13ms. Fixed the gradients but not the
Bz ramp.

ICEF4 to -1410A
EF3 raise some more: 2100 max.
Jul 10 2009 01:56:39:487PM1090710019Ian HutchinsonFizzle. Breakdown at 11ms.
Bz is nulled from early. But there's no field ramp.

ICEF4 to -1450A
EF3 to 2300V at 13-19ms
OH2s drop to 100V at 13ms.
Jul 10 2009 02:09:32:127PM1090710020Ian HutchinsonFizzle.

EF3V to 2300V at 5ms. Bring up the voltage quicker.
Jul 10 2009 02:22:41:347PM1090710021Ian HutchinsonFizzle. Breakdown at 10ms.

Lower OH2V 13-25ms to 100/90V.
We seem to be getting more voltage than is preprogrammed. I think that must
be Rcur.
Jul 10 2009 02:35:49:783PM1090710022Ian HutchinsonFizzle. Breakdown at 9.7ms.

Lower OH2Vs to 80V at 10-15ms.
Br offset to 1.5mT from 1mT
Jul 10 2009 02:48:10:813PM1090710023Ian HutchinsonFizzle. Breakdown at 10ms.

OH2s to 70/80V during 10-20ms.
Jul 10 2009 03:02:51:970PM1090710024Ian HutchinsonFizzle. Bkdwn 11ms.

Lower OH1V to 550V from 624 5-15ms.
Jul 10 2009 03:21:09:007PM1090710025Ian HutchinsonFizzle. Hardly any change.
Seems that OH1 is railed.

EF3V to 2600 from 2300V.
Br offset back to 1mT.

Jul 10 2009 03:26:52:830PM1090710026Ian HutchinsonFizzle.

OH1V to 500V.
It's pretty clear that we are needing very different settings to get anything
close to the same null. This might be because of different power supply
gains or it might be different hardware.
Jul 10 2009 03:39:34:287PM1090710027Ian HutchinsonFizzle. No visible change. A clear demo that OH1 is railed well above its
voltage setting. However, it appears to be PCS demand.

Set OH1V to 300V to get a bench mark.
Jul 10 2009 03:51:32:960PM1090710028Ian HutchinsonFizzle. Fields actually changed this time. Fairly sensible field rise.
Much more rapid.
Breakdown 11ms.
When asking for 300V we get nearly 500V

Reduce OH1v second point after t=0.
Reduce EF3V at 5ms.
Jul 10 2009 04:08:09:817PM1090710029Ian HutchinsonDud. I guess we went too far.

Move oh1 voltage step 1ms earlier.
ICEF4 to -1420A
Jul 10 2009 04:18:54:990PM1090710030Ian HutchinsonFizzle. 20kA of gas current, then crunched on inboard.

OH1V notch to 400 from 300
Jul 10 2009 04:29:43:910PM1090710031Ian HutchinsonFizzle.

Import seg1 from 30
EF3V to 2400 from 2600V at 11-20ms
Jul 10 2009 04:49:50:677PM1090710032Ian HutchinsonFizzle. Breakdown at 9ms.

EF3V 5ms point to 2600V from 2400V.
Jul 10 2009 05:04:47:927PM1090710033Ian HutchinsonFizzle.

ICEF1s to 6000A.
EF3V to 2300 at 12ms.
Jul 10 2009 05:05:43:990PM1090710034Ian HutchinsonFizzle.

ICEF1s to 6050
EF3V to 2300 at 19ms.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:12:51:877AMPlasmaOk
209:29:12:267AMPlasmaOk
309:41:51:597AMPlasmaOk
410:02:09:283AMPlasmaOk
510:16:42:487AMPlasmaOk
610:29:18:847AMPlasmaOk
710:44:30:360AMPlasmaOk
810:59:56:673AMPlasmaOk
911:14:37:207AMPlasmaOk
1011:28:20:363AMPlasmaOk
1111:40:58:877AMPlasmaOk
1212:01:45:330PMPlasmaOk
1312:14:30:267PMPlasmaOk
1412:28:04:690PMPlasmaOk
1512:42:27:487PMPlasmaOk
1601:01:00:487PMPlasmaOk
1701:14:31:610PMPlasmaOk
1801:27:27:940PMPlasmaOk
1901:40:45:957PMPlasmaOk
2001:54:50:250PMPlasmaOk
2102:07:47:080PMPlasmaOk
2202:20:56:520PMPlasmaOk
2302:33:48:767PMPlasmaOk
2402:46:23:220PMPlasmaOk
2502:59:24:017PMPlasmaOk
2603:11:55:173PMPlasmaOk
2703:25:04:000PMPlasmaOk
2803:37:41:443PMPlasmaOk
2903:51:19:910PMPlasmaOk
3004:04:34:567PMPlasmaOk
3104:17:02:363PMPlasmaOk
3204:31:37:600PMPlasmaOk
3304:44:05:770PMPlasmaOk
3404:56:37:240PMPlasmaOk
3505:10:17:677PMPlasmaOk

System Availability
Jul 10 2009 09:12:29:237AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMost systems collecting data but not calibrated. WB2 and WB1 not attached.Jul 07 2009 01:00PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertornoexternal cryopump hardware removed from machine --- system is safeMay 30 2008 01:48PM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanoposes no safety hazard for people working around the machineMay 30 2008 01:54PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoComputer system problem, the lower freq. 16 channels are ready.Jun 26 2009 03:37PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controlleer is on.Jun 24 2009 10:00AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHirex-Sr has been removed from the cell and is in temporary storageMay 30 2008 01:48PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry.May 28 2008 08:16AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanoTransmission line disconnected. HV tagged out. Safe for machine entry. FFT outMay 28 2008 08:17AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoHV tagged. Safe for machine entry. loop dissembly started.May 28 2008 08:17AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoRolled backJun 17 2009 03:43PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is reading identically zero - probably a CAMAC problem.Jun 30 2009 09:40PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoInitial tests on the A-port scanning probe went well. We need to take care of some control glitches that caused some component failures. May 30 2007 08:01PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum needs to be baked and tested for leaks.Jun 30 2009 09:41PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoPower supplies are off. All cables are unplugged at the F-port rack.Jun 02 2008 01:10PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoAll power supplies are off. Cables are unplugged at the A-port rack.Jun 02 2008 01:10PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll power supplies are off. Cables are unplugged at the F-port rack.Jun 02 2008 01:11PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140 and swept are connected and currently being tested but should be available too. The 110 is offlineJul 08 2009 09:47AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is retracted behind gatevalve. Air lines are disconnected. Probes cables disconnected at A-port rack.Jun 02 2008 01:14PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is retracted fully. Air lines are disconnected. Probe cables disconnected at F-port rack.Jun 02 2008 01:13PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoProbe cables are disconnected at F-port rack.Jun 02 2008 01:17PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoExpected availability: week of June 29Jun 24 2009 01:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke