| Physics Operator Comments |
| Jul 16 2009 08:14:13:700AM | | Steve Wolfe |
Pre-run prep for Thursday, July 16, 2009
MP#557: Commisioning of new divertor heat flux diagnostics
SL: LaBombard
PO: wolfe
We'll be starting from the conditions of 1090715035
nl04 = 8e19, strkpsi at -.0007, which had the hot spot
on the third tile from the bottom.
PCS setup:
Load from 1090715035. Note that 36 fizzled, so I may want to
tweak the startup a little. Ian was fighting runaways much of
the day yesterday, but the last fizzle looked like it went in,
so there are contradictory indicators for which way to tweak the
gas.
Seg 1 settings are:
pg4=19msec
RCUR offset=2000
Br_0 offset=+.0007
IC_EF4U=-1300.
PG3 has max of 30V from .02 to .032, then down; I can push that up
Note that Ian had moved the EF1 crowbar from 0.2 to 0.15sec to promote
early xpoint formation; I'll leave that.
I'm noticing that the EF2 voltage demands are going over 800V between
.02 and .04 sec, which the supply can't seem to follow. The feedforward
is below this, so it must be coming from rcur feedback? No, it seems
to actually be EF2U/L current control. I wonder if this
is contributing to the big Br thrash; we got another startup vde on
shot#29 yesterday. The EF2's may be getting some unbalanced windup
from the integral voltage feedback. The EF2 current program calls
for them to drop it -1467@.039sec, then go back up to -2000@.063 sec,
but they actually only reach about -1900A around 40ms. I think I'll
try changing that .039sec point to -1900, once I get a shot going.
For now, I'm going to raise BR_0 from .0007 to .001 and leave it the
rest of seg1 alone.
Seg2:
Ian ended up running P=D=6, I=0 on STRKPSI, this seems to be holding
pretty constant error <1000A-m. The target is -.0007. The other values
used yesterday were 0.000(#3-14); -.0001 (#16-17); -.00015 (#18-27);
-.0007 (#28-36). The key to controlling the angle of the leg for lower
strike point seems to be the ramp in RXL from 0 to -.02. Leave all
of this for now, since Brian was happy with the positioning, although
we could probably get the error down if I turned on integral gain;
note that 700A-m at 800kA is of the same order as the target value of
0.7mm (all of which are too small to really measure, but the flux
expansion makes the effect on the plate ten times bigger).
|
| Jul 16 2009 08:15:45:747AM | 1090716001 | Steve Wolfe |
Shot#1: Change BR_0 from .0007 to .001; leave pg4 at 19msec
Load at 16-Jul-2009 08:15:31.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
|
| Jul 16 2009 09:06:25:327AM | 1090716001 | Steve Wolfe |
Shot#1: No power shot. pcdaqdpcs3 is down (not pingable)
Looks like power is off in interface room
There was a ups problem this morning.
|
| Jul 16 2009 09:26:10:857AM | 1090716001 | Steve Wolfe |
Shot#1: No power shot. pcdaqdpcs3 is down (not pingable)
The alcpwr16 switch shut down on the UPS glitch
Reset manually in the interface room and rebooted.
Everything in there seems to be back up ok (didn't check pcdaqdpcs4,
not used for the run.) The KVM is balky, wouldn't take it's
password, no time to debug.
Took test shot 1090716101 on dpcs, completed normally
Ready to try again.,
|
| Jul 16 2009 09:40:33:530AM | 1090716002 | Steve Wolfe |
Shot#2: try again.,
Dud. No EF4. Engineers will investigate in power room.
Brian needs to sacrifice a chicken.
|
| Jul 16 2009 10:32:04:857AM | 1090716003 | Steve Wolfe |
Shot#3: And try again.
Short disruption
Got a type2 from Willy's OH force circuit.
Seems to have happened after the disruption, so what
caused the disruption.
Dies just after 0.3sec,
No the fault seems to have happened before the disruption
at .229 seconds.
Both EF1U and EF1L are going high, but EF1L is railing at -7.2kA
and the EF2's are going to zero. This shot is out of control.
The supplies stop responding to DPCS and go to forced invert
at about .26sec, resulting in the disruption. Before that, the EF1L
has been below -7kA since .25sec. It didn't do that on 1090715035.
The EF2's start ramping down hard at .2sec, at a gain switch.
At the same time the EF1's take a step in opposite directions.
That seems to be the strkpsi turn on and ZXL step down.
Note that there is no step in EF1 voltage at the new crowbar time
of .15sec, but there is still one at 0.2sec. There is also a
step down in EF4 voltage at 0.2 sec.
|
| Jul 16 2009 10:58:24:560AM | 1090716004 | Steve Wolfe |
Shot#4: Move EF1 crowbar times back to 0.2sec from 0.15sec,
that was certainly a contributing factor.
Reduce initial gain on strkpsi from 2.609 to 1., add a step to
2.5 at .23sec, leave D turn on to 6 at .25sec
Delay 8e19 point from .26 to .4sec
Lots of runaways and another short disruption.
Hards are saturated for the duration of the shot (.38sec)
This one came close to a oh force fault, but didn't trip.
Disruption is during crossover.
Lost a BP05_DE (used in processed, not in control). Bob will zap.
Next: Go to a more standard shot until we get one to run through.
Then we can go back to the strkpsi
|
| Jul 16 2009 11:11:35:857AM | 1090716005 | Steve Wolfe |
Shot#5: Go to a more standard shot until we get one to run through.
Then we can go back to the strkpsi
Import seg3 from 1090709023 seg2 (900kA SNL, normal xpoint control,
6e19)
Seg2 off, seg3 on.
Increase PG3 in seg1. IC_EF4 from -1300 to -1270
pg4 from 19 to 21msec
Still runaways, still disrupted early, made it to 1.4sec this time
Hards still saturating most of the shot.
|
| Jul 16 2009 11:25:20:967AM | 1090716006 | Steve Wolfe |
Shot#6: increase PG4 to 24msec
IC_EF4U from -1270 to -1250
Increase pg3 some more
Still runaways, plasma makes it through.
Need to get rid of the runaways.
|
| Jul 16 2009 11:33:08:340AM | 1090716006 | Steve Wolfe |
Shot#6: increase PG4 to 24msec
IC_EF4U from -1270 to -1250
Increase pg3 some more
Still runaways, plasma makes it through.
Need to get rid of the runaways.
Next: Try the EF2 current adjustment mentioned earlier,
EF4 back to -1270
|
| Jul 16 2009 11:45:37:200AM | 1090716007 | Steve Wolfe |
Shot#7: EF2 at .039 from -1460 to -1900 (both)
EF4 back to -1270. Leave PG4 at 24msec
Plasma full length, runaways better but still present,
not saturated this time.
Next: BR_0 to .0015 in startup.
Go back to Brian's shots, if they'll run
|
| Jul 16 2009 12:05:54:763PM | 1090716008 | Steve Wolfe |
Shot#8: BR_0 to .0015 in startup.
PG4 from 24 to 26msec, small tweak on pg3 in seg1
Seg 3 off, Seg 2 back on.
Go back to Brian's shots, if they'll run
Plasma full length, No runaways!
Injection at 1.3sec, otherwise clean.
Startup is a little ragged, but as long as it doesn't run away
I'll take it. STRKPSI error seems a little higher than yesterday.
EF1 is still taking a big swing negative early, after crowbar.
Also, EF2L is railing from .279 to .385.
|
| Jul 16 2009 12:12:49:280PM | 1090716009 | Steve Wolfe |
Shot#9: Reduce nl04 to 7e19
Increase step in V_EF1 at 0.2 sec from 150 to 200
fizzle, too much gas.
Next: pg4 from 26 to 23msec
|
| Jul 16 2009 12:35:20:950PM | 1090716010 | Steve Wolfe |
Shot#10: pg4 from 26 to 23msec
Reduce nl04 to 7e19
Increase step in V_EF1 at 0.2 sec from 150 to 200
plasma full length
No runaways, lots of vertical thrashing in the first 0.5sec
EF1 and EF2 still swinging wildly and railing.
Got the lower density.
Still some hesitation on current rise.
|
| Jul 16 2009 12:45:36:123PM | 1090716011 | Steve Wolfe |
Shot#11: Start RXL further inside, -.005
Rcur offeset from 2000 to 1500
Fizzle. looks like it bounced around 12msec, might be
going up.
Next: BR_0 back to .001, RCUR back to 2000
|
| Jul 16 2009 12:58:30:000PM | 1090716012 | Steve Wolfe |
Shot#12:BR_0 back to .001, RCUR back to 2000
Start RXL further inside, -.005
Keep Strkpsi gain at 1 until .269sec
plasma, Still thrashing vertically
Still railing EF1L and EF2L, though not as
badly.
Next: delay the big step in strkpsi gain
from 0.269 to .45
|
| Jul 16 2009 01:16:23:857PM | 1090716013 | Steve Wolfe |
Shot#13: delay the big step from 1 to 6 in strkpsi P gain
from 0.27 to .45sec
RCUR from .658 to .655 to make bigger outer gap
plasma, still looks shaky on the TV,
EF2L stays off the rail this time,but EF1L just kisses it.
Vertical thrashing is reduced. Injection at 1.3sec
Startup hesitation getting worse. Right gap is now too big at 2cm?
OOps, moved RCUR 3mm instead of 1mm.
Next: RCUR from .655 to .657 (where it should have been this time)
|
| Jul 16 2009 01:28:16:717PM | 1090716014 | Steve Wolfe |
Shot#14: RCUR from .655 to .657 (where it should have been this time)
pg4 from 23 to 21msec (try to avoid fizzle)
plasma, probe pokes, outer gap is 16mm as requested
Scopes are not updating, locking up.
Next: repeat?
|
| Jul 16 2009 01:51:06:717PM | 1090716015 | Steve Wolfe |
Shot#15: repeat after a delay for Event server
Plasma, ef2L back close to rail around l.34sec,
EF1L still flirting with -7500A.
Next: nl04 to .65e20 and change initial strkpsi to -.007
|
| Jul 16 2009 02:05:48:967PM | 1090716016 | Steve Wolfe |
Shot#16: nl04 to .65e20
change initial strkpsi to -.007 instead of 0.
plasma, still touching the rail on the EF1L and EF2L;
the strkpsi targeting didn't help. Physaout11 is still very negative
around -8000 at 0.2sec
Next: adjust RCUR to keep outer edge 1mm further in at end of shot
|
| Jul 16 2009 02:14:24:763PM | 1090716017 | Steve Wolfe |
Shot#17:adjust RCUR at 1.5sec from .657 to .656
leave point at .258sec at .657.
plasma no injections from probe this time
Still no runways.
Starting to get a hesitation in startup, time for a gas tweak.
pg4 from 21 to 19msec, lower nl04 to 6e19
|
| Jul 16 2009 02:30:34:687PM | 1090716018 | Steve Wolfe |
Shot#18:pg4 from 21 to 19msec, lower nl04 to 6e19
plasma full length, probe pokes,
getting a little burst on Dalpha at 0.1sec,
spike on bolo at .257, no runaways.
Starting to get dithers or something on Dalpha between 1.1 and 1.6sec
|
| Jul 16 2009 02:46:04:513PM | 1090716019 | Steve Wolfe |
Shot#19: repeat, long sample on IR camera.
plasma full length, dithering seems a little larger on Dalpha
Next: repeat, add an observer strkpsi on wire 13
|
| Jul 16 2009 02:54:17:857PM | 1090716020 | Steve Wolfe |
Shot#20: repeat,add an observer strkpsi on wire 13 with GAINS=0
with ZSOUT=.49,RSOUt=.615
which should be closer to the desired target point
For some reason when Ian tried to move the ref point it screwed up,
This isn't going to tell me what I want
Dud, no EF3.
Probably just as well, I may have screwed the target
by adding a linked waveform. Yes, it set the STRKPSI
waveform back to zero, that would have been a wasted shot anyway.
Next: Re-load from 1090716019
|
| Jul 16 2009 03:14:21:983PM | 1090716021 | Steve Wolfe |
Shot#21: Re-load from 1090716019
Stuck in init on one of Brian's init's.
plasma ran through, but he probably is missing crucial data.
next: repeat again
|
| Jul 16 2009 03:24:24:653PM | 1090716022 | Steve Wolfe |
Shot#22: repeat again
Stuck in INIT again, this time the logbook lost the state cycle.
Logbook is back but Brian's cpci is still hosed.
plasma again. Josh is being contacted about the digitizers.
|
| Jul 16 2009 03:53:11:890PM | 1090716023 | Steve Wolfe |
Shot#23: repeat again, again. Josh has fixed the cpci problem,
after rebooting eng1.
next: drop nl04 to 5e19.
|
| Jul 16 2009 04:09:34:030PM | 1090716024 | Steve Wolfe |
Shot#24: drop nl04 from 6 to 5e19.
plasma, pokes, ...
IR guys seem happy.
Next: 5.5e19
|
| Jul 16 2009 04:18:09:043PM | 1090716025 | Steve Wolfe |
Shot#25: raise nl04 from 5e19. to 5.5e19
plasma, getting some hards back (1e13)
Need to raise the fill a little more?
Dithers on Dalpha.
Next: pg4 to 22msec, raise nl04 to ?
|
| Jul 16 2009 04:34:26:420PM | 1090716026 | Steve Wolfe |
Shot#26: pg4 from 19 to 22msec
raise nl04 from 5.5 to 7e19
Load a "strkin" observer on wire10, with rsin=.615,zsin=-.49
Gains at zero, controller at 0.
Still trying to see what a displaced ref pt does for strkpsi
The strkin alg does the same thing as strkpsi, but it won't link
waveforms. I thought there was a way to force unlinking
of waveforms with the same name, but I don't remember what it is.
plasma with poking probe.
Runaways are gone, slight hesitation in startup
The wire10 physaout error is pretty flat at -250 to -800a-m
almost but not quite parallel to the strkpsi error, which tends
to get more postive during the pulse. I think that this means a
specifying the reference point is better than drawing a non-zero
target. This actually makes sense because the flux expansion
is going to vary some with the equilibrium.
Of course it's too late to re-do this now, but I think the right
way is to change the ref point and use integral gain.
Next: nl04=0.8e20
|
| Jul 16 2009 04:45:15:327PM | 1090716027 | Steve Wolfe |
Shot#27: pg4 from 22 to 21msec
raise nl04 from 7 to 8e19
plasma, got 8e19, startup still a little hesitant
No hards.
Next: drop pg4 again, change nl04 ?
|
| Jul 16 2009 04:54:16:143PM | 1090716028 | Steve Wolfe |
Shot#28: pg4 from 21msec to 19
No change to density.
plasma, startup marginally better, still no runaways
early injection .17sec
Next: up to 9e19
|
| Jul 16 2009 05:05:26:607PM | 1090716029 | Steve Wolfe |
Shot#29: nl04 from 8 to 9e19
Five o'clock fizzle.
END OF RUN
|
| Jul 16 2009 05:22:44:680PM | 1090716029 | Steve Wolfe |
Shot#29: nl04 from 8 to 9e19
Five o'clock fizzle.
END OF RUN
|
| System Availability |
| Jul 16 2009 09:00:57:047AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 01:48:14:623PM |
Analysis routine doesn't return correct central ne and Te. It could be some tricky issue in the codes and could be fixed. Right now, just modify the node SPECT_ACT in the model tree to previous value before changed from this shot. Shots before #3 today will not be affected. shot 4 has been refitted.
|
| Jul 16 2009 01:54:35:780PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 02:08:54:093PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 02:21:41:327PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 02:34:24:437PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 02:47:15:030PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 02:59:50:857PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 03:16:09:577PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 03:46:58:730PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 03:59:44:857PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 04:12:45:560PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 04:25:17:530PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 04:37:48:500PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 04:50:20:623PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Jul 16 2009 05:02:47:070PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|