| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change |
| Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes |
| BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan |
| Bolometers | yes | Most systems collecting data but not calibrated. WB2 and WB1 not attached. | Jul 07 2009 01:00PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke |
| Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby |
| CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker |
| Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard |
| CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan |
| D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe |
| Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar |
| Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte |
| Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry |
| Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry |
| DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung |
| ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer |
| FRC-ECE | yes | The lower freq. 16 channels are ready. Still need calibration and signal level adjustments | Jul 14 2009 12:15PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips |
| G-Side Ratiomatic | yes | Gauge installed. Problem with controller - signal noisy. | Jul 14 2009 09:11PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland |
| Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby |
| GPC | yes | Operational, but NOT CALIBRATED. Ch 1 seems low, others reasonable. | Jun 26 2009 08:25AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt |
| GPC2 | yes | Operational, but NOT CALIBRATED | Jun 26 2009 08:26AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt |
| GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben |
| H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar |
| HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow |
| Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice |
| Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice |
| HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt |
| ICRF D-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. | May 28 2008 08:16AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin |
| ICRF E-Antenna | no | Transmission line disconnected. HV tagged out. Safe for machine entry. FFT out | May 28 2008 08:17AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin |
| ICRF J-Antenna | no | HV tagged. Safe for machine entry. loop dissembly started. | May 28 2008 08:17AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin |
| Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg |
| LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar |
| Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached. | Jul 07 2009 01:01PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke |
| McPherson | no | Pumped down and awaiting good vacuum conditions to allow plasma tests | Jul 13 2009 10:08PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry |
| Michelson | yes | Operational. NOT RECALIBRATED | Jun 26 2009 11:25AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt |
| MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard |
| MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard |
| MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott |
| Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore |
| Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby |
| NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry |
| PCI | no | Both HeNe and CO2 lasers have been shutdown. System is safe. | May 30 2008 01:58PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab |
| Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard |
| Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe |
| Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby |
| Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby |
| Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby |
| Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby |
| Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby |
| Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard |
| Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard |
| Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard |
| Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard |
| Reflectometer | yes | As of 7/8/09, the 50, 60, 75 and 88 (baseband, lsb and usb) are available. The 140GHz channel and swept frequency channel are online but untested for their cutoff frequencies. The 110 is offline | Jul 14 2009 02:30PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar |
| Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard |
| Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard |
| Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick |
| Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin |
| TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray |
| TS - Core | yes | Midplane channel is operational, but ***uncalibrated*** | Jul 14 2009 08:36AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang |
| TS - Edge | no | Expected availability: week of July 20 | Jun 24 2009 01:32PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang |
| Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
| XTOMO | yes | cables attached, DAQ test run, ready for first plasma | Jun 17 2009 03:42PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |