Alcator C-Mod Run 1090722 Information

Back to runs

Miniproposals
Miniproposal:355
Date Filed:11/12/2003
Title:ICRF Testing & Conditioning
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-7)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Ian Hutchinson
Engineering operator(s):Sam Pierson,Ed Fitzgerald

Engineering Operator Run Comment
ICRF Testing & Conditioning EO Pierson, SL Wukitch, PO

Session Leader Plans
Entered: Jul 21 2009 04:52:33:710PM
Author: Steve Wukitch
1. Using standard discharge developed Friday (1090717029 is a good
example except nl04 needs to be increased from 0.6 to 0.7), we will
begin J antenna operation. We will run J separate from D and E
antennas and begin with low power pulses. After evaluating the state
of J antenna from an operational standpoint, we will seek to increase
the power to 2 MW.

2. Discharge target is 1 MA, 5.4 T with moderate shaping and 1 cm outer
gap. If time permits we will change plasma current and density to
condition the antenna and other surfaces.

Physics Operators Plans

Session Leader Summaries
Entered: Jul 22 2009 10:47:42:150PM
Author: Steve Wukitch
We managed to trouble shoot the J antenna transmitter low level RF system but did not have sufficient opportunity to test J antenna into plasma. There were a limited number of plasmas due to EF4L fault among other problems. The EF4L fault was caused by short in the bus outside the cryostat, on the machine side of the rogowskis. Two bolts of the wrong length and inserted in the wrong direction acted as a spark gap. Once fixed, main gas puff was working incorrectly and a work around was implemented and 007 was a reasonable target. One of the transmitters, FMIT#4, however had unusually low demand. It was rectified by power cycling the board and the transmitter worked fine into dummy load. There was no further discharges due to alternator vibration.

Physics Operator Summaries
Entered: Jul 22 2009 04:54:27:813PM
Author: Ian Hutchinson
Overview
__________

The first shot had no main gas and disrupted because of a fault on EF4.
This was a serious overcurrent eventually traced to a short in the warm bus
on the machine side of the rogowskis. After reassembly, gas was still in bad
shape and the first and only plasma with a main gas puff was shot 7 with
direct connection to the valve, chopping removed. We shut down early because
of alternator vibration. In all mostly an engineering bug fixing day. Only 3 plasmas.

Essentially no RF conditioning accomplished.

Scorecard
__________

  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |   01   0.739   1.017   Plasma  |   02   0.000   0.006   Dud     |
  |   03   0.000   0.002   Dud     |   04   0.000   0.002   Dud     |
  |   05   1.965   1.014   Plasma  |   06   0.000   0.003   Dud     |
  |   07   1.966   1.014   Plasma 
Date 1090722:   7 shots.   3 plasmas.   0 fizzles.   4 duds.   0 System Error.

All duds were deliberate gas or power supply tests.


Session Leader Comments
Jul 22 2009 09:25:17:967AM1090722001Steve Wukitchearly disruption - no RF

power supply question - big spike on EF4_L
Jul 22 2009 09:32:18:643AM1090722001Steve Wukitchholding: checking EF4_L - it is going to take some time
Jul 22 2009 12:29:56:313PM1090722001Steve Wukitchstill holding
Jul 22 2009 02:14:43:687PM1090722001Steve Wukitchstill holding

found arc in the EF4L bus where two bolts were too close

estimated restart time is ~2:30

Physics Operator Comments
Jul 22 2009 09:06:03:980AMIan HutchinsonLoad from 1090717029
Raise nl04 to 0.7e20. Was 0.5 (not .6 as per SL Plan)
This shot limits on the inner divertor corner till 200ms.
I think that is a bad idea. But I'll leave EF1 crowbar at .2s for first shot.
Lower the zxu gain step at .3s to 4 (from 6).
Load.
Jul 22 2009 10:26:58:750AM1090722001Ian HutchinsonDisrupts at 0.75s. EF4L has a big current spike on it at .63 then crowbars.

EF4L shows every evidence of a short circuit on the machine side of the rogowskis. At .631s the bus voltage drops to about 50V and simultaneously the
rapid current ramp in EF4L begins. It reaches 15kA in EF4L rogowski at .6375,
about 6ms later.

The current rises in approximately 2 PS-phases. At .635s, probably in the second phase, the Reverse Inhibit goes positive.
At .642s the PS detects a shoot-through.

The bus voltage drops to zero at 0.664s, when the EF4L current has returned
to the same level as EF4U.

It looks like a short across the terminals of EF4L. Stop to do engineering diagnosis.
Jul 22 2009 01:09:54:657PM1090722001Ian HutchinsonHipot of EF4L shows good resistance to ground.

Ring out of EF4L shows the coil to be reproducibly good at 3kV charge.
[After one or two somewhat strange traces in the early tests.]
Jul 22 2009 02:17:07:047PM1090722001Ian HutchinsonAfter further discussion and inspection, an arc has been found between the
bus connectors above the cold bus. The bolts are to be replaced and insulation
installed.
Jul 22 2009 02:59:40:110PM1090722002Ian HutchinsonEF4 test under PLC control. Plus gas enabled to test the puff problems.
EF4 looks fine. The gas came on full blast.

Draw a ramp up and a ramp down in the PG3.
Load.
Jul 22 2009 03:26:47:670PM1090722003Ian HutchinsonGas is shown to be broken at the chopper board.

Set up to connect input to output.
Load seg 1 from shot 1. Let preprogrammed puff be 100V till time 50ms.
Then hope that the feedback can do it from there on.
Load.

Change mind. Use a board from before load the ramp again and do a gas test.
Jul 22 2009 03:41:08:250PM1090722004Ian HutchinsonGas test. It was decided after the fact that this should not work because
the pin out was different. It did not give a puff.

Replace with a board with input connected to output.
Put back the 100V till 50ms puff trace. Load.
Jul 22 2009 04:03:36:297PM1090722005Ian HutchinsonPlasma to rampdown. No segment 2 puff.

Install a 100V puff in Seg 2, PG4 .02 till .1s ramping down to low at .5s
Install 40psi in B-Side-Upper.
Install a 20ms 100V pulse on PG2 at 1s in segment 2.
Load.
Jul 22 2009 04:12:28:343PM1090722006Ian HutchinsonGas test. Got gas from the B-main with the chopper board changed to be a wire.

Set the PG3 puff to be short. Load.
Jul 22 2009 04:47:07:670PM1090722007Ian HutchinsonPlasma to rampdown. Got gas but rather oscillatory.

Move plasma in 3mm at .3s.
Reduce gas proportional gain to 3 from 8. Keep derivative gain on through shot.
Draw a faster current ramp in the first .1s as we are getting. Load.

Never ran the next shot because of alternator vibration.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:05:30:903AMPlasmaBadEF4 Type 1 Fault
202:50:30:483PMTestOkEF4 Reverse Test
303:03:34:500PMTestBadGas Test
403:27:16:170PMTestOkGas Test
503:37:27:547PMPlasmaOk
603:58:53:860PMPlasmaOkNo Power, Gas Puff Only
704:11:29:110PMPlasmaOk

System Availability
Jul 22 2009 09:05:09:137AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMost systems collecting data but not calibrated. WB2 and WB1 not attached.Jul 07 2009 01:00PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesThe lower freq. 16 channels are ready. Still need calibration and signal level adjustmentsJul 14 2009 12:15PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Problem with controller - signal noisy.Jul 14 2009 09:11PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable for conditioning and testingJul 21 2009 04:50PM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoPumped down and awaiting good vacuum conditions to allow plasma testsJul 13 2009 10:08PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 7/21/09, all channels are operational (50, 60, 75, 88, 88usb, 88lsb, 110, 140 and 110-140 swept frequency)Jul 21 2009 01:39PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesMidplane channel is operational, but ***uncalibrated***Jul 14 2009 08:36AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke